Pipe joint, pipe roof jacking equipment and pipe roof jacking measuring method

By setting up connection components and limit rings on the pipe sections, combined with the clamping and mud discharge components of the hoisting equipment, the problem of skew during the hoisting process of the pipe curtain steel pipe is solved, stable coaxial splicing and efficient hoisting are achieved, and welding quality and path accuracy of the pipe sections are ensured.

CN120402118APending Publication Date: 2025-08-01ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510658902.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-05-21
Publication Date
2025-08-01

AI Technical Summary

Technical Problem

During the ejection process of pipe curtain steel pipes, especially during the ejection process of small diameter long distance pipe curtain steel pipes, the trajectory of the steel pipe is not easy to control, resulting in cracks or deformation and bending at the splicing position of the pipe joints, and the ejection path is skewed.

Method used

The connecting components are used to splice the two pipe joints coaxially, and support them through the limiting ring and positioning block. The pipe joints are combined with the ejection assembly and the clamping assembly to achieve stable ejection of the pipe joints. The sludge discharge assembly is used to remove sludge, and the ejection path is adjusted in combination with the water level pipe and total station measurement method.

Benefits of technology

It effectively reduces the skew of the pipe joints during the ejection process, improves the ejection efficiency and accuracy, ensures the coaxiality and stability of the welded position of the pipe joints, and reduces the risk of pipe joint deformation and cracks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120402118A_ABST
    Figure CN120402118A_ABST
Patent Text Reader

Abstract

The invention relates to the field of pipe roof jacking, in particular to a pipe joint, pipe roof jacking equipment and a pipe roof jacking measuring method.The pipe joint comprises a pipe joint body, the pipe joint body is provided with a connecting assembly used for connecting the two adjacent pipe joint bodies, and the connecting assembly comprises a left connecting block, a right connecting block, a positioning block and a reset piece; the left connecting block is installed on the inner wall of one end of the pipe joint body, one end of the right connecting block is arranged on the left connecting block in a sleeving mode, the other end of the right connecting block extends in the direction away from the left connecting block, and the positioning block is installed in the left connecting block and located at the end of the pipe joint body. The right connecting block is used for being inserted into the adjacent pipe joint bodies and pushing the positioning block to abut against the connecting portion of the two pipe joints, the reset piece is installed in the right connecting block, and the reset piece is further connected with the left connecting block. And the effect of reducing the deflection condition of the pipe joint in the jacking process can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of pipe jacking, and in particular to a pipe section, a pipe curtain jacking device and a pipe curtain jacking measurement method. Background Art

[0002] The pipe curtain method is a common construction method for large-section underground excavation tunnels at present. Pipe curtain steel pipes are jacked into the perimeter or arch of the planned underground space, and the pipes are connected to each other by locking joints (generally T-shaped locking joints), which not only increases the support strength of the overall structure but also plays a role in water stoppage.

[0003] The main pipe curtain construction methods include the root pipe drilling method, the pipe jacking method, the horizontal directional spiral jacking method, etc. During the jacking process of pipe curtain steel pipes, especially small-diameter long-distance pipe curtain steel pipes, due to factors such as formation geology and the length of the pipe curtain steel pipes, it is difficult to control the jacking trajectory of the steel pipes, resulting in cracks or deformation and bending at the splicing position of two pipe sections, thus causing the jacking path of the pipe sections to be skewed. Summary of the Invention

[0004] In order to reduce the skewing of pipe sections during jacking, the present application provides a pipe section, a pipe curtain jacking device and a pipe curtain jacking measurement method.

[0005] In a first aspect, the present application provides a pipe section, adopting the following technical solution: A pipe section includes a pipe section body, and a connection assembly for connecting two adjacent pipe section bodies is provided on the pipe section body. The connection assembly includes a left connection block, a right connection block, a positioning block and a reset member. The left connection block is installed on the inner wall of one end of the pipe section body. One end of the right connection block is sleeved on the left connection block, and the other end of the right connection block extends away from the left connection block. The positioning block is installed in the left connection block and is also connected to the right connection block, and the positioning block is located at the end position of the pipe section body. The right connection block is used for being inserted into an adjacent pipe section body and pushing the positioning block to abut against the joint part of the two pipe sections. The reset member is installed in the right connection block and is also connected to the left connection block.

[0006] By adopting the above technical solution, by splicing two pipe section bodies along the same straight line, the right connection block on one pipe section body is inserted into the end of the other pipe section body, so as to facilitate keeping the two pipe section bodies coaxial. At the same time, the right connection block is also used to drive the positioning block to extend out, so that the positioning block abuts against the splicing position of the two pipe section bodies, thus facilitating the welding work in the subsequent process of the two pipe section bodies, facilitating the support of the welding position of the two pipe section bodies, and thus facilitating the reduction of the skewing of the pipe section body during the jacking process.

[0007] In a specific feasible implementation, a limiting ring is further installed on the inner wall of the end of the pipe section away from the left connection block, and the limiting ring is used to abut against the end of the right connection block in the adjacent pipe section.

[0008] By adopting the above technical solution, by setting the limiting ring, it is convenient to limit the insertion depth of the right connection block through the limiting ring. At the same time, the limiting ring also drives the right connection block to drive the positioning block to move, so as to facilitate the positioning block to limit the splicing position of the two pipe section bodies.

[0009] In a specific feasible implementation, the reset member includes a reset spring, the reset spring is installed in the right connection block, and the reset spring also abuts against one end of the left connection block located in the right connection block.

[0010] By adopting the above technical solution, when the two pipe section bodies are in a separated state, the right connection block is reset under the action of the reset spring, so as to facilitate keeping the positioning block in a retracted state.

[0011] In a specific feasible implementation, a jacking rod is installed on the positioning block, the jacking rod passes through the side wall of the left connection block and extends to the inner side wall of the right connection block, a jacking groove for the end of the jacking rod to slide is formed on the inner side wall of the right connection block, one end of the jacking groove is located at the end of the right connection block close to the left connection block, and the other end of the jacking groove extends obliquely upward in a direction away from the left connection block.

[0012] By adopting the above technical solution, when the two pipe section bodies are spliced, the positioning block is driven to move in a direction away from the splicing position of the two pipe section bodies through the jacking groove on the right connection block, so as to facilitate the positioning block to support the splicing position of the pipe section bodies.

[0013] In a second aspect, the present application provides a pipe curtain jacking device, adopting the following scheme: A pipe curtain jacking device includes a jacking frame and a jacking mechanism. The jacking mechanism includes a jacking component, a mud discharging component and a clamping component. The jacking component is installed on the jacking frame, the mud discharging component and the clamping component are both installed on the jacking component. The clamping component is used to clamp the end of the pipe section body, and the mud discharging component is used to discharge the muddy water in the pipe section body during jacking.

[0014] By adopting the above technical solution, the end of the pipe section body is placed on the jacking frame, the end of the pipe section body is clamped by the clamping component, then the pipe section body is jacked into the soil layer by the jacking component, and the muddy water in the pipeline body is discharged by the mud discharging component during jacking.

[0015] In a specific feasible implementation, the jacking assembly includes a support plate, a jacking hydraulic cylinder, a slider, a positioning member, and a linkage member. The support plate and the slider are both slidably mounted on the jacking frame. The jacking hydraulic cylinder is mounted on the support plate, and the piston rod of the jacking hydraulic cylinder is connected to the slider. The support plate is used to push the pipe joint body. Positioning members are mounted on both the support plate and the slider, and the positioning members are used to position the support plate or the slider on the jacking frame. The linkage member connects the positioning member on the support plate and the positioning member on the slider.

[0016] By adopting the above technical solution, the slider is positioned on the jacking frame through the positioning member, and then the support plate is pushed by the jacking hydraulic cylinder to slide in a direction away from the slider, so that the support plate jacks the pipe joint body into the soil layer, thereby facilitating the jacking of the pipe joint body.

[0017] In a specific feasible implementation, the positioning member includes a positioning pin, a positioning spring, an insertion block, and an insertion spring. The positioning pin is mounted on the slider and passes downward through the slider. A positioning hole for inserting the positioning pin is formed on the jacking frame. A baffle is mounted on the side wall of the positioning pin, and the baffle is also connected to the linkage member. The positioning spring is mounted on the positioning pin, and one end of the positioning spring is connected to the baffle, and the other end is connected to the slider. The insertion block is mounted on the support plate. A limiting groove for inserting the insertion block is formed on the side wall of the jacking frame at the position of the positioning hole. The insertion spring is also mounted on the support plate and is also connected to the insertion block.

[0018] By adopting the above technical solution, when it is necessary to position the slider, the positioning pin is inserted into the positioning hole, and at the same time, the insertion block is separated from the jacking frame through the linkage member, so that when the jacking hydraulic cylinder acts, the support plate can be pushed to slide in a direction away from the slider, thereby jacking the pipe joint body. And when it is necessary to further jack the pipe joint body, the linkage member is separated from the insertion block, so that the insertion block is inserted into the limiting groove, thereby limiting the support plate. At the same time, after the piston rod of the jacking hydraulic cylinder extends, it also drives the positioning pin to move upward through the linkage member to be separated from the positioning hole, thereby releasing the positioning of the slider. At this time, the piston rod of the jacking hydraulic cylinder is contracted, so that the slider can move in a direction close to the support plate, and the above actions are repeated to gradually jack the pipe joint body into the soil.

[0019] In a specific feasible implementation scheme, the linkage part includes a left lifting plate, a sleeve, a right push plate and a linkage spring, one end of the left lifting plate is installed on the slider, and the other end of the left lifting plate passes through the side wall of the slider and extends in the direction of the support plate, and a left lifting block is installed at the end of the left lifting plate close to the slider, the cross-section of the left lifting block is a right triangle, and the hypotenuse of the left lifting block is used to contact the bottom wall of the baffle, the sleeve is installed on the side wall of the support plate, and one end of the sleeve is sleeved on the left lifting plate, the right push plate and the linkage spring are both installed on the sleeve, and the linkage spring is also connected to the right push plate, the right push plate is used to contact the slider, and the right push plate is also used to drive the insert block to separate from the limit slot.

[0020] By adopting the above technical solution, during the process of jacking the pipe segment body, when the piston rod of the jacking hydraulic cylinder is extended to the maximum stroke, the left lifting plate moves relative to the slider toward the support plate under the restriction of the sleeve, so that the left lifting plate drives the left lifting block to lift the positioning pin, thereby facilitating the unlocking of the slider. When the jacking hydraulic cylinder retracts the piston rod to move the slider toward the support plate, the positioning pin moves downward under the action of the positioning spring to abut against the jacking frame and slides along the jacking frame until the positioning pin slides to the next positioning hole and is inserted into the positioning hole. At this time, the slider pushes the right push plate, so that the right push plate pushes the push rod to separate the insert block from the limit groove, thereby releasing the positioning of the support plate, thereby facilitating further jacking of the pipe segment body into the soil, thereby facilitating the jacking assembly to continuously jack the pipe segment body into the soil, thereby facilitating improving the jacking efficiency.

[0021] In a specific feasible implementation scheme, the mud discharge assembly includes a driving member and a mud discharge rod, the driving member is installed on the jacking assembly, the mud discharge rod is used to be inserted into the pipe section body, and one end of the mud discharge rod is connected to the driving member, and the other end of the mud discharge rod is used to dig into the soil. A spiral blade is also installed on the side wall of the mud discharge rod, and the spiral blade is used to transport the silt in the pipe section body toward the jacking assembly.

[0022] By adopting the above technical solution, during the process of pushing the pipe segment body into the soil, the driving member drives the mud discharge rod to operate, so that the mud discharge rod discharges the silt in the pipe segment body, thereby facilitating the pushing of the pipe segment body.

[0023] In a third aspect, the present application provides a pipe roof jacking measurement method, which adopts the following technical solutions: A pipe roof jacking measurement method comprises the following steps: S1. Measurement using a water level pipe: A water level pipe for measuring the levelness of the pipe joint body is provided on the side wall of the pipe joint body. The axis of the water level pipe is parallel to the axis of the pipe joint body, and a certain amount of water is injected into the water level pipe. By observing whether there is a height difference between the water level in the water level pipe and the set horizontal water level, the levelness of the pipe joint body is judged. S2. Measurement using a total station in stages: S21. Measurement before jacking: Before the jacking equipment jacks the pipe joint body, the center point of the pipe curtain hole position is lofted on the retaining wall according to the design position. After the mud discharging rod in the mud discharging component of the jacking equipment is installed and debugged in place, the total station is used to accurately position the axis and elevation position of the mud discharging pipe. S22. Measurement during jacking: Measurements are carried out respectively when the jacking reaches 30%, 60%, and 90%. The total station is used to measure the actual position of the center axis of the head end and the tail end of the pipe joint body once each. The slope, plane offset value, and elevation offset value of the pipe joint body can be calculated using the measured coordinates. After comparing the actual deviation value with the design value, the jacking of the pipe joint body is adjusted.

[0024] In summary, the present application includes at least one of the following beneficial effects: 1. By providing a connection component in the present application, it is convenient to keep the two pipe joint bodies coaxial through the connection component, and at the same time, the connection position of the two pipe joint bodies is supported by the connection component, so as to facilitate reducing the situation of skewing of the pipe joint body during jacking.

[0025] 2. By providing a jacking component in the present application, it is convenient to realize the continuous jacking action of the pipe joint body into the soil through the jacking component, so as to facilitate improving the jacking efficiency. Description of the Drawings

[0026] Figure 1 is a schematic structural diagram of the pipe joint of the present application.

[0027] Figure 2 is a schematic structural diagram of the connection component in the embodiment of the present application.

[0028] Figure 3 is Figure 2 the enlarged view of part A in

[0029] Figure 4 is a schematic diagram of the connection component when two pipe joint bodies are spliced in the embodiment of the present application.

[0030] Figure 5 is a schematic structural diagram of the pipe curtain jacking equipment of the present application.

[0031] Figure 6 is a schematic structural diagram of the jacking component in the embodiment of the present application.

[0032] Figure 7It is an exploded view of the jacking component in the embodiment of the present application.

[0033] Figure 8 It is a schematic structural diagram of the sludge discharging component in the embodiment of the present application.

[0034] Explanation of reference signs: 1. Pipe joint body; 11. Limit ring; 2. Connection component; 21. Left connection block; 22. Right connection block; 221. Jacking groove; 23. Positioning block; 24. Return spring; 25. Jacking rod; 3. Jacking frame; 31. Guide rail; 311. Positioning hole; 312. Limit groove; 4. Jacking mechanism; 41. Jacking component; 411. Support plate; 4111. Connection plate; 412. Jacking hydraulic cylinder; 413. Slide block; 4131. Column; 414. Positioning pin; 4141. Baffle; 415. Positioning spring; 416. Insert block; 4161. Return rod; 4162. Unlocking groove; 417. Inserting spring; 418. Left lifting plate; 4181. Left lifting block; 4182. Slide groove; 419. Sleeve; 4110. Right pushing plate; 4120. Push rod; 4130. Linking spring; 42. Sludge discharging component; 421. Driving motor; 422. Reducer; 423. Driving shaft; 424. Sludge discharging rod; 425. Spiral blade; 43. Clamping component; 431. Clamping collar. Detailed implementation manners

[0035] The following further describes the present application in detail with reference to the accompanying drawings.

[0036] The embodiment of the present application discloses a pipe joint. Referring to Figure 1 , it includes a pipe joint body 1, and a connection component 2 for connecting two adjacent pipe joints is installed on the pipe joint body 1. The connection component 2 enables the two pipe joints to be coaxial during splicing, thus facilitating subsequent welding and splicing.

[0037] Referring to Figure 2 and Figure 3, six groups of connecting components 2 are arranged inside one end of each pipe joint body 1 except the first pipe joint body 1. The six groups of connecting components 2 inside each pipe joint body 1 are arranged on the inner wall of one end of the pipe joint body 1 along the circumferential direction of the pipe joint. A limiting ring 11 is fixedly installed on the inner wall of the other end of each pipe joint body 1. The connecting component 2 includes a left connecting block 21, a right connecting block 22, a positioning block 23 and a resetting member. One end of the left connecting block 21 is fixedly installed on the inner wall of the end of the pipe joint body 1 away from the limiting ring 11, and the other end of the left connecting block 21 extends towards the end of the pipe joint body 1 away from the limiting ring 11, and there is a gap between the side wall of the end of the left connecting block 21 away from the limiting ring 11 and the inner wall of the pipe joint body 1. One end of the right connecting block 22 is slidably sleeved on the end of the left connecting block 21 away from the limiting ring 11, the other end of the right connecting block 22 extends away from the left connecting block 21, and the end of the right connecting block 22 away from the left connecting block 21 is used for being inserted into the adjacent pipe joint body 1, and the side wall of the right connecting block 22 is in contact with the inner wall of the pipe joint body 1, and the end of the right connecting block 22 away from the left connecting block 21 is used for abutting against the limiting ring 11 inside the adjacent pipe joint body 1.

[0038] Refer to Figure 3 and Figure 4 , the positioning block 23 is slidably installed inside the left connecting block 21, and the sliding path of the positioning block 23 is perpendicular to the axis of the pipe joint body 1, and one end of the positioning block 23 extends towards the direction away from the axis of the pipe joint body 1, and the end of the positioning block 23 away from the axis of the pipe joint body 1 is used for passing through the side wall of the left connecting block 21 and abutting against the inner wall of the end of the pipe joint body 1. Lifting rods 25 are fixedly installed at both ends of the positioning block 23, the ends of the lifting rods 25 extend to the inner wall of the right connecting block 22, and lifting grooves 221 for the lifting rods 25 to slide are formed on the inner wall of the right connecting block 22. One end of the lifting groove 221 is located at the end of the right connecting block 22 close to the left connecting block 21, and the other end extends away from the left connecting block 21 and inclines towards the direction away from the axis of the pipe joint body 1. An avoidance groove for avoiding the positioning block 23 is formed at one end of the right connecting block 22 close to the inner wall of the pipe joint body 1. The resetting member includes a reset spring 24. The reset spring 24 is installed inside the right connecting block 22, one end of the reset spring 24 abuts against the end of the left connecting block 21 located inside the right connecting block 22, and the other end abuts against the inner wall of the right connecting block 22. In the initial state, the reset spring 24 is in a relaxed state, and at this time, the distance between the limiting ring 11 and the end of the pipe joint body 1 is less than the distance between the end of the right connecting block 22 and the end of the pipe joint body 1.

[0039] The working principle of the embodiment of the present application is as follows: When splicing two pipe body 1s, by keeping the two pipe body 1s coaxial and inserting the right connection block 22 on one of the pipe body 1s into the other pipe body 1, the right connection block 22 slides along the inner wall of the pipe body 1 until it abuts against the limit ring 11 and stops moving under the action of the limit ring 11. When the right connection block 22 starts to abut against the limit ring 11 until it stops moving, the ends of the two pipe body 1s abut against each other, thus realizing the splicing. At the same time, the right connection block 22 moves towards the left connection block 21 under the action of the limit ring 11, so that the right connection block 22 drives the jacking groove 221 to move towards the left connection block 21, thereby lifting the positioning block 23, and the end of the jacking block sequentially passes through the side walls of the left connection block 21 and the right connection block 22 and abuts at the splicing position of the two pipe body 1s, which is convenient for keeping the two pipe body 1s coaxial, reducing the misalignment between the two pipe body 1s, facilitating subsequent welding of the splicing position of the two pipe body 1s, splicing the two pipe body 1s into a longer pipe section, maintaining the coaxiality between the two pipe body 1s through the positioning block 23, protecting the welding position of the two pipe body 1s, reducing cracks at the welding position, and facilitating keeping a straight line when jacking the pipe body 1 and reducing deviation.

[0040] The embodiment of the present application also discloses a pipe curtain jacking device. Referring to Figure 5 and Figure 6 , it includes a jacking frame 3 and a jacking mechanism 4. The jacking mechanism 4 includes a jacking assembly 41, a mud discharging assembly 42 and a clamping assembly 43. The jacking assembly 41 is installed on the jacking frame 3, and the mud discharging assembly 42 and the clamping assembly 43 are both installed on the jacking assembly 41. The clamping assembly 43 is used to clamp the end of the pipe body 1, the jacking assembly 41 is used to jack the pipe body 1 into the soil layer, and the mud discharging assembly 42 is used to discharge the silt generated during the jacking process of the pipe body 1.

[0041] Referring to the figure, a guide rail 31 is fixedly installed at the upper end of the jacking frame 3. A plurality of positioning holes 311 are opened on the top wall of the guide rail 31, and the plurality of positioning holes 311 are arranged at equal intervals along the length direction of the guide rail 31. The jacking assembly 41 includes a support plate 411, a jacking hydraulic cylinder 412, a slider 413, a positioning member and a linkage member. The support plate 411 and the slider 413 are both slidably installed on the guide rail 31. The cylinder body of the jacking hydraulic cylinder 412 is fixedly installed on the side wall of the support plate 411, and the jacking hydraulic cylinder 412 is arranged along the axis direction of the guide rail 31, and the piston rod of the jacking hydraulic cylinder 412 is fixedly connected to the side wall of the slider 413. The side wall of the support plate 411 away from the jacking hydraulic cylinder 412 is used to jack the pipe body 1.

[0042] Referring to Figure 6 and Figure 7, the positioning member includes a positioning pin 414, a positioning spring 415, an insertion block 416 and an insertion spring 417. A through hole corresponding to the positioning hole 311 on the guide rail 31 is formed on the top wall of the slider 413. The positioning pin 414 is slidably installed on the slider 413 in the vertical direction, and the lower end of the positioning pin 414 passes through the through hole and is inserted into the positioning hole 311 on the guide rail 31. A baffle 4141 is fixedly installed on the side wall of the end of the positioning pin 414 close to the guide rail 31. The diameter of the outer circle of the baffle 4141 is larger than the aperture of the through hole. The positioning spring 415 is sleeved on the positioning pin 414, and one end of the positioning spring 415 abuts against the top wall of the baffle 4141, and the other end is connected to the slider 413.

[0043] Referring to Figure 6 and Figure 7 , a reset rod 4161 is fixedly installed at the end of the insertion block 416 away from the guide rail 31. A connecting plate 4111 is fixedly installed on the side wall of the support plate 411. The reset rod 4161 is slidably connected to the connecting plate 4111 on the side wall of the support plate 411. The insertion block 416 is arranged in a direction perpendicular to the axis of the guide rail 31, and one end of the insertion block 416 extends towards the side wall of the guide rail 31 and is inserted into the side wall of the guide rail 31. A plurality of limiting grooves 312 for inserting the insertion block 416 are formed on the side wall of the guide rail 31. The plurality of limiting grooves 312 are equidistantly arranged on the side wall of the guide rail 31 along the axis direction of the guide rail 31. The insertion spring 417 is sleeved on the reset rod 4161, and one end of the insertion spring 417 abuts against the end of the insertion block 416, and the other end abuts against the side wall of the connecting plate 4111.

[0044] Referring to Figure 6 and Figure 7 , the linkage member includes a left lifting plate 418, a sleeve 419, a right pushing plate 4110 and a linkage spring 4130. The left lifting plate 418 is slidably installed on the slider 413 along the axis direction of the guide rail 31, and one end of the left lifting plate 418 also passes through the side wall of the slider 413 and extends towards the support plate 411. A left lifting block 4181 is fixedly installed at the end of the left lifting plate 418 close to the slider 413. The cross section of the left lifting block 4181 is a right triangle, and the hypotenuse of the left lifting block 4181 is located near the positioning pin 414 and is used to abut against the bottom wall of the baffle 4141. A chute 4182 for avoiding the positioning pin 414 is formed on the top wall of the left lifting plate 418. A column 4131 is fixedly installed on the slider 413 at the position connected to the left lifting plate 418. The column 4131 is also located in the chute 4182, and the column 4131 is used to abut against the inner wall of the end of the chute 4182 away from the left lifting block 4181.

[0045] Referring to Figure 6 and Figure 7, the sleeve 419 is fixedly installed on the side wall of the support plate 411 near the slider 413 along the axial direction of the guide rail 31, and one end of the sleeve 419 extends towards the slider 413 and is sleeved on one end of the left lifting plate 418 away from the slider 413, and the sleeve 419 is slidably connected to the left lifting plate 418. The right push plate 4110 is slidably installed on one end of the left lifting plate 418 near the sleeve 419 along the axial direction of the guide rail 31. The linkage spring 4130 is sleeved on the left lifting plate 418, and one end of the linkage spring 4130 abuts against the side wall of the right push plate 4110, and the other end abuts against the end of the sleeve 419, and the right push plate 4110 is used to abut against the slider 413.

[0046] Referring to Figure 6 and Figure 7 , a push rod 4120 is also fixedly installed on the side wall of the right push plate 4110. The push rod 4120 is arranged along the axial direction of the guide rail 31, and one end of the push rod 4120 extends towards the support plate 411 to the insert block 416. One end of the push rod 4120 near the support plate 411 is slidably connected to the side wall of the support plate 411. An unlocking groove 4162 for the push rod 4120 to be inserted is formed on the side wall of the insert block 416. One end of the push rod 4120 near the insert block 416 is also provided with a contact inclined surface. One end of the contact inclined surface is located at the end of the push rod 4120, and the other end extends obliquely away from the guide rail 31 to the side wall of the push rod 4120, and the contact inclined surface is used to abut against the side wall of the unlocking groove 4162 away from the guide rail 31.

[0047] Referring to Figure 6 and Figure 7, when the jacking assembly 41 starts to work, the left lifting block 4181 on the left lifting plate 418 is in a separated state from the baffle plate 4141, and the positioning pin 414 passes through the through hole on the slider 413 and is inserted into the positioning hole 311. One end of the left lifting plate 418 close to the sleeve 419 is inserted into the sleeve 419, and the slider 413 abuts against the right push plate 4110, so that the right push plate 4110 drives the push rod 4120 to be inserted into the unlocking groove 4162 of the insert block 416, so that the push rod 4120 pushes the insert block 416 away from the guide rail 31 by means of the abutting inclined surface and compresses the insertion spring 417, separating the insert block 416 from the guide rail 31. Then, the piston rod of the jacking hydraulic cylinder 412 extends, so that the jacking hydraulic cylinder 412 pushes the support plate 411 to move away from the slider 413 to the next limiting groove 312, so that the support plate 411 pushes the pipe joint body 1 into the soil layer, thus realizing the jacking of the pipe joint body 1. During the process of the support plate 411 moving to the new limiting groove 312, the left lifting plate 418 gradually slides out of the sleeve 419, and the slider 413 gradually moves away from the support plate 411, so that the slider 413 is separated from the right push plate 4110. Thus, the right push plate 4110 moves away from the support plate 411 under the action of the linkage spring 4130, driving the push rod 4120 to be gradually separated from the insert block 416, so that the insert block 416 is reset under the action of the insertion spring 417, and the end of the insert block 416 abuts against the side wall of the guide rail 31. And as the support plate 411 gradually slides towards the limiting groove 312, and as the piston rod of the jacking hydraulic cylinder 412 gradually extends to the limit position, the left lifting plate 418 gradually extends from the sleeve 419 to the maximum distance and is pulled by the sleeve 419, so that the left lifting plate 418 drives the left lifting block 4181 to move towards the slider 413, so that the inclined side on the left lifting block 4181 abuts against the baffle plate 4141 and pushes the baffle plate 4141 upward and compresses the positioning spring 415, separating the positioning pin 414 from the positioning hole 311, thus releasing the positioning of the slider 413. At the same time, the insert block 416 also slides to the limiting groove 312 with the support plate 411 and is inserted into the limiting groove 312, so that the support plate 411 is positioned at the current position.

[0048] Refer to Figure 6 and Figure 7, then the piston rod is driven to contract by the jacking hydraulic cylinder 412, so that the piston rod drives the slider 413 to move towards the support plate 411, shortening the distance between the slider 413 and the support plate 411. When the slider 413 slides to a positioning hole 311 near the support plate 411, the left lifting plate 418 is inserted to the deepest part in the sleeve 419. Then, as the slider 413 continues to move, the slider 413 drives the positioning pin 414 to move relative to the left lifting block 4181 in a direction away from the left lifting block 4181, causing the left lifting block 4181 to gradually separate from the baffle 4141 on the positioning pin 414, so that the positioning pin 414 moves downward under the drive of the positioning spring 415, until the lower end of the positioning pin 414 abuts against the top wall of the guide rail 31. Until the slider 413 slides under the drive of the jacking hydraulic cylinder 412 to align the positioning pin 414 with the positioning hole 311, so that the positioning pin 414 is inserted into the positioning hole 311 under the action of the positioning spring 415, thereby positioning the slider 413 at the current position. At the same time, the slider 413 abuts against the right push plate 4110, so that the right push plate 4110 drives the push rod 4120 to be inserted into the insert block 416, and separates the insert block 416 from the guide rail 31 again, thereby releasing the limit of the support plate 411. Then repeat the above steps to further realize the action of jacking the pipe joint body 1 into the soil layer.

[0049] Refer to Figure 6 and Figure 7 , when the jacking assembly 41 moves to the position closest to the soil layer and the piston rod of the jacking hydraulic cylinder 412 is in a contracted state, the insert block 416 on the support plate 411 separates from the limit groove 312, then the positioning pin 414 is lifted upward to release the limit of the slider 413 by the positioning pin 414, and then the slider 413 and the support plate 411 are pushed in the direction away from the soil layer to the initial position, so as to facilitate continuous jacking of the pipe joint body 1.

[0050] Refer to Figure 5 and Figure 8, the mud discharging assembly 42 includes a driving member and a mud discharging rod 424. The driving member includes a driving motor 421, a speed reducer 422 and a driving shaft 423. A support hydraulic cylinder is fixedly installed on the side wall of the support plate 411 close to the slider 413. The support hydraulic cylinder is arranged along the axis of the guide rail 31, and the piston rod of the support hydraulic cylinder extends towards the slider 413. The speed reducer 422 is fixedly installed on the piston rod of the support hydraulic cylinder. The driving motor 421 is drivingly installed on the side wall of the speed reducer 422, and the output shaft of the driving motor 421 is connected to the input end of the speed reducer 422. The driving shaft 423 is rotatably installed on the speed reducer 422, and the driving shaft 423 is connected to the output end of the speed reducer 422. The driving shaft 423 is parallel to the axis of the guide rail 31, and one end of the driving shaft 423 passes through the side wall of the support plate 411 and extends away from the slider 413. The mud discharging rod 424 is used for being inserted into the pipe section, and one end of the mud discharging rod 424 is sleeved on the end of the driving shaft 423 away from the slider 413. The other end of the mud discharging rod 424 is used for abutting against the side wall of the soil layer and for tunneling into the soil layer. A spiral blade 425 is also fixedly installed on the peripheral side wall of the mud discharging rod 424. The spiral blade 425 is used for conveying the silt during the tunneling process of the mud discharging rod 424 towards the support plate 411, and a mud discharging hole for discharging the silt is formed on the support plate 411. The operations of the speed reducer 422 and the tunneling of the mud discharging rod 424 are prior arts in the field and will not be elaborated here.

[0051] Referring to Figure 8 , the clamping assembly 43 includes a clamping collar 431. The clamping collar 431 is fixedly installed on the side wall of the support plate 411 away from the slider 413, and the clamping collar 431 is coaxial with the driving shaft 423, and the clamping collar 431 is used for the end of the pipe section body 1 to be inserted.

[0052] The working principle of the embodiment of the present application is as follows: By sleeving one end of the mud discharging pipe on the rotating shaft, then sleeving one end of the pipe section body 1 on the clamping collar 431 on the support plate 411, and then gradually pushing the pipe section body 1 into the soil through the jacking assembly 41. After one pipe section body 1 is pushed into a suitable position, the jacking assembly 41 is reset, and then a new pipe section body 1 is spliced to the original pipe section. The connecting assembly 2 is used to position the connecting part of the two pipe section bodies 1 and weld the two pipe section bodies 1. At the same time, a new mud discharging pipe is spliced to the original mud discharging pipe to facilitate continuous tunneling into the soil, so as to facilitate the jacking of the pipe section.

[0053] The embodiment of the present application also discloses a pipe curtain jacking measurement method, including the following steps: S1. Measurement using a water level pipe: By installing a water level pipe on the side wall of the pipe joint body 1, with the axis of the water level pipe parallel to the axis of the pipe joint body 1, and injecting a certain amount of water into the water level pipe. The starting end of the water level pipe is located at the starting end of the pipe joint body 1, and the ending end of the water level pipe is located at the ending end of the pipe joint body 1. The water level pipe at the ending end of the pipe joint body 1 is provided with a vertical section at one end, and a scale is vertically arranged correspondingly. The water level in the water level pipe on the scale is at the same horizontal plane as the front end of the pipe joint. During the jacking process of the pipe joint body 1, by observing the height difference between the water level in the water level pipe on the scale and the set water level, the deviation value is calculated, so as to adjust the jacking path of the pipe joint body 1 in a timely manner.

[0054] S2. Measurement using a total station in stages: S21. Measurement before jacking: Before the jacking equipment jacks the pipe joint body 1, the center point of the pipe curtain hole position is lofted on the retaining wall according to the design position. After the mud discharging rod 424 in the mud discharging assembly 42 of the jacking equipment is installed and debugged in place, the total station is used to accurately position the axis and elevation position of the mud discharging pipe.

[0055] S22. Measurement during jacking: Measurements are carried out respectively when the jacking reaches 30%, 60%, and 90%. The total station is used to measure the actual positions of the axis of the front end and the rear end of the pipe joint body 1 once each. The slope, plane offset value, and elevation offset value of the pipe joint body 1 can be calculated using the measured coordinates. After comparing the actual deviation value with the design value, the jacking of the pipe joint body 1 is adjusted.

[0056] The above is the preferred embodiment of this application, and it does not limit the protection scope of this application accordingly. Therefore, all equivalent changes made according to the structure, shape, and principle of this application should be covered within the protection scope of this application.

Claims

1. A pipe section, characterized in that, It includes a pipe section body (1), and a connecting component (2) for connecting two adjacent pipe section bodies (1) is provided on the pipe section body (1). The connecting component (2) includes a left connecting block (21), a right connecting block (22), a positioning block (23) and a resetting member. The left connecting block (21) is installed on the inner wall at one end of the pipe section body (1). One end of the right connecting block (22) is sleeved on the left connecting block (21), and the other end of the right connecting block (22) extends in a direction away from the left connecting block (21). The positioning block (23) is installed in the left connecting block (21), and the positioning block (23) is also connected to the right connecting block (22), and the positioning block (23) is located at the end position of the pipe section body (1). The right connecting block (22) is used to be inserted into the adjacent pipe section body (1) and push the positioning block (23) to abut against the connecting part of the two pipe sections. The resetting member is installed in the right connecting block (22), and the resetting member is also connected to the left connecting block (21).

2. A pipe section according to claim 1, wherein: A limiting ring (11) is further installed on the inner wall at the end of the pipe section away from the left connecting block (21), and the limiting ring (11) is used to abut against the end of the right connecting block (22) in the adjacent pipe section.

3. A pipe section according to claim 1, characterized in that: The resetting member includes a reset spring (24). The reset spring (24) is installed in the right connecting block (22), and the reset spring (24) also abuts against one end of the left connecting block (21) located inside the right connecting block (22).

4. A pipe section according to claim 1, characterized in that: A jacking rod (25) is installed on the positioning block (23). The jacking rod (25) passes through the side wall of the left connecting block (21) and extends to the inner side wall of the right connecting block (22). A jacking groove (221) for the end of the jacking rod (25) to slide is formed on the inner side wall of the right connecting block (22). One end of the jacking groove (221) is located at the end of the right connecting block (22) close to the left connecting block (21), and the other end of the jacking groove (221) extends obliquely upward in a direction away from the left connecting block (21).

5. A pipe roof jacking device for jacking a pipe section as described in any one of claims 1-4, characterized in that: It includes a jacking frame (3) and a jacking mechanism (4). The jacking mechanism (4) includes a jacking component (41), a mud discharging component (42) and a clamping component (43). The jacking component (41) is installed on the jacking frame (3). Both the mud discharging component (42) and the clamping component (43) are installed on the jacking component (41). The clamping component (43) is used to clamp the end of the pipe section body (1), and the mud discharging component (42) is used to discharge the muddy water in the pipe section body (1) during the jacking process.

6. The pipe roof jacking equipment according to claim 5, characterized in that: The jacking assembly (41) includes a support plate (411), a jacking hydraulic cylinder (412), a slider (413), a positioning member, and a linkage member. The support plate (411) and the slider (413) are both slidably mounted on the jacking frame (3). The jacking hydraulic cylinder (412) is mounted on the support plate (411), and the piston rod of the jacking hydraulic cylinder (412) is connected to the slider (413). The support plate (411) is used to push the pipe joint body (1). Positioning members are mounted on both the support plate (411) and the slider (413), and the positioning members are used to position the support plate (411) or the slider (413) on the jacking frame (3). The linkage member connects the positioning member on the support plate (411) and the positioning member on the slider (413).

7. The pipe roof jacking equipment according to claim 6, characterized in that: The positioning member includes a positioning pin (414), a positioning spring (415), an insertion block (416), and an insertion spring (417). The positioning pin (414) is mounted on the slider (413), and the positioning pin (414) passes downward through the slider (413). A positioning hole (311) for inserting the positioning pin (414) is formed in the jacking frame (3). A baffle (4141) is mounted on the side wall of the positioning pin (414), and the baffle (4141) is also connected to the linkage member. The positioning spring (415) is mounted on the positioning pin (414), and one end of the positioning spring (415) is connected to the baffle (4141), and the other end is connected to the slider (413). The insertion block (416) is mounted on the support plate (411). A limiting groove (312) for inserting the insertion block (416) is formed in the side wall of the jacking frame (3) at the position of the positioning hole (311). The insertion spring (417) is also mounted on the support plate (411), and the insertion spring (417) is also connected to the insertion block (416).

8. The pipe roof jacking equipment according to claim 7, characterized in that: The linkage member includes a left lifting plate (418), a sleeve (419), a right pushing plate (4110), and a linkage spring (4130). One end of the left lifting plate (418) is mounted on the slider (413). The other end of the left lifting plate (418) passes through the side wall of the slider (413) and extends towards the support plate (411). A left lifting block (4181) is mounted at one end of the left lifting plate (418) close to the slider (413). The cross section of the left lifting block (4181) is in the shape of a right triangle, and the hypotenuse of the left lifting block (4181) is used to abut against the bottom wall of the baffle (4141). The sleeve (419) is mounted on the side wall of the support plate (411), and one end of the sleeve (419) is sleeved on the left lifting plate (418). The right pushing plate (4110) and the linkage spring (4130) are both mounted on the sleeve (419), and the linkage spring (4130) is also connected to the right pushing plate (4110). The right pushing plate (4110) is used to abut against the slider (413), and the right pushing plate (4110) is also used to drive the insertion block (416) to separate from the limiting groove (312).

9. The pipe roof jacking equipment according to claim 5, characterized in that: The sludge discharging assembly (42) includes a driving member and a sludge discharging rod (424). The driving member is installed on the jacking assembly (41). The sludge discharging rod (424) is used to be inserted into the pipe joint body (1). One end of the sludge discharging rod (424) is connected to the driving member, and the other end of the sludge discharging rod (424) is used to bore into the soil. A spiral blade (425) is also installed on the side wall of the sludge discharging rod (424). The spiral blade (425) is used to convey the sludge in the pipe joint body (1) towards the direction of the jacking assembly (41).

10. A pipe roof jacking measurement method, based on a pipe curtain jacking device according to any one of claims 4-9, characterized in that, It includes the following steps: S1. Measurement using a water level pipe: A water level pipe for measuring the levelness of the pipe joint body (1) is provided on the side wall of the pipe joint body (1). The axis of the water level pipe is parallel to the axis of the pipe joint body (1). A certain amount of water is injected into the water level pipe. By observing whether there is a height difference between the water level in the water level pipe and the set horizontal water level, the levelness of the pipe joint body (1) is judged. S2. Phased measurement using a total station: S21. Measurement before jacking: Before the pipe joint body (1) is jacked by the jacking equipment, the center point of the pipe curtain hole position is lofted on the retaining wall according to the design position. After the sludge discharging rod (424) in the sludge discharging assembly (42) of the jacking equipment is installed and debugged in place, the total station is used to accurately position the axis and elevation position of the sludge discharging pipe. S22. Measurement during jacking: Measurements are carried out respectively when 30%, 60%, and 90% of the jacking is completed. The total station is used to measure the actual position of the axis of the head end and the tail end of the pipe joint body (1) once each. The slope, plane offset value, and elevation offset value of the pipe joint body (1) can be calculated using the measured coordinates. After comparing the actual deviation value with the design value, the jacking of the pipe joint body (1) is adjusted.