Municipal road engineering pavement construction process and equipment thereof
By setting up water storage tanks and atomization spray heads in municipal road construction equipment, water mist is used to suppress dust flying, and through adjustable motor height and positioning rod system, the problem of dust pollution in the existing equipment during cutting is solved, achieving a more efficient and environmentally friendly construction effect.
Patent Information
- Application Number
- CN202510154701.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-12
- Publication Date
- 2025-06-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing municipal road construction equipment will produce a large amount of dust during the cutting process, resulting in air pollution and it is difficult to effectively suppress the dust flying.
A municipal road engineering pavement construction equipment is designed, equipped with a water storage tank, water pump, water outlet pipe and atomization spray head. The dust is sprayed on the dust generated during cutting through water mist to achieve dust reduction effect, and through the adjustable motor height and positioning rod system, it can adapt to cutting joints at different depths.
It effectively suppresses the flying of dust, reduces the pollution index of nearby air, and quickly adjusts the motor height, which is suitable for cutting joints at different depths, improving construction efficiency and equipment versatility.
Smart Images

Figure CN120083108A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of municipal construction, and particularly to a pavement construction process and equipment for municipal road engineering. Background Art
[0002] The construction of concrete pavements usually involves multiple layers, mainly including subgrade, base course, cushion course and surface course. Among them, the surface course is the most critical part of the pavement structure, which is mainly composed of concrete materials. In order to ensure the durability and safety of the pavement, strict requirements are imposed on the concrete materials of the surface course, and these requirements include but are not limited to wear resistance, flatness, anti-slip performance and sufficient strength. After the concrete pavement construction is completed, it is necessary to wait for the concrete to completely solidify and then carry out joint cutting. The purpose of joint cutting is to effectively control the generation and expansion of cracks when the pavement is subjected to various stress actions, so as to avoid the damage and fracture phenomena of the pavement caused by stress concentration.
[0003] Since a large amount of dust will appear during the cutting of construction equipment, and the cutting equipment does not have components to suppress the flying of dust, it will pollute the nearby air. Therefore, it is very necessary to propose a pavement construction process and equipment for municipal road engineering. Summary of the Invention
[0004] The purpose of the present invention is to solve the disadvantages existing in the prior art, and to propose a pavement construction process and equipment for municipal road engineering.
[0005] In order to achieve the above purpose, the present invention adopts the following technical solution: A pavement construction equipment for municipal road engineering, including a mounting plate, a through groove is provided on the mounting plate, two push handles are fixedly provided on the top of the mounting plate, a mounting frame is fixedly provided on the top of the mounting plate, a connecting rod is movably provided on the inner wall of the top of the mounting frame, a motor is fixedly provided at the bottom of the connecting rod, a cutting disc is fixedly provided at the output end of the motor, a locking structure is fixedly provided on the inner wall of one side of the mounting frame, and a dust reduction structure is fixedly provided on the top of the mounting plate.
[0006] Four universal wheels arranged in a rectangle are fixedly provided at the bottom of the mounting plate, a baffle is fixedly provided at the bottom of the mounting plate, and a rubber pad is fixedly provided on one side of the baffle.
[0007] A pressing plate is fixedly provided at the top of the connecting rod, two first springs are fixedly provided at the bottom of the pressing plate, and the bottom ends of both first springs are fixedly connected to the top of the mounting frame. A plurality of positioning holes are provided on one side of the connecting rod.
[0008] The locking structure includes a mounting member fixedly connected to the mounting frame. The mounting member is in an "L" shape. A positioning rod is movably arranged inside the mounting member. One end of the positioning rod penetrates through one inner wall of the mounting frame and is movably connected to the mounting frame. A limiting groove is provided on the front inner wall of the mounting member. A pull rod is movably arranged in the limiting groove. One end of the pull rod is fixedly connected to the positioning rod. A second spring is sleeved on the positioning rod.
[0009] A sliding groove is provided on the top inner wall of the mounting member. A sliding block is fixedly arranged on the positioning rod. The sliding block is movably connected to the sliding groove. Two ends of the second spring are respectively welded to the sliding block and one inner wall of the mounting frame.
[0010] A circular hole is provided on one inner wall of the mounting frame. A sealing ring is provided on the inner wall of the circular hole. The inner wall of the sealing ring is movably connected to the positioning rod.
[0011] The dust reduction structure includes a water storage tank for storage. A water outlet pipe is fixedly arranged at the bottom of the water storage tank. The other end of the water outlet pipe is fixedly provided with a water pump. The water pump is fixedly connected to the mounting plate. A drain pipe is fixedly arranged on one side of the water pump away from the water outlet pipe. The end of the drain pipe away from the water pump is fixedly provided with an atomizing nozzle.
[0012] Among them, the construction technology of the municipal road engineering pavement includes the following steps: The first step: Push the equipment to the construction point, and then inject water into the water storage tank. The second step: Adjust the height of the motor according to the depth of the cutting seam. Pull the pull rod to one side. The pull rod drives the positioning rod. When the positioning rod disengages from the positioning hole, press the pressing plate. The pressing plate squeezes the first spring and drives the connecting rod. The connecting rod then drives the motor. The motor then drives the cutting blade. When the height of the motor is appropriate, release the pull rod. Under the resilience of the second spring, the positioning rod resets and is inserted into the positioning hole, realizing the positioning of the connecting rod and completing the adjustment of the height of the motor. The third step: Start the motor and the water pump. The motor drives the cutting blade to cut the road surface. The water pump sucks the water in the water storage tank and sprays it out through the drain pipe.
[0013] Compared with the prior art, the present invention has the following beneficial effects: 1. By setting the water storage tank, the water pump, the water outlet pipe and the drain pipe, start the water pump before cutting. The water pump sucks the water in the water storage tank through the water outlet pipe and sprays it out through the atomizing nozzle at one end of the drain pipe. The water mist acts on the flying dust, which can achieve the purpose of dust suppression and reduce the pollution index of the nearby air.
[0014] 2. By setting the connecting rod, positioning hole, positioning rod, pull rod and spring two, pulling the pull rod can make the positioning rod disengage from the positioning hole, pressing the connecting rod can adjust the height of the motor, and when the pull rod is released, spring two makes the positioning rod reset and insert into the positioning hole, so as to realize the rapid adjustment of the motor height and make the equipment applicable to cutting slots with different depths. Brief Description of the Drawings
[0015] Figure 1 It is a three-dimensional structural schematic diagram of the first perspective of the present invention; Figure 2 It is a three-dimensional structural schematic diagram of the second perspective of the present invention; Figure 3 It is a three-dimensional schematic diagram of the dust reduction structure in the present invention; Figure 4 It is a three-dimensional schematic diagram of the locking structure in the present invention.
[0016] In the figure, 1. mounting plate; 2. through groove; 3. push handle; 4. mounting bracket; 5. connecting rod; 6. motor; 7. cutting blade; 8. baffle; 9. locking structure; 901. mounting part; 902. positioning rod; 903. slider; 904. pull rod; 905. spring two; 10. dust reduction structure; 101. water storage tank; 102. water pump; 103. water outlet pipe; 104. drain pipe; 11. pressing plate; 12. spring one. Detailed Embodiment
[0017] The following are specific embodiments of the present invention and in combination with the drawings, the technical solutions of the present invention will be further described, but the present invention is not limited to these embodiments.
[0018] Refer to Figures 1-4, the pavement construction equipment for municipal road projects includes a mounting plate 1. There is a through groove 2 on the mounting plate 1. Two push handles 3 are fixedly arranged on the top of the mounting plate 1. A mounting frame 4 is fixedly arranged on the top of the mounting plate 1. A connecting rod 5 is movably arranged on the inner wall of the top of the mounting frame 4. The bottom end of the connecting rod 5 is fixedly provided with a motor 6. The output end of the motor 6 is fixedly provided with a cutting disc 7. Four universal wheels arranged in a rectangle are fixedly arranged at the bottom of the mounting plate 1. A baffle 8 is fixedly arranged at the bottom of the mounting plate 1. A rubber pad is fixedly arranged on one side of the baffle 8. A pressing plate 11 is fixedly arranged on the top of the connecting rod 5. Two first springs 12 are fixedly arranged at the bottom of the pressing plate 11. The bottom ends of the two first springs 12 are both fixedly connected to the top of the mounting frame 4. There are a plurality of positioning holes on one side of the connecting rod 5; In order to achieve the purpose of quickly adjusting the cutting depth, a locking structure 9 is fixedly arranged on the inner wall of one side of the mounting frame 4. The locking structure 9 includes a mounting part 901 fixedly connected to the mounting frame 4. The mounting part 901 is in an "L" shape. A positioning rod 902 is movably arranged in the mounting part 901. A chute is arranged on the inner wall of the top of the mounting part 901. A slider 903 is fixedly arranged on the positioning rod 902. The slider 903 is movably connected to the chute. The two ends of a second spring 905 are respectively welded to the slider 903 and the inner wall of one side of the mounting frame 4. One end of the positioning rod 902 penetrates through the inner wall of one side of the mounting frame 4 and is movably connected to the mounting frame 4. A circular hole is arranged on the inner wall of one side of the mounting frame 4. A sealing ring is arranged on the inner wall of the circular hole. The inner wall of the sealing ring is movably connected to the positioning rod 902. A limiting groove is arranged on the inner wall of the front surface of the mounting part 901. A pull rod 904 is movably arranged in the limiting groove. One end of the pull rod 904 is fixedly connected to the positioning rod 902. A second spring 905 is sleeved on the positioning rod 902. Pulling the pull rod 904 can make the positioning rod 902 disengage from the positioning hole. Pressing the connecting rod 5 can adjust the height of the motor 6. When the pull rod 904 is released, the second spring 905 makes the positioning rod 902 reset and insert into the positioning hole, thereby realizing the quick adjustment of the height of the motor 6 and making the equipment suitable for cutting gaps with different depths; In order to achieve the purpose of dust reduction, a dust reduction structure 10 is fixedly arranged on the top of the mounting plate 1. The dust reduction structure 10 includes a water storage tank 101 for storage. A water outlet pipe 103 is fixedly arranged at the bottom of the water storage tank 101. The other end of the water outlet pipe 103 is fixedly provided with a water pump 102. The water pump 102 is fixedly connected to the mounting plate 1. A drain pipe 104 is fixedly arranged on the side of the water pump 102 away from the water outlet pipe 103. The end of the drain pipe 104 away from the water pump 102 is fixedly provided with a spray nozzle. Before cutting, start the water pump 102. The water pump 102 sucks the water in the water storage tank 101 through the water outlet pipe 103 and sprays it out through the spray nozzle at one end of the drain pipe 104. The water mist acts on the flying dust, which can achieve the purpose of dust suppression and reduce the pollution index of the nearby air.
[0019] Among them, the pavement construction technology for municipal road projects includes the following steps: The first step: Push the equipment to the construction site and then fill the water storage tank 101 with water; Step 2: Adjust the height of the motor 6 according to the depth of the cutting seam. Pull the pull rod 904 to one side. The pull rod 904 drives the positioning rod 902. When the positioning rod 902 disengages from the positioning hole, press the pressing plate 11. The pressing plate 11 squeezes the first spring 12 and drives the connecting rod 5. The connecting rod 5 then drives the motor 6, and the motor 6 drives the cutting blade 7. When the height of the motor 6 is appropriate, release the pull rod 904. Under the resilience of the second spring 905, the positioning rod 902 resets and is inserted into the positioning hole to position the connecting rod 5 and complete the adjustment of the height of the motor 6; Step 3: Start the motor 6 and the water pump 102. The motor 6 drives the cutting blade 7 to cut the road surface. The water pump 102 sucks out the water in the water storage tank 101 and sprays it through the drain pipe 104. The water mist is sprayed on the dust generated during cutting, which can play a role in dust reduction.
[0020] The above components are all common standard components or components known to those skilled in the art. Their structures and principles can all be learned by those skilled in the art through technical manuals or obtained through conventional experimental methods.
[0021] The specific embodiments described herein are merely illustrative of the spirit of the present invention. Those skilled in the art of the present invention can make various modifications or supplements to the described specific embodiments or use similar methods to replace them, but will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.
Claims
1. A municipal road engineering pavement construction device, comprising a mounting plate (1), characterized in that: The mounting plate (1) is provided with a through slot (2), two push handles (3) are fixedly provided on the top of the mounting plate (1), a mounting frame (4) is fixedly provided on the top inner wall of the mounting frame (4), a connecting rod (5) is movably provided on the top inner wall of the mounting frame (4), a motor (6) is fixedly provided on the bottom end of the connecting rod (5), a cutting blade (7) is fixedly provided on the output end of the motor (6), a locking structure (9) is fixedly provided on the inner wall of one side of the mounting frame (4), and a dust reduction structure (10) is fixedly provided on the top of the mounting plate (1).
2. A municipal road engineering pavement construction equipment according to claim 1, characterized in that: Four universal wheels arranged in a rectangular shape are fixedly provided at the bottom of the mounting plate (1), a baffle plate (8) is fixedly provided at the bottom of the mounting plate (1), and a rubber pad is fixedly provided on one side of the baffle plate (8).
3. A municipal road engineering pavement construction equipment according to claim 1, characterized in that: A pressure plate (11) is fixedly provided on the top of the connecting rod (5), two springs (12) are fixedly provided on the bottom of the pressure plate (11), the bottom ends of the two springs (12) are fixedly connected to the top of the mounting frame (4), and a plurality of positioning holes are provided on one side of the connecting rod (5).
4. A municipal road engineering pavement construction equipment according to claim 1, characterized in that: The locking structure (9) comprises a mounting member (901) fixedly connected to the mounting frame (4), the mounting member (901) being in an "L" shape, a positioning rod (902) being movably provided in the mounting member (901), one end of the positioning rod (902) penetrating an inner wall of one side of the mounting frame (4) and being movably connected to the mounting frame (4), a limiting groove being provided on the front inner wall of the mounting member (901), a pulling rod (904) being movably provided in the limiting groove, one end of the pulling rod (904) being fixedly connected to the positioning rod (902), and a second spring (905) being sleeved on the positioning rod (902).
5. A municipal road engineering pavement construction equipment according to claim 4, characterized in that: A slide groove is provided on the top inner wall of the mounting member (901), a slider (903) is fixedly provided on the positioning rod (902), the slider (903) and the slide groove are movably connected, and the two ends of the second spring (905) are respectively welded to the slider (903) and the inner wall of one side of the mounting frame (4).
6. A municipal road engineering pavement construction equipment according to claim 4, characterized in that: A circular hole is provided on the inner wall of one side of the mounting frame (4), a sealing ring is provided on the inner wall of the circular hole, and the inner wall of the sealing ring is movably connected to the positioning rod (902).
7. A municipal road engineering pavement construction equipment according to claim 1, characterized in that: The dust reduction structure (10) comprises a water storage tank (101) for storing water, a water outlet pipe (103) being fixedly provided at the bottom of the water storage tank (101), a water pump (102) being fixedly provided at the other end of the water outlet pipe (103), the water pump (102) being fixedly connected to a mounting plate (1), a drainage pipe (104) being fixedly provided at a side of the water pump (102) away from the water outlet pipe (103), and an atomizing nozzle being fixedly provided at one end of the drainage pipe (104) away from the water pump (102).
8. A municipal road engineering pavement construction process, characterized in that: The steps include: The first step is to push the equipment to the construction site and then fill water into the water storage tank (101); Step 2: Adjust the height of the motor (6) according to the depth of the cutting seam, pull the pull rod (904) to one side, the pull rod (904) drives the positioning rod (902), when the positioning rod (902) is out of the positioning hole, press the pressure plate (11), the pressure plate (11) squeezes the spring 1 (12) and drives the connecting rod (5), the connecting rod (5) drives the motor (6), the motor (6) drives the cutting blade (7), when the height of the motor (6) is appropriate, release the pull rod (904), the positioning rod (902) is reset and inserted into the positioning hole under the rebound force of the spring 2 (905), the connecting rod (5) is positioned, and the height of the motor (6) is adjusted; Step 3: Start the motor (6) and the water pump (102), the motor (6) drives the cutting blade (7) to cut the road surface, and the water pump (102) sucks out the water in the water storage tank (101) and sprays it out through the drainage pipe (104).