Subway station construction method for spring lake area

Through reverse construction, the transition and temporary support components in the auxiliary structure are used to work together, the problems of main structure inclination and groundwater pollution during the construction of subway stations in Quanhu area were solved, and construction safety and environmentally friendly improvements were achieved.

CN120425758AInactive Publication Date: 2025-08-05ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP +3
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510941919.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-07-09
Publication Date
2025-08-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional subway station construction methods face complex hydrogeological conditions in Quanhu area, resulting in the inclination of the main structure and the risk of groundwater environmental pollution, and it is difficult to meet the strict control requirements for vault settlement and deformation.

Method used

The reverse construction method is adopted. First, the auxiliary structure construction of the auxiliary foundation pit is carried out, and transition support and temporary support are provided on the auxiliary structure. With the synergistic effect of these support members, the main body top plate and main body structure are gradually constructed, and finally the main body and the auxiliary structure are connected, and the temporary support is removed.

Benefits of technology

It effectively avoids the inclination of the main structure caused by the unilateral soil unloading effect, reduces the risk of groundwater environmental pollution, ensures the settlement and deformation control of the main structure, and improves construction safety and environmental friendliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120425758A_ABST
    Figure CN120425758A_ABST
Patent Text Reader

Abstract

The invention provides a subway station construction method for spring lake areas, and relates to the technical field of subway station construction.The subway station construction method comprises the steps that accessory structure construction is conducted on an accessory foundation pit, a transition supporting piece is arranged on the accessory structure, and a temporary supporting piece is synchronously arranged at the joint of the accessory structure and a main body structure; by means of the synergistic effect of the temporary supporting pieces and the transition supporting pieces, a main body top plate is constructed through a reverse construction method, then main body structure construction is carried out with the main body top plate as a horizontal support, finally, the main body structure communicates with the accessory structure, and the temporary supporting pieces are dismantled; the method can effectively cope with complex hydrogeological conditions in the spring lake area, the problem that the main body inclines due to the single-side soil unloading effect caused by traditional construction of'main body first and then accessory 'is solved, meanwhile, the potential pollution risk of construction to the underground water environment in the spring lake area is reduced, the strict control requirement of the main body structure for vault settlement and deformation is guaranteed, and the construction efficiency is improved. And the safety and environmental friendliness of subway station construction in special geological areas are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of subway station construction, and in particular to a subway station construction method for use in Quanhu area. Background Art

[0002] Subway stations are the core nodes of the metro network, handling crucial functions such as passenger gathering and distribution, transfers, and equipment installation. Compared to section tunnels, subway stations are characterized by their enormous size, complex structure, numerous interfaces, and high environmental sensitivity. Their construction is one of the most technically challenging and risky aspects of subway construction, with the most significant impact on the surrounding environment.

[0003] With the continued development of transportation infrastructure in my country, the "main structure first, ancillary structures later" construction method commonly used in traditional subway stations faces significant challenges in unique geological areas. In the Quanhu area, the hydrogeological conditions are complex, with shallow groundwater depths and interlaced spring runoff channels. Construction often requires traversing thick silt strata and water-rich gravel layers, while strictly protecting the groundwater environment. This presents significant construction difficulties and risks. When constructing near the core outcropping of springs, the traditional method of excavating ancillary structures triggers a unilateral soil unloading effect, causing the main structure to tilt toward the excavation side. Since the main structure requires extremely strict control of vault settlement and deformation, this effect poses a serious threat. This process also exacerbates the potential pollution risk to the groundwater environment in the Quanhu area. Summary of the Invention

[0004] The purpose of this application is to address the above problems and provide a subway station construction method for the Quanhu area.

[0005] This application provides a method for constructing a subway station in the Quanhu area, comprising the following steps: S100: Construction of auxiliary structures inside the auxiliary foundation pit; S200: arranging a transition support member for the main structure on the auxiliary structure, and simultaneously arranging a temporary support member at the connection between the auxiliary structure and the main structure; S300: Under the coordinated action of the temporary support members and the transition support members, a main body top plate is constructed on the top of the main body foundation pit using a reverse construction method; S400: Using the main body top plate as a horizontal support, constructing the main structure inside the main body foundation pit; S500: Connect the main structure with the auxiliary structure and remove the temporary support members.

[0006] According to the technical solution provided by this application, the following steps are also included before step S100: S010: Determine the positions of the main foundation pit and the auxiliary foundation pit, and set up an isolation structure between the two. The isolation structure includes: a first ground-connected wall and a second ground-connected wall connected to each other; wherein the first ground-connected wall is set corresponding to the main top plate, and the second ground-connected wall is set corresponding to the main structure.

[0007] According to the technical solution provided by this application, step S300 includes the following steps: S301: Setting a second enclosure structure on the top of the main body foundation pit, and setting a first support column in the main body foundation pit, wherein the first support column is used to support the main body top plate; S302: excavating the main foundation pit, erecting a second support member during the excavation process, and simultaneously chiseling away the first ground diaphragm wall while retaining the first main reinforcement of the first ground diaphragm wall; S303: After the main foundation pit is excavated to the designed elevation of the main top plate, the main top plate is constructed on the top of the main foundation pit and connected to the top plate of the auxiliary structure; S304: Anchoring the first main reinforcement into the top plate of the auxiliary structure to form a first rigid connection structure.

[0008] According to the technical solution provided by this application, step S300 further includes the following steps: S305: When the main body top plate reaches the design strength, the second support member is removed, a corbel is installed at the connection between the main body top plate and the second enclosure structure, and a retaining wall is installed inside the enclosure structure; S306: After the corbels and the retaining wall reach the designed strength, backfill the top plate of the main body with soil.

[0009] According to the technical solution provided by this application, step S400 includes the following steps: S401: Setting up a third enclosure structure around the main foundation pit, excavating the main foundation pit in layers, and sequentially setting up a plurality of third support members from top to bottom during the excavation process; S402: After excavating the main foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the main foundation pit from bottom to top, and the third support members are sequentially removed from bottom to top. Simultaneously, the second ground diaphragm wall is chiseled out while retaining the second main reinforcement of the second ground diaphragm wall. S403: Anchoring the second main reinforcement into the bottom plate of the auxiliary structure to form a second rigid connection structure.

[0010] According to the technical solution provided by this application, step S100 includes the following steps: S101: performing rotary jet grouting on the side walls and bottom walls of the auxiliary foundation pit to reinforce the soil of the auxiliary foundation pit; S102: Setting up a first enclosure structure around the auxiliary foundation pit, excavating the auxiliary foundation pit in layers, and sequentially setting up a plurality of first support members from top to bottom during the excavation process; S103: After excavating the auxiliary foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the auxiliary foundation pit from bottom to top, and the first supporting members are sequentially removed from bottom to top; S104: Moving the pipelines within the main structure to above the top plate of the auxiliary structure to form the auxiliary structure.

[0011] According to the technical solution provided by this application, after step S200 and before step S300, the following steps are further included: S210: After the transition support member reaches the designed strength, backfill the top plate of the auxiliary structure with soil.

[0012] According to the technical solution provided in this application, the construction process of the water-stop curtain includes the following steps: A drilling rig is used to drill holes below the impermeable layer at predetermined locations, and high-pressure jet grouting is used to inject slurry into the formation to fill the pores and form a continuous water-stop curtain. The permeability, strength and finish of the water-stop curtain are tested, and the drilled holes are sealed to prevent leakage.

[0013] Compared with the prior art, the present invention has the following advantages: The present application provides a subway station construction method for the Quanhu area, which comprises the following steps: first, constructing an auxiliary structure for an auxiliary foundation pit, setting a transition support on the auxiliary structure, and simultaneously setting a temporary support at the connection between the auxiliary structure and the main structure; with the help of the synergistic effect of the temporary support and the transition support, constructing the main top plate in a reverse manner, and then carrying out the main structure construction with the main top plate as a horizontal support; finally, connecting the main structure and the auxiliary structure, and removing the temporary support; this method can effectively cope with the complex hydrogeological conditions in the Quanhu area, avoid the problem of main body tilting caused by the unilateral soil unloading effect caused by the traditional "main body first and auxiliary body later" construction, and at the same time reduce the potential pollution risk of the construction to the groundwater environment in the Quanhu area, ensure the strict control requirements of the main structure on the arch settlement and deformation, and improve the safety and environmental friendliness of subway station construction in special geological areas.

[0014] It should be understood that the description of technical features, technical solutions, beneficial effects or similar language in this application does not imply that all features and advantages can be realized in any single embodiment. On the contrary, it is understood that the description of a feature or beneficial effect means that a specific technical feature, technical solution or beneficial effect is included in at least one embodiment. Therefore, the description of a technical feature, technical solution or beneficial effect in this specification does not necessarily refer to the same embodiment. Furthermore, the technical features, technical solutions and beneficial effects described in the present embodiment can also be combined in any appropriate manner. Those skilled in the art will understand that the embodiment can be implemented without one or more specific technical features, technical solutions or beneficial effects of a specific embodiment. In other embodiments, additional technical features and beneficial effects can also be identified in specific embodiments that do not embody all embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the technical solution in this embodiment, the following is a brief introduction to the drawings required for the description of the embodiment. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without any creative work.

[0016] Figure 1 A flowchart of a subway station construction method for the Quanhu area provided in an embodiment of the present application; Figure 2 A schematic diagram of the distribution of the auxiliary structures provided in the embodiment of the present application; Figure 3 A schematic diagram of the top plate of the construction body provided in an embodiment of the present application; Figure 4 A schematic diagram of the main construction structure provided in an embodiment of the present application; Figure 5 This is a schematic diagram of the completed construction of the main structure and auxiliary structures provided in the embodiment of the present application.

[0017] In the figure: 1. First outlet; 2. Second outlet; 3. Third outlet; 4. Fourth outlet; 5. First air duct; 6. Second air duct; 7. First enclosure structure; 8. First ground-connected wall; 9. Second ground-connected wall; 10. Temporary support member; 11. Transition support member; 12. Second enclosure structure; 13. Second support member; 14. First support column; 15. Third support member; 16. Third enclosure structure; 17. Pipeline; 18. Ancillary structure; 19. Main structure; 20. Main top plate. DETAILED DESCRIPTION

[0018] In order to enable those skilled in the art to better understand the technical solutions of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the accompanying drawings. The description in this section is only exemplary and explanatory and should not have any limiting effect on the scope of protection of the present application. Specifically, the embodiments described are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present application.

[0019] It should be noted that similar reference numerals and letters represent similar items in the following figures. Therefore, once an item is defined in one figure, it does not need to be further defined or explained in subsequent figures. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units that are not explicitly listed or inherent to these processes, methods, products or apparatuses.

[0020] In order to make the technical solution of this application clearer and easier to understand, the following introduces a subway station construction method for the Quanhu area provided in an embodiment of this application.

[0021] like Figure 1 As shown, this embodiment provides a subway station construction method for the Quanhu area, which includes the following steps: S100: constructing the auxiliary structure 18 inside the auxiliary foundation pit; Specifically, such as Figure 2 As shown, the auxiliary structure 18 includes outlets and air ducts, which in this embodiment are specifically the first outlet 1, the second outlet 2, the third outlet 3, the fourth outlet 4, the first air duct 5 and the second air duct 6; during construction, in order to ensure the stability of the soil, the fourth outlet 4 and the first air duct 5 distributed diagonally are constructed first, and after they are stable, the first outlet 1, the second outlet 2, the third outlet 3 and the second air duct 6 are constructed simultaneously.

[0022] Specifically, optionally, the following steps are included before step S100: S010: Determine the positions of the main foundation pit and the auxiliary foundation pit, and set up an isolation structure between the two. The isolation structure includes: a first ground-connected wall 8 and a second ground-connected wall 9 that are connected; wherein the first ground-connected wall 8 is set corresponding to the main top plate 20, and the second ground-connected wall 9 is set corresponding to the main structure 19.

[0023] Specifically, in this embodiment, after determining the locations of the main foundation pit and the auxiliary foundation pit, the fencing work of the construction site of the auxiliary structure 18 is carried out, and the boundaries of the construction area are clearly defined by building closed protective facilities. At the same time, the pipeline 17 is relocated and traffic is relieved. The pipeline 17 existing on the site is relocated, diverted or temporarily protected according to the plan to make room for construction. For the surrounding traffic affected by the construction, a reasonable diversion and guidance plan is formulated and implemented to ensure the orderly passage of regional traffic during the construction period. In this way, from the aspects of site closure, pipeline 17 coordination, and traffic guarantee, safe and smooth preconditions are created for the subsequent construction of the auxiliary structure 18, and the construction preparation work is promoted to be implemented efficiently. Specifically, such as Figure 3 As shown, an isolation structure is set between the main foundation pit and the auxiliary foundation pit. The isolation structure is composed of a first ground-connected wall 8 and a second ground-connected wall 9 that are interconnected. The isolation structure supports the foundation pit and resists the lateral pressure of the soil by virtue of its own strength and sealing. It also isolates the main foundation pit from the auxiliary foundation pit to avoid mutual interference during construction and prevent the main structure 19 from being disturbed twice. In the force-bearing system, it can cooperate with temporary supports 10 and transition supports 11 to bear loads and ensure reverse construction and other processes.

[0024] Specifically, optionally, step S100 includes the following steps: S101: performing rotary jet grouting on the side walls and bottom walls of the auxiliary foundation pit to reinforce the soil of the auxiliary foundation pit; S102: Setting up a first enclosure structure 7 around the auxiliary foundation pit, excavating the auxiliary foundation pit in layers, and sequentially setting up a plurality of first support members from top to bottom during the excavation process; S103: After excavating the auxiliary foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the auxiliary foundation pit from bottom to top, and the first supporting members are sequentially removed from bottom to top; S104 : Moving the pipeline 17 located within the main structure 19 to above the top plate of the auxiliary structure 18 to form the auxiliary structure 18 .

[0025] Specifically, in this embodiment, for the construction of the auxiliary foundation pit, first, a rotary jet grouting operation is carried out on the side walls and bottom walls. The grouting material is injected into the water-rich and silty strata using high-pressure rotary jet technology to cement the soil particles, strengthen the auxiliary foundation pit soil, block the groundwater infiltration path in advance, and enhance the stability of the soil. Subsequently, a first enclosure structure 7 is set around the auxiliary foundation pit. In this embodiment, since an isolation structure is set between the auxiliary foundation pit and the main foundation pit, in this embodiment, the first enclosure structure 7 is set on the other three sides of the auxiliary foundation pit. The first enclosure structure 7 is an underground continuous wall. Subsequently, the auxiliary foundation pit is excavated layer by layer from top to bottom. When the excavation reaches 0.5m below the preset position of each first support member, the first support member is immediately erected to prevent soil collapse. At the same time, when the first first support member is erected, the crown beam and concrete retaining wall are constructed at the same time. In this embodiment, the first support member is a steel support. After excavation reaches the design elevation of the auxiliary foundation pit, the cushion layer, water-stop curtain and plate wall are sequentially constructed from the bottom to the top in the auxiliary foundation pit to build a waterproof and load-bearing foundation structure. At the same time, in accordance with the structural construction strength, the first support members are gradually removed from the bottom to the top to achieve a safe conversion of the support system. Finally, considering the protection requirements of pipeline 17 in the Quanhu area, the pipeline 17 that was originally temporarily relocated within the scope of the main structure 19 was permanently relocated and regularized above the top plate of the auxiliary structure 18, completing the spatial integration and functional connection, and finally forming a complete auxiliary structure 18 that adapts to the Quanhu geology and meets the main-auxiliary coordinated force, laying the foundation for the subsequent reverse main construction.

[0026] S200: arranging a transition support member 11 for the main structure 19 on the auxiliary structure 18, and simultaneously arranging a temporary support member 10 at the connection between the auxiliary structure 18 and the main structure 19; Specifically, such as Figure 3 As shown, in order to ensure the stability and rationality of force during the construction of the main structure 19, a transition support 11 for receiving the load transfer of the main structure 19 is precisely set on the formed auxiliary structure 18. It is combined with the auxiliary structure 18 through a reliable connection process to ensure effective transmission of force; at the same time, considering the mechanical complexity of the connection area between the main body and the auxiliary structure 18, a temporary support 10 is simultaneously added at the connection between the two. With the help of the auxiliary force of the temporary support 10, the unilateral soil unloading effect that may occur during the construction process is responded to, and the main structure 19 is prevented from tilting due to uneven force, creating a stable force environment for the subsequent reverse construction of the main top plate 20 and the main structure 19, which is in line with the strict control requirements for the settlement and deformation of the arch of the main structure 19 under the complex geology of the Quanhu area, and reducing construction risks from the perspective of structural coordination.

[0027] Optionally, after step S200, the following steps are further included: S210: After the transition support member 11 reaches the designed strength, the top plate of the auxiliary structure 18 is backfilled with soil.

[0028] Specifically, after completing the setting of the transition support 11, wait until the transition support 11 reaches the design strength and has a stable bearing capacity, then carry out the soil covering operation on the top plate of the auxiliary structure 18. This operation, on the one hand, uses the soil covering to form a reverse pressure load on the top plate of the auxiliary structure 18, balancing the lateral force of the soil that may occur during the construction process, and meeting the demand for structural stress stability under the complex geological conditions of the Quanhu area; on the other hand, through soil backfilling, more favorable site conditions are created for the subsequent construction of the main structure 19 and the restoration of the surrounding environment, so that the auxiliary structure 18 and the subsequent main structure 19 are better adapted to the coordination of the force system and the site, and the control ability of the groundwater environment and soil deformation during the overall construction process is enhanced, which helps to promote the safe and orderly progress of the subway station construction.

[0029] S300: Under the coordinated action of the temporary support member 10 and the transition support member 11, a main body top plate 20 is constructed on the top of the main foundation pit using a reverse construction method; Optionally, step S300 includes the following steps: S301: Setting a second enclosure structure 12 on the top of the main body foundation pit, and setting a first support column 14 in the main body foundation pit, wherein the first support column 14 is used to support the main body top plate 20; S302: excavating the main foundation pit, erecting the second support member 13 during the excavation process, and simultaneously chiseling away the first ground diaphragm wall 8 while retaining the first main reinforcement of the first ground diaphragm wall 8; S303: After the main foundation pit is excavated to the design elevation of the main top plate 20, the main top plate 20 is constructed on the top of the main foundation pit and connected to the top plate of the auxiliary structure 18; S304: Anchoring the first main reinforcement into the top plate of the auxiliary structure 18 to form a first rigid connection structure.

[0030] Specifically, before implementing the reverse construction method to construct the main roof 20, the fencing work of the main roof 20 construction site is carried out, and the boundaries of the construction area are clearly defined by building closed protective facilities; When implementing the reverse construction method to construct the main top plate 20, a second enclosure structure 12 is set on the top of the main foundation pit. In this embodiment, the second enclosure structure 12 is an underground continuous wall; and a first support column 14 is set in the main foundation pit as the vertical support foundation of the main top plate 20, which undertakes the load transfer mission during the construction and use stages of the main top plate 20; in this embodiment, the first support column 14 is composed of a steel tube concrete column and a pile foundation; then, the main foundation pit is excavated, and the second support member 13 is erected during the excavation process, and a crown beam is constructed at the same time to form a dynamically stable foundation pit support system; at the same time, during the excavation process, The first step is to carry out targeted chiseling operations on the first ground-connected wall 8 and retain its first main reinforcement; after excavation to the design elevation of the main top plate 20, the main top plate 20 is constructed on the top of the main foundation pit, and the main top plate 20 is rigidly connected to the top plate of the auxiliary structure 18; finally, the retained first main reinforcement is bent in two directions and anchored into the auxiliary top plate to form a first rigid connection structure, so that the main body and the auxiliary structure 18 are deeply integrated in mechanical transmission and deformation coordination, adapting to the complex geology of the Quanhu area for the stringent requirements of structural integrity and stability, and ensuring the safety and controllability of the reverse top plate construction and subsequent main structure 19 construction from multiple dimensions.

[0031] Optionally, step S300 further includes the following steps: S305: When the main body top plate 20 reaches the design strength, the second support member 13 is removed, a corbel is installed at the connection between the main body top plate 20 and the second enclosure structure 12, and a retaining wall is installed inside the enclosure structure; S306: After the corbels and the retaining wall reach the designed strength, backfill the soil covering the main body top plate 20 .

[0032] Specifically, after the construction of the main top plate 20 is completed and reaches the design strength, the second support member 13 is removed. At this time, the main top plate 20 has independent bearing capacity; in order to further strengthen the synergistic effect between the main top plate 20 and the second retaining structure 12, a corbel is set at the connection between the two, and the corbel is used to transmit horizontal and vertical forces. At the same time, a retaining wall is built on the inner side of the retaining structure. The retaining wall is used to resist the pressure of the external soil, which meets the needs of the structure to resist lateral displacement and leakage in the water-rich strata and complex geological conditions in the Quanhu area; after the corbel and the retaining wall reach the design strength and form a stable force system, the main top plate 20 is backfilled with soil, and the soil is used to form a reverse load on the main structure 19, balancing the stress difference of the soil inside and outside the foundation pit, consolidating the overall stability of the structure, and laying the foundation for the subsequent downward excavation of the main foundation pit and the formation of the entire structure of the station. The whole process ensures construction safety and structural durability, and adapts to the harsh construction environment requirements of the Quanhu area.

[0033] S400: Using the main body top plate 20 as a horizontal support, construct the main structure 19 inside the main body foundation pit; Optionally, step S400 includes the following steps: S401: Setting up a third enclosure structure 16 around the main foundation pit, excavating the main foundation pit in layers, and sequentially setting up a plurality of third support members 15 from top to bottom during the excavation process; S402: After excavating the main foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the main foundation pit from bottom to top. The third support members 15 are sequentially removed from bottom to top, and the second ground diaphragm wall 9 is simultaneously chiseled out while retaining the second main reinforcement of the second ground diaphragm wall 9. S403: Anchoring the second main reinforcement into the bottom plate of the auxiliary structure 18 to form a second rigid connection structure.

[0034] Specifically, before the main structure 19 is constructed, the construction site of the main structure 19 is fenced off and the boundaries of the construction area are clearly defined by building closed protective facilities. Specifically, such as Figure 4 As shown, when the main structure 19 is constructed, first, a third enclosure structure 16 is set around the main foundation pit to provide lateral protection for the excavation of the main foundation pit; in this embodiment, since an isolation structure is set between the auxiliary foundation pit and the main foundation pit, in this embodiment, the first enclosure structure 7 is set on the other three sides of the auxiliary foundation pit, and the third enclosure structure 16 is an underground continuous wall; Subsequently, the main foundation pit is excavated layer by layer from top to bottom. When the excavation reaches 0.5m below the preset position of each third support member 15, the third support member 15 is immediately erected to prevent soil collapse. At the same time, when the first third support member 15 is erected, the crown beam and concrete retaining wall are constructed at the same time. In this embodiment, the third support member 15 is a steel support. After the main foundation pit is excavated to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed from the bottom upwards in the main foundation pit to construct a waterproof and load-bearing foundation structure. At the same time, in accordance with the structural construction strength, the third support members 15 are gradually removed from bottom to top to achieve a safe conversion of the support system. When the second ground diaphragm wall 9 is simultaneously removed, the second main reinforcement of the second ground diaphragm wall 9 is retained. Finally, the retained second main reinforcement is bent in two directions and anchored into the bottom plate of the auxiliary structure 18 to form a second rigid connection structure, so that the main body and the auxiliary structure 18 can deeply coordinate in the vertical force system, which meets the strict requirements of the Quanhu area on the structural integrity and deformation resistance of the subway station, and ensures the construction safety and long-term stability of the main structure 19.

[0035] Optionally, the water-stop curtain construction includes the following steps: A drilling rig is used to drill holes below the impermeable layer at predetermined locations, and high-pressure jet grouting is used to inject slurry into the formation to fill the pores and form a continuous water-stop curtain. The permeability, strength and finish of the water-stop curtain are tested, and the drilled holes are sealed to prevent leakage.

[0036] Specifically, in this embodiment, during the construction of the water-stop curtain, a drilling rig is first used to accurately drill a hole at a predetermined position, so that the hole depth penetrates below the impermeable layer to form a grouting operation channel; then, a high-pressure jet grouting method is used to inject a slurry suitable for the local stratum into the stratum around the borehole at high pressure, and the slurry is used to fill and compact the soil pores, so that the soil particles are cemented, and a continuous, closed water-stop curtain is constructed underground to block the groundwater seepage path. After the construction is completed, the permeability, strength and integrity of the water-stop curtain are comprehensively tested through penetration tests, strength tests and geological radar to ensure that it meets the strict groundwater environmental protection and foundation pit water-stopping requirements of the Quanhu area; at the same time, the construction boreholes are properly sealed to prevent the boreholes from becoming groundwater leakage channels; throughout the process, the groundwater level and curtain stability are continuously monitored to ensure the water-stopping effect and construction safety.

[0037] S500: Connect the main structure 19 with the auxiliary structure 18 and remove the temporary support member 10.

[0038] Specifically, after the main structure 19 and the auxiliary structure 18 are completed and their respective strength and stability meet the design requirements, the connection operation between the two is carried out; at this time, the temporary support members 10 set up in the early stage to ensure the stability of the structure during the construction process have completed their mission and need to be dismantled in an orderly manner. The dismantling process strictly follows the principles of symmetry and grading to avoid disturbing the formed main body and auxiliary structure 18, and ensure that the overall structure after connection can still maintain a good stress state and deformation coordination ability under the complex geological environment of the Quanhu area.

[0039] Specifically, such as Figure 5 As shown, after the construction of the main structure 19 and the auxiliary structure 18 is completed, and the strength, stability and functional integrity of each structure meet the design requirements, subsequent site restoration operations are carried out, and the top plate is backfilled in an orderly manner. At the same time, various pipelines 17 that were temporarily relocated during the construction period are accurately relocated to their permanent positions to ensure that the pipelines 17 function normally and are compatible with the subway station structure; finally, the road surface is restored to return the construction site to its urban public space function, realizing the transformation from a subway construction site to an organic part of urban transportation and municipal facilities, and ensuring the coordination and integrity of the urban environment and infrastructure in the Quanhu area.

[0040] Working principle: First, construct the auxiliary structure 18 of the auxiliary foundation pit, set the transition support 11 on the auxiliary structure 18, and simultaneously set the temporary support 10 at the connection between the auxiliary structure 18 and the main structure 19; with the help of the synergistic effect of the temporary support 10 and the transition support 11, construct the main top plate 20 in a reverse manner, and then use the main top plate 20 as a horizontal support to carry out the construction of the main structure 19, finally connect the main structure 19 and the auxiliary structure 18, and remove the temporary support 10; this method can effectively cope with the complex hydrogeological conditions in the Quanhu area, avoid the unilateral soil unloading effect caused by the traditional "main body first and then auxiliary" construction, and cause the main body to tilt, while reducing the potential pollution risk of the construction to the groundwater environment in the Quanhu area, ensuring the strict control requirements of the main structure 19 on the arch settlement and deformation, and improving the safety and environmental friendliness of subway station construction in special geological areas.

[0041] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. The above is only the preferred implementation method of this application. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principles of this application, they can also make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the scope of protection of this application.

Claims

1. A subway station construction method for Quanhu area, characterized in that: The steps include: S100: Construction of auxiliary structures inside the auxiliary foundation pit; S200: arranging a transition support member for the main structure on the auxiliary structure, and simultaneously arranging a temporary support member at the connection between the auxiliary structure and the main structure; S300: Under the coordinated action of the temporary support members and the transition support members, a main body top plate is constructed on the top of the main body foundation pit using a reverse construction method; S400: Using the main body top plate as a horizontal support, constructing the main structure inside the main body foundation pit; S500: Connect the main structure with the auxiliary structure and remove the temporary support members.

2. A subway station construction method for Quanhu area according to claim 1, characterized in that: Before step S100, the following steps are also included: S010: Determine the positions of the main foundation pit and the auxiliary foundation pit, and set up an isolation structure between the two. The isolation structure includes: a first ground-connected wall and a second ground-connected wall connected to each other; wherein the first ground-connected wall is set corresponding to the main top plate, and the second ground-connected wall is set corresponding to the main structure.

3. A subway station construction method for Quanhu area according to claim 2, characterized in that: The step S300 includes the following steps: S301: Setting a second enclosure structure on the top of the main body foundation pit, and setting a first support column in the main body foundation pit, wherein the first support column is used to support the main body top plate; S302: excavating the main foundation pit, erecting a second support member during the excavation process, and simultaneously chiseling away the first ground diaphragm wall while retaining the first main reinforcement of the first ground diaphragm wall; S303: After the main foundation pit is excavated to the designed elevation of the main top plate, the main top plate is constructed on the top of the main foundation pit and connected to the top plate of the auxiliary structure; S304: Anchoring the first main reinforcement into the top plate of the auxiliary structure to form a first rigid connection structure.

4. A subway station construction method for Quanhu area according to claim 3, characterized in that: The step S300 further includes the following steps: S305: When the main body top plate reaches the design strength, the second support member is removed, a corbel is installed at the connection between the main body top plate and the second enclosure structure, and a retaining wall is installed inside the enclosure structure; S306: After the corbels and the retaining wall reach the designed strength, backfill the top plate of the main body with soil.

5. A subway station construction method for Quanhu area according to claim 2, characterized in that: The step S400 includes the following steps: S401: Setting up a third enclosure structure around the main foundation pit, excavating the main foundation pit in layers, and sequentially setting up a plurality of third support members from top to bottom during the excavation process; S402: After excavating the main foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the main foundation pit from bottom to top, and the third support members are sequentially removed from bottom to top. Simultaneously, the second ground diaphragm wall is chiseled out while retaining the second main reinforcement of the second ground diaphragm wall. S403: Anchoring the second main reinforcement into the bottom plate of the auxiliary structure to form a second rigid connection structure.

6. A subway station construction method for Quanhu area according to claim 1, characterized in that: The step S100 includes the following steps: S101: performing rotary jet grouting on the side walls and bottom walls of the auxiliary foundation pit to reinforce the soil of the auxiliary foundation pit; S102: Setting up a first enclosure structure around the auxiliary foundation pit, excavating the auxiliary foundation pit in layers, and sequentially setting up a plurality of first support members from top to bottom during the excavation process; S103: After excavating the auxiliary foundation pit to the designed elevation, a cushion layer, a water-stop curtain, and a plate wall are sequentially constructed in the auxiliary foundation pit from bottom to top, and the first supporting members are sequentially removed from bottom to top; S104: Moving the pipelines within the main structure to above the top plate of the auxiliary structure to form the auxiliary structure.

7. The method for constructing a subway station in Quanhu area according to claim 1, characterized in that: After step S200 and before step S300, the following steps are further included: S210: After the transition support member reaches the designed strength, backfill the top plate of the auxiliary structure with soil.

8. A subway station construction method for Quanhu area according to claim 5 or 6, characterized in that: The construction process of the water-stop curtain includes the following steps: A drilling rig is used to drill holes below the impermeable layer at predetermined locations, and high-pressure jet grouting is used to inject slurry into the formation to fill the pores and form a continuous water-stop curtain. The permeability, strength and finish of the water-stop curtain are tested, and the drilled holes are sealed to prevent leakage.

Citation Information

Patent Citations

  • Deeply-buried pool construction method for gridded underground continuous-wall foundation pit support

    CN104846842A

  • Station foundation pit engineering cover excavation construction method

    CN112240025A

  • Method for firstly performing open excavation construction on auxiliary rear cover of subway station and performing top-down excavation on construction main body

    CN114960751A

  • Subway station and accessory connecting structure and construction method

    CN116446450A

  • Construction method of cover excavation and underground excavation combined subway station structure

    CN116770888A