Trans-department comprehensive supervision system based on item driving and implementation method
Through a matter-driven cross-departmental comprehensive supervision system, the problems of joint inspection plans are solved in cross-departmental comprehensive supervision, efficient and accurate generation and implementation of supervision plans are achieved, and regulatory efficiency and corporate efficiency are improved.
Patent Information
- Application Number
- CN202510266051.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-07
- Publication Date
- 2025-06-10
AI Technical Summary
In the comprehensive cross-departmental supervision, it is difficult for the existing technology to quickly determine the joint inspection plan, resulting in high labor costs, low plan success rate and accuracy.
It provides a cross-departmental comprehensive supervision system driven by matters, including matter library construction module, regulatory plan initiation module, regulatory plan reminder module, regulatory plan confirmation module, regulatory task generation module, task execution module and regulatory result summary module. The system reduces manual participation and improves the success rate of program matching by building a cross-departmental comprehensive regulatory matter list and automated regulatory plan generation.
The rapid determination of joint inspection plans has been achieved, which reduces labor costs, improves the success rate and accuracy of the plan, reduces the burden of repeated inspections by enterprises, and enhances the efficiency of departmental collaborative supervision.
Smart Images

Figure CN120125178A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of government services, and more specifically, to a cross-department comprehensive supervision system and implementation method based on matter-driven Background Art
[0002] In traditional inspection methods, due to information asymmetry among departments, each regulatory department initiates administrative inspections of market entities on its own. The inspection time, frequency, content, etc. are quite arbitrary. Each department is independent and lacks cross-departmental cooperation. As a result, there are often regulatory loopholes or misjudgments, and repeated inspections are often required, which also brings a burden of repeated inspections to enterprises. How to solve the problem of repeated inspections for enterprises and help enterprises reduce burdens and increase efficiency has become a practical problem at present. At the current stage, the following several technologies are usually adopted to solve it:
[0003] 1. The regulatory department actively initiates a joint inspection task through a joint inspection system, selects other regulatory departments for joint law enforcement inspections, and the selected departments confirm online whether they participate in the joint inspection task. If confirmed, a joint inspection task for multiple departments is generated, and multiple parties jointly conduct on-site inspections of the same market entity on the agreed date;
[0004] 2. Through the method of offline communication and docking, in the form of paper documents or telephone notifications, departments communicate and coordinate to agree on the centralized inspection time, inspection object, inspection content, etc. to achieve on-site joint inspections.
[0005] The above two technologies achieve cross-department comprehensive supervision by the leading department actively initiating and selecting departments jointly participating in the joint inspection. There are problems such as a large workload in task initiation, departments shifting responsibilities, low matching success rate, and passive work; through methods such as offline document transfer and telephone communication, the efficiency is low and the error probability is high, bringing a large amount of repetitive work to staff.
[0006] How to quickly determine the joint inspection plan, reduce labor costs, and improve the success rate and accuracy of the plan in cross-department comprehensive supervision is a technical problem to be solved. Summary of the Invention
[0007] The technical task of the present invention is to address the above deficiencies and provide a cross-department comprehensive supervision system and implementation method based on matter-driven to solve the technical problems of how to quickly determine the joint inspection plan, reduce labor costs, and improve the success rate and accuracy of the plan in cross-department comprehensive supervision.
[0008] In the first aspect, a cross-department comprehensive supervision system based on matter-driven of the present invention includes a matter library construction module, a supervision plan initiation module, a supervision plan reminder module, a supervision plan confirmation module, a supervision task generation module, a supervision task execution module, and a supervision result summary module;
[0009] The matter library construction module is targeted at the industry competent department as the leading department, and is used to support the leading department in constructing an inter-departmental comprehensive supervision matter list based on supervision matters and supervision departments, and storing the inter-departmental comprehensive supervision matter list in a pre-constructed inter-departmental comprehensive supervision matter library;
[0010] The supervision plan initiation module is targeted at supervision departments, and is used to support supervision departments in initiating supervision plans, and sending the generated supervision plans to the supervision plan reminder module;
[0011] The supervision plan reminder module is used to compare the supervision plans initiated by a single supervision department based on the inter-departmental comprehensive supervision matter library, judge whether the supervision plans need to organize inter-departmental comprehensive supervision. If so, sending the supervision plans as to-be-confirmed inter-departmental comprehensive supervision plans to the supervision plan confirmation module. If not, constructing single-department supervision tasks based on the supervision plans, and sending the single-department supervision tasks to the corresponding supervision departments;
[0012] The supervision plan confirmation module is targeted at supervision departments, and is used to push the to-be-confirmed inter-departmental comprehensive supervision plans to relevant supervision departments as collaborative departments, accept the feedback from each collaborative department, and send the to-be-confirmed inter-departmental comprehensive supervision plans and the feedback from each collaborative department to the supervision task generation module;
[0013] The supervision task generation module is used to generate inter-departmental comprehensive supervision tasks according to the to-be-confirmed inter-departmental comprehensive supervision plans and the feedback from each collaborative department, and send the inter-departmental comprehensive supervision tasks to the corresponding supervision departments;
[0014] The task execution module is targeted at supervision departments, and is used to support law enforcement officers executing supervision tasks in entering supervision verification information, where the supervision tasks include inter-departmental comprehensive supervision tasks and single-department supervision tasks;
[0015] The supervision result summary module is used to summarize and calculate the supervision verification information related to supervision tasks, generate supervision results, and support supervision departments in viewing the supervision results.
[0016] Preferably, the inter-departmental comprehensive supervision matter list includes supervision fields, supervision departments, supervision matters, setting bases, supervision objects, matter categories, inspection methods, and supervision levels.
[0017] Preferably, when a supervision department initiates a supervision plan, the supervision plan initiation module is used to support the supervision department in selecting supervision information including supervision objects, inspection matters, supervision time, and law enforcement officers, and generating a supervision plan for a single supervision department.
[0018] Preferably, the supervision plan reminder module is used to perform the following:
[0019] L100, determine whether the regulatory items in the current regulatory plan exist in the cross-departmental comprehensive regulatory items database, if yes, execute step L200, if not, execute step L500;
[0020] L200, determine whether the current supervision plan is initiated by the leading department, if yes, execute step L300, if no, execute step L400;
[0021] L300, determining that the current supervision plan needs to organize cross-departmental comprehensive supervision, and sending the supervision plan as a cross-departmental comprehensive supervision plan to be confirmed to the supervision plan confirmation module;
[0022] L400. If the current supervision plan is initiated by the collaborative supervision part, a confirmation notice is sent to the leading department, and the leading department confirms whether to organize cross-departmental comprehensive supervision. If the leading department confirms to organize cross-departmental comprehensive supervision, the leading department initiates a new supervision plan, integrates the current supervision plan into the new supervision plan to obtain a cross-departmental comprehensive supervision plan, and sends the cross-departmental comprehensive supervision plan as a supervision plan to be confirmed to the supervision plan confirmation module;
[0023] L500, end execution.
[0024] Preferably, the supervision plan confirmation module is used to perform the following:
[0025] Push the inter-departmental comprehensive supervision plan to be confirmed to the relevant collaborative supervision departments, including the clear supervision objects, supervision time, and the inspection items that each department is responsible for;
[0026] Support collaborative regulatory departments to provide feedback. If the collaborative regulatory department chooses to participate in the cross-departmental comprehensive regulatory plan, it shall choose to submit feedback information of participation and supplement the law enforcement personnel information. If the collaborative regulatory department chooses not to participate in the cross-departmental comprehensive regulatory plan, it shall submit feedback information of non-participation and indicate the reasons.
[0027] If the collaborative regulatory department fails to select and submit the plan within the scheduled time, the cross-departmental comprehensive regulatory plan will be deemed to have automatically expired.
[0028] In a second aspect, the present invention provides a method for implementing cross-departmental integrated supervision based on event-driven, characterized in that cross-departmental integrated supervision is performed through a cross-departmental integrated supervision system based on event-driven as described in any one of the first aspects, and the method comprises the following steps:
[0029] Construction of the matters database: The industry competent department of the leading department shall construct a cross-departmental comprehensive regulatory matters list based on regulatory matters and regulatory departments, and store the cross-departmental comprehensive regulatory matters list in the pre-constructed cross-departmental comprehensive regulatory matters database;
[0030] Regulatory plan initiation: The regulatory department initiates a regulatory plan;
[0031] Regulatory plan reminder: Compare the regulatory plan initiated by a single regulatory department based on the cross-departmental comprehensive supervision matter library to determine whether the regulatory plan needs to organize cross-departmental comprehensive supervision. If so, regard the regulatory plan as a cross-departmental comprehensive supervision plan to be confirmed. If not, construct a single-department supervision task based on the regulatory plan and send the single-department supervision task to the corresponding regulatory department;
[0032] Regulatory plan confirmation: Push the cross-departmental comprehensive supervision plan to be confirmed to the relevant regulatory departments as collaborative departments and accept the feedback from each collaborative department;
[0033] Regulatory task generation: Generate a cross-departmental comprehensive supervision task based on the cross-departmental comprehensive supervision plan to be confirmed and the feedback from each collaborative department, and send the cross-departmental comprehensive supervision task to the corresponding regulatory department;
[0034] Task execution: Law enforcement officers executing the supervision task enter supervision verification information, where the supervision task includes cross-departmental comprehensive supervision tasks and single-department supervision tasks;
[0035] Regulatory result summary: Summarize and calculate the supervision verification information related to the supervision task to generate a regulatory result, and support the regulatory department to view the regulatory result.
[0036] Preferably, the cross-departmental comprehensive supervision matter list includes supervision fields, regulatory departments, supervision matters, setting bases, supervision objects, matter categories, inspection methods, and supervision levels.
[0037] Preferably, when the regulatory department initiates a regulatory plan, the regulatory department selects supervision information including supervision objects, inspection matters, supervision time, and law enforcement officers to generate a regulatory plan for a single regulatory department.
[0038] Preferably, the regulatory plan reminder includes the following operations:
[0039] L100. Determine whether the supervision matter in the current regulatory plan exists in the cross-departmental comprehensive supervision matter library. If it exists, execute step L200. If not, execute step L500;
[0040] L200. Determine whether the current regulatory plan is initiated by the leading department. If so, execute step L300. If not, execute step L400;
[0041] L300. Determine that the current regulatory plan needs to organize cross-departmental comprehensive supervision, and regard the regulatory plan as a cross-departmental comprehensive supervision plan to be confirmed;
[0042] L400. If the current supervision plan is initiated by the collaborative supervision part, send a confirmation notice to the leading department to confirm whether to organize cross-departmental comprehensive supervision. If the leading department confirms to organize cross-departmental comprehensive supervision, the leading department initiates a new supervision plan and integrates the current supervision plan into the new supervision plan to obtain a cross-departmental comprehensive supervision plan, and obtain a cross-departmental comprehensive supervision plan to be confirmed;
[0043] L500. End the execution.
[0044] Preferably, the supervision plan confirmation includes the following operations:
[0045] Push the cross-departmental comprehensive supervision plan to be confirmed to the relevant collaborative supervision departments. The pushed information includes the clear supervision object, supervision time, and the information on the inspection items respectively responsible for by each department;
[0046] The collaborative supervision departments give feedback. If the collaborative supervision departments choose to participate in the cross-departmental comprehensive supervision plan, they choose to submit the feedback information of participation and supplement the law enforcement personnel information. If the collaborative supervision departments choose not to participate in the cross-departmental comprehensive supervision plan, they submit the feedback information of non-participation and indicate the reasons;
[0047] If the collaborative supervision departments do not perform the selection and submission operation within the scheduled time, it is determined that the cross-departmental comprehensive supervision plan expires automatically.
[0048] The cross-departmental comprehensive supervision system and implementation method based on matter-driven of the present invention have the following advantages:
[0049] 1. Through cross-departmental comprehensive supervision matters, bind the supervision matters involving multiple departments to form a cross-departmental comprehensive supervision matter list. After the leading department initiates an inspection plan, a cross-departmental comprehensive supervision plan is automatically pre-generated, and other collaborative supervision departments are reminded to conduct online confirmation. After confirmation, a cross-departmental comprehensive supervision plan task is automatically generated, so as to realize cross-departmental comprehensive supervision, truly achieve entering the door once to check multiple matters, reduce the repeated inspection burden of market entities such as enterprises and individual industrial and commercial households, enhance the collaborative supervision efficiency of departments, and create a fair and just market competition environment and a legal and convenient business environment;
[0050] 2. It is simple and fast to use, does not require complex operations, has low cost and high efficiency. Most importantly, it can greatly reduce manual participation, improve the success rate of plan matching, and reduce the inspection frequency;
[0051] 3. According to the cross-departmental comprehensive supervision matters, actively match the inspection plans of the leading department and the collaborative supervision departments to generate cross-departmental comprehensive supervision tasks, which is more accurate and reliable than the supervision departments initiating by themselves and transmitting offline. Description of the Drawings
[0052] To more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the accompanying drawings required for use in the embodiments or the description of the prior art. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can be obtained based on these drawings.
[0053] The present invention will be further described below with reference to the accompanying drawings.
[0054] Figure 1 It is a flowchart of a method for implementing cross - department comprehensive supervision based on event - driven for Embodiment 2. Specific embodiments
[0055] The present invention will be further described below with reference to the accompanying drawings and specific embodiments, so that those skilled in the art can better understand the present invention and be able to implement it. However, the embodiments cited are not intended to limit the present invention. Without conflict, the embodiments of the present invention and the technical features in the embodiments can be combined with each other.
[0056] The embodiments of the present invention provide a cross - department comprehensive supervision system and implementation method based on event - driven, which are used to solve the technical problems of how to quickly determine the joint inspection plan, reduce labor costs, and improve the success rate and accuracy rate of the plan in cross - department comprehensive supervision.
[0057] Embodiment 1:
[0058] A cross - department comprehensive supervision system based on event - driven of the present invention includes an event library construction module, a supervision plan initiation module, a supervision plan reminder module, a supervision plan confirmation module, a supervision task generation module, a supervision task execution module, and a supervision result summary module.
[0059] The event library construction module is oriented to the industry competent department as the leading department, and is used to support the leading department to construct a cross - department comprehensive supervision event list based on supervision events and supervision departments, and store the cross - department comprehensive supervision event list in a pre - constructed cross - department comprehensive supervision event library.
[0060] In this embodiment, the cross - department comprehensive supervision event list includes supervision fields, supervision departments, supervision events, setting bases, supervision objects, event categories, inspection methods, and supervision levels.
[0061] As the leading department, the industry competent department, for supervision events involving multiple departments, jointly with relevant supervision departments, item - by - item clarifies supervision fields, supervision departments, supervision events, setting bases, supervision objects, event categories, inspection methods, supervision levels, etc., forms a cross - department comprehensive supervision event list, and establishes a cross - department comprehensive supervision event library. An example of the cross - department comprehensive supervision event is shown in Table 1.
[0062] Table 1, Cross-department Comprehensive Supervision Items
[0063]
[0064] The supervision plan initiation module is oriented to the supervision department, and is used to support the supervision department in initiating a supervision plan and sending the generated supervision plan to the supervision plan reminder module.
[0065] In this embodiment, when the supervision department initiates a supervision plan, the supervision plan initiation module is used to support the supervision department in selecting supervision information including supervision objects, inspection items, supervision time, and law enforcement personnel, and generating a supervision plan for a single supervision department.
[0066] The supervision plan reminder module is used to compare the supervision plan initiated by a single supervision department based on the cross-department comprehensive supervision item library, determine whether the supervision plan needs to organize cross-department comprehensive supervision. If so, send the supervision plan as a cross-department comprehensive supervision plan to be confirmed to the supervision plan confirmation module. If not, construct a single-department supervision task based on the supervision plan and send the single-department supervision task to the corresponding supervision department.
[0067] As a specific implementation of the supervision plan reminder module, this module is used to perform the following:
[0068] L100. Determine whether the supervision items in the current supervision plan exist in the cross-department comprehensive supervision item library. If they exist, execute step L200. If not, execute step L500;
[0069] L200. Determine whether the current supervision plan is initiated by the leading department. If so, execute step L300. If not, execute step L400;
[0070] L300. Determine that the current supervision plan needs to organize cross-department comprehensive supervision, and send the supervision plan as a cross-department comprehensive supervision plan to be confirmed to the supervision plan confirmation module;
[0071] L400. If the current supervision plan is initiated by the collaborative supervision part, send a confirmation notice to the leading department, and the leading department confirms whether to organize cross-department comprehensive supervision. If the leading department confirms to organize cross-department comprehensive supervision, the leading department initiates a new supervision plan, integrates the current supervision plan into the new supervision plan to obtain a cross-department comprehensive supervision plan, and sends the cross-department comprehensive supervision plan as a supervision plan to be confirmed to the supervision plan confirmation module;
[0072] L500. End the execution.
[0073] In this embodiment, after a single regulatory department initiates a regulatory plan, the system will compare the inspection items selected by the department in the regulatory plan with the cross-department integrated regulatory item library. There are three cases for the comparison results:
[0074] (1) When the leading department A initiates an inspection plan for inspection item a, the system automatically pre-generates a cross-department integrated regulatory plan and actively reminds the collaborative regulatory departments B and C whether to join this regulatory plan;
[0075] (2) When the collaborative regulatory department B initiates an inspection plan for inspection item b, the system automatically notifies the leading department A, and the leading department A determines whether to organize cross-department integrated supervision: ① If the leading department A determines to organize cross-department integrated supervision, the leading department A initiates a regulatory plan for inspection item a, resets the inspection time, and integrates the plan of department B into the plan of department A. At the same time, the system pre-generates a cross-integrated regulatory plan and reminds the collaborative regulatory department C whether to join this regulatory plan; ② If the leading department determines not to organize cross-department integrated supervision, department B conducts inspections alone;
[0076] (3) When the regulatory items in the regulatory plan are not in the cross-department integrated regulatory item library, it ends.
[0077] The regulatory plan confirmation module is oriented to regulatory departments and is used to push the cross-department integrated regulatory plan to be confirmed to relevant regulatory departments as collaborative departments, accept the feedback from each collaborative department, and send the cross-department integrated regulatory plan to be confirmed and the feedback from each collaborative department to the regulatory task generation module.
[0078] As a specific implementation of the regulatory plan confirmation module, this module is used to perform the following:
[0079] (1) Push the cross-department integrated regulatory plan to be confirmed to relevant collaborative regulatory departments. The pushed information includes clear regulatory objects, regulatory time, and information on inspection items respectively responsible for by each department;
[0080] (2) Support collaborative regulatory departments to give feedback. If a collaborative regulatory department chooses to participate in the cross-department integrated regulatory plan, it selects to submit feedback information for participation and supplements law enforcement personnel information. If a collaborative regulatory department chooses not to participate in the cross-department integrated regulatory plan, it submits feedback information for non-participation and indicates the reason;
[0081] (3) If a collaborative regulatory department does not perform a selection and submission operation within the predetermined time, it is determined that the cross-department integrated regulatory plan has automatically expired.
[0082] In this embodiment, the cross-department comprehensive supervision plan to be confirmed and actively pushed to the collaborative supervision department includes information such as clear supervision objects, supervision time, and information on inspection matters separately responsible for each department. For example, when the leading department A initiates a plan for inspection matter a of supervision object M, the plan to be actively pushed to department B for confirmation is the plan for inspection matter b of supervision object M, and the plan to be actively pushed to department C for confirmation is the plan for inspection matters c1 and c2 of supervision object M.
[0083] If the collaborative supervision department chooses to participate, it needs to further select the law enforcement personnel information of this department and submit the confirmation. If it does not participate, it can directly select not to participate and submit after stating the reason. If no operation is performed and it exceeds 17:00 on the day before the supervision time, this cross-department comprehensive supervision plan will automatically expire.
[0084] The supervision task generation module is used to generate cross-department comprehensive supervision tasks according to the cross-department comprehensive supervision plan to be confirmed and the feedback of each collaborative department, and send the cross-department comprehensive supervision tasks to the corresponding supervision departments.
[0085] In this embodiment, the supervision task generation module automatically generates a cross-department comprehensive supervision task at 17:00 on the day before the supervision time according to the confirmation situation of each supervision department for the cross-department supervision sub-plan. For example: after the leading department A initiates a plan for matter a, assuming that the collaborative supervision department B does not participate and C participates, the system automatically integrates the plans of departments A and C to generate a comprehensive supervision task.
[0086] The task execution module is oriented to the supervision department and is used to support law enforcement personnel who execute supervision tasks to enter supervision verification information, where the supervision tasks include cross-department comprehensive supervision tasks and single-department supervision tasks.
[0087] In this embodiment, on the day of the supervision time, all law enforcement personnel involved in the cross-department comprehensive supervision task arrive at the site of the supervision object according to the planned time to enter the cross-department comprehensive supervision task, and the system automatically brings in the supervision object information, the inspection matter information responsible for each department, etc. The law enforcement personnel can carry out on-site supervision work and enter relevant information according to the normal process.
[0088] The supervision result summary module is used to summarize and calculate the supervision verification information related to the supervision task, generate supervision results, and support the supervision department to view the supervision results.
[0089] In this embodiment, after each supervision department completes on-site supervision verification, issues the results and submits them in the system, the system will automatically summarize and push the relevant result information to all departments participating in this cross-department comprehensive supervision. Relevant law enforcement personnel can log in to the system to view the supervision results.
[0090] Based on the system disclosed in this embodiment, the industry competent department, as the leading department, for regulatory matters involving multiple departments, will, together with relevant regulatory departments, clarify the regulatory areas, regulatory departments, regulatory matters, setting basis, regulatory objects, matter categories, inspection methods, regulatory levels, etc. item by item, form a list of cross-departmental comprehensive regulatory matters, and establish a cross-departmental comprehensive regulatory matter library.
[0091] According to roles such as law enforcement officers and administrators, system accounts and permissions are opened for each regulatory department. The regulatory departments initiate regulatory plans on their own and carry out cross-departmental comprehensive regulatory work.
[0092] Based on the system disclosed in this embodiment, a case of realizing cross-departmental comprehensive supervision based on this system is given. The regulatory department initiates an inspection plan, and the system determines whether the regulatory matters in the plan belong to cross-departmental comprehensive regulatory matters and whether the regulatory department is the leading department: (1) If it is a cross-departmental comprehensive regulatory matter and is the leading department, the system automatically pre-generates a cross-departmental comprehensive regulatory plan and actively reminds other collaborative regulatory departments whether to join this regulatory plan; (2) If it is a cross-departmental comprehensive regulatory matter and is not the leading department, the system automatically notifies the leading department, and the leading department determines whether to organize cross-departmental comprehensive supervision. If the leading department determines to organize, the system, according to the plan initiated by the leading department, automatically pre-generates a cross-departmental comprehensive regulatory plan and actively reminds other collaborative regulatory departments whether to join this regulatory plan. If the leading department determines not to organize, conduct inspections separately; (3) When the matters in the regulatory plan are not in the cross-departmental comprehensive regulatory matter library, it ends.
[0093] After the leading department initiates an inspection plan, the collaborative departments confirm whether to participate, and the system integrates the regulatory plans of the collaborative regulatory departments that confirm participation into the plan of the leading department to generate a cross-departmental regulatory task.
[0094] On the day of the task, the law enforcement officers of each department arrive at the enterprise on schedule, and submit the supervision results after completing on-site supervision;
[0095] After the comprehensive supervision ends, the system automatically summarizes and exchanges the supervision results, and ends the cross-departmental comprehensive supervision business.
[0096] Embodiment 2:
[0097] A method for realizing cross-departmental comprehensive supervision based on matter-driven of the present invention realizes cross-departmental supervision through the method disclosed in Embodiment 1, including seven steps: matter library construction, regulatory plan initiation, regulatory plan reminder, regulatory plan confirmation, regulatory task generation, task execution, and supervision result summary.
[0098] Step S100 Matter Library Construction: The industry competent department of the leading department constructs a cross-department comprehensive supervision matter list based on supervision matters and supervision departments, and stores the cross-department comprehensive supervision matter list in a pre-constructed cross-department comprehensive supervision matter library.
[0099] In this embodiment, the cross-department comprehensive supervision matter list includes supervision fields, supervision departments, supervision matters, setting bases, supervision objects, matter categories, inspection methods, and supervision levels.
[0100] As the leading department, the industry competent department, for supervision matters involving multiple departments, in conjunction with relevant supervision departments, item by item clarifies supervision fields, supervision departments, supervision matters, setting bases, supervision objects, matter categories, inspection methods, supervision levels, etc., forms a cross-department comprehensive supervision matter list, and establishes a cross-department comprehensive supervision matter library.
[0101] Step S200 Supervision Plan Initiation: The supervision department initiates a supervision plan.
[0102] In this embodiment, when the supervision department initiates a supervision plan, the supervision department selects supervision information including supervision objects, inspection matters, supervision time, and law enforcement officers to generate a supervision plan for a single supervision department.
[0103] Step S300 Supervision Plan Reminder: Based on the cross-department comprehensive supervision matter library, compare the supervision plan initiated by a single supervision department, and judge whether the supervision plan needs to organize cross-department comprehensive supervision. If so, regard the supervision plan as a cross-department comprehensive supervision plan to be confirmed. If not, construct a single-department supervision task based on the supervision plan and send the single-department supervision task to the corresponding supervision department.
[0104] As a specific implementation of the supervision plan reminder, it includes the following operations:
[0105] L100. Judge whether the supervision matters in the current supervision plan exist in the cross-department comprehensive supervision matter library. If they exist, execute step L200. If not, execute step L500;
[0106] L200. Judge whether the current supervision plan is initiated by the leading department. If so, execute step L300. If not, execute step L400;
[0107] L300. Determine that the current supervision plan needs to organize cross-department comprehensive supervision, and regard the supervision plan as a cross-department comprehensive supervision plan to be confirmed;
[0108] L400. If the current supervision plan is initiated by the collaborative supervision part, send a confirmation notice to the leading department, and the leading department shall confirm whether to organize cross-departmental comprehensive supervision. If the leading department confirms to organize cross-departmental comprehensive supervision, the leading department shall initiate a new supervision plan and integrate the current supervision plan into the new supervision plan to obtain a cross-departmental comprehensive supervision plan;
[0109] L500. End the execution.
[0110] In this embodiment, after a single supervision department initiates a supervision plan, compare the inspection items selected by the department in the supervision plan with the cross-departmental comprehensive supervision item library. There are the following three situations for the comparison results:
[0111] (1) When the leading department A initiates an inspection plan for inspection item a, automatically pre-generate a cross-departmental comprehensive supervision plan and actively remind the collaborative supervision departments B and C whether to join the supervision plan;
[0112] (2) When the collaborative supervision department B initiates an inspection plan for inspection item b, automatically inform the leading department A, and the leading department A shall determine whether to organize cross-departmental comprehensive supervision: ① If the leading department A determines to organize cross-departmental comprehensive supervision, the leading department A shall initiate a supervision plan for inspection item a, reset the inspection time, integrate the plan of department B into the plan of department A, and at the same time pre-generate a cross-comprehensive supervision plan and remind the collaborative supervision department C whether to join the supervision plan; ② If the leading department determines not to organize cross-departmental comprehensive supervision, department B shall conduct the inspection alone;
[0113] (3) End when the supervision items in the supervision plan are not in the cross-departmental comprehensive supervision item library.
[0114] Step S400 Supervision plan confirmation: Push the cross-departmental comprehensive supervision plan to be confirmed to the relevant supervision departments as collaborative departments and accept the feedback from each collaborative department.
[0115] As a specific implementation of the supervision plan confirmation, it includes the following operations:
[0116] (1) Push the cross-departmental comprehensive supervision plan to be confirmed to the relevant collaborative supervision departments. The pushed information includes clear supervision objects, supervision time, and information on the inspection items respectively responsible for by each department;
[0117] (2) Support the collaborative supervision departments to give feedback. If a collaborative supervision department chooses to participate in the cross-departmental comprehensive supervision plan, it shall choose to submit feedback information on participation and supplement the law enforcement personnel information. If a collaborative supervision department chooses not to participate in the cross-departmental comprehensive supervision plan, it shall submit feedback information on non-participation and indicate the reasons;
[0118] (3) If the collaborative supervision department fails to perform the selection and submission operation within the scheduled time, it is determined that the cross-department comprehensive supervision plan has automatically expired.
[0119] In this embodiment, the cross-department comprehensive supervision plan to be confirmed actively pushed to the collaborative supervision department includes information such as clear supervision objects, supervision time, and inspection item information respectively responsible for each department. For example, when the leading department A initiates a plan for inspection item a of supervision object M, the plan to be confirmed actively pushed to department B is the plan for inspection item b of supervision object M, and the plan to be confirmed actively pushed to department C is the plan for inspection items c1 and c2 of supervision object M.
[0120] If the collaborative supervision department chooses to participate, it needs to further select the law enforcement personnel information of this department and submit the confirmation. If it does not participate, it can directly select not to participate and submit after stating the reason. If no operation is performed and it exceeds 17:00 on the day before the supervision time, the cross-department comprehensive supervision plan will automatically expire.
[0121] Step S500 Supervision task generation: Generate cross-department comprehensive supervision tasks according to the cross-department comprehensive supervision plan to be confirmed and the feedback from each collaborative department, and send the cross-department comprehensive supervision tasks to the corresponding supervision departments.
[0122] In this embodiment, when generating the supervision tasks, according to the confirmation situation of each supervision department for the cross-department supervision sub-plans, the cross-department comprehensive supervision tasks are automatically generated at 17:00 on the day before the supervision time. For example: After the leading department A initiates a plan for item a, assuming that the collaborative supervision department B does not participate and C participates, the system automatically integrates the plans of departments A and C to generate comprehensive supervision tasks.
[0123] Step S600 Task execution: The law enforcement personnel executing the supervision tasks enter the supervision verification information, where the supervision tasks include cross-department comprehensive supervision tasks and single-department supervision tasks.
[0124] In this embodiment, on the day of the supervision time, all law enforcement personnel involved in the cross-department comprehensive supervision tasks arrive at the supervision object site according to the planned time to enter the cross-department comprehensive supervision tasks, and the system automatically brings in the supervision object information and the inspection item information responsible for each department, etc. The law enforcement personnel can carry out on-site supervision work and enter relevant information according to the normal process.
[0125] Step S700 Supervision result summary: Summarize and calculate the supervision verification information related to the supervision tasks, generate supervision results, and support the supervision departments to view the supervision results.
[0126] In this embodiment, after each regulatory department completes on-site regulatory verification, issues the results, and submits them to the system, the system will automatically aggregate and push the relevant result information to all departments participating in the cross-department comprehensive supervision of this time. Relevant law enforcement officers can log in to the system to view the supervision results.
[0127] Based on the method disclosed in this embodiment, the industry competent department, as the leading department, for supervision matters involving multiple departments, in conjunction with relevant regulatory departments, specifies the supervision field, supervision department, supervision matter, setting basis, supervision object, matter category, inspection method, supervision level, etc. item by item, forms a cross-department comprehensive supervision matter list, and establishes a cross-department comprehensive supervision matter library.
[0128] According to roles such as law enforcement officers and administrators, system accounts and permissions are opened for each regulatory department. The regulatory department initiates the supervision plan by itself and conducts cross-department comprehensive supervision work.
[0129] The above has introduced in detail the cross-department comprehensive supervision system and implementation method based on event-driven provided by the present invention. Specific examples are used in this article to elaborate on the principle and implementation manner of the present invention. The description of the above embodiments is only used to help understand the method and its core idea of the present invention; at the same time, for those of ordinary skill in the art, according to the idea of the present invention, there will be changes in the specific implementation manner and application scope. In summary, the content of this specification should not be construed as a limitation to the present invention.
Claims
1. A cross-departmental integrated supervision system based on event-driven, characterized by: It includes the event database construction module, the supervision plan initiation module, the supervision plan reminder module, the supervision plan confirmation module, the supervision task generation module, the supervision task execution module and the supervision result summary module; The item library construction module is aimed at the industry regulatory department as the lead department, and is used to support the lead department to build a cross-departmental comprehensive regulatory item list based on regulatory items and regulatory departments, and store the cross-departmental comprehensive regulatory item list in the pre-built cross-departmental comprehensive regulatory item library; The regulatory plan initiation module is oriented to the regulatory department and is used to support the regulatory department in initiating a regulatory plan and sending the generated regulatory plan to the regulatory plan reminder module; The supervision plan reminder module is used to compare the supervision plan initiated by a single supervision department based on the cross-departmental comprehensive supervision matters database, determine whether the supervision plan needs to organize cross-departmental comprehensive supervision, and if necessary, send the supervision plan as a cross-departmental comprehensive supervision plan to be confirmed to the supervision plan confirmation module; if not, construct a single-department supervision task based on the supervision plan, and send the single-department supervision task to the corresponding supervision department; The regulatory plan confirmation module is oriented to the regulatory department, and is used to push the inter-departmental comprehensive regulatory plan to be confirmed to the relevant regulatory departments as collaborative departments, accept feedback from the collaborative departments, and send the inter-departmental comprehensive regulatory plan to be confirmed and the feedback from the collaborative departments to the regulatory task generation module; The supervision task generation module is used to generate a cross-departmental comprehensive supervision task according to the cross-departmental comprehensive supervision plan to be confirmed and the feedback of each collaborative department, and send the cross-departmental comprehensive supervision task to the corresponding supervision department; The task execution module is oriented to the regulatory department and is used to support law enforcement personnel who perform regulatory tasks to enter regulatory verification information, where regulatory tasks include cross-departmental comprehensive regulatory tasks and single-department regulatory tasks; The supervision result summary module is used to summarize and calculate the supervision verification information related to the supervision task, generate supervision results, and support the supervision department to view the supervision results.
2. The event-driven cross-departmental integrated supervision system according to claim 1 is characterized in that: The list of cross-departmental comprehensive regulatory matters includes regulatory areas, regulatory departments, regulatory matters, establishment basis, regulatory objects, matter categories, inspection methods and regulatory levels.
3. The event-driven cross-departmental integrated supervision system according to claim 1 is characterized in that: When a regulatory department initiates a regulatory plan, the regulatory plan initiation module is used to support the regulatory department in selecting regulatory information including regulatory objects, inspection items, regulatory time and law enforcement personnel, and generate a regulatory plan for a single regulatory department.
4. The event-driven cross-departmental integrated supervision system according to claim 1 is characterized in that: The supervision plan reminder module is used to perform the following: L100, determine whether the regulatory items in the current regulatory plan exist in the cross-departmental comprehensive regulatory items database, if yes, execute step L200, if not, execute step L500; L200, determine whether the current supervision plan is initiated by the leading department, if yes, execute step L300, if no, execute step L400; L300, determining that the current supervision plan needs to organize cross-departmental comprehensive supervision, and sending the supervision plan as a cross-departmental comprehensive supervision plan to be confirmed to the supervision plan confirmation module; L400. If the current supervision plan is initiated by the collaborative supervision part, a confirmation notice is sent to the leading department, and the leading department confirms whether to organize cross-departmental comprehensive supervision. If the leading department confirms to organize cross-departmental comprehensive supervision, the leading department initiates a new supervision plan, integrates the current supervision plan into the new supervision plan to obtain a cross-departmental comprehensive supervision plan, and sends the cross-departmental comprehensive supervision plan as a supervision plan to be confirmed to the supervision plan confirmation module; L500, end execution.
5. The event-driven cross-departmental integrated supervision system according to claim 1 is characterized in that: The supervision plan confirmation module is used to perform the following: Push the inter-departmental comprehensive supervision plan to be confirmed to the relevant collaborative supervision departments, including the clear supervision objects, supervision time, and the inspection items that each department is responsible for; Support collaborative regulatory departments to provide feedback. If the collaborative regulatory department chooses to participate in the cross-departmental comprehensive regulatory plan, it shall choose to submit feedback information of participation and supplement the law enforcement personnel information. If the collaborative regulatory department chooses not to participate in the cross-departmental comprehensive regulatory plan, it shall submit feedback information of non-participation and indicate the reasons. If the collaborative regulatory department fails to select and submit the plan within the scheduled time, the cross-departmental comprehensive regulatory plan will be deemed to have automatically expired.
6. A method for implementing cross-departmental integrated supervision based on event-driven, characterized in that: Cross-departmental supervision is performed by a cross-departmental integrated supervision system based on event-driven management as described in any one of claims 1 to 5, the method comprising the following steps: Construction of the matters database: The industry competent department of the leading department shall construct a cross-departmental comprehensive regulatory matters list based on regulatory matters and regulatory departments, and store the cross-departmental comprehensive regulatory matters list in the pre-constructed cross-departmental comprehensive regulatory matters database; Initiation of regulatory plan: The regulatory authority initiates the regulatory plan; Supervision plan reminder: Compare the supervision plan initiated by a single supervision department based on the cross-departmental comprehensive supervision matters database to determine whether the supervision plan requires cross-departmental comprehensive supervision. If necessary, the supervision plan will be used as a cross-departmental comprehensive supervision plan to be confirmed. If not, a single-department supervision task will be constructed based on the supervision plan and sent to the corresponding supervision department. Confirmation of the supervision plan: Push the inter-departmental comprehensive supervision plan to be confirmed to the relevant supervisory departments as collaborative departments, and accept feedback from the collaborative departments; Supervision task generation: Generate cross-departmental comprehensive supervision tasks based on the cross-departmental comprehensive supervision plan to be confirmed and the feedback from each collaborative department, and send the cross-departmental comprehensive supervision tasks to the corresponding supervision department; Task execution: Law enforcement officers who perform supervision tasks enter supervision verification information, where supervision tasks include cross-departmental comprehensive supervision tasks and single-department supervision tasks; Supervision result summary: summarize and calculate the supervision verification information related to the supervision task, generate supervision results, and support the supervision department to view the supervision results.
7. The method for implementing cross-departmental comprehensive supervision based on event-driven management according to claim 6 is characterized in that: The list of cross-departmental comprehensive regulatory matters includes regulatory areas, regulatory departments, regulatory matters, establishment basis, regulatory objects, matter categories, inspection methods and regulatory levels.
8. The method for implementing cross-departmental comprehensive supervision based on event-driven management according to claim 6 is characterized in that: When a regulatory department initiates a regulatory plan, it selects regulatory information including regulatory objects, inspection items, regulatory time and law enforcement personnel to generate a regulatory plan for a single regulatory department.
9. The method for implementing cross-departmental comprehensive supervision based on event-driven management according to claim 6 is characterized in that: The supervision plan reminder includes the following operations: L100, determine whether the regulatory items in the current regulatory plan exist in the cross-departmental comprehensive regulatory items database, if yes, execute step L200, if not, execute step L500; L200, determine whether the current supervision plan is initiated by the leading department, if yes, execute step L300, if no, execute step L400; L300. Determine that the current regulatory plan requires cross-departmental comprehensive supervision, and treat the regulatory plan as a cross-departmental comprehensive regulatory plan to be confirmed; L400. If the current supervision plan is initiated by the coordinated supervision part, a confirmation notice is sent to the leading department, and the leading department confirms whether to organize cross-departmental comprehensive supervision. If the leading department confirms to organize cross-departmental comprehensive supervision, the leading department initiates a new supervision plan and integrates the current supervision plan into the new supervision plan to obtain a cross-departmental comprehensive supervision plan, and obtains a cross-departmental comprehensive supervision plan to be confirmed; L500, end execution.
10. The method for implementing cross-departmental comprehensive supervision based on event-driven management according to claim 6 is characterized in that: Confirmation of the supervision plan includes the following operations: Push the inter-departmental comprehensive supervision plan to be confirmed to the relevant collaborative supervision departments, including the clear supervision objects, supervision time, and the inspection items that each department is responsible for; Provide feedback to the collaborative regulatory department. If the collaborative regulatory department chooses to participate in the cross-departmental comprehensive regulatory plan, it shall choose to submit feedback information of participation and supplement the law enforcement personnel information. If the collaborative regulatory department chooses not to participate in the cross-departmental comprehensive regulatory plan, it shall submit feedback information of non-participation and indicate the reason; If the collaborative regulatory department fails to select and submit the plan within the scheduled time, the cross-departmental comprehensive regulatory plan will be deemed to have automatically expired.