An asphalt waterproofing material processing device and method for building construction
By designing a pre-cooling mechanism and a wrapping mechanism, the problems of peeling and lifting during the cooling process of the coating and modified bitumen layer are solved, achieving tight wrapping of the coating and improving the wrapping and protective effect of the bitumen waterproof membrane.
Patent Information
- Application Number
- CN202510444812.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-10
- Publication Date
- 2025-11-04
- Estimated Expiration
- 2045-04-10
AI Technical Summary
Existing equipment is prone to peeling and peeling at the edges of the coating during the lamination and cooling process of the modified asphalt layer, which affects the wrapping properties and makes the modified asphalt layer susceptible to contamination or wear during transportation and storage.
The pre-cooling and wrapping mechanisms are used to reduce the temperature gradient between the coating and the modified asphalt layer through the synergistic effect of the cooling roller and the extrusion roller. Water spray pipes are used to surround the outside of the coating to ensure that the reserved edge of the coating is tightly wrapped around the edge of the modified asphalt layer and to prevent it from lifting.
It effectively reduces the temperature gradient between the coating and the modified asphalt layer, prevents the coating from peeling off, ensures that the coating tightly wraps the modified asphalt layer, avoids contamination and wear, and improves product quality.
Smart Images

Figure CN119974507B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of asphalt waterproofing membrane processing, in particular to an asphalt waterproofing membrane processing equipment and method for building construction. BACKGROUND
[0002] Asphalt waterproofing membrane is a rolled material made of asphalt material, base material and surface-sprayed anti-sticking material, commonly known as oil felt. Asphalt waterproofing membrane can be divided into two types: with base and without base. The former is made by impregnating petroleum asphalt into thick paper, glass fiber cloth, asbestos cloth, cotton and linen fabric, etc., while the latter is made by adding asbestos and rubber powder to asphalt material and then rolling.
[0003] The processing equipment of asphalt waterproofing membrane mainly includes several links such as raw material pretreatment, base cloth impregnation, scraping and thickness control, film covering and exhaust, cooling and shaping, and cutting and packaging. Among them, film covering and exhaust and cooling and shaping are crucial parts in the whole production process, usually by immersing the laminated film and modified asphalt layer into water or through other cooling devices for cooling.
[0004] Chinese patent discloses application number 202221195383.9 "cooling device for waterproofing membrane" including a rack and multiple water-cooled rollers, the water-cooled rollers are arranged in multiple layers, each layer includes N water-cooled rollers arranged side by side in front and back, and water supply main pipes and water collecting pipes on the left and right sides; the water-cooled roller includes a shaft, a cylinder and multiple support plates, the both ends of the shaft are rotatably arranged on the rack; the inner wall of the left end of the cylinder is provided with an annular sealing plate, and the right end is a neck-in structure; the sealing plate and the shaft have an annular gap between them, the water supply main pipes and the water collecting pipes are arranged on the rack along the front and back direction, the water supply main pipes are provided with N water supply branch pipes, the inner ends of the water supply branch pipes pass through the gap to the space between the sealing plate and the leftmost support plate; the right side of the neck-in structure forms an annular end face coaxial with the cylinder, the upper side of the water collecting pipe is provided with N notches, and the lower part of the annular end face extends into the notches; the water of all water collecting pipes is collected together; multiple hollow holes through which water flows are arranged on the support plates around the shaft.
[0005] Although this device can cool, due to the different shrinkage rates of the film and the modified asphalt layer, their cooling shrinkage speeds do not match, which easily leads to peeling between them. In addition, the edges of the film may be raised, affecting its wrapping property. During subsequent transportation and storage, the modified asphalt layer may be exposed, and then contaminated or worn. SUMMARY
[0006] The purpose of the present application is to provide an asphalt waterproofing membrane processing equipment and method for building construction, which solves the problem of peeling and film edge lifting during film covering and modified asphalt layer laminating and cooling in the existing equipment, thereby affecting the wrapping property.
[0007] To achieve the above object, the present application provides the following technical scheme: an asphalt waterproofing membrane processing equipment for building construction, comprising a cooling box and an extrusion roller above the cooling box, further comprising:
[0008] A pre-cooling mechanism comprising a cooling roller in communication with the cooling box, a modified asphalt layer, a film and the extrusion roller being arranged in sequence above the cooling roller; the cooling roller and the extrusion roller work together to laminate the modified asphalt layer and the film while reducing the temperature gradient between them through the pre-cooling function of the cooling roller;
[0009] A wrapping mechanism comprising a plurality of water spray pipes in communication with the cooling roller, and the two sides of the water spray pipes being bent downward at 45 degrees and annularly surrounding the outside of the film; when the film shrinks, the excess reserved edges of the film are tightly wrapped around the edges of the modified asphalt layer under the guidance of the water spray.
[0010] Preferably, the outer wall of the cooling box is in communication with a water pump, one side of the water pump is in communication with a second pipeline, and the second pipeline is in communication with the cooling roller.
[0011] Preferably, the cooling roller and the extrusion roller are symmetrically rotatably installed with a fixed plate at both ends, and the fixed plate is fixedly installed on the cooling box.
[0012] Preferably, the cooling roller is internally installed with a helical blade.
[0013] Preferably, the upper end surface of the water spray pipe is fixedly installed with a support plate, and the support plate is fixedly installed at both ends on the cooling box.
[0014] Preferably, a plurality of water spray heads are installed on the side of the water spray pipe facing the film.
[0015] Preferably, the upper end surface of the water spray pipe is in communication with a third pipeline through the support plate, the third pipeline is in communication with the first pipeline away from the water spray pipe, and the first pipeline is in communication with the cooling roller away from the third pipeline.
[0016] Preferably, a first circular rod and a second circular rod are rotatably installed on the inner wall of the cooling box, respectively.
[0017] Preferably, the asphalt waterproofing membrane processing method for building construction comprises the following steps:
[0018] First step: when the film and the modified asphalt layer are laminated by the extrusion roller and the cooling roller, the water in the cooling box enters the cooling roller at this time, and since the cooling roller is in abutment with the modified asphalt layer, it will take away part of the heat of the modified asphalt layer, thereby reducing the temperature gradient of the film and the modified asphalt layer;
[0019] Second step: as the film and modified asphalt layer advances, the modified asphalt layer is in contact with the water in the cooling box, at which time the water pipe sprays the film on the modified asphalt layer, and since the water pipe is bent downward at 45 degrees and surrounds the outside of the film, the shrinkage of the film will cause the reserved edge to wrap around the outer wall of the modified asphalt layer.
[0020] Compared with the prior art, the present application has the following advantages:
[0021] First, the present application is provided with a pre-cooling mechanism, which, when the cooling roller and the extrusion roller cooperate, simultaneously laminates the modified asphalt layer and the film, and reduces the temperature gradient between the two through the pre-cooling function of the cooling roller.
[0022] Second, the present application is provided with a wrapping mechanism, which, when the modified asphalt layer is in contact with the water in the cooling box, at which time the water in the cooling roller enters the water pipe through the first pipe and the third pipe, and the water in the water pipe is sprayed out through the water head, at which time the water head parallel to the film cools it down, and the water head at 45 degrees on both sides of the water pipe will cause the reserved edge to bend downward, and the reserved edge of the film will not be raised upward, but will be attached to the outer wall of the modified asphalt layer, protecting the modified asphalt layer from being contaminated or worn. BRIEF DESCRIPTION OF DRAWINGS
[0023] Figure 1 The present application is a schematic diagram of the overall structure;
[0024] Figure 2 The present application is a schematic diagram of the inside of the cooling box;
[0025] Figure 3 The present application is a schematic diagram of the present application; Figure 2 The present application is an enlarged schematic diagram of A;
[0026] Figure 4 The present application is a schematic diagram of the reserved edge after cooling;
[0027] Figure 5 The present application is a sectional view of the cooling roller.
[0028] In the figure: 1, cooling box; 2, modified asphalt layer; 3, film; 301, reserved edge; 4, first pipe; 5, extrusion roller; 6, fixed plate; 7, cooling roller; 8, second pipe; 9, water pump; 10, first circular rod; 11, support plate; 12, third pipe; 13, second circular rod; 14, water pipe; 15, water head; 16, spiral blade. DETAILED DESCRIPTION
[0029] Please refer to Figures 1 to 5 , the present application provides a technical scheme: a kind of asphalt waterproofing membrane processing equipment for building construction, including cooling box 1, and extrusion roller 5 located above cooling box 1, still include:
[0030] The pre-cooling mechanism comprises a cooling roller 7 communicated with the cooling box 1, a modified asphalt layer 2, a film 3 and an extrusion roller 5 arranged in sequence above the cooling roller 7; the cooling roller 7 and the extrusion roller 5 cooperate to simultaneously laminate the modified asphalt layer 2 and the film 3 and reduce the temperature gradient between them through the pre-cooling function of the cooling roller 7;
[0031] The wrapping mechanism comprises a plurality of water spraying pipes 14 communicated with the cooling roller 7, and the water spraying pipes 14 are bent downward by 45 degrees on both sides and annularly surround the outside of the film 3; when the film 3 shrinks, the excess reserved edge 301 of the film 3 is tightly wrapped around the edge of the modified asphalt layer 2 under the guidance of the water flow.
[0032] Further, as shown in the Figure 1 water pump 9 is communicated with the second pipeline 8 on one side, the second pipeline 8 is communicated with the cooling roller 7; when the water pump 9 works, the water in the cooling box 1 is transported into the cooling roller 7 through the second pipeline 8.
[0033] Further, as shown in the Figure 1 the cooling roller 7 and the extrusion roller 5 are symmetrically rotatably installed on both ends of the fixed plate 6, and the fixed plate 6 is fixedly installed on the cooling box 1; the fixed plate 6 supports the extrusion roller 5 and the cooling roller 7.
[0034] Further, as shown in the Figure 5 the cooling roller 7 is internally installed with a spiral blade 16; when the cooling roller 7 rotates, the spiral blade 16 rotates to accelerate the water flow from the cooling roller 7, so that the cooling roller 7 and the modified asphalt layer 2 can always maintain a large temperature difference and timely remove heat.
[0035] Further, as shown in the Figure 2 the support plate 11 is fixedly installed on the upper end surface of the water spraying pipe 14 and fixedly installed on the cooling box 1 on both ends; the support plate 11 supports the water spraying pipe 14.
[0036] Further, as shown in the Figure 3 a plurality of water spraying heads 15 are installed on the side of the water spraying pipe 14 facing the film 3; the water spraying heads 15 cool the film 3 and make the reserved edge 301 bend downward.
[0037] Further, as shown in the Figure 1 the third pipeline 12 is communicated with the first pipeline 4 away from the water spraying pipe 14 on one side, and the first pipeline 4 is communicated with the cooling roller 7 away from the third pipeline 12 on the other side; the water in the cooling roller 7 enters the water spraying pipe 14 through the first pipeline 4 and the third pipeline 12.
[0038] Further, as shown in the Figure 1As shown, the inner wall of the cooling box 1 is respectively rotatably installed with a first round rod 10 and a second round rod 13; the first round rod 10 and the second round rod 13 change the movement trajectory of the modified asphalt layer 2 and the film 3.
[0039] In this embodiment, as shown in the figure, Figure 4 As shown, when the film 3 passes through the water spraying head 15, the reserved edge 301 will show a bending trend from horizontal to downward, at this time, the film 3 shrinks, and the reserved edge 301 will wrap the outer wall of the modified asphalt layer 2 and will not be raised.
[0040] In this embodiment, the asphalt waterproof coiled material processing method for building construction comprises the following steps:
[0041] First step: when the film 3 and the modified asphalt layer 2 are conveyed between the extrusion roller 5 and the cooling roller 7, at this time, the extrusion roller 5 and the cooling roller 7 perform lamination on them, at the same time, the water pump 9 works, and the water in the cooling box 1 is extracted through the second pipeline 8 into the cooling roller 7, since the cooling roller 7 is internally installed with a spiral blade 16, at this time, the spiral blade 16 rotates with the cooling roller 7, and the spiral blade 16 will accelerate the flow of water, so as to better cool the modified asphalt layer 2, thereby reducing the temperature gradient of the film 3 and the modified asphalt layer 2;
[0042] Second step: as the film 3 and the modified asphalt layer 2 advance, they will be changed in path by the first round rod 10, at this time, the modified asphalt layer 2 abuts against the water in the cooling box 1, at the same time, the water in the cooling roller 7 enters the water spraying pipe 14 through the first pipeline 4 and the third pipeline 12, and the water in the water spraying pipe 14 is sprayed out through the water spraying head 15, at this time, the water spraying head 15 parallel to the film 3 cools and lowers the temperature of the film 3, and the water spraying head 15 arranged at 45 degrees on both sides of the water spraying pipe 14 will make the reserved edge 301 bend downward, at this time, the film 3 and the modified asphalt layer 2 shrink due to cooling, since the water in the water spraying pipe 14 flows in through the cooling roller 7, the temperature is different from the water temperature in the cooling box 1, so the shrinkage speed difference between the film 3 and the modified asphalt layer 2 is reduced, when the film 3 and the modified asphalt layer 2 pass through the second round rod 13, at this time, the lamination and cooling of the film 3 and the modified asphalt layer 2 are completed, the reserved edge 301 of the film 3 will not be raised upward, but will be attached to the outer wall of the modified asphalt layer 2, thereby protecting the modified asphalt layer 2 from being polluted or abraded.
[0043] In this document, relational terms such as first and second and the like can be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises", "comprising", or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but can include other elements not expressly listed or inherent to such process, method, article, or apparatus. An element proceeded by "comprises... a" does not, without more constraints, exclude the existence of additional identical elements in the process, method, article, or apparatus that comprises the element.
[0044] The above embodiments are only used to illustrate the technical solutions of the present application, not limit the present application; even though the present application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: it can still modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement for part of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A processing equipment for asphalt waterproof membrane for building construction, comprising a cooling box and an extrusion roller located above the cooling box, characterized in that, Also includes: The precooling mechanism includes a cooling roller connected to a cooling box, and a modified asphalt layer, a coating, and an extrusion roller are arranged sequentially above the cooling roller; The cooling roller and the extrusion roller work together to reduce the temperature gradient between the laminated modified asphalt layer and the coating by pre-cooling the cooling roller. The wrapping mechanism includes several water spray pipes connected to the cooling rollers, with both sides of the water spray pipes bent downwards at 45 degrees and encircling the outside of the film; when the film shrinks, the extra width of the reserved edge is tightly wrapped around the edge of the modified asphalt layer under the guidance of the spray water flow. The cooling roller (7) has a spiral blade (16) installed inside, and the water spray pipe (14) has several water spray heads (15) installed on the side facing the film (3).
2. The asphalt waterproof membrane processing equipment for building construction according to claim 1, characterized in that: The outer wall of the cooling box (1) is connected to a water pump (9), and a second pipe (8) is connected to one side of the water pump (9). The second pipe (8) is connected to the cooling roller (7).
3. The asphalt waterproof membrane processing equipment for building construction according to claim 1, characterized in that: The cooling roller (7) and the extrusion roller (5) are symmetrically rotated and fixed plates (6) are installed at both ends, and the fixed plates (6) are fixedly installed on the cooling box (1).
4. The asphalt waterproof membrane processing equipment for building construction according to claim 1, characterized in that: A support plate (11) is fixedly installed on the upper end face of the water spray pipe (14), and both ends of the support plate (11) are fixedly installed on the cooling box (1).
5. The asphalt waterproof membrane processing equipment for building construction according to claim 4, characterized in that: The upper end face of the water spray pipe (14) passes through the support plate (11) and is connected to the third pipe (12). The side of the third pipe (12) away from the water spray pipe (14) is connected to the first pipe (4), and the side of the first pipe (4) away from the third pipe (12) is connected to the cooling roller (7).
6. The asphalt waterproof membrane processing equipment for building construction according to claim 1, characterized in that: The inner wall of the cooling box (1) is rotatably mounted with a first round rod (10) and a second round rod (13).
7. A method for processing asphalt waterproof membrane for building construction, using the asphalt waterproof membrane processing equipment described in claim 1, characterized in that: Includes the following steps: Step 1: When the film (3) and the modified asphalt layer (2) are laminated by the extrusion roller (5) and the cooling roller (7), the water in the cooling box (1) enters the cooling roller (7). Since the cooling roller (7) is in contact with the modified asphalt layer (2), it will take away some of the heat of the modified asphalt layer (2), thereby reducing the temperature gradient between the film (3) and the modified asphalt layer (2). Step 2: As the membrane (3) and the modified asphalt layer (2) move forward, the modified asphalt layer (2) comes into contact with the water in the cooling box (1). At this time, the water spray pipe (14) sprays water to cool the membrane (3) on the modified asphalt layer (2). Since the water spray pipe (14) is bent downward at 45 degrees and surrounds the outside of the membrane (3), the shrinkage of the membrane (3) will cause the reserved edge (301) to wrap around the outer wall of the modified asphalt layer (2).
Citation Information
Patent Citations
Cooling device for waterproof coiled material
CN217729941U
Film-mulching method for waterproof coiled material and waterproof coiled material
CN108162525A
Film laminating device for producing asphalt waterproof coiled material
CN117001991A