Work ticket generation method and device based on work safety management system

Through the electronic job ticket generation method based on the job safety management system, the problem of long approval process and inconsistent data records in special job safety management is solved, and the job tickets are quickly generated and managed, which improves management efficiency and security.

CN120387782APending Publication Date: 2025-07-29HINA GRAND ENTERPRISES INC YUANDA
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510263942.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-06
Publication Date
2025-07-29

AI Technical Summary

Technical Problem

In the prior art, special operations safety management has long approval procedures, slow information transmission, weak management and control efforts, and the inability to understand the progress of the operation and safety risks in real time, and the operation data records are not uniform, which affects management efficiency.

Method used

It provides a job ticket generation method based on the job security management system. Through the collaborative work of the client and the server, electronic job tickets including job application, review, on-site confirmation, monitoring data upload and acceptance inspection are quickly generated, supporting printing, exporting and viewing, realizing unified data recording and management.

Benefits of technology

It improves the speed and efficiency of job ticket generation, facilitates understanding and control of the operation status, solves the problem of difficulty in presenting vouchers, and improves the management efficiency and safety of special operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120387782A_ABST
    Figure CN120387782A_ABST
Patent Text Reader

Abstract

The invention discloses an operation ticket generation method and equipment based on an operation safety management system. The job ticket generation method comprises the following steps: a server receives a job ticket generation request input by a user through a client; determining the type of the requested job ticket according to the generation request; according to the determined type of the operation ticket, data records of corresponding operation stages in the operation are read, a ticket template corresponding to the type of the operation ticket is called, and the operation stages at least comprise an operation application and auditing stage, an operation site confirmation stage, an in-operation monitoring data uploading stage and an operation acceptance inspection stage; and writing the data record of the corresponding operation stage in the operation into the ticket template, and generating an operation ticket. According to the embodiment of the invention, the method has the advantages of high generation speed and high generation efficiency of the work ticket in each stage of work, and further facilitates the understanding and control of the work condition through the checking of the work ticket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of special operation safety management, and particularly relates to a method and device for generating work tickets based on a work safety management system. Background Art

[0002] Currently, for the safety management of special operations, most traditional enterprises still adopt the offline paper work ticket application and approval mode. The approval process is long, information transmission is slow, approvers cannot understand the progress of operations in real time, there are no effective control points for work safety management, and there is no real-time statistics method for work orders. Managers cannot effectively obtain the overall situation of special operations in their enterprises in real time, such as how many operations are in progress on the same day, where the operations are located respectively, what levels the operations are, what are the reasons for the suspension of operations on the same day, and what safety risks are there, etc.

[0003] Although some other enterprises have adopted software such as dangerous operation control service platforms, work order treasures, and operation supervision systems through information technology means, generally speaking, general product software still has problems of being "shallow" and "extensive", manifested as insufficient depth in core management processes, weak control intensity, relatively many functions, but not fully consistent with the business of the enterprise. Customized software has problems of being "specialized" and "expensive", manifested as a high degree of customization, not matching the enterprise's own processes, high customization costs, and long development time cycles. Neither method can well meet the safety management requirements of enterprises for special operations.

[0004] In addition, during the operation process, different personnel usually record a lot of operation data according to requirements. In related technologies, it is also not possible to well unify and view the relevant data at each stage, which affects the understanding and control of the operation. Summary of the Invention

[0005] Based on this, in view of the above technical problems, it is necessary to provide a method and device for generating work tickets based on a work safety management system, which have the advantages of fast generation speed and high generation efficiency of work tickets at each stage of the operation, and further facilitate the understanding and control of the operation status through the viewing of work tickets.

[0006] In a first aspect, a method for generating a work ticket based on a work safety management system is provided. The work safety management system includes a client and a server. The client is installed on the user's intelligent terminal respectively. The method for generating a work ticket includes:

[0007] The server receives a generation request for a work ticket input by the user through the client;

[0008] According to the generation request, determine the type of the requested work ticket;

[0009] According to the determined type of the work ticket, read the data records of the corresponding work stages in the work, and call the ticket template corresponding to the type of the work ticket from the pre-stored set of ticket templates, where the work stages at least include the work application and review stage, the work site confirmation stage, the monitoring data upload stage during the work, and the work acceptance inspection stage, and the set of ticket templates includes ticket templates corresponding to different types of work tickets;

[0010] Write the data records of the corresponding work stages in the work into the ticket template, and generate a work ticket.

[0011] In some examples, the writing the data records of the corresponding work stages in the work into the ticket template and generating a work ticket includes:

[0012] Obtain the attribute information of each data in the data record;

[0013] According to the attribute information of each data, determine the field to which each data belongs in the ticket template;

[0014] Write each data into the corresponding field of the ticket template to generate the work ticket.

[0015] In some examples, the server receiving the generation request of the work ticket input by the user through the client includes:

[0016] Provide the user with a work ticket export list;

[0017] According to the work ticket selected by the user from the work ticket export list, obtain the generation request of the work ticket input by the user through the client.

[0018] In some examples, the reading the data records of the corresponding work stages in the work according to the determined type of the work ticket includes:

[0019] According to the type of the work ticket, determine the corresponding work stages in the work;

[0020] Read out the data records corresponding to the work stages from the database.

[0021] In some examples, the reading out the data records corresponding to the work stages from the database includes:

[0022] If the work stage is the work application and review stage, read out the relevant data during the work application and review stage;

[0023] If the work stage is the work site confirmation stage, read out the relevant data uploaded during the work site confirmation;

[0024] If the operation stage is the stage of uploading monitoring data during the operation, relevant data during the uploading of monitoring data during the operation is read out;

[0025] If the operation stage is the operation acceptance inspection stage, relevant data uploaded during the operation acceptance inspection is read out.

[0026] In some examples, before calling the ticket template corresponding to the type of the work ticket, it further includes:

[0027] Obtain multiple ticket templates that correspond one-to-one to the types of multiple work tickets;

[0028] Store multiple said ticket templates.

[0029] In some examples, the calling of the ticket template corresponding to the type of the work ticket includes:

[0030] According to the type of the work ticket, select the corresponding ticket template from multiple pre-stored ticket templates;

[0031] Call the selected ticket template.

[0032] In some examples, after generating the work ticket, it further includes:

[0033] In response to the user's print request, print the paper document of the work ticket.

[0034] In some examples, after generating the work ticket, it further includes:

[0035] In response to the user's export request, convert the work ticket into a PDF file and export the PDF file.

[0036] In some examples, after generating the work ticket, it further includes:

[0037] In response to the user's view request, display the work ticket on the page.

[0038] In a second aspect, a computer device is provided, including a memory, a processor, and a computer program stored on the memory and executable on the processor, characterized in that when the processor executes the program, it implements the steps of the work ticket generation method based on the operation safety management system in the first aspect and any possible implementation manner of the first aspect.

[0039] Using the embodiments of the present application, the server receives a generation request for a work ticket input by a user through a client, determines the type of the requested work ticket according to the generation request, then reads relevant data in the work according to the determined type of the work ticket, calls a ticket template corresponding to the type of the work ticket, writes the relevant data into the ticket template, and generates a work ticket. It has the advantages of fast generation speed and high generation efficiency of work tickets in each stage of the work. Furthermore, through the viewing of work tickets, it is convenient to understand and control the work status, thus solving the technical problem of difficult presentation of various vouchers during work in enterprise production and improving the efficiency of voucher presentation in each stage during work. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Other features, objects, and advantages of the present application will become more apparent from the following detailed description of non-limiting embodiments read in conjunction with the accompanying drawings:

[0041] Figure 1 Schematic diagram of the work safety management system provided by the embodiment of the present application;

[0042] Figure 2 Schematic diagram of work ticket export for the work ticket generation method provided by the embodiment of the present application;

[0043] Figure 3 Another schematic diagram of work ticket export for the work ticket generation method provided by the embodiment of the present application;

[0044] Figure 4 Another schematic diagram of work ticket export for the work ticket generation method provided by the embodiment of the present application;

[0045] Figure 5 Schematic diagram of the work safety management system provided by the embodiment of the present application;

[0046] Figure 6 Block diagram of the structure of the computer device provided by the embodiment of the present application;

[0047] Figures 7A to 7C Schematic diagram of the ticket template for the hot work ticket. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0048] The present application will be further described in detail below in conjunction with the embodiments and the drawings. It can be understood that the specific embodiments described herein are only used to explain the related application and do not limit the application. Additionally, it should be noted that for the sake of description, only parts related to the application are shown in the drawings.

[0049] It should be noted that, without conflict, the embodiments and the features of the embodiments in the present application can be combined with each other. The present application will be described in detail below with reference to the drawings and in conjunction with the embodiments.

[0050] The method and device for generating a work permit based on a job safety management system according to an embodiment of the present application will be described in detail below with reference to the accompanying drawings.

[0051] The job safety management system includes a client and a server, and the client is installed on the user's intelligent terminal respectively.

[0052] Figure 1 It is a flowchart of the method for generating a work permit based on a job safety management system. As Figure 1 shown, the method for generating a work permit based on a job safety management system according to an embodiment of the present application includes the following steps:

[0053] S101: The server receives a generation request for a work permit input by the user through the client.

[0054] In an embodiment of the present application, the server receiving a generation request for a work permit input by the user through the client includes: providing a work permit export list for the user; obtaining a generation request for a work permit input by the user through the client according to the work permit selected by the user from the work permit export list.

[0055] S102: According to the generation request, determine the type of the requested work permit. For example, the types of the work permit include a hot work permit, an electrical work permit, a high-altitude work permit, etc., that is, work permits corresponding to different operations.

[0056] S103: According to the determined type of the work permit, read the data records of the corresponding work stages in the operation, and call the ticket template corresponding to the type of the work permit from the pre-stored ticket template set. Among them, the work stages at least include a work application and approval stage, a work site confirmation stage, a guardianship data upload stage during the work, and a work acceptance inspection stage, and the ticket template set includes ticket templates corresponding to different types of work permits.

[0057] Taking hot work as an example, the corresponding ticket template is the hot work ticket template as Figures 7A to 7C shown.

[0058] In an embodiment of the present application, reading the data records of the corresponding work stages in the operation according to the determined type of the work permit includes: determining the corresponding work stages in the operation according to the type of the work permit; reading out the data records corresponding to the work stages from the database.

[0059] In this example, reading the data record corresponding to the operation phase from the database includes: if the operation phase is the operation application and review phase, reading the relevant data during the operation application and review phase; if the operation phase is the operation site confirmation phase, reading the relevant data uploaded during the operation site confirmation; if the operation phase is the monitoring data upload phase during the operation, reading the relevant data uploaded during the monitoring data upload during the operation; if the operation phase is the operation acceptance inspection phase, reading the relevant data uploaded during the operation acceptance inspection.

[0060] It should be noted that before calling the ticket template corresponding to the type of the work ticket, it also includes: obtaining a plurality of ticket templates corresponding one by one to the types of a plurality of work tickets; storing the plurality of ticket templates.

[0061] Thus, calling the ticket template corresponding to the type of the work ticket includes: selecting the corresponding ticket template from the pre-stored plurality of ticket templates according to the type of the work ticket; calling the selected ticket template.

[0062] S104: Write the data record of the operation phase corresponding to the operation into the ticket template and generate a work ticket.

[0063] In a specific example, writing the data record of the operation phase corresponding to the operation into the ticket template and generating a work ticket includes: obtaining the attribute information of each data in the data record; determining the field to which each data belongs in the ticket template according to the attribute information of each data; writing each data into the corresponding field of the ticket template to generate the work ticket.

[0064] Generally, each ticket template includes many fields. After obtaining the data record, different data needs to be written into the matching fields. Therefore, in the embodiments of the present invention, after obtaining the data record, the attribute information of each data is obtained respectively, and then the association relationship with the fields can be established according to the attribute information. In this way, each data can be written into the corresponding field to generate a work ticket. Among them, the attribute information is, for example, a number, and the association relationship between different numbers and fields is established in advance. Therefore, the field into which the data is written can be determined.

[0065] Among them, after generating the work ticket, it also includes: in response to the user's print request, printing the paper file of the work ticket, or in response to the user's export request, converting the work ticket into a PDF file and exporting the PDF file, or in response to the user's view request, displaying the work ticket on the page.

[0066] In specific applications, such as Figure 2As shown, the enterprise operation administrator can export different operations and operation tickets at different stages of the operation through the computer terminal, and can directly select and print through the list, or print from the document. The operations are as Figure 2 shown. For example: as Figure 3 shown, through the print template, select "Online preview, directly print with the browser", or export the operation ticket in PDF format. Taking the hot work operation as an example, the exported operation ticket is as Figure 4 shown.

[0067] According to the operation ticket generation method based on the operation safety management system in the embodiment of the present application, the server receives the generation request of the operation ticket input by the user through the client, determines the type of the requested operation ticket according to the generation request, then reads the relevant data in the operation according to the determined type of the operation ticket, and calls the ticket template corresponding to the type of the operation ticket, writes the relevant data into the ticket template, and generates the operation ticket. It has the advantages of fast generation speed and high generation efficiency of operation tickets at each stage of the operation. Furthermore, by viewing the operation ticket, it is convenient to understand and control the operation status, thus solving the technical problem of difficult presentation of various certificates during the operation in enterprise production, and improving the efficiency of presenting certificates at each stage during the operation.

[0068] The following will detail the full-process control of the operation safety management system for operation application & review -> on-site operation verification -> safety guardianship during operation (and real-time video monitoring) -> operation acceptance -> completion evaluation: as Figure 5 shown, according to an embodiment of the present application, the operation safety management system 500 includes: a client 510 and a server 520. The client 510 is installed on the user's intelligent terminal respectively, where:

[0069] The intelligent terminal is, for example, the user's smart phone, tablet computer, etc.

[0070] The server 520 is used to receive the special operation application submitted by the applicant and send a review notice to the person in charge. Among them, the person in charge at least includes the person in charge of the operation department, the person in charge of the territorial department, and the person in charge of the EHS department; after the person in charge approves, a reminder for requisition is sent to the equipment custodian, so that the equipment custodian can notify the operation person in charge of the equipment requisition notice, and after the operation is completed, the equipment is returned to the equipment custodian, where the operation person in charge is designated by the person in charge of the operation department; before the operation starts, a on-site verification notice is sent to the territorial guardian, the operation person in charge, and the EHS personnel, where the territorial guardian is designated by the person in charge of the territorial department, and the EHS personnel are designated by the person in charge of the EHS department; during the on-site verification and during the operation execution, at least provide the territorial guardian with the service of regularly uploading the guardianship data during the operation; after the operation is completed, at least conduct an operation acceptance service for the operation person in charge and the territorial guardian; after the acceptance is passed, provide an operation completion evaluation service for the operation person in charge, the territorial guardian, and the EHS personnel.

[0071] In an embodiment of the present application, the server is used to receive the special operation application submitted by the applicant and send a review notice to the person in charge, including: determining the operation level of the special operation application submitted by the applicant; if it is a special-level or first-level operation, a review notice is sent to the person in charge of the operation department, the person in charge of the territorial department, the person in charge of the EHS department, and the general manager; if it is not a special-level or first-level operation, a review notice is sent to the person in charge of the operation department, the person in charge of the territorial department, and the person in charge of the EHS department.

[0072] In this example, the review by the person in charge includes: the person in charge of the operation department selects the operation personnel and the operation person in charge, selects the operation equipment, and fills in the review opinions; the person in charge of the territorial department selects the territorial guardian and fills in the review opinions; the person in charge of the EHS department selects the EHS personnel and fills in the review opinions. Among them, if it is a special-level or first-level operation, the general manager conducts the review and fills in the review opinions.

[0073] Taking the action operation as an example of the special operation (operation), the applicant enters the application home page through the client of the operation safety management system, selects "Hot Work Operation Application", and starts to fill in the form as required.

[0074] After the application is submitted, it is first reviewed by the person in charge of the operation department. It should be noted that the person in charge of the operation department selects the "Hot Work Operator" and the "Operation Person in Charge", selects the operation equipment, fills in the review opinions and signs to pass.

[0075] Similarly, after the review by the person in charge of the operation department, it comes to the review by the person in charge of the territorial department. It should be noted that the person in charge of the territorial department selects the "Territorial Guardian", fills in the review opinions and signs to pass.

[0076] Similarly, after the person in charge of the territorial department reviews, it goes to the person in charge of the EHS department for review. It should be noted that the person in charge of the EHS department must select "EHS personnel", fill in the review comments and sign to pass.

[0077] If it is a special or first-class hot work, it also needs to go to the general manager for review. The general manager reviews whether the relevant content complies with the regulations. After verification, fill in the review comments and sign to pass.

[0078] When the review is completed, the equipment custodian will receive a reminder for equipment requisition. The requisition form can be opened through "Mine" - "My Requisitions", and click "Notify for Collection" to notify the person in charge of the operation to come and collect. Before the operation starts, the person in charge of the operation opens and clicks "Collect" through the requisition reminder. The person in charge of the operation selects the equipment integrity in the requisition form and signs to confirm the collection. After the operation is completed, the person in charge of the operation returns the equipment. The equipment custodian opens the requisition form in "Mine" - "My Requisitions" and clicks "Return". The equipment custodian selects the equipment integrity at the time of return and signs to confirm the return.

[0079] In an embodiment of the present application, the territorial guardian, the person in charge of the operation, and the EHS personnel conduct on-site verification, including: after receiving the on-site verification notice, the territorial guardian enters the confirmation form through the notice link to fill in and confirm; after receiving the on-site verification notice, the person in charge of the operation enters the confirmation form through the notice link to fill in and confirm; after receiving the on-site verification notice, the EHS personnel enters the confirmation form through the notice link to fill in and confirm. Among them, if it is a special or first-class operation, before the operation starts, it is necessary to reconfirm whether the last gas detection is overdue. In case of an overdue reminder, a verification notice for uploading gas detection data is sent again.

[0080] Specifically, the territorial guardian receives the notice, enters the confirmation form through the notice link, and fills it in according to the requirements of the document. It should be noted that in addition to the required fields filled in by the guardian, the "operation site monitoring link" can be filled in, and relevant personnel during the operation can view the operation situation in real time through the link; at the same time, "gas sampling analysis" for "special" and "first-class" hot work is required.

[0081] Similarly, the person in charge of the operation receives the notice, enters the confirmation form through the notice link, and fills it in according to the requirements of the document. In addition to the required fields filled in by the person in charge of the operation, "on-site supplementary safety measures" can be added to ensure the safety of the operation.

[0082] Similarly, the EHS personnel receives the notice, enters the confirmation form through the notice link, and fills it in according to the requirements of the document. In addition to the required fields filled in by the EHS personnel, "on-site supplementary safety measures" can be added, and the "handover record" can be selectively uploaded according to the company's system.

[0083] For "special grade" and "first grade" hot work operations, after the operation confirmation is completed and before the operation officially starts, it will be reconfirmed whether the most recent gas detection is overdue. In case of overdue reminder, after reconfirming and uploading the gas detection data, the operation will officially start.

[0084] During the operation, it also includes: when it is necessary to change the operator, a change notice is sent to the operation supervisor so that the operation supervisor can change the operator.

[0085] During the operation, it also includes: during the operation process, if a failure occurs, the on-site guardian is notified to report the failure; after the enterprise operation personnel receive the failure report notice, rectification tasks are assigned so that the problem handler can handle the failure, and after the failure is handled, a rectification completion feedback is made.

[0086] After the acceptance is passed, a job completion evaluation service is provided for the operation supervisor, on-site guardian and the EHS personnel, including: sending a request for scoring the job performance of the on-site guardian and the EHS personnel to the operation supervisor so that the operation supervisor can score the job performance of the on-site guardian and the EHS personnel; sending a request for scoring the job performance of the operation supervisor and the EHS personnel to the on-site guardian so that the on-site guardian can score the job performance of the operation supervisor and the EHS personnel; sending a request for scoring the job performance of the on-site guardian and the operation supervisor to the EHS personnel so that the EHS personnel can score the job performance of the on-site guardian and the operation supervisor.

[0087] The operation safety management system also includes: providing a service for exporting operation tickets at each stage of the operation for users.

[0088] During the operation, the operation safety management system also includes: providing a service for viewing monitoring videos and an operation pause / resumption service for users.

[0089] During the operation, the on-site guardian will regularly receive a site confirmation notice and needs to add an operation guardianship record in a timely manner, just fill it out according to the requirements of the document.

[0090] Similarly, during the operation, for "special grade" and "first grade" hot work operations, on-site confirmation by EHS personnel is required. Similarly, the EHS personnel will regularly receive a site confirmation notice and need to add an operation guardianship record in a timely manner, just fill it out according to the requirements of the document.

[0091] During the operation, in case of emergencies where relevant personnel need to be changed, the operation supervisor can submit a replacement application through the [Replace Personnel] button. Select the personnel to be replaced and the corresponding replacement personnel, and then submit. Note: After the approval is passed and the on-site guardian uploads the "personnel change handover photo", the replacement is completed and the personnel are automatically changed.

[0092] During the operation, if any faults are found, the situation can be reported at any time. The on-site guardian can report it through the fault reporting button. Fill in the problem details and submit it. After receiving the problem reporting message, the enterprise operation personnel will open a separate document, click on "Under rectification", select the problem handler, and assign the rectification task. After receiving the problem handling task, the problem handler will handle it. After completion, click the "Rectification completed" button to give feedback and end the problem.

[0093] After the operation is completed, the operation leader will initiate the acceptance. Open the operation application form and click the operation acceptance button to start the acceptance. Fill in the document content according to the form requirements and then submit it. It should be noted that if the relevant work is not completed and "No" is selected, it cannot be submitted, and it must be confirmed that it is completed.

[0094] After the operation leader initiates the acceptance, the guardian will receive the acceptance notice and click on the notice message to go and fill it in to start the acceptance. Confirm whether the acceptance information is accurate. If it is correct, fill in the opinions and sign and submit. It should be noted that according to the regulatory requirements, for hot work acceptance, the inspection results can only be submitted 30 minutes after the operation is completed. The HS personnel will conduct the final acceptance. The EHS personnel will receive the acceptance notice, click on the notice message to go and fill it in to start the acceptance. Confirm whether the acceptance information is accurate. If it is correct, fill in the opinions and sign and submit. It should be noted that for secondary hot work, EHS personnel are not required for acceptance.

[0095] After the operation acceptance is passed, the "operation leader", "on-site guardian", and "EHS personnel" will each receive an evaluation message and rate the performance of the other two role holders for this operation.

[0096] During the operation, relevant personnel can view the operation site situation through the "Monitor in real time" function. Through the home page and operation real-time viewing, select the corresponding operation form and click to enter to view the current operation screen. The operation screen can be controlled by the pan-tilt head, enabling the adjustment of the camera lens and real-time conversation at the scene, facilitating remote command.

[0097] During the operation, in case of any situation, it can be paused with one key at any time. The on-site guardian clicks the "Pause operation" button and fills in the specific pause reason and then confirms. During the operation, if the gas detection is unqualified and the result is uploaded, it will be automatically paused. After the operation pause ends, the on-site guardian clicks the "Resume operation" button, fills in the description of the resume situation, and after confirmation, the operation can start again. In addition, in the operation application form, the operation pause and resume records can be viewed, and the details can be expanded for viewing. Through the "Work order statistics" function, the statistical charts of various dimensions of the hot work and the statistical situation of the handling and rectification of the "Take a snapshot" problem reporting can be clearly viewed.

[0098] Through "Operations Management," company operations managers can view and maintain operator information, gain access to comprehensive hot work statistics and analysis, report issues captured by users, and address and rectify these issues at any time. The homepage allows users to quickly review the day's operations. Clicking the corresponding daily operations button links to a detailed list. The day's operations map provides detailed information on the day's operations, with red, yellow, and green markings indicating "paused operations," "normal operations," and "completed operations."

[0099] The operation safety management system of the embodiment of the present application uses information technology to open up the whole process management from operation application and review, operation site verification, safety monitoring during operation, operation acceptance, completion evaluation, and electronic operation ticket generation. By adding a series of control points such as positioning punch-in, real-person verification, electronic signature, dangerous tool code issuance, operator license management, real-time video monitoring, etc., it realizes the safety management of special operations. At the same time, a multi-dimensional three-dimensional analysis of the operation work order data is carried out to enable enterprise managers to have a "clear understanding" of operation safety issues and assist managers in safety management and decision-making analysis. Real-time electronic operation ticket generation can meet local requirements for safe operation supervision.

[0100] The system designs and implements a complete and brand-new safety management process for special operations, and solidifies this complete standardized process through technical means. The operation safety management of the enterprise no longer overly relies on human experience, but is controlled through the standard process of the information system. The complete process includes: operation application & review -> on-site operation verification -> safety guardianship during operation (and real-time video monitoring) -> operation acceptance -> completion evaluation. At each link, the system verifies the pre-set safety control points through technical means. If the verification fails, the process cannot continue, thus achieving the purpose of safety control. For example, in the operation review link, when the relevant person in charge designates the operation implementer and the on-site guardian for this operation, the system will only display the personnel with corresponding qualifications for selection (with the corresponding operation certificate and the certificate within the valid period), and the personnel with risks will be automatically screened out; in the on-site operation verification link, the operation person in charge, the on-site guardian, and the EHS personnel need to verify their identities through location punching, face verification, and mutual photo taking to ensure that the relevant operation personnel are indeed at the operation site and all three on-site operation person in charges have arrived before starting the operation; the gas inspection at the operation site is automatically judged. When the gas detection value exceeds the normal threshold, the system will give a "detection unqualified" warning and require re-measurement after rectification, otherwise the system process cannot continue, etc. The above-mentioned full-process operation data will be recorded in the system in real time and associated through a unique operation ID. To meet the local safety supervision requirements for special operations, a standard word template for the safety operation ticket is defined and customized. The operation data for each special operation is generated into an electronic operation ticket in real time through the system interface and can be exported and shared, which is more convenient, more efficient, and has more complete data than the traditional paper operation ticket, and at the same time prevents data tampering.

[0101] The operation safety management system according to the embodiment of the present application defines the safety control right process for the enterprise's special operations, solidifies this standard process through informatization means, reduces the dependence on human experience in special operations in traditional enterprises, innovates the management mode, designs control measures, and realizes full-range management through system intelligent control; customizes data analysis forms according to business requirements to make data serve management; visually obtains and analyzes the operation personnel scores, operation statistics, etc. at any time; generates electronic operation tickets in real time to meet the safety supervision requirements. In addition, this system is a lightweight application of the system built on a low-code development platform, which not only reduces the enterprise's informatization investment cost, but also improves the enterprise's safety management efficiency.

[0102] The following refers to Figure 6 , Figure 6 shows a schematic structural diagram of a computer device suitable for implementing the embodiment of the present application.

[0103] As Figure 6As shown, the computer system includes a central processing unit (CPU) 1001, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 1002 or a program loaded from a storage section 1008 into a random access memory (RAM) 1003. In the RAM 1003, various programs and data required for the operation instructions of the system are also stored. The CPU 1001, the ROM 1002, and the RAM 1003 are connected to each other via a bus 1004. An input / output (I / O) interface 1005 is also connected to the bus 1004.

[0104] The following components are connected to the I / O interface 1005; an input section 1006 including a keyboard, a mouse, etc.; an output section 1007 including, for example, a cathode ray tube (CRT), a liquid crystal display (LCD), etc. and a speaker, etc.; a storage section 1008 including a hard disk, etc.; and a communication section 1009 including a network interface card such as a LAN card, a modem, etc. The communication section 1009 performs communication processing via a network such as the Internet. A drive 1010 is also connected to the I / O interface 1005 as required. A removable medium 1011, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 1010 as required so that a computer program read from it can be installed into the storage section 1008 as required.

[0105] It should be noted that the computer-readable medium shown in this application can be a computer-readable signal medium, a computer-readable storage medium, or any combination of the two. A computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the above. More specific examples of a computer-readable storage medium can include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this application, a computer-readable storage medium can be any tangible medium that contains or stores a program, which can be used by or in conjunction with an instruction execution system, apparatus, or device. In this application, a computer-readable signal medium can include a data signal propagated in a baseband or as part of a carrier wave, which carries computer-readable program code. Such a propagated data signal can take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. A computer-readable signal medium can also be any computer-readable medium other than a computer-readable storage medium, which can send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device. The program code contained on a computer-readable medium can be transmitted using any appropriate medium, including but not limited to: wireless, wire, optical cable, RF, etc., or any suitable combination of the above.

[0106] The flowcharts and block diagrams in the accompanying drawings illustrate the possible architectures, functions, and operation instructions of systems, methods, and computer program products according to various embodiments of this application. In this regard, each block in a flowchart or block diagram can represent a module, a program segment, or a part of code, and the foregoing module, program segment, or part of code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the blocks can occur in a different order than marked in the accompanying drawings. For example, two connected blocks can actually be executed substantially in parallel, and they can sometimes be executed in the reverse order, depending on the functions involved. It should also be noted that each block in the block diagram and / or flowchart, and the combination of blocks in the block diagram and / or flowchart, can be implemented by a dedicated hardware-based system for performing the specified functions or operation instructions, or can be implemented by a combination of dedicated hardware and computer instructions.

[0107] The units or modules involved in the embodiments described in this application can be implemented in software or in hardware. The described units or modules can also be provided in a processor. Among them, the names of these units or modules do not, in some cases, constitute a limitation on the units or modules themselves.

[0108] The technical features of the above embodiments can be combined arbitrarily. For the sake of brevity of description, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, it should be considered as the scope described in this specification.

[0109] The above embodiments only represent several implementation manners of this application, and the description thereof is relatively specific and detailed, but it should not be understood as a limitation on the scope of the patent application. It should be noted that for those of ordinary skill in the art, without departing from the concept of this application, several modifications and improvements can still be made, and these all belong to the protection scope of this application. Therefore, the protection scope of the patent of this application shall be subject to the appended claims.

Claims

1. A method for generating a work permit based on a job safety management system, characterized in that The described job safety management system includes a client and a server. The client is installed on the user's intelligent terminal respectively. The method for generating a job ticket includes: The server receives a generation request for a job ticket input by the user through the client. According to the generation request, determine the type of the requested job ticket. According to the determined type of the job ticket, read the data records of the corresponding job stages in the job, and call the ticket template corresponding to the type of the job ticket from the pre-stored ticket template set. Among them, the job stages at least include a job application and review stage, a job site confirmation stage, a guardianship data upload stage during the job, and a job acceptance inspection stage. The ticket template set includes ticket templates corresponding to different types of job tickets. Write the data records of the corresponding job stages in the job into the ticket template and generate a job ticket.

2. The method for generating a job ticket based on a job safety management system according to claim 1, the step of writing the data records of the corresponding job stages in the job into the ticket template and generating a job ticket includes: Obtain the attribute information of each data in the data record. According to the attribute information of each data, determine the field to which each data belongs in the ticket template. Write each data into the corresponding field of the ticket template to generate the job ticket.

3. The method for generating a work permit based on a job safety management system according to claim 1, wherein The server receiving a generation request for a job ticket input by the user through the client includes: Provide a job ticket export list for the user. According to the job ticket selected by the user from the job ticket export list, obtain the generation request for the job ticket input by the user through the client.

4. The method for generating a work permit based on the job safety management system according to claim 1, characterized in that, The step of reading the data records of the corresponding job stages in the job according to the determined type of the job ticket includes: According to the type of the job ticket, determine the corresponding job stages in the job. Read out the data records corresponding to the job stages from the database.

5. The method for generating a work permit based on a job safety management system according to claim 4, wherein The step of reading out the data records corresponding to the job stages from the database includes: If the job stage is a job application and review stage, read out the relevant data during the job application and review stage. If the job stage is a job site confirmation stage, read out the relevant data uploaded during the job site confirmation. If the job stage is a guardianship data upload stage during the job, read out the relevant data uploaded during the guardianship data upload during the job. If the job stage is a job acceptance inspection stage, read out the relevant data uploaded during the job acceptance inspection.

6. The method for generating a work permit based on the operation safety management system according to claim 1, wherein, Before calling the ticket template corresponding to the type of the job ticket, it further includes: Obtain a plurality of ticket templates corresponding one by one to a plurality of types of job tickets. Store the plurality of ticket templates.

7. The method for generating a work permit based on a job safety management system according to claim 6, wherein The step of calling the ticket template corresponding to the type of the job ticket includes: According to the type of the job ticket, select the corresponding ticket template from the pre-stored plurality of ticket templates. Call the selected ticket template.

8. The method for generating a work permit based on a job safety management system according to claim 1, wherein After generating the job ticket, it further includes: Respond to the user's print request and print the paper file of the job ticket.

9. The method for generating a work permit based on a job safety management system according to claim 1, wherein After generating the job ticket, it further includes: In response to the user's export request, convert the work ticket into a PDF file and export the PDF file, or In response to the user's viewing request, display the work ticket on the page.

10. A computer device, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, characterized in that, When the processor executes the program, it implements the work ticket generation method based on the job safety management system according to any one of claims 1-9.