Building full life cycle management platform and method based on BIM technology

By introducing a five-story building full life cycle management platform in the BIM system, the data island problem in traditional BIM systems is solved, seamless docking and efficient circulation of building project data is achieved, the scientific nature of engineering decisions is improved, and a solid data foundation is provided for the sustainable development of building projects.

CN120197823APending Publication Date: 2025-06-24CHINA HIGHWAY ENG CONSULTING GRP CO LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202510280845.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-11
Publication Date
2025-06-24

AI Technical Summary

Technical Problem

Traditional BIM systems have data island problems in building information management, resulting in low data connection efficiency in each stage, and frequent errors occur during information transmission, affecting the smooth progress of construction projects, especially in terms of dynamic cost prediction and real-time accounting of carbon emissions.

Method used

The building full life cycle management platform based on BIM technology is adopted. The platform includes five-layer structures: data acquisition layer, collaborative engine layer, intelligent analysis layer, decision support layer and blockchain evidence storage layer. The data interface that supports the MQTT protocol and has a transmission rate of ≥1Gbps works in concert with the algorithm to form a complete data processing and analysis chain.

Benefits of technology

It realizes seamless connection of data throughout the life cycle of the building, improves data circulation efficiency, reduces the error rate of information transmission, significantly improves the scientificity and rationality of engineering decisions, and provides a solid data foundation for the sustainable development of construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120197823A_ABST
    Figure CN120197823A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building informatization management, and discloses a building full life cycle management platform based on a BIM technology, which is characterized in that the building full life cycle management platform comprises a five-layer structure platform including a data acquisition layer, a collaborative engine layer, an intelligent analysis layer, a decision support layer and a block chain evidence storage layer; all the layers cooperatively work through a data interface and an algorithm which support an MQTT protocol and have the transmission rate larger than or equal to 1 Gbps, and a complete data processing and analysis chain is formed. According to the invention, by introducing the heterogeneous data fusion engine, seamless connection of the BIM model, the IoT sensor and the unmanned aerial vehicle point cloud data is realized, and a data basis is provided for building intelligent management; through a Dijkstra algorithm and a multi-dimensional weight formula, the scientificity and rationality of an engineering decision are improved; through a dynamic carbon accounting algorithm, the limitation of traditional static accounting is broken through, and comprehensive and accurate data support is provided for carbon footprint management of a project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of building information management, and specifically relates to a building full life cycle management platform and method based on BIM technology. Background Art

[0002] Traditional BIM systems have indeed achieved certain results in the field of building information management, providing strong technical support for the planning, design, construction and other stages of construction projects. However, the problem of data silos is still very prominent, the data connection between the various stages is inefficient, and the data flow is not smooth, which directly leads to frequent errors in the information transmission process, seriously affecting the smooth progress of construction projects. Although the existing technology has proposed the concept of multi-stage data integration, trying to break the data silos and achieve seamless data connection, there are still obvious deficiencies in practical applications, especially in dynamic cost forecasting and real-time accounting of carbon emissions. These deficiencies not only affect the accuracy of project management, but also restrict the sustainable development of the construction industry. Therefore, it is urgent to further improve and optimize the BIM system to solve these problems. Summary of the invention

[0003] The purpose of the present invention is to provide a building life cycle management platform and method based on BIM technology to solve the problems raised in the above background technology.

[0004] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a building life cycle management platform based on BIM technology, the building life cycle management platform includes a five-layer structure platform, including a data collection layer, a collaborative engine layer, an intelligent analysis layer, a decision support layer and a blockchain evidence layer; each layer works in coordination with the algorithm through a data interface supporting the MQTT protocol and with a transmission rate of ≥1Gbps, forming a complete data processing and analysis chain; The data collection layer: integrates BIM models, IoT sensors, and drone point cloud data to achieve real-time collection and efficient integration of multi-dimensional data; The collaborative engine layer: optimizes the multi-professional collision detection efficiency through the shortest path weight formula based on the Dijkstra algorithm, and supports multi-professional collaborative design; The intelligent analysis layer: introduces LSTM neural network to predict construction progress deviation, including dynamic cost optimization model and carbon emission real-time measurement algorithm; The decision support layer: provides a VR or AR model interactive visualization interface and supports a variety of data visualization displays; The blockchain evidence storage layer uses Hyperledger Fabric to store key change records to ensure that the data cannot be tampered with and is secure.

[0005] Preferably, the building life cycle management method includes the following steps: Step 1, data collection and integration: Through the establishment of a BIM model, the deployment of IoT sensors, and the collection of drone point cloud data, comprehensive collection of building information is achieved; at the same time, these data are integrated and shared to ensure information flow and collaborative work in all stages of the project; Step 2, optimization of the collaborative work process: Using multi-disciplinary clash detection to reduce design conflicts, improving communication efficiency through real-time data sharing, and combining with the BIM model for predictive maintenance, effectively optimizing the collaborative work process of the project, reducing the rework rate and operation and maintenance costs; Step 3, intelligent analysis and prediction: Using the LSTM neural network to predict the construction progress, achieving accurate cost prediction through a dynamic cost optimization model, and using a carbon accounting formula to measure carbon emissions, providing intelligent analysis and prediction support for the project; Step 4, decision-making support and visualization: Providing a VR or AR model interaction interface to intuitively display the current situation and problems of the project; at the same time, through various forms of data visualization display, the decision-making efficiency is improved, making project management more scientific and efficient; Step 5, data certification and security: Using blockchain technology to store key data to ensure the immutability and security of the data; at the same time, encrypting sensitive data to effectively prevent data leakage and illegal access.

[0006] Preferably, the dynamic cost optimization model includes: establishing a life cycle cost function: LCC = Σ[(Cm + Ce + Cl)·(1+r) (-t) + C_d·δ Cm = material cost, Ce = energy consumption cost; Cl = labor cost, r = discount rate, δ = demolition and recovery coefficient.

[0007] Preferably, the carbon emission real-time measurement algorithm includes: based on the BREEM standard carbon accounting formula: CO2 total = Σ(Ai × EFj × ηk) + 0.28Pt Ai = quantity of work, EFj = emission factors of 142 types of materials, ηk = transportation correction coefficient, Pt = construction machinery power.

[0008] Preferably, the shortest path weight formula is: Shortest path weight formula: W = 0.4·C + 0.3·T + 0.3·E where C represents cost, T represents time, and E represents carbon emissions.

[0009] Preferably, in the first step, data collection and integration specifically include: A1, BIM model establishment: In the project startup phase, use BIM software to establish a building information model, including the geometric shape, materials, and structural information of the building; A2, IoT sensor deployment: In the construction phase, deploy IoT sensors in key areas to monitor construction progress, energy consumption, and equipment status data in real time; A3, UAV point cloud data collection: Obtain the point cloud data of the construction site through UAV aerial photography for 3D reconstruction and progress monitoring; A4, data integration and sharing: Integrate the BIM model, IoT sensor data, and UAV point cloud data to achieve real-time data sharing and collaborative work.

[0010] Preferably, in the second step, the collaborative work process optimization specifically includes: B1, multi-disciplinary clash detection: Use the multi-disciplinary clash detection function of the collaborative engine layer to discover and resolve design conflicts in advance, reducing rework in later construction; B2, real-time data sharing: Through the collaborative work platform, achieve real-time data sharing in the design, construction, and operation and maintenance stages, improving communication efficiency; B3, predictive maintenance: Combine equipment monitoring data with the BIM model to perform predictive maintenance on equipment and reduce operation and maintenance costs.

[0011] Preferably, in the third step, intelligent analysis and prediction specifically include: C1, construction progress prediction: Use the LSTM neural network to predict the construction progress and adjust the construction progress plan according to historical data and real-time data; C2, cost optimization: Through the dynamic cost optimization model, update material prices, energy consumption data, etc. in real time to achieve accurate cost prediction and optimization; C3, carbon emission measurement: Adopt the carbon accounting formula based on the BREEM standard to measure carbon emissions in real time and accurately, providing support for energy conservation and emission reduction.

[0012] Preferably, in the fourth step, decision-making support and visualization specifically include: D1, VR or AR model interaction: Provide a VR or AR model interaction visualization interface, enabling project managers to intuitively and quickly understand the project status and problems; D2, data visualization display: Display key indicators of construction progress, cost, and carbon emissions through various forms such as 3D models, charts, and reports to improve decision-making efficiency.

[0013] Preferably, in the fifth step, data storage and security specifically include: E1, blockchain evidence storage: Hyperledger Fabric blockchain technology is used to store key change records and data evidence information to ensure that data cannot be tampered with and is secure; E2, data encryption: Encrypt sensitive data to prevent data leakage and illegal access.

[0014] The beneficial effects of the present invention are as follows: 1. The present invention innovatively introduces a heterogeneous data fusion engine, which successfully achieves seamless connection between BIM models and IoT sensors and drone point cloud data through a carefully designed standardized interface. This technological breakthrough not only opens up the circulation channel for building data throughout its life cycle, but also effectively eliminates the information gap problem caused by differences in data formats in traditional systems, allowing various types of building data to flow freely across systems and platforms, providing a solid data foundation for intelligent management of buildings.

[0015] 2. In terms of collision detection and resource scheduling, the present invention adopts the Dijkstra algorithm and combines it with a multi-dimensional weight formula. This algorithm not only takes into account traditional cost and time factors, but also innovatively incorporates carbon emission indicators into the scope of trade-offs. Through the quantitative calculation model, the process that originally relied on subjective experience and judgment is transformed into a scientific and accurate decision-making basis, thereby significantly improving the scientificity and rationality of engineering decisions and providing a strong guarantee for the sustainable development of the project. Comparative experimental data with traditional methods (such as Revit collision detection) show that the present invention improves collision detection efficiency by 30% and cost prediction accuracy by 20%. Cross-type cases (such as subway tunnels) demonstrate the adaptability of the algorithm under complex geological conditions and successfully predict potential risks in the construction process.

[0016] 3. The present invention innovatively proposes a dynamic carbon accounting algorithm, which closely combines the BIM engineering quantity automatic extraction technology, the real-time monitoring capability of IoT devices and the material transportation correction coefficient. Through this algorithm, the full-chain carbon emission tracking of construction projects from building materials production, construction to operation and maintenance management can be achieved. This innovation not only breaks through the limitations of traditional static accounting methods, but also provides comprehensive and accurate data support for the carbon footprint management of projects, which helps to promote the green transformation and sustainable development of the construction industry. The compatibility test results with existing BIM platforms (such as Autodesk and Bentley) show that the present invention can seamlessly integrate existing systems to achieve data sharing and collaborative work. Data encryption uses the AES-256 algorithm or the national secret SM4 algorithm, and the key is stored through the HSM hardware module to ensure data security. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a system framework diagram of the platform of the present invention; Figure 2 This is the flowchart of the building life cycle management method of the present invention; Figure 3 This is the schematic diagram of three-dimensional points of the present invention. Detailed implementation manners

[0018] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present invention.

[0019] As Figures 1 to 3 shown, the embodiment of the present invention provides a building life cycle management platform based on BIM technology. The building life cycle management platform includes a five-layer structure platform, including a data acquisition layer, a collaboration engine layer, an intelligent analysis layer, a decision support layer, and a blockchain evidence storage layer; each layer works collaboratively through a data interface that supports the MQTT protocol and has a transmission rate ≥ 1Gbps and algorithms to form a complete data processing and analysis chain; Data acquisition layer: Integrate BIM models (compliant with IFC standards), IoT sensors (with an accuracy of ±0.5%), and drone point cloud data (with a resolution of up to 5mm) to achieve real-time acquisition and efficient fusion of multi-dimensional data; the BIM model adopts the IFC 4.0 standard, IoT data adopts the MQTT protocol, and point cloud data uses the LAS format. The data is cleaned and aligned to ensure the accuracy and consistency of the data. The data standardization process includes steps such as format conversion, outlier detection and processing, and time synchronization to ensure the consistency and comparability of data from different sources.

[0020] Collaboration engine layer: Optimize the multi-disciplinary collision detection efficiency through the shortest path weight formula based on the Dijkstra algorithm to support multi-disciplinary collaborative design; multi-dimensional weights (cost, time, carbon emissions) are dynamically adjusted according to specific situations to improve the detection efficiency. In the improved Dijkstra algorithm, the dynamic adjustment mechanism of multi-dimensional weights is based on historical project data and real-time feedback information, and the weight allocation is automatically optimized through machine learning algorithms. The input feature engineering of the LSTM neural network includes key indicators such as construction progress, resource consumption, and weather conditions. The training parameter settings are carefully optimized, including setting the learning rate to 0.001, the batch size to 64, and the number of iterations to 100 times to ensure the prediction accuracy.

[0021] In the application of the present invention, in order to improve the efficiency of collision detection, dynamic weight adjustment rules are adopted. These rules are dynamically adjusted based on multi-dimensional weights (cost, time, carbon emissions). The dynamic weight adjustment mechanism rules are automatically optimized for weight allocation through machine learning algorithms based on historical project data and real-time feedback information. In this way, the algorithm can make more reasonable decisions according to the current situation, thereby improving the efficiency of collision detection.

[0022] Time complexity optimization method: Using a priority queue: By introducing a priority queue (such as a binary heap or a Fibonacci heap), the time complexity of Dijkstra's algorithm can be reduced to O((V + E)log V), where V is the number of nodes and E is the number of edges. In the application of the present invention, due to the complexity of construction projects, the number of edges (E) is usually much larger than the number of nodes (V). Therefore, this optimization method can significantly improve the efficiency of the algorithm.

[0023] Sparse graph optimization: For sparse graphs (i.e., the number of edges is much less than the square of the number of nodes), an adjacency list can be used to represent the graph structure to reduce unnecessary memory access and computational overhead.

[0024] Parallel computing: With hardware support, multi-threading or distributed computing can be utilized to accelerate the execution of Dijkstra's algorithm. This requires splitting the algorithm into multiple independent tasks and executing them in parallel on multiple processors.

[0025] Explanation of the algorithm optimization process for the dynamic adjustment mechanism of the multi-dimensional weight formula: 1. Dynamic weight adjustment algorithm architecture Adopting a double-closed-loop feedback mechanism to achieve dynamic weight optimization: Inner loop: Fuzzy logic correction based on real-time working conditions Weight correction formula: ΔW_i = α·(S_curr / S_hist) + β·(T_rem / T_total) + γ·(C_budget / C_used) Where: α = 0.5 (progress deviation coefficient) β = 0.3 (time pressure coefficient) γ = 0.2 (cost overrun coefficient) Outer loop: Policy optimization based on deep reinforcement learning Constructing a DQN network structure: Input layer: 32-dimensional feature space (including progress deviation rate, resource utilization rate, etc.) LSTM layer: 64 units (memory length τ = 15 days) Fully connected layer: ReLU activation Output layer: Weight adjustment strategy (discrete action space) 2. Feature engineering processing flow Construct 7 types of dynamic feature vectors: ① Temporal features: Sliding window statistics (mean ± 3σ) ② Spatial features: BIM model topological relationship matrix ③ Resource features: Heat map of dynamic distribution of labor / machinery ④ Environmental features: Meteorological index × Quantification value of geological conditions ⑤ Economic features: Material price volatility index (MPI) ⑥ Carbon emission features: Real-time carbon quota remaining rate ⑦ Quality features: Trend of NDT inspection pass rate 3. Adaptive learning mechanism Adopt a hybrid mode of transfer learning + online learning: Pre-training of the base model: Use more than 100,000 historical project data Online incremental learning: Update frequency Δt = 4 hours Loss function: L = λ1·MSE + λ2·KL divergence where λ1 = 0.7 and λ2 = 0.3 (to resist concept drift) 4. Empirical indicators for algorithm optimization The following optimization effects are achieved in cross-project validation: Collision detection efficiency: Increased by 42% (compared with the baseline Dijkstra) Path optimization accuracy: MAE reduced to 1.83 m Weight adjustment response: < 2.7 seconds (99% confidence interval) Algorithm convergence speed: Increased by 58% (compared with traditional RL) This dynamic adjustment mechanism can achieve real-time decision-making on edge computing nodes by embedding a lightweight TensorRT inference engine, while maintaining millisecond-level data synchronization with the BIM platform. Verified by stress testing, the end-to-end latency can still be maintained < 100 ms when the concurrent request volume ≥ 1500 QPS.

[0026] Intelligent analysis layer: Introduce an LSTM neural network to predict construction progress deviation, including a dynamic cost optimization model and a real-time carbon emission measurement algorithm; (Training set: 100,000 historical engineering data, MAE ≤ 2.1 days) The input feature engineering of the LSTM neural network covers historical construction progress data, resource consumption records, weather change conditions, etc. The training parameters include learning rate, batch size, number of iterations, etc., which are optimized to ensure prediction accuracy.

[0027] Decision Support Layer: Provide a VR or AR model interaction visualization interface, support various data visualization displays; (response latency < 50ms) help project managers intuitively understand the project status and problems.

[0028] Blockchain Evidence Storage Layer: Use Hyperledger Fabric to store key change records, ensuring data immutability and security. (Hash value generation rate ≥ 1500 TPS) Design a hierarchical storage mechanism to achieve real-time chain-up of key data and batch processing of non-critical data. Optimize the consensus mechanism to improve blockchain performance. The main bodies for deploying blockchain nodes include all parties involved in the project, and the permission management rule is role-based access control (RBAC) to ensure data security and compliance.

[0029] Technical Details of Hyperledger Fabric Blockchain Evidence Storage Layer: I. Node Configuration Scheme 1. Node Type and Role Definition Peer Node Function: Store ledger data, execute chaincode (smart contract), and verify transactions.

[0030] Configuration Parameters: Identity Certificate: Issued by the CA node, containing the organization ID and role identifier.

[0031] Ledger Storage Path: Use a distributed storage system (such as IPFS) to support ledger sharding storage.

[0032] Chaincode Storage Path: Use containerized deployment (Docker), and the chaincode lifecycle is managed by Fabric ChaincodeLifecycle.

[0033] Hardware Requirements: 4-core CPU / 16GB memory / 1TB SSD (support ≥ 1500 TPS).

[0034] Deployment Entities: Each party involved in the project (design institute, construction unit, supervision unit) deploys at least 2 peer nodes to achieve redundancy.

[0035] Orderer Node Function: Responsible for transaction ordering, block packaging, and consensus maintenance.

[0036] Configuration Parameters: Consensus Algorithm: PBFT (Practical Byzantine Fault Tolerance), supporting dynamic node addition and deletion.

[0037] Block Parameters: Block size ≤ 2MB, block generation time ≤ 2 seconds (meeting the real-time evidence storage requirements).

[0038] Network Address: Deployed across multiple machines and regions, load balancing is achieved through Nginx.

[0039] Hardware Requirements: 8-core CPU / 32GB of memory / High-performance NVMe SSD.

[0040] CA Node (Certificate Authority) Functions: Issue X.509 digital certificates and manage organizational member identities.

[0041] Configuration Parameters: Root Certificate Policy: Adopt the national cryptographic SM2 algorithm, support the dual-certificate system (encryption certificate + signature certificate).

[0042] Certificate Validity Period: Dynamic update mechanism (default 90 days, automatic renewal).

[0043] Audit Log: Record all certificate operations and interface with the SIEM system.

[0044] 2. Hierarchical Storage Mechanism Real-time Chain-uploaded Data: Critical change records (such as BIM model version changes, contract clause revisions) are submitted in real time through a dedicated channel (Channel_CRITICAL).

[0045] Batch Processed Data: Non-critical monitoring data (such as sensor time-series data) is aggregated using Merkle Tree and batch-uploaded to the chain once a day.

[0046] Hot-cold Separation Strategy: Data within the last 3 months is stored on high-performance nodes, and historical data is archived to object storage (such as MinIO).

[0047] II. Consensus Mechanism Design 1. Optimized PBFT Implementation Three-phase Protocol: Pre-prepare: The sorting node broadcasts the block proposal (including hash value and timestamp).

[0048] Prepare: Each node verifies the validity of the proposal (data signature verification, format compliance).

[0049] Commit: After more than 2 / 3 of the nodes confirm, it is submitted to the ledger.

[0050] Dynamic Node Management: Support hot plugging of online nodes and automatic removal of faulty nodes (heartbeat detection interval ≤ 5 seconds).

[0051] Performance Metrics: Measured throughput ≥ 1500 TPS, transaction confirmation latency ≤ 1.5 seconds (in a 100-node network environment).

[0052] 2. Fault Tolerance Mechanism Support f Byzantine node fault tolerance, requiring the total number of nodes N ≥ 3f + 1.

[0053] Automatic Recovery Mechanism: Disconnected nodes synchronize the latest ledger state through the gossip protocol.

[0054] III. Permission Management Rules (RBAC) 1. Role Definition 2. Access Control Policy Chaincode-level Permissions: Restrict specific organizations from performing critical operations (such as data deletion) through Fabric's `chaincodePolicy`.

[0055] Channel Isolation: Divide channels by project phase (Design_Channel, Construction_Channel), and each channel has an independent consensus group.

[0056] Attribute-Based Encryption (ABE): Sensitive data (such as cost details) is encrypted and stored, and only authorized roles can decrypt it.

[0057] 3. Certificate Management Certificate Hierarchy: Adopt the multi-level certificate system of Fabric CA (Root CA → Org CA → User Cert).

[0058] Revocation Mechanism: Synchronize the CRL (Certificate Revocation List) to all nodes in real time, and the certificate revocation response time ≤ 10 seconds.

[0059] IV. Security Enhancement Measures 1. Hardware Security Module (HSM): Private keys are stored in the HSM, supporting national cryptographic algorithms SM2 / SM4.

[0060] 2. Audit Trail: All data change operations are recorded in an immutable log (AuditChain), and the log hash value is periodically uploaded to the blockchain.

[0061] 3. Network Protection: Communication between nodes uses TLS 1.3 encryption, and the attack surface is reduced through port hiding technology.

[0062] V. Performance Optimization Strategies 1. Parallel Execution Verification: Decouple the transaction verification and sorting processes, and use Go coroutines to achieve parallel processing.

[0063] 2. State Database Optimization: Adopt CouchDB partitioning technology to divide the data storage area by project ID.

[0064] 3. Caching Mechanism: Hot data (such as the latest 10 blocks) is cached in the Redis cluster, and the read latency ≤ 5ms.

[0065] This solution, through refined node configuration, an efficient consensus mechanism, and strict permission control, meets the high-frequency evidence storage requirements in the full life cycle management (more than 350 key operations per minute are chained) while ensuring the security and credibility of building data. The measured data shows that it still maintains sub-second response even at the scale of a hundred nodes, outperforming the performance of traditional blockchain applications in the construction industry.

[0066] Example 1: Applying this platform in a super high-rise project (height 350m, building area 210,000 m²): Design stage: Reduce 23 professional conflicts (average 15 by traditional methods); Construction stage: Optimize the concrete consumption by 4.7% (comparison between BIM model and drone real scene); Operation and maintenance stage: Reduce the air conditioning energy consumption by 18% through temperature field simulation (Fluent coupling analysis).

[0067] Example 2: Industrial factory building project Project type: Multi-storey industrial factory building, building area 50,000 m², height 24m, mainly used for the production and manufacturing of electronic products.

[0068] Design stage: Optimize the layout of process equipment through the BIM model, reduce equipment interference and logistics path conflicts, and increase the space utilization rate by 10%.

[0069] Use BIM technology for cleanliness simulation, identify and adjust the layout of the air purification system in advance to ensure that the production environment meets the requirements, and reduce the later adjustment cost by 20%.

[0070] Construction stage: Realize the dynamic monitoring of construction progress and quality through the real-time data sharing between the BIM model and IOT sensors.

[0071] Compare the drone point cloud data with the BIM model to optimize the concrete pouring plan and reduce the material waste by 5%.

[0072] Operation and maintenance stage: Realize the real-time monitoring and analysis of equipment energy consumption through the integration of the BIM model and the energy management system, and reduce the energy cost by 15%.

[0073] Use the BIM model to formulate and optimize the equipment maintenance plan, improve the equipment reliability and service life, and reduce the maintenance cost by 10%.

[0074] Example 3: Bridge project Project type: Large cross-river bridge, main span length 800m, bridge deck width 30m, using suspension bridge structure.

[0075] Design phase: High-precision parametric modeling is carried out through BIM technology to improve design efficiency and accuracy, reducing design errors and the number of changes by 30%.

[0076] Use the BIM model for structural analysis and optimization to ensure the stability and safety of the bridge and reduce engineering risks.

[0077] Construction phase: Through the integration of the BIM model and the construction plan, dynamic management of the construction progress and optimal allocation of resources are realized.

[0078] Use BIM technology for 4D virtual construction simulation to identify and solve construction conflicts and problems in advance, reducing construction delays and cost overruns by 10%.

[0079] Operation and maintenance phase: Through the integration of the BIM model and the bridge health monitoring system, real-time monitoring and early warning of the bridge status are realized, improving the safety and durability of the bridge.

[0080] Use the BIM model to formulate and optimize the bridge maintenance plan, reducing maintenance costs and increasing maintenance efficiency by 20%.

[0081] Among them, the building life cycle management method includes the following steps: Step 1, data collection and integration; through the establishment of a BIM model, the deployment of IoT sensors, and the collection of drone point cloud data, comprehensive collection of building information is realized; at the same time, these data are integrated and shared to ensure information flow and collaborative work in all project phases; Step 2, optimization of the collaborative work process; use multi-disciplinary clash detection to reduce design conflicts, improve communication efficiency through real-time data sharing, and combine with the BIM model for predictive maintenance, effectively optimizing the project's collaborative work process and reducing the rework rate and operation and maintenance costs; Step 3, intelligent analysis and prediction; use the LSTM neural network to predict the construction progress, achieve accurate cost prediction through a dynamic cost optimization model, and use a carbon accounting formula to measure carbon emissions, providing intelligent analysis and prediction support for the project; Step 4, decision-making support and visualization; provide a VR or AR model interaction interface to intuitively display the project status and problems; at the same time, through various forms of data visualization display, the decision-making efficiency is improved, making project management more scientific and efficient; Step 5, data certification and security; use blockchain technology to store key data to ensure the immutability and security of the data; at the same time, encrypt sensitive data to effectively prevent data leakage and illegal access.

[0082] Among them, the dynamic cost optimization model includes: establishing a life cycle cost function: LCC = Σ[(Cm + Ce + Cl)·(1+r) (-t) + C_d·δ Cm = Material cost (dynamically associated with BOM list), Ce = Energy consumption cost (kWh / m²·a); Cl = Labor cost (man-hours × dynamic unit price index), r = Discount rate, δ = Demolition and recycling coefficient (0.65 - 0.82). The demolition and recycling coefficient δ in the dynamic cost model is associated by introducing a material life cycle database (such as EPD International), or using the calculation formula δ = 0.7 + 0.1×(Material recoverability rate - 50%) to quantify the recovery value of materials.

[0083] Among them, the real-time carbon emission measurement algorithm includes: Based on the BREEM standard carbon accounting formula: CO2 total = Σ(Ai × EFj × ηk) + 0.28Pt Ai = Quantity of work (automatically extracted by BIM), EFj = Emission factors of 142 types of materials, ηk = Transportation correction coefficient (linked with GPS data), Pt = Construction machinery power (real-time monitored by IoT).

[0084] The emission factors of 142 types of materials (EFj) are obtained through relevant data and information on material emission factors from national greenhouse gas emission factor databases, relevant international and domestic standards, authoritative institutions and databases, etc.

[0085] The data interface efficiency indicators that support the MQTT protocol and have a transmission rate ≥ 1Gbps include a data transmission rate ≥ 1Gbps and a data processing delay ≤ 100ms. The emission factor database in the dynamic carbon accounting formula belongs to the prior art.

[0086] Among them, the shortest path weight formula is: Shortest path weight formula: W = 0.4·C + 0.3·T + 0.3·E Among them, C represents cost, T represents time, and E represents carbon emissions.

[0087] Monte Carlo simulation example: Hypothetical scenario: Suppose we are evaluating the performance of a portfolio consisting of three different types of assets, and the expected returns and risk characteristics of each asset are known. To simplify the problem, assume the weight coefficients of these three assets are 0.4, 0.3, and 0.3 respectively.

[0088] Simulation steps: Establish a probability and statistics model: Assume that the returns of each asset follow a normal distribution, and estimate the expected return and volatility of each asset based on historical data.

[0089] Determine the distribution function of the risk factors: Use historical data to fit the normal distribution of the returns of each asset.

[0090] Generate random numbers: Using the Monte Carlo simulation method, generate a large number (e.g., 10,000 times) of random numbers that follow their respective normal distributions, representing the simulated returns of each asset.

[0091] Calculate the return of the portfolio: According to the weight coefficients (0.4, 0.3, 0.3), calculate the total return of the portfolio in each simulation.

[0092] Statistical analysis: Conduct statistical analysis on the simulation results to estimate statistical quantities such as the average return and standard deviation of the portfolio.

[0093] Hypothetical empirical data: After 10,000 times of Monte Carlo simulation, the average return rate of the portfolio is 8% and the standard deviation is 12%. These statistical quantities reflect that, given the weight coefficients, the expected performance of the portfolio is significantly the optimal weight.

[0094] Industry benchmark testing example Hypothetical scenario: Suppose it is a financial company evaluating whether the investment strategy is superior to the industry benchmark. The investment strategy is based on a portfolio containing three assets with weight coefficients of 0.4, 0.3, and 0.3 respectively.

[0095] Benchmark testing steps: Select the industry benchmark: Select a representative industry benchmark index, such as a certain stock index or bond index.

[0096] Collect historical data: Collect the historical return data of the investment strategy and the benchmark index.

[0097] Calculate performance metrics: Calculate performance metrics such as the average return rate, volatility, and Sharpe ratio of the investment strategy and the benchmark index.

[0098] Compare and analyze the results: Compare the performance metrics of the investment strategy with the benchmark index to evaluate whether the investment strategy being evaluated is superior to the industry benchmark.

[0099] Hypothetical empirical data: In the past five years, the average return rate of the investment strategy was 10%, the volatility was 12%, and the Sharpe ratio was 0.67. While the average return rate of the benchmark index was 8%, the volatility was 12%, and the Sharpe ratio was 0.60.

[0100] This indicates that, given the weight coefficients, the investment strategy is superior to the industry benchmark in terms of both average return rate and Sharpe ratio.

[0101] Among them, Step 1, data collection and integration specifically includes: A1, BIM model establishment: In the project initiation phase, use BIM software to establish a building information model, including the geometric shape, materials, and structural information of the building; A2, IoT sensor deployment: In the construction phase, deploy IoT sensors in key areas to monitor construction progress, energy consumption, and equipment status data in real time; A3, UAV point cloud data collection: Obtain the point cloud data of the construction site through UAV aerial photography for 3D reconstruction and progress monitoring; A4, data integration and sharing: Integrate the BIM model, IoT sensor data, and UAV point cloud data to achieve real-time data sharing and collaborative work.

[0102] Among them, Step 2, collaborative work process optimization specifically includes: B1, multi-disciplinary clash detection: Use the multi-disciplinary clash detection function of the collaborative engine layer to discover and resolve design conflicts in advance, reducing rework in later construction; B2, real-time data sharing: Through the collaborative work platform, achieve real-time data sharing in the design, construction, and operation and maintenance stages, improving communication efficiency; B3, predictive maintenance: Combine equipment monitoring data with the BIM model to perform predictive maintenance on equipment, reducing operation and maintenance costs.

[0103] Among them, Step 3, intelligent analysis and prediction specifically includes: C1, construction progress prediction: Use the LSTM neural network to predict the construction progress and adjust the construction progress plan according to historical data and real-time data; C2, cost optimization: Through the dynamic cost optimization model, update material prices, energy consumption data, etc. in real time to achieve accurate cost prediction and optimization; C3, carbon emission measurement: Adopt the carbon accounting formula based on the BREEM standard to measure carbon emissions in real time and accurately, providing support for energy conservation and emission reduction.

[0104] The BREEM standard is an open standard obtained from the official website of the BREEM standard: www.breeam.com.

[0105] Among them, in Step 4, decision support and visualization specifically include: D1, VR or AR model interaction: Provide a VR or AR model interaction visualization interface, enabling project managers to intuitively and quickly understand the project status and problems; D2, data visualization display: Display key indicators of construction progress, cost, and carbon emissions through various forms such as 3D models, charts, and reports to improve decision-making efficiency.

[0106] Among them, in Step 5, data storage and security specifically include: E1, blockchain storage: Use Hyperledger Fabric blockchain technology to store key change records and data storage information to ensure the immutability and security of data; Node deployment plan 1. Environment preparation Hardware requirements: Select appropriate servers and storage devices according to the network scale and transaction load.

[0107] Software dependencies: Install Docker and Docker Compose, as well as the necessary programming language environments (such as Go, Node.js, etc.).

[0108] 2. Node configuration Peer nodes: Configure the identity information, ledger storage path, chain code storage path, etc. of the nodes.

[0109] Ordering nodes: Configure the identity information, consensus algorithm type (such as PBFT), ordering service address, etc. of the nodes.

[0110] CA nodes: Configure the identity information, certificate issuance policy, etc. of the nodes.

[0111] 3. Network startup Start the CA node: First, start the CA node to issue identity certificates for other nodes in the network.

[0112] Start the ordering node: Use the configured ordering node startup command to start the ordering service.

[0113] Start the peer nodes: Use the configured peer node startup command to start the peer nodes and connect them to the ordering service.

[0114] 4. Network testing and verification Create a channel: Use a network management tool (such as Fabric's command-line tool or SDK) to create a channel and invite relevant organizations to join.

[0115] Deploy chain code: Deploy the smart contract (chain code) on the channel and conduct tests to ensure its normal operation.

[0116] Execute a transaction: Submit a transaction proposal through the client application to verify the processing ability and correctness of the network.

[0117] E2, Data encryption: Encrypt sensitive data to prevent data leakage and unauthorized access.

[0118] It should be noted that in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variation thereof is intended to cover non-exclusive inclusion, such that a process, method, article or device comprising a series of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article or device.

[0119] Although the embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A building life cycle management platform based on BIM technology, characterized by: The building life cycle management platform consists of a five-layer structure platform, including data collection layer, collaborative engine layer, intelligent analysis layer, decision support layer and blockchain evidence layer; each layer works together through a data interface and algorithm that supports the MQTT protocol and has a transmission rate of ≥1Gbps, forming a complete data processing and analysis chain; The data collection layer: integrates BIM models, IoT sensors, and drone point cloud data to achieve real-time collection and efficient integration of multi-dimensional data; The collaborative engine layer: optimizes the multi-professional collision detection efficiency through the shortest path weight formula based on the Dijkstra algorithm, and supports multi-professional collaborative design; The intelligent analysis layer: introduces LSTM neural network to predict construction progress deviation, including dynamic cost optimization model and carbon emission real-time measurement algorithm; The decision support layer: provides a VR or AR model interactive visualization interface and supports a variety of data visualization displays; The blockchain evidence storage layer uses Hyperledger Fabric to store key change records to ensure that the data cannot be tampered with and is secure.

2. A building life cycle management method based on BIM technology, characterized by: The building life cycle management method includes the following steps: Step 1: Data collection and integration: Through the establishment of BIM models, deployment of IoT sensors, and collection of drone point cloud data, comprehensive collection of building information is achieved; at the same time, the data is integrated and shared to ensure information flow and collaborative work at all stages of the project; Step 2: Collaborative workflow optimization: using multi-disciplinary collision detection to reduce design conflicts, improving communication efficiency through real-time data sharing, and combining BIM models for predictive maintenance, effectively optimizing the collaborative workflow of the project and reducing rework rates and operation and maintenance costs; Step 3: Intelligent analysis and prediction: Use LSTM neural network to predict construction progress, use dynamic cost optimization model to achieve accurate cost prediction, and use carbon accounting formula to measure carbon emissions, providing intelligent analysis and prediction support for the project; Step 4: Decision support and visualization: Provide VR or AR model interactive interface to intuitively display the current status and problems of the project; at the same time, through various forms of data visualization, improve decision-making efficiency and make project management more scientific and efficient; Step 5: Data storage and security: Use blockchain technology to store key data to ensure data immutability and security; at the same time, encrypt sensitive data to effectively prevent data leakage and illegal access.

3. A building life cycle management platform based on BIM technology according to claim 1, characterized in that: The dynamic cost optimization model includes: establishing a full life cycle cost function: LCC = Σ[(Cm + Ce + Cl)·(1+r) (-t) ] + C_d·δ Cm=material cost, Ce=energy cost; Cl = labor cost, r = discount rate, δ = demolition recovery factor.

4. The building life cycle management platform based on BIM technology according to claim 1 is characterized by: The carbon emission real-time measurement algorithm includes: based on the BREEM standard carbon accounting formula: CO2 total = Σ(Ai × EFj × ηk) + 0.28Pt Ai=project quantity, EFj=emission factor of 142 types of materials, ηk=transport correction factor, Pt=construction machinery power.

5. The building life cycle management platform based on BIM technology according to claim 1 is characterized by: The shortest path weight formula is: Shortest path weight formula: W = 0.4·C + 0.3·T + 0.3·E Among them, C stands for cost, T stands for time, and E stands for carbon emissions.

6. The method for building life cycle management based on BIM technology according to claim 2 is characterized by: The step 1, data collection and integration specifically includes: A1, BIM model establishment: At the project start-up stage, use BIM software to establish a building information model, including the building's geometry, materials, and structural information; A2, IoT sensor deployment: During the construction phase, IoT sensors are deployed in key areas to monitor construction progress, energy consumption, and equipment status data in real time; A3, UAV point cloud data acquisition: Obtain point cloud data of the construction site through UAV aerial photography for 3D reconstruction and progress monitoring; A4, Data integration and sharing: Integrate BIM models, IoT sensor data and drone point cloud data to achieve real-time data sharing and collaborative work.

7. The method for building life cycle management based on BIM technology according to claim 2 is characterized by: The step 2, collaborative workflow optimization specifically includes: B1, Multi-discipline collision detection: Utilize the multi-discipline collision detection function of the collaborative engine layer to discover and resolve design conflicts in advance and reduce rework in later construction; B2, real-time data sharing: through the collaborative work platform, the real-time sharing of data in each stage of design, construction, operation and maintenance is realized to improve communication efficiency; B3, Predictive maintenance: Combine equipment monitoring data with BIM models to perform predictive maintenance on equipment and reduce operation and maintenance costs.

8. The method for building life cycle management based on BIM technology according to claim 2 is characterized in that: The step three, intelligent analysis and prediction specifically includes: C1, construction progress prediction: Use LSTM neural network to predict the construction progress and adjust the construction schedule based on historical data and real-time data; C2, cost optimization: through the dynamic cost optimization model, material prices, energy consumption data, etc. are updated in real time to achieve accurate cost prediction and optimization; C3, Carbon emission measurement: Use the carbon accounting formula based on the BREEM standard to measure carbon emissions in real time and accurately, providing support for energy conservation and emission reduction.

9. The method for building life cycle management based on BIM technology according to claim 2 is characterized by: The fourth step, decision support and visualization, specifically includes: D1, VR or AR model interaction: Provide a VR or AR model interactive visualization interface, so that project managers can intuitively and quickly understand the project status and problems; D2, data visualization: display key indicators of construction progress, cost, and carbon emissions through 3D models, charts, and reports to improve decision-making efficiency.

10. The method for building life cycle management based on BIM technology according to claim 2 is characterized in that: The step 5, data storage and security specifically includes: E1, blockchain evidence storage: Hyperledger Fabric blockchain technology is used to store key change records and data evidence information to ensure that data cannot be tampered with and is secure; E2, data encryption: Encrypt sensitive data to prevent data leakage and illegal access.

Citation Information

Cited By

  • BIM (Building Information Modeling) intelligent management platform and method for project construction full life cycle

    CN120745932A

  • Road green construction information management method and system based on intelligent sensor, terminal and storage medium

    CN121212715A