Conversion frame and bath heater

By designing the conversion frame and bracket, the bathroom heater is fixedly connected to the installation basis, which solves the problem caused by the gap between the bathroom heater duct and the host, and realizes the ease of installation, aesthetics and completeness of the bathroom heater and guarantees air intake.

CN120232055APending Publication Date: 2025-07-01OPP (ZHONGSHAN) INTELLIGENT TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311873796.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-12-30
Publication Date
2025-07-01

AI Technical Summary

Technical Problem

There is a large gap between the air duct of the existing bathroom heater and the host, resulting in problems such as water inlet, dust accumulation, high maintenance rate, high cost and inconvenient installation.

Method used

A conversion frame is designed to fix the bathroom heater to the installation basis through a bracket and a rotary member, and to fix the air heating main unit and air duct structure to solve the gap problem and improve installation convenience and aesthetics.

Benefits of technology

It realizes the easy installation, beautiful and completeness of the bathroom heater, fixes the distance between the outer ring module and the installation foundation, ensures the air intake, and blocks the opening and internal structure on the installation foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120232055A_ABST
    Figure CN120232055A_ABST
Patent Text Reader

Abstract

The invention provides a conversion frame and a bath heater, the conversion frame enables the bath heater to be installed on an installation foundation, the conversion frame comprises a frame body, the frame body comprises a top wall facing the installation foundation, and an installation opening is formed in the position, corresponding to an opening, of the inner side of the top wall; the support is arranged on the side, facing the mounting base, of the top wall and rotationally connected with the top wall, the support has a first position and a second position, at least part of orthographic projection of the support is located in the mounting opening at the first position so as to enter the mounting base through the mounting opening, and at least part of orthographic projection of the support is located on the outer side of the top wall at the second position so as to enter the mounting base through the mounting opening. The bath heater is fixedly connected to an installation foundation through the support, and the air heating main machine and the air duct structure of the bath heater are fixedly connected. The conversion frame fixes the distance between the outer ring module and the installation base, the air inflow of the bath heater is guaranteed, the support directly supports the air heating main machine and shields an opening in the installation base and the internal structure of the bath heater, and the appearance of the bath heater is more attractive and complete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of household appliances, and particularly to a conversion frame and a bathroom heater. Background Art

[0002] The bathroom heater has become an essential part of the fashionable life of modern families. With the increasingly advanced technology and the increasingly perfect quality, the ownership rate of bathroom heaters in Chinese families has been increasing year by year.

[0003] Currently, there are generally large gaps between the air ducts of bathroom heaters on the market and the main body for air intake. These gaps are not aesthetically pleasing, are prone to water ingress and dust accumulation, have a relatively high repair rate, high cost, and are inconvenient to install.

[0004] In view of this, it is necessary to provide a conversion frame and a bathroom heater to solve the above problems. Summary of the Invention

[0005] The purpose of the present invention is to provide an easily installable conversion frame and a bathroom heater.

[0006] To achieve the above purpose, the present invention provides a conversion frame for installing a bathroom heater on an installation base. An opening is provided on the installation base, and an installation space for accommodating the air heating main body of the bathroom heater is provided above the installation base. The conversion frame includes:

[0007] A frame main body including a top wall facing the installation base, and an installation opening is provided on the inner side of the top wall corresponding to the position of the opening;

[0008] A bracket is provided on the side of the top wall facing the installation base and is rotatably connected to the top wall. The bracket has a first position and a second position. In the first position, at least a part of the orthographic projection of the bracket is located within the installation opening to enter the interior of the installation base through the installation opening. In the second position, at least a part of the orthographic projection of the bracket is located outside the top wall to fixedly connect the bathroom heater to the installation base through the bracket and fixedly connect the air heating main body and the air duct structure of the bathroom heater.

[0009] As a further improvement of the present invention, the conversion frame further includes a rotating member. A first rotating hole is provided on the top wall, and a second rotating hole is correspondingly provided on the bracket. The rotating member sequentially passes through the first rotating hole and the second rotating hole to rotatably connect the bracket to the frame main body.

[0010] As a further improvement of the present invention, a limiting wall extending towards the installation base is provided on the inner side of the top wall, and the limiting wall is configured to limit the rotation angle of the bracket.

[0011] As a further improvement of the present invention, the outer side of the top wall is further provided with an outer peripheral wall extending away from the mounting base, and the outer peripheral wall is provided with a plurality of first grilles for air intake.

[0012] As a further improvement of the present invention, a plurality of second grilles arranged at intervals are provided on the top wall, and the second grilles are arranged close to the installation opening and at least partially located on the inner side of the opening.

[0013] As a further improvement of the present invention, the bracket includes a first part rotatably connected to the top wall, a second part extending from the first part toward the mounting base, and a third part arranged at an angle to the second part and used to fix the air heating main unit and the air duct structure, the second part includes a first plate extending vertically and a second plate extending laterally from the first plate, the first part is connected to the first plate, and the third part is connected to the second plate.

[0014] As a further improvement of the present invention,

[0015] An assembly hole is provided at one end of the first plate away from the first part, and a fastener passes through the assembly hole to fix the bracket to the mounting mechanism in the mounting space, thereby fixing the bathroom heater to the mounting base;

[0016] A clearance portion is defined between the second plate and the first portion, and the clearance portion is configured to allow the installation base to pass through.

[0017] As a further improvement of the present invention, a first fixing hole is further provided on the top wall, and a second fixing hole is correspondingly provided on the first part. When the bracket is in the second position, the first fixing hole overlaps with the second fixing hole, and the bracket is fixed in the second position by a fastener.

[0018] As a further improvement of the present invention, a connecting portion and a stop portion are provided on the third part, the connecting portion is used to fix the air heating host and the air duct structure, and the stop portion is configured to limit the installation position of the air heating host.

[0019] As a further improvement of the present invention, the brackets are provided in plurality, the plurality of the brackets are arranged circumferentially along the top wall, and,

[0020] In the first position, the orthographic projections of the second parts of the plurality of brackets are located on the top wall, the extended lines of the orthographic projections of the second parts of the plurality of brackets intersect, and the orthographic projections of the third parts are located in the installation opening;

[0021] When in the second position, the orthographic projection of the second part is at least partially located outside the top wall, the orthographic projections of the second parts of several of the brackets are arranged in parallel, and the orthographic projection of the third part is located on the top wall.

[0022] A bathroom heater, comprising:

[0023] A warm air main unit, installed in an installation space above the installation base;

[0024] An air duct structure, at least partially exposed outside the installation base;

[0025] A conversion frame, the conversion frame is arranged between the warm air main unit and the air duct structure, the warm air main unit is fixedly connected to the installation base through the conversion frame, and the warm air main unit and the air duct structure are fixedly connected through the conversion frame.

[0026] The beneficial effects of the present invention are:

[0027] The conversion frame is arranged between the warm air main unit and the air duct structure. The warm air main unit is fixedly connected to the installation base through the conversion frame, and the warm air main unit and the air duct structure are fixedly connected through the conversion frame. The conversion frame is beneficial to the installation and positioning of the bathroom heater, can fix the distance between the outer ring module and the installation base, ensure the air intake of the bathroom heater, and the brackets of the conversion frame can directly support the warm air main unit, can block the opening on the installation base and the internal structure of the bathroom heater, making the appearance of the bathroom heater more beautiful and complete. Description of the Drawings

[0028] Figure 1 is a schematic structural diagram of the first embodiment of the bathroom heater of the present invention;

[0029] Figure 2 is Figure 1 the exploded view of the bathroom heater in

[0030] Figure 3 is Figure 2 the schematic structural diagram of the conversion frame in

[0031] Figure 4 is Figure 3 the partial enlarged view at A in

[0032] Figure 5 is Figure 3 the schematic structural diagram of the bracket in

[0033] Figure 6 is Figure 3 the schematic structural diagram of the frame body in

[0034] Figure 7 is Figure 6 the partial enlarged view at B in

[0035] Figure 8 It is a schematic diagram of the fixation of the conversion box and the installation mechanism;

[0036] Figure 9 It is Figure 2 a schematic diagram of the structure of the air duct structure in

[0037] Figure 10 It is Figure 9 a sectional view of the air duct structure in

[0038] Figure 11 It is Figure 9 a schematic diagram of the structure of the outer shell in

[0039] Figure 12 It is Figure 9 a schematic diagram of the structure of the outer shell from another angle in

[0040] Figure 13 It is Figure 12 a partial enlarged view of part C in

[0041] Figure 14 It is Figure 2 a schematic diagram of the structure of the outer ring module in

[0042] Figure 15 It is Figure 2 an exploded view of the outer ring module in

[0043] Figure 16 It is Figure 15 a partial enlarged view of part D in

[0044] Figure 17 It is a schematic diagram of the assembly of the air duct structure and the outer ring module;

[0045] Figure 18 It is Figure 2 a schematic diagram of the structure of the warm air main unit in

[0046] Figure 19 It is Figure 18 an exploded view of

[0047] Figure 20 It is a schematic diagram of the structure of the second embodiment of the integrated ceiling heater of the present invention;

[0048] Figure 21 It is a schematic diagram of the structure of the warm air main unit of the second embodiment.

[0049] Explanation of reference numerals:

[0050] Integrated ceiling heater 100,

[0051] Conversion frame 1, frame body 11, top wall 111, first rotation hole 1111, second grille 1112, first fixing hole 1113, installation opening 112, limiting wall 113, outer peripheral wall 114, first grille 1141, bracket 12, second rotation hole 121, first part 122, second fixing hole 1221, second part 123, first plate 1231, assembly hole 1233, second plate 1232, third part 124, connecting part 1241, stopping part 1242, relief part 125, rotating part 13;

[0052] Air duct assembly 200, air duct structure 2, housing 21, outer housing 211, second air inlet 2111, first positioning part 2112, outer edge part 2113, inner housing 212, annular air outlet 2121, arc-shaped air duct 22, first section 221, second section 222, arc section 223, first joint part 23, clearance notch 231, buckle part 232, first clamping surface 2321, first guiding surface 2322, limiting surface 2323, connecting piece 24, connecting end 241;

[0053] Outer ring module 3, module housing 31, assembly opening 311, second joint part 32, protruding part 321, second clamping surface 3211, second guiding surface 3212, limiting structure 3213, second positioning part 33;

[0054] Inner ring module 4;

[0055] Air heating main unit 5, main unit bracket 51, fixed end 511, clamping end 512, main unit housing 52, blowing assembly 521, first air inlet 5211, first air outlet 5221, heating device 523, air extraction assembly 524, air extraction port 5241, exhaust port 5242, frame 53;

[0056] Installation base 6, opening 61, installation mechanism 62, gap 63. Detailed implementation mode

[0057] In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0058] Here, it should be noted that in order to avoid obscuring the present invention due to unnecessary details, only the structures and / or processing steps closely related to the solution of the present invention are shown in the drawings, while other details less related to the present invention are omitted.

[0059] In addition, it should be noted that the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, such that a process, method, article or device comprising a series of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article or device.

[0060] Please refer to Figures 1 to 21 as shown, for the bathroom heater 100 of the present invention.

[0061] Embodiment 1:

[0062] The bathroom heater 100 includes a conversion frame 1, an air duct assembly 200, an inner ring module 4 and a warm air main unit 5. The conversion frame 1 is used to mount the bathroom heater 100 onto an installation base 6. The air duct assembly 200 includes an air duct structure 2 and an outer ring module 3. The air duct structure 2 is disposed below the installation base 6 and at least partially exposed outside the installation base 6, and is detachably connected to the warm air main unit 5. The outer ring module 3 is detachably connected to the outside of the air duct structure 2. The inner ring module 4 is disposed inside the air duct structure 2. The warm air main unit 5 is disposed in the installation space above the installation base 6. The bathroom heater 100 adopts an annular air outlet mode, making the indoor temperature distribution more uniform.

[0063] In this embodiment, the installation base 6 is made of materials such as gypsum board or honeycomb large board. At this time, when installing the bathroom heater 100, a separate hole needs to be opened on the installation base 6, and the warm air main unit 5 is hidden inside the installation base 6. The setting of the conversion frame 1 can block the hole on the installation base 6, making the appearance of the bathroom heater 100 more beautiful and the overall sense stronger.

[0064] Specifically, the installation base 6 is provided with an opening 61, and above the installation base 6, there is an installation space for accommodating the warm air main unit 5 of the bathroom heater 100.

[0065] The conversion frame 1 includes a frame main body 11 and a bracket 12, and the bracket 12 is rotatably connected to the frame main body 11. The conversion frame 1 further includes a rotating member 13. A first rotating hole 1111 is provided on the top wall 111, and a corresponding second rotating hole 121 is provided on the bracket 12. The rotating member 13 sequentially passes through the first rotating hole 1111 and the second rotating hole 121 to rotatably connect the bracket 12 and the frame main body 11.

[0066] The frame main body 11 includes a top wall 111 facing the installation base 6. An installation opening 112 is provided on the inner side of the top wall 111 corresponding to the position of the opening 61, and the installation opening 112 can pass through a part of the internal structure of the bathroom heater 100.

[0067] On the outer side of the top wall 111, there is also an outer peripheral wall 114 extending away from the mounting base 6. The outer peripheral wall 114 extends downward from the top wall 111 and has a certain height. The two ends of the outer peripheral wall 114 are respectively in contact with the mounting base 6 and the outer ring module 3. A number of first grilles 1141 for air intake are provided on the outer peripheral wall 114. When the bathroom heater 100 works, cold air enters the air heating main unit 5 from the first grilles 1141. The first grilles 1141 extend from the direction away from the mounting base 6 towards the mounting base 6, and the height of the first grilles 1141 should be set large enough to ensure sufficient air intake, so as to enable the bathroom heater 100 to achieve sufficient air output. Moreover, the setting of the outer peripheral wall 114 can fix the distance between the outer ring module 3 and the mounting base 6, ensuring the air intake of the bathroom heater 100.

[0068] Further, a number of second grilles 1112 arranged at intervals are provided on the top wall 111. The second grilles 1112 are arranged close to the mounting opening 112 and at least partially located inside the opening 61. The setting of the second grilles 1112 makes the bathroom heater 100 more breathable. In other embodiments, the second grilles 1112 may not be provided.

[0069] On the inner side of the top wall 111, there is a limiting wall 113 extending towards the mounting base 6. The limiting wall 113 is configured to limit the rotation angle of the limiting bracket 12.

[0070] The bracket 12 is arranged on the side of the top wall 111 facing the mounting base 6 and is rotatably connected to the top wall 111. It is configured to fixedly connect the air heating main unit 5 to the mounting base 6 and fixedly connect the air heating main unit 5 and the air duct structure 2.

[0071] The bracket 12 has a first position and a second position. In the first position, at least part of the orthographic projection of the bracket 12 is located inside the mounting opening 112 to enter the interior of the mounting base 6 through the mounting opening 112. In the second position, at least part of the orthographic projection of the bracket 12 is located outside the top wall 111 to fixedly connect the bathroom heater 100 to the mounting base 6 through the bracket 12 and fixedly connect the air heating main unit 5 and the air duct structure 2 of the bathroom heater 100.

[0072] Specifically, the bracket 12 includes a first part 122 rotatably connected to the top wall 111, a second part 123 extending from the first part 122 towards the mounting base 6, and a third part 124 arranged at an angle to the second part 123 and used for fixing the air heating main unit 5 and the air duct structure 2. The second part 123 includes a first plate 1231 extending vertically and a second plate 1232 extending horizontally from the first plate 1231. The first part 122 is connected to the first plate 1231, and the third part 124 is connected to the second plate 1232.

[0073] An assembly hole 1233 is provided at one end of the first plate 1231 away from the first part 122. When the bracket 12 is in the second position, a fastener passes through the assembly hole 1233 to fixedly connect the bracket 12 to the installation mechanism 62 in the installation space, and the ceiling heater 100 is fixedly installed on the installation base 6. In this embodiment, the installation mechanism 62 is a wooden strip, and the wooden strip is directly supported on the keel.

[0074] There is a clearance portion 125 between the second plate 1232 and the first part 122. The clearance portion 125 is configured to allow the installation base 6 to pass through, that is: the second plate 1232 is at a certain distance from the top wall 111, and this distance is greater than the height of the installation base 6, so as to prevent the part of the orthographic projection exceeding the top wall 111 from colliding with the installation base 6 when the bracket 12 rotates to the second position.

[0075] A second fixing hole 1221 is provided on the first part 122, and a first fixing hole 1113 is correspondingly provided on the top wall 111. When the bracket 12 is in the second position, the first fixing hole 1113 overlaps with the second fixing hole 1221, and the bracket 12 is fixed in the second position by a fastener.

[0076] A connecting portion 1241 and a stop portion 1242 are provided on the third part 124. The connecting portion 1241 is used to fixedly connect the air heating main unit 5 and the air duct structure 2, and the stop portion 1242 is configured to limit the installation position of the air heating main unit 5.

[0077] In the present invention, a plurality of brackets 12 are provided, and the plurality of brackets 12 are arranged circumferentially along the top wall 111.

[0078] Specifically, in the first position, the orthographic projections of the second parts 123 of the plurality of brackets 12 are located on the top wall 111, the extension lines of the orthographic projections of the second parts 123 of the plurality of brackets 12 intersect, and the orthographic projection of the third part 124 is located within the installation opening 112.

[0079] In the second position, at least part of the orthographic projection of the second part 123 is located outside the top wall 111, the orthographic projections of the second parts 123 of the plurality of brackets 12 are arranged in parallel, and the orthographic projection of the third part 124 is located on the top wall 111.

[0080] In this embodiment, 4 brackets 12 are provided. In the second position, the orthographic projections of the second parts 123 of the 4 brackets 12 are parallel to each other and are installed on the installation mechanism 62, and the orthographic projections of the two installation mechanisms 62 are also parallel to each other.

[0081] The air duct structure 2 includes a housing 21. The housing 21 includes an outer shell 211 and an inner shell 212. An arc-shaped air duct 22 and an annular air outlet 2121 connecting the arc-shaped air duct 22 are formed between the outer shell 211 and the inner shell 212.

[0082] The housing 211 is provided with a second air inlet 2111. The air enters the arc-shaped air duct 22 through the second air inlet 2111 and then enters the room from the annular air outlet 2121. The shape of the arc-shaped air duct 22 is set to make the air flow more gentle. The annular air outlet mode makes the indoor temperature distribution more uniform. When the air blows on the human body, it will not cause discomfort due to too fast air speed or concentrated blowing area.

[0083] The arc-shaped air duct 22 includes a first section 221, a second section 222 and an arc section 223. The first section 221 is arranged close to the second air inlet 2111, the second section 222 is arranged close to the annular air outlet 2121, and the arc section 223 connects the first section 221 and the second section 222. Moreover, the first section 221 is in a horn shape, and the wide end of the first section 221 is connected to the second air inlet 2111, and the narrow end of the first section 221 is connected to the arc section 223. That is, the second air inlet 2111 and the annular air outlet 2121 are respectively arranged at both ends of the arc-shaped air duct 22. The arc-shaped air duct 22 gradually decreases from large to small, which actually plays a role in guiding the air flow, guiding the air from the second air inlet 2111 to the annular air outlet 2121. This process makes the air speed more gentle. The arc design can also make full use of the air flow, shorten the intake path and reduce the air volume loss.

[0084] The annular air outlet 2121 is exposed outside the installation base 6, that is, the plane where the annular air outlet 2121 is located is lower than the plane where the lower part of the installation base 6 is located.

[0085] At least two first engaging parts 23 are arranged on the housing 21 in the circumferential direction. The outer ring module 3 includes a module housing 31. The module housing 31 has an annular assembly port 311. At least two second engaging parts 32 are arranged at the position of the module housing 31 facing the assembly port 311. The outer ring module 3 and the air duct structure 2 are detachably connected through the first engaging parts 23 and the second engaging parts 32.

[0086] One of the first engaging part 23 and the second engaging part 32 includes a clearance notch 231 and a buckle part 232 arranged in sequence. The buckle part 232 includes a first clamping surface 2321. The other of the first engaging part 23 and the second engaging part 32 includes a protrusion 321 corresponding to the clearance notch 231. The protrusion 321 includes a second clamping surface 3211. The protrusion 321 slides into or out of the buckle part 232 through the clearance notch 231 so that the first clamping surface 2321 is slidably connected to the second clamping surface 3211.

[0087] In this embodiment, an outer edge portion 2113 is formed by extending the outer shell 211 away from the inner shell 212. The first engaging portion 23 is disposed on the outer edge portion 2113 and includes a clearance notch 231 and a snap portion 232 arranged in sequence. The snap portion 232 includes a first engaging surface 2321 disposed upward and a first guiding surface 2322 disposed adjacent to the clearance notch 231. The first guiding surface 2322 extends obliquely downward from the first engaging surface 2321 toward the clearance notch 231.

[0088] Further, the second engaging portion 32 is a convex portion 321 formed by extending the module housing 31 toward the assembly port 311. The convex portion 321 includes a second engaging surface 3211 facing downward and second guiding surfaces 3212 disposed at both ends of the second engaging surface 3211. The positions of the second guiding surfaces 3212 correspond to the positions of the first guiding surfaces 2322.

[0089] One of the snap portion 232 and the convex portion 321 is provided with a limiting structure 3213, and the other of the snap portion 232 and the convex portion 321 is provided with a limiting surface 2323 corresponding to the limiting structure 3213. The limiting structure 3213 and the limiting surface 2323 cooperate to limit the sliding distance of the convex portion 321 on the snap portion 232.

[0090] In this embodiment, the limiting surface 2323 is disposed on the snap portion 232. The limiting surface 2323 is adjacent to the first guiding surface 2322 and faces the clearance notch 231. The limiting structure 3213 is disposed on the convex portion 321 and extends downward from the second engaging surface 3211.

[0091] The housing 21 is provided with a first positioning portion 2112, and the outer ring module 3 is correspondingly provided with a second positioning portion 33. One of the first positioning portion 2112 and the second positioning portion 33 includes an elastic protrusion facing each other, and the other of the first positioning portion 2112 and the second positioning portion 33 includes a card slot facing each other. In this embodiment, the first positioning portion 2112 is a card slot, and the second positioning portion 33 is an elastic protrusion.

[0092] When the outer ring module 3 and the air duct structure 2 are rotationally snapped together, after the convex portion 321 is aligned with the clearance notch 231 from below the air heating main unit 5 and pushed upward in place, the outer ring module 3 is rotated counterclockwise. The second guiding surface 3212 slides into the snap portion 232 along the first guiding surface 2322, and the first engaging surface 2321 abuts against the second engaging surface 3211 until the second positioning portion 33 is snapped into the first positioning portion 2112, indicating that the rotational snap is in place. When the elastic protrusion enters the card slot, a sound will be emitted to indicate that the rotation is in place and play a certain role in preventing rotation, preventing the outer ring module 3 from accidentally falling off during use.

[0093] Further, when the air duct structure 2 is rotationally and snap - connected to the outer ring module 3 in place, the limiting structure 3213 abuts against the limiting surface 2323, thereby limiting the outer ring module 3 to prevent the outer ring module 3 from rotating excessively and causing structural damage, greatly improving the safety of the installation process and saving costs.

[0094] The air duct structure 2 is provided with a connecting member 24, and the connecting member 24 is detachably connected to the air - heating main unit 5. The connecting member 24 includes a connecting end 241 facing the air - heating main unit 5, and the connecting end 241 is detachably connected to the main unit bracket 51.

[0095] Optionally, the outer ring module 3 is any one of an annular lighting assembly, an annular electrical module, an annular display module, and an annular audio module. In this embodiment, the outer ring module 3 is an annular lighting assembly, and the annular lighting assembly is arranged around the air duct structure 2.

[0096] The inner ring module 4 is arranged in the space formed by the depression of the inner shell 212 towards the outer shell 211. The size of the inner ring module 4 matches the size of this accommodation space. The plane where the inner ring module 4 is located is kept horizontal with the plane where the air duct structure 2 is located, making the integrated ceiling heater 100 look more beautiful and making reasonable use of the space.

[0097] In this embodiment, the inner ring module 4 is any one of an electrical module, a display module, an audio module, and a lighting module. In other embodiments, the inner ring module 4 may not be provided either.

[0098] The air - heating main unit 5 includes a main unit bracket 51, a main unit shell 52, and a frame 53. The air - heating main unit 5 is detachably connected to the air duct structure 2 through the main unit bracket 51.

[0099] The main unit bracket 51 includes a fixed end 511 and a clamping end 512. The fixed end 511 is fixedly connected to the connecting member 24 on the air duct structure 2, and the clamping end 512 is fixedly connected to the frame 53 of the air - heating main unit 5.

[0100] The main unit shell 52 is internally provided with a blowing assembly 521, and the first air inlet 5211 of the blowing assembly 521 is connected to the second air inlet 2111 through a wind - guiding structure.

[0101] The wind - guiding structure is arc - shaped, including a third air inlet (not shown) arranged at an angle and a first air outlet 5221. The third air inlet faces the blowing assembly 521 and is connected to the first air outlet 5221. The first air outlet 5221 faces the air duct structure 2 and is connected to the second air inlet 2111. A heating device 523 is arranged at the connection between the first air outlet 5221 and the second air inlet 2111.

[0102] An air extraction component 524 is also provided inside the main housing 52. The air extraction component includes an air extraction port 5241 and an exhaust port 5242. When there is fog in the room, air enters from the air extraction port 5241 and is discharged from the exhaust port 5242.

[0103] Furthermore, the positions of the first air inlet 5211 and the air extraction port 5241 correspond to the position of the second grille 1112 on the conversion frame 1, which is more convenient for air intake.

[0104] The bathroom warmer 100 of the present invention has two working modes, namely the heating and air outlet mode and the ventilation mode, and the two working modes can be turned on and operated simultaneously.

[0105] Specifically, when the heating and air outlet mode is started, gas enters the bathroom warmer 100 from the first grille 1141 and the second grille 1112, enters the air heating main unit 5 through the first air inlet 5211, and then is blown out from the first air outlet 5221 through the heating device 523, enters the arc-shaped air duct 22 of the air duct structure 2, and finally enters the room from the annular air outlet 2121, so that the air outlet in the room is in a ring shape, making the air outlet more uniform and avoiding discomfort caused by the concentrated air outlet blowing the warm air onto the human body.

[0106] When the ventilation mode is started, gas enters the bathroom warmer 100 from the first grille 1141 and the second grille 1112. Then, the gas enters the air heating main unit 5 from the air extraction port 5241 and is blown towards the outside through the exhaust port 5242 to achieve ventilation.

[0107] Embodiment 2:

[0108] In this embodiment, the installation base 6 is an integrated ceiling, and the conversion frame 1 is not provided on the bathroom warmer 100. The integrated ceiling is simple to install, flexible in layout, convenient for maintenance, and can overcome the deficiency of the monotonous color of the ceiling. After installing the bathroom warmer on the integrated ceiling, what is seen is no longer a rigid combination, but a perfectly coordinated top shape, which can overcome the embarrassment of the installation position of traditional bathroom warmers.

[0109] Specifically, the main machine bracket 51 on the air heating main unit 5 is detachably connected to the connecting piece on the air duct structure 2. Thus, the lower half of the air duct structure 2, the outer ring module 3, and the inner ring module 4 are lifted. A triangular keel is provided on the upper part of the installation base 6, and a certain number of support members 64 are fixedly connected to the frame 53. The support members 64 are clamped with the triangular keel, that is, the air heating main unit 5 is directly placed on the triangular keel.

[0110] In this embodiment, there is a gap 63 between the air duct structure 2 and the installation base 6. When the bathroom warmer is working, air directly enters the interior of the bathroom warmer 100 from the gap 63, and the working process is the same as that of Embodiment 1.

[0111] In summary, the conversion frame 1 is arranged between the air heating main unit 5 and the air duct structure 2. The air heating main unit 5 is fixedly connected to the installation base 6 through the conversion frame 1, and the air heating main unit 5 and the air duct structure 2 are fixedly connected through the conversion frame 1. The conversion frame 1 is beneficial to the installation and positioning of the integrated ceiling heater 100, can fix the distance between the outer ring module 3 and the installation base 6, ensure the air intake of the integrated ceiling heater 100, and the bracket 12 of the conversion frame 1 can directly support the air heating main unit 5, and can block the opening 61 on the installation base 6 and the internal structure of the integrated ceiling heater 100, making the appearance of the integrated ceiling heater 100 more beautiful and complete.

[0112] The above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be modified or equivalently replaced without departing from the spirit and scope of the technical solutions of the present invention.

Claims

1. A conversion frame is used to install a bathroom heater on an installation base (6). An opening (61) is provided on the installation base (6), and there is an installation space above the installation base (6) for accommodating the air heating main unit (5) of the bathroom heater. It is characterized in that, The conversion box includes: A frame body (11) including a top wall (111) facing the installation base (6), and an installation opening (112) is provided on the inner side of the top wall (111) corresponding to the position of the opening (61); A bracket (12) is disposed on the side of the top wall (111) facing the installation base (6) and is rotatably connected to the top wall (111). The bracket (12) has a first position and a second position. In the first position, at least a part of the orthographic projection of the bracket (12) is located within the installation opening (112) to enter the interior of the installation base (6) through the installation opening (112). In the second position, at least a part of the orthographic projection of the bracket (12) is located outside the top wall (111) to fixedly connect the bathroom heater to the installation base (6) through the bracket (12), and fixedly connect the air heating main unit (5) and the air duct structure (2) of the bathroom heater.

2. The conversion frame according to claim 1, wherein: The conversion box further includes a rotating member (13). A first rotating hole (1111) is provided on the top wall (111), and a second rotating hole (121) is correspondingly provided on the bracket (12). The rotating member (13) sequentially passes through the first rotating hole (1111) and the second rotating hole (121) to rotatably connect the bracket (12) to the frame body (11).

3. The conversion box according to claim 2, characterized in that: A limiting wall (113) extending towards the installation base (6) is provided on the inner side of the top wall (111), and the limiting wall (113) is configured to limit the rotation angle of the bracket (12).

4. The conversion box according to claim 1, characterized in that: An outer peripheral wall (114) extending away from the installation base (6) is further provided on the outer side of the top wall (111), and a plurality of first grilles (1141) for air intake are provided on the outer peripheral wall (114).

5. The conversion frame according to claim 4, characterized in that: A plurality of second grilles (1112) arranged at intervals are provided on the top wall (111). The second grilles (1112) are arranged close to the installation opening (112) and at least a part of them is located inside the opening (61).

6. The conversion frame according to claim 1, wherein: The bracket (12) includes a first part (122) rotatably connected to the top wall (111), a second part (123) extending from the first part (122) towards the installation base (6), and a third part (124) arranged at an angle with the second part (123) and used for fixing the air heating main unit (5) and the air duct structure (2). The second part (123) includes a first plate (1231) extending vertically and a second plate (1232) extending horizontally from the first plate (1231). The first part (122) is connected to the first plate (1231), and the third part (124) is connected to the second plate (1232).

7. The conversion box according to claim 6, wherein: An assembly hole (1233) is provided at one end of the first plate (1231) away from the first part (122), and a fastener passes through the assembly hole (1233) to fix the bracket (12) to the mounting mechanism (62) in the mounting space, thereby fixing the bathroom heater to the mounting base (6); A clearance portion (125) is provided between the second plate (1232) and the first portion (122), and the clearance portion (125) is configured to allow the installation base (6) to pass through.

8. The conversion box according to claim 6, characterized in that: The top wall (111) is also provided with a first fixing hole (1113), and the first part (122) is correspondingly provided with a second fixing hole (1221); when the bracket (12) is in the second position, the first fixing hole (1113) overlaps with the second fixing hole (1221), and the bracket (12) is fixed in the second position by a fastener.

9. The conversion frame according to claim 6, characterized in that: The third part (124) is provided with a connecting portion (1241) and a stop portion (1242), wherein the connecting portion (1241) is used for fixedly connecting the air-heating main unit (5) and the air duct structure (2), and the stop portion (1242) is configured to limit the installation position of the air-heating main unit (5).

10. The conversion frame according to claim 6, characterized in that: A plurality of the brackets (12) are provided, and the plurality of the brackets (12) are arranged circumferentially along the top wall (111), and, When in the first position, the orthographic projections of the second parts (123) of the plurality of brackets (12) are located on the top wall (111), the extended lines of the orthographic projections of the second parts (123) of the plurality of brackets (12) intersect, and the orthographic projection of the third part (124) is located in the installation opening (112); When in the second position, the orthographic projection of the second part (123) is at least partially located outside the top wall (111), the orthographic projections of the second parts (123) of the plurality of brackets (12) are arranged in parallel, and the orthographic projection of the third part (124) is located on the top wall (111).

11. A bathroom heater, characterized in that, include: The air heating main unit (5) is installed in the installation space above the installation base (6); The air duct structure (2) is at least partially exposed on the installation base (6); The conversion frame according to any one of claims 1 to 10, wherein the conversion frame is arranged between the air heating main unit (5) and the air duct structure (2), the air heating main unit (5) is fixedly connected to the mounting base (6) through the conversion frame, and the air heating main unit (5) and the air duct structure (2) are fixedly connected through the conversion frame.