Construction method for separating and reinforcing steel bars of offshore circular bearing platform
By adopting the construction method of offshore circular bearing reinforcement partition reinforcement in the construction of large offshore bridges, the problem of improper connection between the drilled pile steel bars and the bearing reinforcement is solved, and a higher overall construction quality is achieved.
Patent Information
- Application Number
- CN202510158950.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-13
- Publication Date
- 2025-05-30
AI Technical Summary
In the construction of large offshore bridges, the connection between the drilled pile steel bars and the bearing steel bars is improperly handled, resulting in insufficient overall foundation quality.
The construction method is adopted for partition reinforcement treatment of offshore circular bearing steel bars. The specific steps include cutting off the bearing steel bars in conflict, using spot welding to connect the steel bars to the steel guard, and connecting the steel bundles to the steel guard through double-sided welding.
Through this method, the connection problem between drilled piles and bearing steel bars is effectively dealt with, ensuring the integrity of drilled piles and bearings, thereby improving the overall construction quality.
Smart Images

Figure CN120061383A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of bridge construction, and particularly relates to a construction method for reinforcing the cut-off of steel bars of a circular cap in the sea. Background Art
[0002] In the construction of large-scale bridges in the sea, the construction of the pile foundation of the bridge usually starts with the construction of bored piles and then the construction of the cap. After pouring the bored piles, it is necessary to do a good job in the connection treatment of the steel bars of the bored piles and the steel bars of the cap. If the connection problem is not handled well, the overall foundation quality will be insufficient. Summary of the Invention
[0003] In order to properly handle the connection problem of the steel bars of the bored piles and the steel bars of the cap, a construction method for reinforcing the cut-off of steel bars of a circular cap in the sea is proposed.
[0004] To achieve the above object, the technical solution of the present invention is realized as follows:
[0005] A construction method for reinforcing the cut-off of steel bars of a circular cap in the sea includes the following steps:
[0006] When there is a conflict between the steel bars of the cap and the steel bars of the bored piles, the steel bars of the cap are cut off.
[0007] Furthermore, the steel bars and the strip steel plates of the steel casing are spot-welded.
[0008] Furthermore, the tendon bundles and the steel casing are welded on both sides.
[0009] Compared with the prior art, the present invention has the following advantages:
[0010] The construction method for reinforcing the cut-off of steel bars of a circular cap in the sea according to the present invention can be applied to the construction of the foundation of large-scale bridges in the sea to handle the connection problem of the steel bars of the bored piles and the cap, ensuring that the bored piles and the cap better form an integral body, thus ensuring the overall construction quality. Brief Description of the Drawings
[0011] The drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The schematic embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation to the present invention. In the drawings:
[0012] Figure 1 is the plan view of the reinforcing treatment of the cut-off of steel bars according to the embodiment of the present invention;
[0013] Figure 2 is the elevation view of the reinforcing treatment of the cut-off of steel bars according to the embodiment of the present invention.
[0014] Description of the Reference Numerals:
[0015] 1. Steel casing; 2. Vertically arranged steel bars; 3. Cut-off steel bars; 4. Horizontally arranged steel bars; 5. Strip steel plates for cutting the steel casing. Detailed implementation manners
[0016] It should be noted that, without conflict, the embodiments in the present invention and the features in the embodiments may be combined with each other.
[0017] In the description of the present invention, it should be understood that the orientation or positional relationships indicated by the terms "center", "longitudinal", "transverse", "up", "down", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as a limitation to the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the quantity of the indicated technical features. Thus, the features defined with "first", "second", etc. may explicitly or implicitly include one or more of such features. In the description of the present invention, unless otherwise specified, the meaning of "a plurality" is two or more.
[0018] In the description of the present invention, it should be noted that, unless otherwise clearly defined and limited, the terms "installation", "connection", and "connection" should be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be directly connected or indirectly connected through an intermediate medium, and it may be the communication inside two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.
[0019] The present invention will be described in detail below with reference to the drawings and in combination with embodiments.
[0020] Embodiment 1
[0021] A construction method for reinforcing and separating the steel bars of a circular cap on the sea includes the following steps: When there is a conflict between the cap steel bars and the bored pile steel bars, the cap steel bars are cut off. The steel bars and the strip steel plates for cutting the steel casing are spot welded; the steel bar bundles and the steel casing are welded on both sides.
[0022] The above method is applicable to dealing with the connection problem between the bored pile and the cap steel bars during the construction of the foundation of a large bridge on the sea, ensuring that the bored pile and the cap better form an integral body, thereby ensuring the overall construction quality. The on-site operation is simple and fast, and the treatment effect is good.
[0023] The above are only the preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.
Claims
1. A construction method for reinforcement treatment of offshore circular cap steel bars, characterized in that: The steps include: In case of conflict between the cap reinforcement and the bored pile reinforcement, the cap reinforcement shall be cut off.
2. The offshore circular cap reinforcement treatment construction method according to claim 1 is characterized by: The steel bars and the steel casing cut strip steel plates are spot welded.
3. The offshore circular cap reinforcement treatment construction method according to claim 1 is characterized by: The tendons and steel casing are welded on both sides.