Treatment method and device for slope-to-terrace erosion gully, computer equipment and storage medium

By obtaining surface elevation data and simulated water erosion model prediction, combined with the erosion ditch management plan when designing terraced fields, the problem of slope-to-ladder erosion ditch management is solved, and the stability and long-term benefits of terraced fields are achieved.

CN120145628APending Publication Date: 2025-06-13CENTER FOR AGRICULTURAL TECHNOLOGY NORTHEAST INSTITUTE OF GEOGRAPHY & AGROECOLOGY
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202510108810.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-06-13

AI Technical Summary

Technical Problem

In the prior art, the erosion of slope-to-ladder erosion has been effectively managed, resulting in the damage of terraced ridges and the formation of erosion ditches, affecting the long-term benefits of terraced fields.

Method used

By obtaining the surface elevation data of the area where the slope is to be changed, a simulated water erosion model is used to predict the development location of the erosion ditch, and an erosion ditch management plan is laid when designing terraces, including trimming the bottom of the ditch, laying holed threaded pipes and straw bales, and laying composite seepage wells.

Benefits of technology

Effectively prevent and repair erosion ditches, prevent the damage of terraced ridges, extend the service life of terraced fields, and improve the stability and efficiency of slope-to-side terraced fields.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120145628A_ABST
    Figure CN120145628A_ABST
Patent Text Reader

Abstract

The invention discloses a slope-to-terrace erosion gully treatment method and device, computer equipment and a storage medium, and the method comprises the steps: obtaining the surface elevation data of a to-be-slope-to-terrace region, and obtaining first topographic data; simulating a runoff path and a runoff depth of a terrain corresponding to the first terrain data under a rainstorm condition by adopting a preset water erosion simulation model, and predicting a development site of the erosion gully; and laying an erosion gully treatment scheme for the development site. The method comprises the following steps: acquiring first topographic data of a to-be-changed-to-terrace area, simulating rainstorm weather for the first topographic data by using a preset water erosion simulation model, scouring the first topographic data to form a runoff path and a runoff depth, further predicting that erosion gullies are possibly formed at positions, and then arranging erosion treatment schemes for the positions, the problem that the erosion gully is not effectively treated in the prior art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of agricultural cultivated land slope-to-terrace transformation, and particularly to a method and device for treating erosion ditches in slope-to-terrace transformation, a computer device, and a storage medium. Background Art

[0002] The slope-to-terrace technology has effectively curbed soil erosion in the short term. However, the construction of terraces reshapes the terrain and changes the original runoff concentration path. Runoff is likely to converge at the terrace ridge and form concentrated flow at a relatively low-lying area. Under the long-term scouring of runoff, it is extremely easy to cause damage to the terrace ridge and further form erosion ditches, resulting in the failure of the terrace function. Therefore, when building terraces, how to prevent the formation of ditches is an important issue to be considered. In addition, for the erosion ditches formed after the terraces have been built, how to repair the damaged cultivated land is another problem. Summary of the Invention

[0003] In view of this, the present invention provides a method and device for treating erosion ditches in slope-to-terrace transformation, a computer device, and a storage medium, which are used to solve the problem that erosion ditches are not effectively treated in the prior art.

[0004] To achieve one or part or all of the above purposes or other purposes, the present invention proposes a method for treating erosion ditches in slope-to-terrace transformation, and the method includes:

[0005] Obtain the surface elevation data of the area to be transformed from slope to terrace to obtain the first terrain data;

[0006] Use a preset simulated water erosion model to simulate the runoff path and runoff depth of the terrain corresponding to the first terrain data under rainstorm conditions, and predict the development locations of erosion ditches;

[0007] Layout an erosion ditch treatment plan for the development locations.

[0008] Further, in the step of laying out an erosion ditch treatment plan for the development locations, it includes:

[0009] Layout an erosion ditch treatment plan for the development locations while designing the area to be transformed from slope to terrace into terraces.

[0010] Further, in the step of laying out an erosion ditch treatment plan for the development locations, it includes:

[0011] After the area to be transformed from slope to terrace is designed into terraces, obtain the rainstorm conditions in the area where the terraces are located;

[0012] If there is a rainstorm in the area where the terraces are located, monitor the terraces after the rainstorm;

[0013] Based on the monitored terrace data, determine whether the development site has developed into a gully or has a tendency to develop into a gully;

[0014] If so, mark the development site to obtain the first site to be treated;

[0015] Layout an erosion gully treatment plan for the first site to be treated.

[0016] Further, after the step of obtaining the rainstorm situation in the area where the terrace is located, it includes:

[0017] If the duration of no rainstorm in the area where the terrace is located is greater than the preset duration, trigger an event to monitor the terrace;

[0018] Based on the monitored terrace data, determine whether the development site has developed into a gully or has a tendency to develop into a gully;

[0019] If so, mark the development site to obtain the second site to be treated;

[0020] Layout an erosion gully treatment plan for the second site to be treated.

[0021] Further, the erosion gully treatment plan includes:

[0022] Trim the gully bottom into a rectangular shape, with the trimming depth being 50 - 100 cm, and the trimmed soil is placed on both sides of the gully bank;

[0023] Place multiple perforated threaded pipes with a diameter of 10 - 30 cm wrapped with geotextile along the gully bottom in the direction of the gully;

[0024] Stack straw bales in the gully and press them on the threaded pipes;

[0025] Spread the soil piled on both sides of the gully bank on the straw bales.

[0026] Further, the erosion gully treatment plan includes:

[0027] Layout a composite infiltration well at the junction of the gully and the terrace ridge.

[0028] Further, laying out the composite infiltration well includes:

[0029] Lay out two retaining walls with straw bales in the gully, and place wire mesh and geotextile inside the retaining walls. The distance between the two retaining walls is 1.5 - 3 m;

[0030] Place a perforated threaded vertical pipe wrapped with geotextile between the two retaining walls, and tie the upward pipe orifice with wire mesh and geotextile;

[0031] Fill the space between the two retaining walls with stones having a diameter of 10 - 20 cm up to 10 - 30 cm above the top of the perforated threaded vertical pipe;

[0032] Cover the wire mesh and geotextile, and then fill with coarse sand until it is flush with the terrace ridge.

[0033] The present invention also provides a device for treating erosion ditches in slope - to - terrace conversion, the device comprising:

[0034] An acquisition module, configured to acquire the surface elevation data of the area to be converted from slope to terrace, and obtain the first terrain data;

[0035] A prediction module, configured to use a preset simulated water erosion model to simulate the runoff path and runoff depth of the terrain corresponding to the first terrain data under rainstorm conditions, and predict the development locations of erosion ditches;

[0036] A treatment module, configured to arrange an erosion ditch treatment plan for the development locations.

[0037] The present invention also provides a computer device, including a memory and a processor, the memory storing a computer program, wherein when the processor executes the computer program, the steps of the method described in any one of the above are implemented.

[0038] The present invention also provides a computer - readable storage medium, having a computer program stored thereon, wherein when the computer program is executed by a processor, the steps of the method described in any one of the above are implemented.

[0039] Implementing the embodiments of the present invention will have the following beneficial effects:

[0040] After adopting the above - mentioned method, device, computer device and storage medium for treating erosion ditches in slope - to - terrace conversion, the first terrain data of the area to be converted from slope to terrace is acquired, and the first terrain data is simulated by a preset simulated water erosion model under rainstorm weather for scouring, forming a runoff path and runoff depth, thereby predicting those locations where erosion ditches may be formed, and then arranging an erosion treatment plan for these locations, solving the problem that erosion ditches are not effectively treated in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the following drawings are only some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.

[0042] Among them:

[0043] Figure 1Flow chart of the treatment method for erosion ditches in slope conversion to terraced fields in an embodiment

[0044] Figure 2 Functional module diagram of the treatment device for erosion ditches in slope conversion to terraced fields in an embodiment

[0045] Figure 3 Structural schematic block diagram of a computer device in an embodiment Specific implementation manners

[0046] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.

[0047] As Figure 1 shown, an embodiment of the present invention discloses a treatment method for erosion ditches in slope conversion to terraced fields, and the method includes the following steps:

[0048] Step S101: Obtain the surface elevation data of the area to be converted from slope to terraced fields to obtain the first terrain data.

[0049] Use a drone to obtain the high-precision surface elevation data of the area to be converted from slope to terraced fields.

[0050] Step S102: Use a preset simulated water erosion model to simulate the runoff path and runoff depth of the terrain corresponding to the first terrain data under rainstorm conditions, and predict the development locations of erosion ditches.

[0051] Based on the terrain data, use the SIMulated water erosion model to simulate the runoff path and runoff depth in the area under rainstorm conditions, and judge the possible development locations of erosion ditches.

[0052] Step S103: Layout an erosion ditch treatment plan for the development locations.

[0053] When designing terraced fields, according to needs, layout an erosion ditch treatment plan for the positions where erosion ditches may be formed.

[0054] Obtain the first terrain data of the area to be converted from slope to terraced fields, use a preset simulated water erosion model to simulate the scouring of the first terrain data by rainstorm weather to form a runoff path and runoff depth, and then predict the locations where erosion ditches may be formed. After that, layout an erosion treatment plan for these locations to solve the problem that erosion ditches are not effectively treated in the prior art.

[0055] In this embodiment, in step S103, it includes:

[0056] While designing the area to be terraced into terraced fields, erosion gully control plans are arranged for the development sites.

[0057] In this plan, when designing the terraced fields, erosion gully control plans are arranged for all development sites.

[0058] In some embodiments, in step S103, it includes:

[0059] After designing the area to be terraced into terraced fields, obtain the rainstorm conditions in the area where the terraced fields are located;

[0060] If there is a rainstorm in the area where the terraced fields are located, then monitor the terraced fields after the rainstorm;

[0061] According to the monitored terraced field data, judge whether the development site has developed into a gully or has a tendency to develop into a gully;

[0062] If so, mark the development site to obtain the first site to be treated;

[0063] Arrange an erosion gully control plan for the first site to be treated.

[0064] In this plan, erosion gully control plans are not arranged for all development sites. Instead, after designing the terraced fields and after the exposure, monitor the terraced fields to judge whether the development points have developed into gullies or have a tendency to develop into gullies, and arrange erosion gully control plans for these development points.

[0065] In some embodiments, after the step of obtaining the rainstorm conditions in the area where the terraced fields are located, it includes:

[0066] If the duration without rainstorm in the area where the terraced fields are located is greater than the preset duration, then trigger the event of monitoring the terraced fields;

[0067] According to the monitored terraced field data, judge whether the development site has developed into a gully or has a tendency to develop into a gully;

[0068] If so, mark the development site to obtain the second site to be treated;

[0069] Arrange an erosion gully control plan for the second site to be treated.

[0070] If the terraced fields do not have a rainstorm for more than the preset duration, then it is also necessary to monitor the terraced fields. Specifically, the preset duration is 3 months. Monitor the terraced fields to judge whether the development points have developed into gullies or have a tendency to develop into gullies, and arrange erosion gully control plans for these development points.

[0071] In some embodiments, after the step of designing terraced fields in the area to be terraced and arranging an erosion gully treatment plan for the development site, the following steps are included:

[0072] After a preset first time period, monitor the terraced fields;

[0073] Based on the monitored terraced field data, determine whether the development site has developed into a gully or has a tendency to develop into a gully;

[0074] If so, mark the development site to obtain a third site to be treated;

[0075] Redesign an erosion gully treatment plan for the third site to be treated.

[0076] Although an erosion gully treatment plan has been arranged for the development site, there may be a situation of failure. Therefore, it is necessary to further monitor whether the erosion gully treatment plan arranged at the development point fails. If it fails, it needs to be redesigned.

[0077] Specifically, the preset first time period is 12 months.

[0078] In this embodiment, the erosion gully treatment plan includes:

[0079] Trim the gully bottom into a rectangular shape, with a trimming depth of 50 - 100 cm, and place the trimmed soil on both sides of the gully bank;

[0080] Place multiple perforated threaded pipes with a diameter of 10 - 30 cm wrapped with geotextiles along the gully channel direction at the gully bottom;

[0081] Stack straw bales in the gully channel and press them on the threaded pipes;

[0082] Spread the soil piled on both sides of the gully bank on the straw bales.

[0083] For the bottom and slopes of the gully, first use an excavator to trim the bottom of the gully into a roughly rectangular shape with a trimming depth of about 50 - 100 cm. The excavated soil is placed on both sides of the gully bank. After wrapping the geotextile around the perforated threaded pipe with a diameter of 20 cm, place it along the gully channel at the bottom of the gully (the number of threaded pipes laid: determine the water infiltration rate of the soil and the infiltration rate of the infiltration well, and calculate according to the storm statistical data of the region and the runoff depth at the confluence combined with the hydrological model). Then stack the packed square or cylindrical straw bales (density > 230 kg / m3) in the gully channel, pressing them on top of the threaded pipe. The stacking height depends on the actual gully channel. After stacking, spread the soil piled on both sides on top of the straw. The soil layer thickness can be about 50 cm. The vertical distance from the bottom of the gully after covering the soil to the gully bank should be kept at 1.5 m. In this way, the originally steep gully bank slope length becomes shorter, the gully bank is more stable, and the excess soil is spread on both sides of the gully slope, reducing the slope of the gully bank (gully slope) to below 35° further, so as to achieve the purpose of stabilizing the gully bank without destroying the cultivated land by cutting both sides of the gully bank.

[0084] In this embodiment, the erosion gully treatment plan includes:

[0085] Install a composite infiltration well at the junction of the gully channel and the terrace ridge.

[0086] Install a composite infiltration well at the junction of the gully channel and the terrace ridge. This is the main place where the runoff converges. It is necessary to install an infiltration well to accelerate the infiltration speed of the runoff. It should be noted that the height of the infiltration well should be flush with or slightly higher than the terrace ridge, which can effectively intercept the runoff, extend the infiltration time of the runoff, and increase the infiltration volume.

[0087] Furthermore, the installation of the composite infiltration well includes:

[0088] Install two retaining walls with straw bales in the gully channel, and place wire mesh and geotextile inside the retaining walls. The distance between the two retaining walls is 1.5 - 3 m;

[0089] Place a perforated threaded vertical pipe wrapped with geotextile between the two retaining walls, and tie the upward pipe orifice with wire mesh and geotextile;

[0090] Fill the space between the two retaining walls with stones with a diameter of 10 - 20 cm to a height of 10 - 30 cm from the top of the perforated threaded vertical pipe;

[0091] Cover the wire mesh and geotextile, and then fill with coarse sand until it is flush with the terrace ridge.

[0092] The specific method for arranging infiltration wells is as follows: In the cross-section of the gully, two retaining walls are first arranged with straw bales at the upper and lower parts respectively. The inner distance between the retaining walls is about 2m. Then, wire meshes and geotextiles are placed, and a threaded pipe with holes wrapped with geotextile is put in (at the upward opening of the vertical pipe, it is necessary to tie it with wire meshes and geotextiles to prevent sediment and stones from falling into it, causing blockage and resulting in the failure of the vertical pipe). Stones with a diameter of about 15cm are filled to about 20cm away from the top, the wire meshes and geotextiles are closed, and then coarse sand is filled in the top 20cm to prevent the plowshare from being damaged during tillage. After all the work is completed, the infiltration well is flush with the terrace ridge. The runoff on both sides of the ridge enters the threaded pipe after infiltrating through the coarse sand layer and straw layer, and is discharged from the gully in the form of subsurface runoff, avoiding scouring and erosion caused by flowing on the ground surface.

[0093] As Figure 2 shown, the present invention also proposes a treatment device 1 for slope-to-terrace erosion gullies. The device 1 includes an acquisition module 11, a prediction module 12, and a treatment module 13.

[0094] The acquisition module 11 is used to acquire the surface elevation data of the area to be slope-to-terraced to obtain the first topographic data.

[0095] The high-precision surface elevation data of the area to be slope-to-terraced is acquired by using an unmanned aerial vehicle.

[0096] The prediction module 12 is used to simulate the runoff path and runoff depth of the terrain corresponding to the first topographic data under rainstorm conditions by using a preset simulated water erosion model, and predict the development locations of erosion gullies.

[0097] Based on the topographic data, the runoff path and runoff depth in the region under rainstorm conditions are simulated by using the SIMulated water erosion model to judge the possible development locations of erosion gullies.

[0098] The treatment module 13 is used to arrange an erosion gully treatment plan for the development locations.

[0099] When designing terraces, according to needs, an erosion gully treatment plan is arranged for the positions where erosion gullies may be formed.

[0100] The first topographic data of the area to be slope-to-terraced is acquired, and the first topographic data is simulated by using a preset simulated water erosion model under rainstorm weather for scouring to form a runoff path and runoff depth, and then the locations where erosion gullies may be formed are predicted. After that, an erosion treatment plan is arranged for these locations to solve the problem that erosion gullies are not effectively treated in the prior art.

[0101] In this embodiment, the treatment module 13 includes:

[0102] The first sub-governance module is used to arrange an erosion ditch governance plan for the development site while designing the area to be terraced into terraced fields.

[0103] In this plan, when designing terraced fields, an erosion ditch governance plan is arranged for each development site.

[0104] In some embodiments, the governance module 13 includes:

[0105] The first sub-acquisition module is used to obtain the heavy rain situation in the area where the terraced fields are located after the area to be terraced is designed into terraced fields;

[0106] The first sub-monitoring module is used to monitor the terraced fields after the heavy rain if there is heavy rain in the area where the terraced fields are located;

[0107] The first sub-judgment module is used to judge whether the development site has developed into a gully or has a tendency to develop into a gully according to the monitored terraced field data;

[0108] The first sub-marking module is used to mark the development site if so, to obtain the first site to be governed;

[0109] The second sub-governance module is used to arrange an erosion ditch governance plan for the first site to be governed.

[0110] In this plan, an erosion ditch governance plan is not arranged for all development sites. Instead, after designing the terraced fields and after the exposure, the terraced fields are monitored to judge whether the development points have developed into gullies or have a tendency to develop into gullies, and an erosion ditch governance plan is arranged for these development points.

[0111] In some embodiments, the device 1 includes:

[0112] The first sub-trigger module is used to trigger an event of monitoring the terraced fields if the duration when there is no heavy rain in the area where the terraced fields are located is greater than a preset duration;

[0113] The second sub-judgment module is used to judge whether the development site has developed into a gully or has a tendency to develop into a gully according to the monitored terraced field data;

[0114] The second sub-marking module is used to mark the development site if so, to obtain the second site to be governed;

[0115] The third sub-governance module is used to arrange an erosion ditch governance plan for the second site to be governed.

[0116] If the terraces do not have heavy rain for a preset period of time, they also need to be monitored. Specifically, the preset period is 3 months. The terraces are monitored to determine whether the development points have developed into gullies or have the tendency to develop into gullies, and gully erosion control plans are deployed for these development points.

[0117] In some embodiments, the apparatus 1 comprises:

[0118] A second sub-monitoring module is used to monitor the terraced field after a preset first time period;

[0119] The third sub-judgment module is used to judge whether the development site has developed into a ditch or has a tendency to develop into a ditch according to the monitored terrace data;

[0120] A third sub-marking module is used for marking the development site to obtain a third site to be managed;

[0121] The fourth sub-management module is used to re-arrange the gully erosion management plan for the third location to be managed.

[0122] Although gully erosion control schemes have been deployed at the development sites, there may be cases where the schemes fail. Therefore, it is necessary to further monitor whether the gully erosion control schemes deployed at the development sites fail. If they fail, they need to be re-deployed.

[0123] Specifically, the first period is preset to be 12 months.

[0124] In this embodiment, the gully erosion control scheme includes:

[0125] The ditch bottom is trimmed into a rectangular shape with a trimming depth of 50-100cm, and the trimmed soil is placed on the ditch banks on both sides;

[0126] Wrap multiple threaded pipes with holes of 10-30cm in diameter with geotextiles and place them at the bottom of the ditch along the direction of the ditch;

[0127] Stack the straw bales in the trench and press them on the threaded pipes;

[0128] Spread the soil piled on both sides of the ditch evenly on the straw bales.

[0129] For the bottom and slopes of the gully, first use an excavator to trim the gully bottom into a roughly rectangular shape with a trimming depth of about 50 - 100 cm. The excavated soil is placed on both sides of the gully bank. After wrapping the geotextile around the perforated threaded pipe with a diameter of 20 cm, place it along the gully channel direction at the gully bottom (the number of threaded pipes laid: measure the water infiltration rate of the soil and the infiltration rate of the infiltration well, and calculate according to the storm statistical data of the region and the runoff depth at the confluence combined with the hydrological model). Then stack the packed square or cylindrical straw bales (density > 230 kg / m³) in the gully channel, pressing them on top of the threaded pipe. The stacking height depends on the actual gully channel. After stacking, spread the soil piled on both sides on top of the straw. The soil layer thickness can be about 50 cm. The vertical distance from the covered gully bottom to the gully bank should be kept at 1.5 m. In this way, the originally steep gully bank slope length becomes shorter, the gully bank is more stable, and the excess soil is spread on both sides of the gully slope, reducing the slope of the gully bank (gully slope) to below 35° further, so as to achieve the purpose of stabilizing the gully bank without cutting the two sides of the gully bank and damaging the cultivated land.

[0130] In this embodiment, the erosion gully treatment plan includes:

[0131] Layout composite infiltration wells at the junction of the gully channel and the terrace ridge.

[0132] Layout composite infiltration wells at the junction of the gully channel and the terrace ridge. This is the main place where runoff converges. It is necessary to layout infiltration wells to accelerate the infiltration speed of runoff. It should be noted that the height of the infiltration well should be flush with or slightly higher than the terrace ridge, which can effectively intercept runoff, extend the infiltration time of runoff, and increase the infiltration volume.

[0133] Further, the layout of the composite infiltration well includes:

[0134] Layout two retaining walls with straw bales in the gully channel, and place wire mesh and geotextile inside the retaining walls. The distance between the two retaining walls is 1.5 - 3 m;

[0135] Place a perforated threaded vertical pipe wrapped with geotextile between the two retaining walls, and tie the upward pipe orifice with wire mesh and geotextile;

[0136] Fill the space between the two retaining walls with stones with a diameter of 10 - 20 cm to a height of 10 - 30 cm from the top of the perforated threaded vertical pipe;

[0137] Cover the wire mesh and geotextile, and then fill with coarse sand until it is flush with the terrace ridge.

[0138] The specific method for arranging infiltration wells is as follows: In the cross-section of the ditch, two retaining walls are first arranged with straw bales at the upper and lower parts respectively. The distance between the retaining walls is about 2 m. Then, wire meshes and geotextiles are placed. A threaded pipe with holes wrapped with geotextiles is put in (at the upward opening of the vertical pipe, it is necessary to tie it with wire meshes and geotextiles to prevent sediment and stones from falling into it, causing blockage and resulting in the failure of the vertical pipe). Stones with a diameter of about 15 cm are filled to about 20 cm from the top. The wire meshes and geotextiles are closed. Then, coarse sand is filled in the top 20 cm to prevent the plowshare from being damaged during tillage. After all the work is completed, the infiltration well is flush with the terrace ridge. The runoff on both sides of the ridge enters the threaded pipe after infiltration through the coarse sand layer and straw layer, and is discharged from the ditch in the form of subsurface runoff, avoiding scouring and erosion caused by surface flow.

[0139] As Figure 3 shown, in an embodiment of the present invention, a computer device is further provided. The computer device can be a server, and its internal structure can be as Figure 3 shown. The computer device includes a processor, a memory, a network interface, and a database connected through a system bus. Among them, the processor of the computer design is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as models of the treatment method for erosion ditches in slope-to-terrace conversion. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, it realizes the treatment method for erosion ditches in slope-to-terrace conversion.

[0140] The steps for the above-mentioned processor to execute the treatment method for erosion ditches in slope-to-terrace conversion: Obtain the surface elevation data of the area to be converted from slope to terrace to obtain the first terrain data;

[0141] Adopt a preset simulated water erosion model to simulate the runoff path and runoff depth of the terrain corresponding to the first terrain data under rainstorm conditions, and predict the development locations of erosion ditches;

[0142] Arrange an erosion ditch treatment plan for the development locations.

[0143] In one embodiment, in the step of arranging an erosion ditch treatment plan for the development locations, it includes:

[0144] Arrange an erosion ditch treatment plan for the development locations while designing the area to be converted from slope to terrace into terraces.

[0145] In one embodiment, in the step of arranging an erosion ditch treatment plan for the development locations, it includes:

[0146] After the area to be terraced is designed into terraced fields, obtain the heavy rain situation in the area where the terraced fields are located;

[0147] If there is heavy rain in the area where the terraced fields are located, monitor the terraced fields after the heavy rain;

[0148] According to the monitored terraced field data, judge whether the development location has developed into a gully or has a tendency to develop into a gully;

[0149] If so, mark the development location to obtain the first location to be treated;

[0150] Layout an erosion gully treatment plan for the first location to be treated.

[0151] In one embodiment, after the step of obtaining the heavy rain situation in the area where the terraced fields are located, it includes:

[0152] If the duration without heavy rain in the area where the terraced fields are located is greater than the preset duration, trigger an event to monitor the terraced fields;

[0153] According to the monitored terraced field data, judge whether the development location has developed into a gully or has a tendency to develop into a gully;

[0154] If so, mark the development location to obtain the second location to be treated;

[0155] Layout an erosion gully treatment plan for the second location to be treated.

[0156] In one embodiment, the erosion gully treatment plan includes:

[0157] Trim the gully bottom into a rectangular shape, where the trimming depth is 50 - 100 cm, and the trimmed soil is placed on both sides of the gully bank;

[0158] Place multiple perforated threaded pipes with a diameter of 10 - 30 cm wrapped with geotextile along the gully channel direction at the gully bottom;

[0159] Stack straw bales in the gully channel and press them on the threaded pipes;

[0160] Spread the soil piled on both sides of the gully bank on the straw bales.

[0161] In one embodiment, the erosion gully treatment plan includes:

[0162] Layout a composite infiltration well at the junction of the gully channel and the terraced field ridge.

[0163] In one embodiment, laying out a composite infiltration well includes:

[0164] Two retaining walls are arranged in the channel with straw bales, and wire mesh and geotextile are placed inside the retaining walls. The distance between the two retaining walls is 1.5 - 3 m;

[0165] A perforated threaded vertical pipe wrapped with geotextile is placed between the two retaining walls, and the upward pipe orifice is tied with wire mesh and geotextile;

[0166] The space between the two retaining walls is filled with stones with a diameter of 10 - 20 cm up to 10 - 30 cm above the top of the perforated threaded vertical pipe;

[0167] The wire mesh and geotextile are covered, and then coarse sand is filled until it is flush with the terrace ridge.

[0168] Obtain the first terrain data of the area to be terraced on slopes. Use a preset simulated water erosion model to simulate the erosion of the first terrain data under heavy rain weather to form runoff paths and runoff depths, and then predict those positions where erosion ditches may form. After that, arrange erosion control plans for these positions to solve the problem that erosion ditches are not effectively controlled in the prior art.

[0169] Those skilled in the art can understand that Figure 3 The structure shown in

[0170] An embodiment of the present invention further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, it realizes the method for controlling erosion ditches in terracing on slopes, specifically: obtaining the surface elevation data of the area to be terraced on slopes to obtain the first terrain data;

[0171] Using a preset simulated water erosion model to simulate the runoff paths and runoff depths of the terrain corresponding to the first terrain data under heavy rain conditions to predict the development locations of erosion ditches;

[0172] Arrange erosion control plans for the development locations.

[0173] In one embodiment, in the step of arranging erosion control plans for the development locations, it includes:

[0174] Arranging erosion control plans for the development locations while designing the area to be terraced on slopes into terraces.

[0175] In one embodiment, in the step of arranging erosion control plans for the development locations, it includes:

[0176] After designing the area to be terraced on slopes into terraces, obtain the heavy rain conditions in the area where the terraces are located;

[0177] If there is a rainstorm in the area where the terraced fields are located, the terraced fields shall be monitored after the rainstorm;

[0178] According to the monitored terraced field data, determine whether the development location has developed into a gully or has a tendency to develop into a gully;

[0179] If so, mark the development location to obtain the first location to be treated;

[0180] Layout an erosion gully treatment plan for the first location to be treated.

[0181] In one embodiment, after the step of obtaining the rainstorm situation in the area where the terraced fields are located, it includes:

[0182] If the duration without a rainstorm in the area where the terraced fields are located is greater than a preset duration, trigger an event to monitor the terraced fields;

[0183] According to the monitored terraced field data, determine whether the development location has developed into a gully or has a tendency to develop into a gully;

[0184] If so, mark the development location to obtain the second location to be treated;

[0185] Layout an erosion gully treatment plan for the second location to be treated.

[0186] In one embodiment, the erosion gully treatment plan includes:

[0187] Trim the gully bottom into a rectangular shape, where the trimming depth is 50 - 100 cm, and the trimmed soil is placed on both sides of the gully bank;

[0188] Place multiple perforated threaded pipes with a diameter of 10 - 30 cm wrapped with geotextile along the gully channel direction at the gully bottom;

[0189] Stack straw bales in the gully channel and press them on the threaded pipes;

[0190] Spread the soil piled on both sides of the gully bank on the straw bales.

[0191] In one embodiment, the erosion gully treatment plan includes:

[0192] Layout a composite infiltration well at the junction of the gully channel and the terraced field ridge.

[0193] In one embodiment, laying out a composite infiltration well includes:

[0194] Lay out two retaining walls with straw bales in the gully channel, and place wire mesh and geotextile inside the retaining walls, where the distance between the two retaining walls is 1.5 - 3 m;

[0195] Place a perforated threaded vertical pipe wrapped with geotextile between two retaining walls, and tie the upward-facing pipe orifice with wire mesh and geotextile.

[0196] Fill the space between the two retaining walls with stones having a diameter of 10 - 20 cm up to 10 - 30 cm from the top of the perforated threaded vertical pipe.

[0197] Cover the wire mesh and geotextile, and then fill with coarse sand until it is flush with the terrace ridge.

[0198] Obtain the first topographic data of the area to be terraced, use a preset simulated water erosion model to simulate the scouring of this first topographic data by heavy rain weather, form runoff paths and runoff depths, and then predict which positions may form erosion gullies. After that, arrange erosion control plans for these positions to solve the problem that erosion gullies are not effectively treated in the prior art.

[0199] Those of ordinary skill in the art can understand that all or part of the processes in the methods of the above embodiments can be completed by instructing relevant hardware through a computer program. The computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above methods. Among them, any reference to a memory, storage, database, or other medium provided by the present invention and used in the embodiments can include non-volatile and / or volatile memories. Non-volatile memories can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM), or flash memory. Volatile memories can include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (SSRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), Rambus direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and Rambus dynamic RAM (RDRAM), etc.

[0200] The above-disclosed are only the preferred embodiments of the present invention. Of course, the scope of the rights of the present invention cannot be limited thereby. Therefore, equivalent changes made according to the claims of the present invention still fall within the scope covered by the present invention.

Claims

1. A method for treating erosion gullies by converting slopes into terraces, characterized in that: The method comprises: Acquire surface elevation data of the area to be converted from slope to terrace to obtain first terrain data; Using a preset simulated water erosion model to simulate the runoff path and runoff depth under heavy rain conditions for the terrain corresponding to the first terrain data, and predicting the development location of the erosion gully; Arrange gully control schemes for the development sites.

2. The method for treating erosion gullies by converting slopes into terraces according to claim 1, characterized in that: The step of setting up a gully erosion control scheme for the development site includes: While the area to be converted into terraces is designed as terraces, an erosion gully control plan is arranged at the development site.

3. The method for treating erosion gullies by converting slopes into terraces according to claim 1, characterized in that: The step of setting up a gully erosion control scheme for the development site includes: After the area to be converted from slope to terrace is designed as terraces, obtaining the rainstorm conditions in the area where the terraces are located; If there is heavy rain in the area where the terraces are located, monitoring the terraces after the heavy rain; According to the monitored terrace data, determine whether the development site has developed into a channel or has a tendency to develop into a channel; If yes, the development site is marked to obtain a first site to be managed; An erosion gully control plan is deployed for the first location to be controlled.

4. The method for treating erosion gullies by converting slopes into terraces according to claim 3, characterized in that: After the step of obtaining the rainstorm conditions in the area where the terraced fields are located, the method further comprises: If the duration of no rainstorm in the area where the terrace is located is longer than the preset duration, an event of monitoring the terrace is triggered; According to the monitored terrace data, determine whether the development site has developed into a channel or has a tendency to develop into a channel; If yes, the development site is marked to obtain a second site to be managed; An erosion gully control plan is deployed for the second location to be controlled.

5. The method for treating erosion gullies by converting slopes into terraces according to claim 1, characterized in that: The gully erosion control program includes: The ditch bottom is trimmed into a rectangular shape with a trimming depth of 50-100cm, and the trimmed soil is placed on the ditch banks on both sides; Wrap multiple threaded pipes with holes of 10-30cm in diameter with geotextiles and place them at the bottom of the ditch along the direction of the ditch; Stack the straw bales in the trench and press them on the threaded pipes; Spread the soil piled on both sides of the ditch evenly on the straw bales.

6. The method for treating erosion gullies by converting slopes into terraces according to claim 1, characterized in that: The gully erosion control program includes: Composite infiltration wells are laid at the junction of ditches and terrace ridges.

7. The method for treating erosion gullies by converting slopes into terraces according to claim 6, characterized in that: The layout of composite infiltration wells includes: Two retaining walls are built in the ditch with straw bales, and wire mesh and geotextile are placed inside the retaining walls, with the spacing between the two retaining walls being 1.5-3m; A threaded vertical pipe with holes wrapped with geotextile is placed between two retaining walls, and the upward pipe opening is tied with wire mesh and geotextile; Fill the space between the two retaining walls with stones with a diameter of 10-20 cm to 10-30 cm from the top of the threaded vertical pipe with holes; Cover with wire mesh and geotextile, then fill with coarse sand until it is level with the terrace ridge.

8. A device for treating erosion gullies by converting slopes into terraces, characterized in that: The device comprises: An acquisition module is used to acquire the surface elevation data of the area to be converted from slope to terrace, and obtain first terrain data; A prediction module, used to simulate the runoff path and runoff depth under heavy rain conditions for the terrain corresponding to the first terrain data using a preset simulated water erosion model, and predict the development location of the erosion gully; A management module is used to deploy an erosion gully management plan for the development site.

9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

Citation Information

Cited By

  • Intelligent planning method for water and soil conservation measures of slope cropland

    CN121353012A

  • An intelligent planning method for water and soil conservation measures of slope farmland

    CN121353012B