A method for installing a tilted convex post fold line special-shaped unit type curtain wall
Patent Information
- Application Number
- CN202510793769.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-13
- Publication Date
- 2026-09-22
- Estimated Expiration
- 2045-06-13
AI Technical Summary
[0003]然而,随着幕墙的造型发展,大型异形单元式幕墙板块的尺寸大、高度高、造型复杂,异形单元式幕墙板块通常采用平衡吊或者环轨吊的安装方式,在安装过程中,由于高空幕墙倾斜角度大,凸台悬空距离远,导致安装不稳定,同时,降低了安全性
[0037]综上所述,本发明的有益技术效果为:本申请提供的用于倾斜凸台折线异形单元式幕墙的安装方法,包括如下步骤:将待安装的倾斜凸台折线异形单元式幕墙吊运至待安装的n层楼层内;通过吊装装置、电动葫芦以及手拉葫芦配合,将待安装的倾斜凸台折线异形单元式幕墙水平运至预设位置并挂设于结构上;通过吊装装置、电动葫芦以及拉紧器配合,对待安装的倾斜凸台折线异形单元式幕墙进行插接微调,直至调至插接位置;将插接就位的待安装的倾斜凸台折线异形单元式幕墙紧固连接在结构上;如此设置,与异形单元式幕墙板块常规的安装方式相比,避免了在高空中异形单元式幕墙板块吊装时固定不牢,提高了安装的稳定性;同时,提高了安全性和安装质量。
Smart Images

Figure CN120401814B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building engineering technology, and in particular to an installation method for a tilted boss folded irregular unitized curtain wall. Background Technology
[0002] Currently, unitized curtain walls for super high-rise buildings, as an important component of modern building systems independent of public buildings, play a significant role in enhancing aesthetics and meeting functional needs driven by urbanization. At the same time, the shapes of curtain walls are constantly evolving and innovating, such as cantilevered, inclined, and projecting designs, and the dimensions of individual curtain walls are also continuously increasing in size and width.
[0003] However, with the development of curtain wall designs, large irregular-shaped unitized curtain wall panels are large in size, tall, and complex in shape. Irregular-shaped unitized curtain wall panels are usually installed using a balance crane or a ring rail crane. During the installation process, due to the large tilt angle of the high-altitude curtain wall and the long distance of the bosses suspended in the air, the installation is unstable and safety is reduced. Summary of the Invention
[0004] In view of the shortcomings of the existing technology, the purpose of this invention is to provide an installation method for inclined boss folded irregular unitized curtain walls, which has the advantages of improving installation stability and safety.
[0005] The above-mentioned objective of this invention is achieved through the following technical solution: an installation method for an inclined boss-shaped irregular unitized curtain wall, comprising the following steps:
[0006] The inclined boss zigzag irregular unitized curtain wall to be installed is hoisted to the nth floor where it is to be installed, where n is a natural number greater than 0;
[0007] Using a combination of hoisting equipment, electric hoists, and hand hoists, the inclined boss folded irregular unit curtain wall to be installed is horizontally transported to the preset position and hung on the structure.
[0008] The inclined boss folded irregular unit curtain wall to be installed is finely adjusted by the hoisting device, the electric hoist and the tensioner until it is adjusted to the insertion position.
[0009] The inclined boss-shaped irregular unit curtain wall to be installed is fastened to the structure after being plugged in.
[0010] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention, wherein the inclined boss-shaped irregular unitized curtain wall to be installed is hoisted to the nth floor to be installed, includes:
[0011] Calculate the weight of the inclined boss folded irregular unit curtain wall to be installed according to the drawings. After ensuring that the load-bearing capacity is met, set the lifting position on the inclined boss folded irregular unit curtain wall to be installed.
[0012] The inclined, protruding, irregularly shaped unitized curtain wall to be installed is lifted from the ground by a tower crane and transported vertically to the nth floor.
[0013] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention, wherein the inclined boss-shaped irregular unitized curtain wall to be installed is horizontally transported to a preset position and hung on the structure by means of a hoisting device, an electric hoist, and a hand-operated hoist, includes:
[0014] The hoisting device is installed on the top surface of the (n+1)th floor slab, and a straight track is installed on the bottom surface of the (n+1)th floor slab. The electric hoist is installed on the straight track and can move along the straight track.
[0015] The inclined boss-shaped irregular unit curtain wall located on the nth floor is moved to the installation position by a trolley.
[0016] By using the hoisting device in conjunction with the electric hoist, the inclined boss folded line irregular unit curtain wall to be installed is hoisted out of the nth floor and the horizontal transfer of the inclined boss folded line irregular unit curtain wall to be installed is completed.
[0017] A hand-operated hoist is installed on the nth floor slab. The speed and balance of the inclined boss folded line irregular unit curtain wall to be installed are controlled by the hand-operated hoist until the inclined boss folded line irregular unit curtain wall to be installed is transported to the preset position.
[0018] After the inclined boss folded irregular unit curtain wall to be installed reaches the preset position, the top of the inclined boss folded irregular unit curtain wall to be installed is hung on the support on the (n+1) floor slab, and the bottom of the inclined boss folded irregular unit curtain wall to be installed is hung on the fixed seat on the n floor slab.
[0019] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention includes, in which the inclined boss-shaped irregular unitized curtain wall to be installed is hoisted out of the nth floor by means of the hoisting device and the electric hoist, and the horizontal transfer of the inclined boss-shaped irregular unitized curtain wall to be installed is completed, comprising:
[0020] The electric hoist in the hoisting device hooks onto the top of the inclined boss folded irregular unit curtain wall to be installed;
[0021] The glass suction cup is fixed to the tail of the inclined boss folded irregular unit curtain wall to be installed, and the electric hoist is connected to the glass suction cup by a steel wire rope.
[0022] Using the electric hoist in the hoisting device, the inclined boss folded line irregular unit curtain wall to be installed is gradually hoisted out of the nth floor and the horizontal transfer of the inclined boss folded line irregular unit curtain wall to be installed is completed.
[0023] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention includes installing a hand-operated hoist on the nth floor slab, and controlling the running speed and balance of the inclined boss-shaped irregular unitized curtain wall to be installed through the hand-operated hoist until the inclined boss-shaped irregular unitized curtain wall to be installed is transported to a preset position, including:
[0024] Install a hand chain hoist on the nth floor slab;
[0025] The hand-operated hoist is connected to the tail of the inclined boss zigzag irregular unit curtain wall to be installed via a traction rope, controlling the running speed and balance of the inclined boss zigzag irregular unit curtain wall to be installed until the inclined boss zigzag irregular unit curtain wall to be installed is transported to the preset position.
[0026] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention includes, through the cooperation of the hoisting device, the electric hoist, and the tensioner, fine-tuning the inclined boss-shaped irregular unitized curtain wall to be installed until it is adjusted to the insertion position, comprising:
[0027] After the inclined boss zigzag irregular unit curtain wall to be installed reaches the preset position and is hung on the structure, temporary support points are set up on the nth floor slab.
[0028] Remove the hand-operated hoist connected to the inclined boss-shaped irregular unit curtain wall to be installed;
[0029] Install the tensioner at the temporary support point and connect the tensioner to the tail of the inclined boss zigzag unitized curtain wall to be installed.
[0030] Swing the tensioner to fine-tune the left and right insertion of the inclined boss zigzag unit curtain wall to be installed until it is adjusted to the insertion position.
[0031] Preferably, in the installation method for the inclined boss folded irregular unit curtain wall provided by the present invention, the tensioner is a 5-ton tensioner.
[0032] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention, wherein the inclined boss-shaped irregular unitized curtain wall to be installed, which is inserted and positioned, is fastened to the structure, comprising:
[0033] After the inclined boss folded line irregular unit curtain wall to be installed is inserted into place, the limiting bolt at the top of the inclined boss folded line irregular unit curtain wall to be installed is fastened to the support on the (n+1) floor slab, and the fixing bolt at the bottom of the inclined boss folded line irregular unit curtain wall to be installed is fastened to the fixing seat on the nth floor slab.
[0034] Preferably, the installation method for the inclined boss-shaped irregular unitized curtain wall provided by the present invention, after fastening the inserted and positioned inclined boss-shaped irregular unitized curtain wall to the structure, further includes:
[0035] Check whether the installation of the inclined boss zigzag irregular unit curtain wall to be installed is qualified;
[0036] When the inclined boss folded line irregular unit curtain wall to be installed is installed in a qualified manner, the hoisting device, the electric hoist and the tensioner connected to the inclined boss folded line irregular unit curtain wall to be installed are removed, and the installation of the inclined boss folded line irregular unit curtain wall to be installed is completed.
[0037] In summary, the beneficial technical effects of this invention are as follows: The installation method for the inclined boss folded-line irregular unitized curtain wall provided in this application includes the following steps: hoisting the inclined boss folded-line irregular unitized curtain wall to be installed to the nth floor where it is to be installed; using a hoisting device, an electric hoist, and a hand-operated hoist, horizontally transporting the inclined boss folded-line irregular unitized curtain wall to be installed to a preset position and hanging it on the structure; using a hoisting device, an electric hoist, and a tensioner, fine-tuning the inclined boss folded-line irregular unitized curtain wall to be installed until it is adjusted to the insertion position; and securely connecting the inserted inclined boss folded-line irregular unitized curtain wall to be installed to the structure. Compared with the conventional installation method of irregular unitized curtain wall panels, this setting avoids the problem of unstable fixing when hoisting irregular unitized curtain wall panels at high altitudes, thus improving the stability of the installation; at the same time, it improves safety and installation quality. Attached Figure Description
[0038] Figure 1 This is a flowchart of an installation method for an inclined boss-shaped irregular unit curtain wall provided in an embodiment of the present invention.
[0039] Figure 2 This is a schematic diagram of the structure of the inclined boss folded line irregular unit curtain wall in the installation method for the inclined boss folded line irregular unit curtain wall provided in the embodiment of the present invention.
[0040] Figure 3 This is a cross-sectional view of the inclined boss folded-line irregular unit curtain wall in the installation method for the inclined boss folded-line irregular unit curtain wall provided in the embodiment of the present invention.
[0041] Figure 4 This is a schematic diagram of the installation position of the hoisting device and the hoisting electric hoist + wire rope in the installation method for the inclined boss folded irregular unit curtain wall provided in the embodiment of the present invention.
[0042] Figure 5 This is a schematic diagram of the suspended hoisting process in the installation method for the inclined boss folded irregular unit curtain wall provided in the embodiment of the present invention.
[0043] Figure 6 This is a hoisting and positioning diagram of the installation method for the inclined boss folded irregular unit curtain wall provided in the embodiment of the present invention.
[0044] Figure 7 This is a schematic diagram of the method for fixing and adjusting the inclined boss folded-line irregular unit curtain wall in the installation method of the inclined boss folded-line irregular unit curtain wall provided in the embodiment of the present invention.
[0045] In the diagram, 1. Inclined boss folded irregular unitized curtain wall; 2. n-layer floor slab; 21. Hand-operated hoist; 22. Tensioner assembly; 23. Fixing seat; 3. (n+1)-layer floor slab; 31. Lifting device; 32. Electric hoist; 321. Glass suction cup; 33. Support; 4. Trolley. Detailed Implementation
[0046] The present invention will be further described in detail below with reference to the accompanying drawings.
[0047] Reference Figures 1 to 3 The present invention discloses an installation method for an inclined boss-shaped irregular unitized curtain wall 1, comprising the following steps:
[0048] S101. Hoist the inclined boss folded irregular unit curtain wall 1 to be installed to the nth floor where it is to be installed, where n is a natural number greater than 0.
[0049] S102. The inclined boss folded line irregular unit curtain wall 1 to be installed is horizontally transported to the preset position and hung on the structure by the hoisting device 31, electric hoist 32 and hand hoist 21. This setting facilitates the installation of the inclined boss folded line irregular unit curtain wall 1, reduces the installation difficulty and improves the construction efficiency. At the same time, it reduces the number of hoisting personnel and reduces the construction cost.
[0050] S103. Using the hoisting device 31, electric hoist 32 and tensioner 22, the inclined boss folded irregular unit curtain wall 1 to be installed is finely adjusted by insertion until it is adjusted to the insertion position.
[0051] S104. Securely connect the inclined protrusion folded irregular unitized curtain wall 1, which is to be installed, to the structure. Compared with the conventional installation method of irregular unitized curtain wall panels, this setting avoids the problem of unstable fixing when the irregular unitized curtain wall panels are hoisted at high altitudes, thus improving the stability of the installation. At the same time, it improves safety and installation quality.
[0052] In this embodiment, step S101, hoisting the inclined boss-shaped irregular unit curtain wall 1 to be installed to the nth floor, includes:
[0053] S1011. Calculate the weight of the inclined boss folded irregular unit curtain wall 1 to be installed according to the drawings. After ensuring the load-bearing capacity, set up the lifting position on the inclined boss folded irregular unit curtain wall 1 to be installed.
[0054] Specifically, the weight of the inclined boss folded irregular unit curtain wall 1 to be installed is calculated according to the drawings. After the structural calculation meets the stress requirements, the lifting position is set on the inclined boss folded irregular unit curtain wall 1 to be installed.
[0055] S1012. The inclined boss folded irregular unit curtain wall 1 to be installed is lifted from the ground by a tower crane and transported vertically to the nth floor.
[0056] Specifically, due to the special structure and extra-long size of the inclined boss folded line irregular unit curtain wall 1 to be installed, the lifting end of the tower crane is set up on the inclined boss folded line irregular unit curtain wall 1 to be installed, and the inclined boss folded line irregular unit curtain wall 1 to be installed is lifted from the ground by the tower crane for vertical transportation and pre-stored in the nth floor where it is to be installed.
[0057] Continue to refer to Figures 4 to 6 In this embodiment, S102, the inclined boss-shaped irregular unit curtain wall 1 to be installed is horizontally transported to the preset position and hung on the structure by means of the hoisting device 31, electric hoist 32 and manual hoist 21, including:
[0058] S1021. A hoisting device 31 is installed on the top surface of the (n+1) floor slab 3, and a straight track is installed on the bottom surface of the (n+1) floor slab 3. An electric hoist 32 is installed on the straight track and can move along the straight track.
[0059] Specifically, the hoisting device includes a hoisting rail and a hoisting electric hoist. Multiple inverted L-shaped supports are set on the top surface of the (n+1)th floor slab 3. The multiple inverted L-shaped supports are spaced apart. The hoisting rail is set on the multiple inverted L-shaped supports. The hoisting electric hoist is set on the hoisting rail and can slide along the hoisting rail.
[0060] It should be noted that the hoisting electric hoist, the electric hoist 32, and the hand chain hoist 21 are all devices well known to those skilled in the art, and the structure of the hoisting electric hoist, the electric hoist 32, and the hand chain hoist 21 will not be described in detail here.
[0061] S1022. The inclined boss-shaped irregular unitized curtain wall 1, located on the nth floor, is pushed to the installation position by the trolley 4.
[0062] S1023. By cooperating with the hoisting device 31 and the electric hoist 32, the inclined boss folded line irregular unit curtain wall 1 to be installed is hoisted to the nth floor and the horizontal transfer of the inclined boss folded line irregular unit curtain wall 1 to be installed is completed.
[0063] S1023, using the hoisting device 31 in conjunction with the electric hoist 32, hoists the inclined boss-shaped irregular unitized curtain wall 1 to be installed up to n floors, and completes the horizontal transfer of the inclined boss-shaped irregular unitized curtain wall 1 to be installed, including:
[0064] S10231. Hook the electric hoist in the hoisting device 31 onto the top of the inclined boss folded irregular unit curtain wall 1 to be installed;
[0065] S10232, Fix the glass suction cup 321 to the tail of the inclined boss folded irregular unit curtain wall 1 to be installed, and connect the electric hoist 32 to the glass suction cup 321 through a steel wire rope.
[0066] S10233. Using the hoisting electric hoist 31 and the electric hoist 32 working together, the inclined boss folded line irregular unit curtain wall 1 to be installed is gradually hoisted to n floors, and the horizontal transfer of the inclined boss folded line irregular unit curtain wall 1 to be installed is completed.
[0067] S1024. Install a hand chain hoist 21 on the nth floor slab 2. Control the running speed and balance of the inclined boss folded line irregular unit curtain wall 1 to be installed through the hand chain hoist 21 until the inclined boss folded line irregular unit curtain wall 1 to be installed is transported to the preset position.
[0068] Specifically, S1024, a hand-operated hoist 21 is installed on the nth floor slab 2. The hand-operated hoist 21 controls the running speed and balance of the inclined boss folded-line irregular unitized curtain wall 1 to be installed until it is transported to the preset position, including:
[0069] S10241. Install a hand chain hoist 21 on the nth floor slab 2;
[0070] S10242, the hand chain hoist 21 is connected to the tail of the inclined boss folded line irregular unit curtain wall 1 to be installed via a traction rope, and controls the running speed and balance of the inclined boss folded line irregular unit curtain wall 1 to be installed until the inclined boss folded line irregular unit curtain wall 1 to be installed is transported to the preset position.
[0071] Specifically, the hand-operated hoist 21 controls the running speed and balance of the inclined boss folded irregular unit curtain wall 1 to be installed through the traction rope.
[0072] by Figure 6 Taking the orientation shown as an example, the preset position is that the right end of the inclined protrusion folded irregular unit curtain wall 1 to be installed contacts the support 33 on the (n+1)th floor slab 3, and the left end of the inclined protrusion folded irregular unit curtain wall 1 to be installed contacts the fixing seat 23 on the nth floor slab 2.
[0073] It should be noted that the hand chain hoist 21 is a device well known to those skilled in the art, and its structure will not be described in detail here.
[0074] S1025. After the inclined protrusion folded irregular unit curtain wall to be installed reaches the preset position, hang the top of the inclined protrusion folded irregular unit curtain wall to be installed on the support on the (n+1) floor slab, and hang the bottom of the inclined protrusion folded irregular unit curtain wall to be installed on the fixed seat on the n floor slab.
[0075] Continue to refer to Figure 7 In this embodiment, S103, using the hoisting device 31, electric hoist 32, and tensioner 22, the inclined boss folded irregular unit curtain wall 1 to be installed is finely adjusted by insertion until it is adjusted to the insertion position, including:
[0076] S1031. After the inclined boss folded irregular unit curtain wall 1 to be installed reaches the preset position and is hung on the structure, temporary support points are set up on the nth floor slab 2.
[0077] Specifically, the top of the inclined protrusion folded irregular unit curtain wall 1 to be installed is hung on the support on the (n+1) floor slab, and the bottom of the inclined protrusion folded irregular unit curtain wall 2 to be installed is hung on the fixed seat on the n floor slab. Then, temporary support points are set up on the n floor slab 2.
[0078] S1032. Remove the hand chain hoist 21 that is connected to the inclined boss folded irregular unit curtain wall 1 to be installed.
[0079] S1033. Install the tensioner at the temporary support point and connect the tensioner to the tail of the inclined boss folded irregular unit curtain wall 1 to be installed.
[0080] It should be noted that the tensioner is a device well known to those skilled in the art, and its structure will not be described in detail here.
[0081] S1034, Swing tensioner, used to fine-tune the left and right insertion of the inclined boss folded irregular unit curtain wall 1 to be installed until it is adjusted to the insertion position.
[0082] Specifically, by manually and slightly swinging the tensioner, the inclined boss folded line irregular unit curtain wall 1 to be installed is slightly adjusted left and right until the inclined boss folded line irregular unit curtain wall 1 to be installed is directly opposite the adjacent inclined boss folded line irregular unit curtain wall that has been installed. In other words, the inclined boss folded line irregular unit curtain wall 1 to be installed is tightly fitted with the adjacent inclined boss folded line irregular unit curtain wall that has been installed. This means that the inclined boss folded line irregular unit curtain wall 1 to be installed is in the insertion position.
[0083] The tensioner used is a 5-ton tensioner. Of course, other models of tensioners can also be used, as long as they can tighten the inclined boss folded irregular unitized curtain wall 1 to be installed.
[0084] Further, in this embodiment, S104, fastening the inclined boss folded line irregular unit curtain wall 1 to be installed to the structure after being inserted into place, includes: after the inclined boss folded line irregular unit curtain wall 1 to be installed is inserted into place, fastening the limiting bolt at the top of the inclined boss folded line irregular unit curtain wall 1 to the support 33 on the (n+1)th floor slab 3, and fastening the fixing bolt at the bottom of the inclined boss folded line irregular unit curtain wall 1 to the fixing seat 23 on the nth floor slab 2.
[0085] S104, after fastening the inserted inclined boss folded line irregular unit curtain wall 1 to the structure, also includes: checking whether the installation of the inclined boss folded line irregular unit curtain wall 1 is qualified; when the installation of the inclined boss folded line irregular unit curtain wall 1 is qualified, the hoisting device 31, electric hoist 32 and tensioner 22 connected to the inclined boss folded line irregular unit curtain wall 1 are removed, and the installation of the inclined boss folded line irregular unit curtain wall 1 is completed.
[0086] The installation method for the inclined boss folded-line irregular unitized curtain wall 1 provided in this application includes the following steps: hoisting the inclined boss folded-line irregular unitized curtain wall 1 to be installed to the nth floor where it is to be installed; using the hoisting device 31, electric hoist 32, and hand hoist 21, horizontally transporting the inclined boss folded-line irregular unitized curtain wall 1 to be installed to the preset position and hanging it on the structure; using the hoisting device 31, electric hoist 32, and tensioner 22, fine-tuning the inclined boss folded-line irregular unitized curtain wall 1 to be installed until it is adjusted to the insertion position; and fastening the inserted inclined boss folded-line irregular unitized curtain wall 1 to be installed to the structure. Compared with the conventional installation method of irregular unitized curtain wall panels, this setting avoids the problem of unstable fixing when hoisting irregular unitized curtain wall panels at high altitudes, thus improving the stability of the installation; at the same time, it improves safety and installation quality.
[0087] It should be noted that, in this document, relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0088] Finally, it should be noted that the above embodiments are merely examples for clearly illustrating the present invention and are not intended to limit the implementation. Those skilled in the art will recognize that other variations or modifications can be made based on the above description. It is neither necessary nor possible to exhaustively list all possible implementations. However, obvious variations or modifications derived therefrom are still within the scope of protection of this invention.
Claims
1. An installation method for a tilted boss-shaped irregular unitized curtain wall, characterized in that: The steps include the following: The inclined boss zigzag irregular unitized curtain wall to be installed is hoisted to the nth floor where it is to be installed, where n is a natural number greater than 0; Using a combination of hoisting equipment, electric hoists, and hand hoists, the inclined boss folded irregular unit curtain wall to be installed is horizontally transported to the preset position and hung on the structure. The inclined boss folded irregular unit curtain wall to be installed is finely adjusted by the hoisting device, the electric hoist and the tensioner until it is adjusted to the insertion position. The inclined boss-shaped irregular unit curtain wall to be installed is fastened to the structure after being plugged in. The process of using a hoisting device, electric hoist, and manual hoist to horizontally transport the inclined, raised, irregularly shaped unitized curtain wall to a predetermined position and hang it on the structure includes: The hoisting device is installed on the top surface of the (n+1)th floor slab, and a straight track is installed on the bottom surface of the (n+1)th floor slab. The electric hoist is installed on the straight track and can move along the straight track. The inclined boss-shaped irregular unit curtain wall, located on the nth floor, is transported to the installation position by a trolley. By using the hoisting device in conjunction with the electric hoist, the inclined boss folded line irregular unit curtain wall to be installed is hoisted out of the nth floor and the horizontal transfer of the inclined boss folded line irregular unit curtain wall to be installed is completed. A hand-operated hoist is installed on the nth floor slab. The speed and balance of the inclined boss folded line irregular unit curtain wall to be installed are controlled by the hand-operated hoist until the inclined boss folded line irregular unit curtain wall to be installed is transported to the preset position. After the inclined protrusion folded irregular unit curtain wall to be installed reaches the preset position, the top of the inclined protrusion folded irregular unit curtain wall to be installed is hung on the support on the (n+1) floor slab, and the bottom of the inclined protrusion folded irregular unit curtain wall to be installed is hung on the fixed seat on the n floor slab. A hand-operated hoist is installed on the nth floor slab. The hoist controls the running speed and balance of the inclined boss-shaped irregular unitized curtain wall to be installed until it is moved to a preset position, including: Install a hand chain hoist on the nth floor slab; The hand-operated hoist is connected to the tail of the inclined boss folded line irregular unit curtain wall to be installed via a traction rope, controlling the running speed and balance of the inclined boss folded line irregular unit curtain wall to be installed until the inclined boss folded line irregular unit curtain wall to be installed is transported to the preset position. The process of fine-tuning the inclined boss-shaped irregular unit curtain wall to be installed by means of the hoisting device, the electric hoist, and the tensioner until it is adjusted to the insertion position includes: After the inclined boss zigzag irregular unit curtain wall to be installed reaches the preset position and is hung on the structure, temporary support points are set up on the nth floor slab. Remove the hand-operated hoist connected to the inclined boss-shaped irregular unit curtain wall to be installed; Install the tensioner at the temporary support point and connect the tensioner to the tail of the inclined boss zigzag unitized curtain wall to be installed. Swing the tensioner to fine-tune the left and right insertion of the inclined boss zigzag unit curtain wall to be installed until it is adjusted to the insertion position.
2. The installation method for the inclined boss-shaped irregular unitized curtain wall according to claim 1, characterized in that: The process of hoisting the inclined, protruding, irregularly shaped unitized curtain wall to be installed to the nth floor includes: Calculate the weight of the inclined boss folded irregular unit curtain wall to be installed according to the drawings. After ensuring that the load-bearing capacity is met, set the lifting position on the inclined boss folded irregular unit curtain wall to be installed. The inclined, protruding, irregularly shaped unitized curtain wall to be installed is lifted from the ground by a tower crane and transported vertically to the nth floor.
3. The installation method for the inclined boss-shaped irregular unitized curtain wall according to claim 1, characterized in that: The process of hoisting the inclined boss-shaped irregular unit curtain wall to be installed from the nth floor using the hoisting device in conjunction with the electric hoist, and completing the horizontal transfer of the inclined boss-shaped irregular unit curtain wall to be installed, includes: The electric hoist in the hoisting device hooks onto the top of the inclined boss folded irregular unit curtain wall to be installed; The glass suction cup is fixed to the tail of the inclined boss folded irregular unit curtain wall to be installed, and the electric hoist is connected to the glass suction cup by a steel wire rope. Using the electric hoist in the hoisting device, the inclined boss folded line irregular unit curtain wall to be installed is gradually hoisted out of the nth floor and the horizontal transfer of the inclined boss folded line irregular unit curtain wall to be installed is completed.
4. The installation method for inclined boss-shaped irregular unitized curtain walls according to claim 1, characterized in that: The tensioner is a 5-ton tensioner.
5. The installation method for an inclined boss-shaped irregular unitized curtain wall according to claim 1, characterized in that: The process of fastening the inclined boss-shaped irregular unitized curtain wall to the structure after it has been inserted and positioned includes: After the inclined boss folded line irregular unit curtain wall to be installed is inserted into place, the limiting bolt at the top of the inclined boss folded line irregular unit curtain wall to be installed is fastened to the support on the (n+1) floor slab, and the fixing bolt at the bottom of the inclined boss folded line irregular unit curtain wall to be installed is fastened to the fixing seat on the nth floor slab.
6. The installation method for an inclined boss-shaped irregular unitized curtain wall according to claim 1, characterized in that: After the inclined boss-shaped irregular unit curtain wall to be installed is fastened to the structure, the process further includes: Check whether the installation of the inclined boss zigzag irregular unit curtain wall to be installed is qualified; When the inclined boss folded line irregular unit curtain wall to be installed is installed in a qualified manner, the hoisting device, the electric hoist and the tensioner connected to the inclined boss folded line irregular unit curtain wall to be installed are removed, and the installation of the inclined boss folded line irregular unit curtain wall to be installed is completed.
Citation Information
Patent Citations
Assembly type low energy consumption curtain wall system and construction method thereof
CN109853800A
Integral lifting construction method for ultra-large hyperbolic integrated unit aluminium plate curtain walls
WO2021012971A1