Improved structure and method of launching barge

By installing a detachable watertight steel structure temporary floating box on both sides of the upper side of the landing barge, the problems of single use and low utilization rate of the landing barge are solved, and the overall stability and utilization rate of the landing barge are achieved, so that it has the functions of ship launching and repairing, and avoiding idle and waste of assets.

CN120191487APending Publication Date: 2025-06-24GUANGDONG COSCO SHIPPING HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510256473.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-05
Publication Date
2025-06-24

AI Technical Summary

Technical Problem

The existing water barrier function has a single purpose, low utilization rate, and is prone to idleness and waste of resources.

Method used

Temporary floating boxes are set up on both sides above the main body of the floating box of the drain barge. The temporary floating boxes are watertight steel structure boxes with a detachable structure to increase the overall buoyancy and stability of the drain barge, forming a floating dock type that can be used for launching and repairing small ships.

Benefits of technology

It improves the overall stability and utilization rate of the launching barge, so that it also has the functions of ship launching and repairing, avoids idle assets and meets the full-load production needs of the shipyard.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120191487A_ABST
    Figure CN120191487A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of ship engineering, and particularly relates to a launching barge improvement structure and method.The launching barge improvement structure comprises a launching barge body, the launching barge body comprises a buoyancy tank body and four towers arranged at the four ends of the buoyancy tank body respectively, the launching barge body further comprises temporary buoyancy tanks, and the temporary buoyancy tanks are installed on the two sides of the upper portion of the buoyancy tank body respectively and located between the head tower and the tail tower; the temporary floating box is a watertight steel structure box body. Due to the fact that the buoyancy tank body provides buoyancy and the four towers located at the four ends provide overall stability, the basic in-grade standard requirement of design and construction of the floating dock is met, the temporary buoyancy tank is additionally arranged so that the launching barge can become a non-self-propelled floating dock ship type, the improved launching barge can have the ship launching and repairing functions at the same time, the utilization rate of the launching barge is increased, and the launching barge is suitable for being popularized and used. Idle waste of assets is avoided, and the full-load production requirement of a shipyard is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of ship engineering, and particularly relates to an improved structure and method for a launching barge. Background Art

[0002] The hull of the launching barge consists of a large floating box main body and four towers respectively located at the four corners above the floating box main body (as Figure 1 shown), and devices such as a main ballast water pump, a mooring shore power connection box, and a measurement control operation device are also provided on the launching barge. The hull is of all-welded structure and can adopt two ways of longitudinal berthing or transverse berthing for the ship launching operation. When operating, the equipment on the ship takes the electricity provided by the shore motor as the main power source.

[0003] Among them, the floating box main body is a watertight box structure, which provides the main buoyancy and longitudinal strength for the launching barge. The four towers at the four ends provide the overall stability to ensure that when the ship enters and exits the launching barge, the mechanical parameters and strength such as the section modulus of the floating box main body structure meet the requirements. When the launching barge sinks and floats, the floating box main body can provide sufficient buoyancy, and the buoyancy is about the length * width * height (tons) of the floating box main body, which guarantees the safety of the launching barge's sinking and floating operation. When the launching barge dives, the floating box main body is submerged underwater. At this time, the overall stability of the launching barge is provided by the towers, which can ensure the stability safety during the diving operation of the launching barge.

[0004] When the width of the ship is less than the inner width between the front towers, it meets the width requirement for the ship to enter and exit longitudinally, and is applicable to the construction operation of non-overwidth ships entering and exiting the launching barge. When the width of the ship is greater than the inner width between the front towers but the length is less than the inner length between the head and tail towers of the launching barge, it can meet the overwidth requirement for the ship to enter and exit transversely, and is applicable to the construction operation of overwidth ships entering and exiting the launching barge transversely.

[0005] In shipbuilding and ship repair projects in shipyards, the generally designed launching barges are only used for the launching function of ships after construction on the land shipbuilding berth. Their functional uses are relatively single, and the underutilized ones will form idle asset equipment, resulting in waste of resources. Summary of the Invention

[0006] The purpose of the present invention is to provide an improved structure and method for a launching barge, so as to solve the problems of the existing launching barge having single functional uses, low utilization rate, and being prone to idleness resulting in waste of resources.

[0007] To achieve the above purpose, an improved structure for a launching barge provided by an embodiment of the present invention includes a launching barge body. The launching barge body includes a floating box main body and four towers respectively arranged at the four ends of the floating box main body, and further includes a temporary floating box. The temporary floating box is respectively installed on both sides above the floating box main body and is located in the middle of the head and tail towers; the temporary floating box is a watertight steel structure box.

[0008] Furthermore, the temporary floating caisson is a detachable structure.

[0009] Furthermore, the number of temporary floating caissons located in the middle of both sides of the floating caisson body can be multiple, and the number and combination form of the temporary floating caissons on both sides of the floating caisson body are the same.

[0010] Furthermore, multiple temporary floating caissons can be vertically stacked and installed to form a multi-layer temporary floating caisson structure.

[0011] Furthermore, multiple temporary floating caissons are horizontally arranged between the head and tail towers to form an independent non-continuous temporary floating caisson structure.

[0012] Furthermore, an upper-level passage is also provided. The upper-level passage is arranged above the temporary floating caisson and is connected to the head and tail towers on both sides of the temporary floating caisson at both ends.

[0013] Furthermore, a docking pier is detachably installed in the middle of the top surface of the floating caisson body, and the docking pier is symmetrically arranged from the middle to both sides.

[0014] An improvement method for a launching barge, including the above-mentioned improved structure of the launching barge, comprises the following steps:

[0015] S1. The launching barge docks at the shore, and the temporary floating caisson is installed in the middle of both sides of the floating caisson body to form a floating dock ship type that can be used for the launching and repair of small ships.

[0016] S2. The launching barge is flooded and submerged, the ship to be repaired is transported into the launching barge, the launching barge drains water and floats up out of the water surface, and the ship can be stabilized on the launching barge for repair work.

[0017] S3. After the ship repair is completed, the launching barge is reflooded and submerged, and the ship sails out of the launching barge by itself.

[0018] Furthermore, in step S1, the temporary floating caisson is a detachable structure.

[0019] Furthermore, in step S1, an upper-level passage is arranged between the head and tail towers and above the temporary floating caisson for connecting the head and tail towers.

[0020] One or more of the above technical solutions in the improved structure and method of the launching barge provided by the embodiments of the present invention have at least the following technical effects:

[0021] Temporary floating boxes are provided on both sides above the floating box body of the launching barge, which does not affect the launching function of the ship entering and leaving the launching barge. Moreover, the temporary floating boxes are similar in structure to the floating box body and are watertight steel structure boxes. Their structural form is simple and convenient for construction, but they can assist in increasing the overall displacement and overall buoyancy of the launching barge, improving the overall stability of the launching barge. The increased buoyancy value is the length * width * height (tons) of the temporary floating box, and it is ensured that the diving depth of the launching barge is less than the maximum sinking depth (the sum of the heights of the floating box body and the temporary floating box), providing a better stable environment for the actual floating and sinking operations of the launching barge, improving the use safety, and can be applied to the maintenance business of ships.

[0022] Since the floating box body provides buoyancy and the four towers at the four ends provide overall stability, meeting the requirements of the classification code for the design and construction of basic floating docks, the added temporary floating boxes make the launching barge into a non-self-propelled floating dock ship type, enabling the improved launching barge to have both the functions of ship launching and repair at the same time, improving the utilization rate of the launching barge, avoiding the idle waste of assets, and meeting the full-load production needs of the shipyard. Brief Description of the Drawings

[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following will briefly introduce the drawings required for use in the embodiments or the description of the prior art. Obviously, the following drawings are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can also be obtained based on these drawings.

[0024] Figure 1 It is a side view of the launching barge.

[0025] Figure 2 It is a side view of the improved structure of the launching barge provided by the embodiment of the present invention.

[0026] Figure 3 It is a top view of the improved structure of the launching barge provided by the embodiment of the present invention.

[0027] Figure 4 It is a cross-sectional view of the two side end towers in the improved structure of the launching barge provided by the embodiment of the present invention.

[0028] Figure 5 It is a cross-sectional view of the two side temporary floating boxes in the improved structure of the launching barge provided by the embodiment of the present invention.

[0029] In the figure, 100 is the launching barge body, 110 is the floating box body, and 120 is the tower;

[0030] 200 is the temporary floating box; 300 is the upper channel; 400 is the dock pier. Detailed Embodiments

[0031] Embodiments of the present invention will be described in detail below. Examples of the embodiments are shown in the accompanying drawings, where the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to explain the embodiments of the present invention and should not be construed as limiting the present invention.

[0032] In the description of the embodiments of the present invention, it should be understood that the orientation or positional relationships indicated by the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. are based on the orientation or positional relationships shown in the drawings, and are only for the convenience of describing the embodiments of the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention.

[0033] In addition, the terms "first" and "second" are only used for descriptive purposes and should not be construed as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, the features defined with "first" and "second" may explicitly or implicitly include one or more of such features. In the description of the embodiments of the present invention, the meaning of "a plurality" is two or more, unless otherwise specifically defined.

[0034] In the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "mounted", "connected", "coupled", "fixed", etc. should be understood in a broad sense. For example, it may be a fixed connection, a detachable connection, or integrated; it may be a mechanical connection or an electrical connection; it may be directly connected or indirectly connected through an intermediate medium, and it may be the internal communication of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present invention can be understood according to specific circumstances.

[0035] In an embodiment of the improved structure of the launching barge of the present invention, please refer to Figures 2 to 5 . The improved structure of the launching barge includes a launching barge body 100. The launching barge body 100 includes a floating box main body 110 and four towers 120 respectively arranged at the four ends of the floating box main body 110. It further includes a temporary floating box 200. The temporary floating boxes 200 are respectively installed on both sides above the floating box main body 100 and are located in the middle of the head and tail towers 120; the temporary floating box 200 is a watertight steel structure box.

[0036] Specifically, temporary floating boxes 200 are provided on both sides above the floating box main body 110 of the launching barge, which does not affect the launching function of the ship entering and leaving the launching barge 100. Moreover, the temporary floating box 200 is similar in structure to the floating box main body 110 and is a watertight steel structure box. Its structural form is simple and convenient for construction, but it can assist in increasing the overall displacement and overall buoyancy of the launching barge 100, improving the overall stability of the launching barge 100. The increased buoyancy value is the length * width * height (tons) of the temporary floating box 200, and it is ensured that the diving depth of the launching barge 100 is less than the maximum sinking depth (the sum of the heights of the floating box main body 110 and the temporary floating box 200), providing a better stable environment for the actual floating and sinking operation of the launching barge 100, improving the use safety, and can be applied to ship repair operations.

[0037] Since the floating box main body 110 provides buoyancy and the four towers 120 at the four ends provide overall stability, meeting the requirements of the classification code for the design and construction of basic floating docks, the added temporary floating box 200 enables the launching barge 100 to become a non-self-propelled floating dock ship type, improving the utilization rate of the launching barge 100, enabling the improved launching barge 100 to have both ship launching and repair functions at the same time, avoiding the idle waste of assets, and meeting the full-load production needs of the shipyard.

[0038] Furthermore, the temporary floating box 200 is a detachable structure. Specifically, when the width of the ultra-wide ship is greater than the inner width of the front tower 120 of the launching barge and the length is less than the net length between the front and rear towers 120, the temporary floating box 200 blocks the entry and exit of the ultra-wide ship. The temporary floating box 200 can be temporarily disassembled and lifted off, allowing the ultra-wide ship to enter and exit the launching barge 100 laterally, and then reinstalling the temporary floating box 200. The detachable temporary floating box 200 can be repeatedly installed and disassembled according to actual production needs, facilitating construction, meeting the high-efficiency construction needs at a low cost, and improving efficiency.

[0039] Furthermore, the number of temporary floating boxes 200 located in the middle of both sides of the floating box main body 110 can be multiple, and the number and combination form of the temporary floating boxes 200 on both sides of the floating box main body 110 are the same. Specifically, multiple temporary floating boxes 200 can assist in increasing more buoyancy values of the launching barge 100. The number and combination form of the temporary floating boxes 200 on both sides are the same, ensuring the overall stability of the launching barge 100, thereby improving the safety construction coefficient and improving the safety construction operation. Preferably, multiple temporary floating boxes 200 can be vertically stacked and installed to form a multi-layer temporary floating box structure. Or multiple temporary floating boxes 200 are horizontally arranged between the front and rear towers 120 to form an independent non-continuous temporary floating box structure. Among them, the number of temporary floating boxes 200 on one side is preferably 2, and the two combination forms can be installed and disassembled according to actual production needs.

[0040] Further, an upper channel 300 is also provided. The upper channel 300 is arranged above the temporary floating box 200 and is connected to the head and tail towers 120 on both sides of the temporary floating box 200 at both ends. Specifically, the upper channel 300 communicates with the head and tail towers 120 on both sides of the floating box main body 110 respectively, enabling the staff to safely pass through and perform construction operations on the upper channel 300 when the launching barge 100 conducts diving operations. This upper channel 300 adopts a conventional steel structure channel design.

[0041] Further, a dock pier 400 is detachably installed in the middle of the top surface of the floating box main body 110, and the dock pier 400 is symmetrically arranged from the middle to both sides. Specifically, the dock pier 400 is used to stably support the ships entering and leaving the launching barge 100, ensuring that the ships do not deform or displace during the maintenance or launching process. The detachable dock pier 400 enables the adjustment of the position distribution of the dock pier 400 on the floating box main body 110 according to the ship type and weight, ensuring uniform force on different ships. The dock pier 400 is in the form of a conventional steel pier structure.

[0042] In this embodiment, the floating box main body 110 is 95m long, 38.5m wide, and 5.4m high, the tower 120 is 12.5m long, 2.1 / 3.2m wide, and 13.6m high. One floating box main body 110 and four towers 120 form a launching barge 100 with a total height of 16.9m. The temporary floating box 200 is 1.8m wide, 17.5m long, and 7.5m high. The dock pier 400 is about 1.2m high. Two temporary floating boxes 200 are respectively arranged in the middle on both sides of the floating box main body 110 to increase the overall operation stability of the launching barge 100 during the diving and floating stages of the ship repair process, and can meet the functions of launching and repairing small ships below 5000 tons.

[0043] The improvement method of the launching barge in another embodiment of the present invention refers to Figures 2 to 5 and includes the above-mentioned improved structure of the launching barge, and comprises the following steps:

[0044] S1. The launching barge 100 docks at the shore, and the temporary floating box 200 is installed in the middle on both sides of the floating box main body 110 to form a floating dock ship type available for launching and repairing small ships; S2. The launching barge 100 is filled with water and dives, and the ship to be repaired is transported into the launching barge 100. The launching barge 100 drains water and floats out of the water surface, and the ship can be stably maintained on the launching barge 100. S3. After the ship repair is completed, the launching barge 100 is filled with water again and dives, and the ship sails out of the launching barge 100 by itself. In step S1, the temporary floating box 200 is of a detachable structure. In step S1, an upper channel 300 is arranged between the head and tail towers 120 and above the temporary floating box 110 for communicating the head and tail towers 120.

[0045] Specifically, temporary floating boxes 200 are additionally arranged in the middle on both sides of the floating box body 110 of the launching barge to form an overall structural form, effectively assisting in increasing the overall buoyancy and stability of the launching barge 100, and it can be improved into a floating dock to improve the single function of the launching barge 100, enabling it to meet the functions of ship launching and repair at the same time, improving the utilization rate of the launching barge 100, avoiding the idle waste of the shipyard's assets, and meeting the full-load production requirements of the shipyard. The temporary floating box 200 has a simple structure and is a detachable structure, which can be detachably lifted off and restored, facilitating construction and improving the ship repair efficiency. The upper channel 300 enables the staff to pass and carry out construction operations on the upper channel 300 when the launching barge 100 is diving.

[0046] The above are only the preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An improved structure of a launching barge, comprising a launching barge body, wherein the launching barge body comprises a pontoon body and four towers respectively arranged at four ends of the pontoon body, characterized in that: It also includes temporary pontoons, which are respectively installed on both sides above the pontoon body and located in the middle of the first and last towers; the temporary pontoons are watertight steel structure boxes.

2. The improved structure of launching barge according to claim 1, characterized in that: The temporary buoyancy tank is a detachable structure.

3. The improved structure of launching barge according to claim 1 is characterized in that: There may be multiple temporary pontoons respectively located in the middle of both sides of the pontoon body, and the number and combination of the temporary pontoons on both sides of the pontoon body are the same.

4. The improved structure of launching barge according to claim 3 is characterized in that: A plurality of the temporary pontoons may be vertically stacked and installed to form a multi-layer temporary pontoon structure.

5. The improved structure of launching barge according to claim 3 is characterized in that: A plurality of temporary pontoons are horizontally arranged between the fore and aft towers to form an independent non-continuous temporary pontoon structure.

6. The improved launching barge structure according to any one of claims 1 to 5, characterized in that: An upper passage is also provided, and the upper passage is arranged above the temporary floating box, and the two ends of the upper passage are respectively connected to the head and tail towers on both sides of the temporary floating box.

7. The improved structure of launching barge according to claim 1 is characterized in that: A dock is detachably mounted in the middle of the top surface of the buoyancy box body, and the dock is symmetrically arranged from the middle to both sides.

8. A method for improving a launching barge, comprising the improved launching barge structure according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1. The launching barge is docked at the shore, and the temporary pontoon is installed in the middle of both sides of the pontoon body to form a floating dock ship type that can be used for launching and repairing small ships; S2. The launching barge is filled with water and submerged, and the ship to be repaired is transported into the launching barge. The launching barge is drained and floats out of the water, and the ship can be stably repaired on the launching barge; S3. After the ship maintenance is completed, the launching barge is refilled with water and submerged, and the ship drives out of the launching barge by itself.

9. The method for improving launching barge according to claim 8, characterized in that: In step S1, the temporary buoyancy tank is a detachable structure.

10. The improved method for launching a barge according to claim 8, characterized in that: In step S1, an upper passage is provided between the bow and stern towers and above the temporary buoyancy box to connect the bow and stern towers.