System and method for cleaning coal bed gas horizontal multilateral well based on continuous pipe

Through a continuous pipe cleaning system, the fluid channels are established in the coalbed methane well to clean pollutants safely and efficiently, solving the problem of pollutant cleaning difficulties in the existing technology, and achieving stable production increase in coalbed methane wells.

CN120426007APending Publication Date: 2025-08-05CHINA NAT PETROLEUM CORP +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410163517.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2025-08-05

AI Technical Summary

Technical Problem

The prior art is difficult to quickly, economically and safely clean horizontal section pollutants in coalbed methane wells, and there is a risk of contaminating reservoirs, especially for PE pipe completion processes with screenings, making it difficult to establish fluid channels and efficiently clean pollutants.

Method used

The continuous pipe cleaning system is adopted. By entering the well repair tool string from the horizontal well, pumping into the liquid forward washing the well, and the vertical well absorbs liquid at the same displacement, establishing a fluid channel, sweeps downhole pollutants into the cave, and then performing sand fishing operations to ensure that the bottom of the well remains unchanged and achieve safe and efficient pollutant cleaning.

Benefits of technology

The safe, efficient and economical cleaning of pollutants in the wells without polluting formations has been achieved, the production capacity of coalbed methane wells has been improved, and the stable production increase effect has been significant.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120426007A_ABST
    Figure CN120426007A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of oil and gas resource development, and particularly relates to a system and method for cleaning a coalbed methane horizontal multilateral well based on a continuous pipe. The method comprises the following steps: 1) assembling a wellhead device, a liquid pumping device and a pressure relief device on an inlet of the horizontal well, and starting the pressure relief device for pressure relief after pressure test; (2) a continuous pipe and a well repair tool string are configured, the continuous pipe is lowered till the well repair tool string reaches the position below the liquid level, then a well mouth is washed in the forward direction, and meanwhile, a screw pump in a vertical well pipe column is started according to the same displacement, liquid suction is started, a fluid channel is established, and forward washing is conducted; (3) reverse sand washing and sand bailing are carried out; and 4) dismounting equipment and the like. According to the method, after a well repair tool string is put down from a horizontal well and liquid is pumped in to wash the well in the forward direction, a vertical well sucks liquid according to the same displacement, it is guaranteed that the liquid level at the bottom of the well is not changed, meanwhile, a fluid channel is established, underground pollutants are swept into a cave, and then sand bailing operation is conducted to clean the pollutants in the well.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of oil and gas resource development, and in particular relates to a system and method for cleaning coalbed methane horizontal multi-branch wells based on continuous tubing. Background Art

[0002] A horizontal multi-branch coalbed methane well was completed using multiple sections of PE pipe. A vertical well was drilled adjacent to the well, completed using tubing and an electric submersible pump, and connected to the horizontal well at a specified depth. After a long period of drainage, the gas production rate continued to decline abnormally. Analysis suggests that the drainage process may have carried sand and fly ash from the coal seam to low-lying areas in the horizontal section, blocking the passage of water and coalbed methane to the wellbore, thereby reducing the production capacity of the coalbed methane well. Cleaning of contaminants in the horizontal section of the well was urgently needed to improve its production capacity.

[0003] The currently disclosed method for cleaning coalbed methane wellbores is the invention patent with application number 201911376593.0, which discloses an operating device and method for cleaning the contaminated area near the coalbed methane well. During the well washing operation, nitrogen foam well washing fluid is injected through the annulus between the coalbed methane wellbore and the well washing operation string, and returned from the well washing operation string. This method has high cleaning efficiency, low formation filtration loss of well washing fluid, low water consumption, and strong ash carrying capacity of well washing fluid. The invention patent with application number 202111299267.1 discloses a concentric continuous tube sand suction device, whose sand suction process is mainly to inject continuous high-pressure liquid into the cavity between the continuous inner tube and the continuous outer tube, and spray upward through the lifting nozzle to form a low pressure at the bottom of the well, and finally suck the sand at the bottom of the well and lift it to the ground. The above method is also the most widely used method for cleaning coalbed methane well pollutants in oil fields and on the market. There are the following two problems with the above method:

[0004] (1) Coalbed methane wells are completed using PE pipes with mesh, which makes it difficult to establish fluid channels and achieve internal circulation. The existing method uses continuous tubing under pressure, which requires expensive nitrogen assistance and is difficult to economically clean long horizontal sections of the wellbore. At the same time, large-volume sand removal will pollute the reservoir.

[0005] (2) The application of concentric continuous tubing negative pressure sand flushing technology in China is not yet mature. The pipe materials and corresponding supporting facilities are not perfect, and the transportation cost and difficulty are high. The problems of high cost of this technology and large pressure loss along the deep well have not been solved.

[0006] In view of the problems existing in the above-mentioned existing coalbed methane wellbore cleaning processes and tools, combined with the needs of on-site matching and the characteristics of continuous tubing pressure operation and low cost, it is necessary to design a set of processes that can quickly clean up horizontal section pollutants without polluting the formation and are safe, efficient and economical, which is suitable for the coalbed methane well PE pipe completion process that makes it impossible to establish fluid circulation. Summary of the Invention

[0007] To address the shortcomings of the existing technology, the present invention provides a system and method for cleaning horizontal multi-branch coalbed methane wells based on coiled tubing. This system addresses the existing problem of requiring concentric coiled tubing for cleaning horizontal multi-branch coalbed methane wellbore. The present invention's technical solution is fast and safe to implement. By inserting a workover tool string from the horizontal well and pumping liquid for forward well cleaning, the vertical well is then pumped at the same rate, ensuring a constant bottomhole liquid level while establishing a fluid channel. Downhole contaminants are then swept into the cavern, where sand bailing is then performed to clean the contaminants within the well. This invention achieves stable production increases while remaining safe, efficient, and economical, without contaminating the formation.

[0008] The technical solutions provided by the present invention are as follows:

[0009] A system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing, comprising:

[0010] Wellhead equipment;

[0011] A coiled tubing that passes through the wellhead assembly and extends into the horizontal well, with a workover tool string provided at one end of the coiled tubing;

[0012] Drums for lifting or lowering coiled tubing;

[0013] and a liquid pumping device connected to the other end of the continuous tube.

[0014] Based on this technical solution, after the workover tool string pumps liquid forward to clean the well, the vertical well can then pump liquid at the same rate, ensuring a constant bottomhole liquid level. This creates a fluid channel from the workover tool string to the cavern and then to the vertical well string, allowing downhole contaminants to be swept into the cavern. Reverse sand flushing is then performed, and after cleaning, the sand can be removed through bailing operations.

[0015] Specifically, the wellhead device includes an injection head, a blowout preventer box, a four-gate blowout preventer, a blowout preventer, a pressure relief tee, a flat valve and a wellhead four-way valve, which are connected in sequence from top to bottom.

[0016] Specifically, the well repair tool string includes a connector, a check valve, a mechanical release and a multi-hole sand flushing nozzle that are connected in sequence.

[0017] Specifically, the liquid pumping device includes a liquid tank and a pump truck which are connected in sequence. The pump truck is connected to the continuous pipe through at least one stopcock, and a pressure sensor is provided on the pipeline connected to the continuous pipe.

[0018] Specifically, the system for cleaning coalbed methane horizontal multi-branch wells based on continuous pipes is provided with a pressure relief device, which includes a mud pool and a throttling manifold connected in sequence, and the throttling manifold is connected to the pressure relief tee through at least one plug valve.

[0019] The present invention also provides a method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing, comprising the following steps:

[0020] 1) Assemble the wellhead assembly, pumping device, and pressure relief device at the inlet of the horizontal well, and perform a pressure test on the wellhead assembly, pumping device, and pressure relief device. After the pressure test, open the pressure relief device to relieve pressure. The above operations are in accordance with the recommended practices for coiled tubing operations in oil and gas wells;

[0021] 2) Install the coiled tubing and workover tool string, then open the flat valve and lower the coiled tubing until the workover tool string reaches the liquid surface. Then, start the pumping device to pump liquid into the wellhead for forward flushing. Simultaneously, the screw pump in the vertical well string starts pumping at the same displacement to start priming liquid, establish a fluid channel, and perform forward flushing.

[0022] 3) Continue lowering the coiled tubing to clean the wellbore contaminants until it reaches the completion method boundary. Then, reverse sand flushing is performed while the coiled tubing is raised to near the liquid surface. The pump truck and screw pump simultaneously reduce displacement until the pump is shut down. The coiled tubing is then raised to the wellhead, the horizontal well is shut down, and sand bailing is performed to remove contaminants deposited in the caverns.

[0023] 4) Remove the equipment, close the flat valve, close the wellhead, and continue the sand bailing operation from the vertical well. When the return fluid is free of pollutants, stop the operation and restore the vertical wellhead to gas production. Then, compare the daily gas production after production and the daily gas production before the well repair to evaluate the effect of the well repair.

[0024] Based on the above technical solution, the system for cleaning coalbed methane horizontal multi-branch wells based on continuous pipes provided by the present invention can be used to clean coalbed methane horizontal multi-branch wells. Specifically, after liquid is pumped into the well by the well repair tool string for forward well washing, the vertical well cooperates to absorb liquid at the same displacement. While ensuring that the liquid level at the bottom of the well remains unchanged, a fluid channel is formed from the well repair tool string to the cave, and then to the vertical well pipe string, so that underground pollutants can be swept into the cave, and then discharged by sand bailing operations.

[0025] Specifically, in step 1): the pressure test requires increasing the pump pressure step by step by 10%, 50%, and 100% to 35MPa, and maintaining the pressure for at least 10 minutes. The pressure drop is less than 0.7MPa to be qualified. If leakage is found, stop the pump immediately to relieve the pressure and make corrections.

[0026] Specifically, in step 2):

[0027] The specific steps for configuring the coiled tubing and workover tool string are as follows: open the drum to lower the coiled tubing, pass the coiled tubing through the injection head, connect the workover tool string, then lift the coiled tubing into the blowout preventer and connect it to the four-ram blowout preventer;

[0028] After slowly lowering the tubing through the wellhead, it should pass smoothly 10m below the wellhead at a low speed not exceeding 3m / min. During the lowering process, the speed should be adjusted according to the value of the pressure sensor. When the tubing approaches the liquid surface, the lowering speed should be reduced. Finally, the workover tool string should be lowered at a speed of less than 15m / min until it reaches the liquid surface.

[0029] After reaching the liquid surface, the circulating fluid is pumped in at a small displacement for positive circulation. The pump truck is controlled to start the pump at the specified displacement, pump in the liquid, flush the sand, and remove the contaminants on the PE pipe mesh. At the same time, the vertical well string is sucked in at the same displacement to establish a fluid channel.

[0030] Specifically, in step 3):

[0031] During the well flushing process, it is necessary to ensure that the wellhead pressure difference between the vertical well and the horizontal well is greater than the sum of the hydrostatic pressure and friction pressure from the connection point to the end of the completion PE pipe, so as to ensure that the flushed pollutants flow to the vertical well and do not flow to the open hole section to pollute the formation;

[0032] Lift the coiled tubing at a speed of 5-8m / min for reverse sand flushing and cleaning;

[0033] Each time the displacement of the pump truck and the electric submersible pump of the vertical well are changed, the displacement needs to be changed at the same time and kept equal, that is, the height of the liquid level must remain unchanged.

[0034] Specifically, in step 4), all equipment above the four-gate blowout preventer at the wellhead of the horizontal well is dismantled, the coiled tubing operation equipment is evacuated, and the flat plate valve is closed to close the wellhead.

[0035] Specifically, after the workover tool string pumps liquid into the well for forward washing, the vertical well is aspirated at the same rate to ensure that the bottom hole liquid level remains unchanged and to form a fluid channel.

[0036] Specifically, the fluid channel is routed from the well repair tool string to the cave, and then to the vertical well string.

[0037] Furthermore, a gas-liquid separator and a fan are sequentially provided at the discharge end of the vertical well pipe string.

[0038] Beneficial effects of the present invention:

[0039] By inserting a sand flushing tool string into a horizontal well and pumping liquid to flush the well forward, the vertical well is then pumped with liquid at the same rate to ensure a constant bottom hole liquid level while establishing a fluid channel. Downhole contaminants are swept into the cavern, and sand bailing is then performed. This invention achieves the goal of no formation pollution, and is safe, efficient, and economical, achieving the goal of stable production increases. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a system diagram of the system for cleaning coalbed methane horizontal multi-branch wells based on continuous tubing provided by the present invention.

[0041] Figure 2 It is a structural schematic diagram of the wellhead portion of a horizontal multi-branch well for cleaning coalbed methane based on continuous tubing provided by the present invention.

[0042] Figure 3 It is a structural diagram of a PE pipe section with mesh.

[0043] Figure 4 This is a schematic diagram of the forward cleaning principle in the method for cleaning coalbed methane horizontal multi-branch wells based on continuous tubing provided by the present invention.

[0044] Figure 5 This is a schematic diagram of the reverse sand flushing and cleaning principle in the method for cleaning a coalbed methane horizontal multi-branch well based on continuous tubing provided by the present invention.

[0045] Attachment Figure 1 、 2 In , 3, 4, and 5, the structures represented by each number are listed as follows:

[0046] 1. Wellhead assembly; 1-1. Injection head; 1-2. BOP; 1-3. Four-gate BOP; 1-4. BOP; 1-5. Pressure relief tee; 1-6. Flat valve; 1-7. Wellhead spool; 1-8. Drum; 1-9. Pump truck; 1-10. Liquid tank; 1-11. Choke manifold; 1-12. Mud pit; 2. Gas-liquid separator; 3. Blower; 4. Coiled tubing; 5. Horizontal well; 5-1. PE pipe section; 5-2. Open hole section; 6. Vertical well string; 7. Vertical well; 8. Workover tool string; 9. Cave. DETAILED DESCRIPTION

[0047] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0048] In a specific embodiment, Figure 1 As shown, the coiled tubing-based system for cleaning horizontal multi-branch coalbed methane wells comprises a wellhead assembly 1; a coiled tubing 4 extending through the wellhead assembly 1 and into a horizontal well 5, with a workover tool string 8 mounted on one end of the coiled tubing 4; rollers 1-8 for raising and lowering the coiled tubing 4; and a pumping device connected to the other end of the coiled tubing 4. This technical solution creates a fluid channel from the workover tool string 8 to a cavern 9 and then to the vertical well string 6, sweeping downhole contaminants into the cavern. Reverse sand flushing is then performed, and after cleaning, the contaminants can be removed through bailing operations.

[0049] Example 1

[0050] On the basis of the above implementation mode, Figure 1As shown, the system for cleaning coalbed methane horizontal multi-branch wells based on continuous tubing is also provided with a pressure relief device, which includes a mud pool 1-12 and a throttle manifold 1-11 connected in sequence, and the throttle manifold 1-11 is connected to the pressure relief tee 1-5 through at least one plug valve 1-13.

[0051] Example 2

[0052] Based on the above embodiments, Figure 1 As shown, the wellhead device 1 includes an injection head 1-1, a blowout preventer box 1-2, a four-gate blowout preventer 1-3, a lubricant pipe 1-4, a pressure relief tee 1-5, a flat valve 1-6 and a wellhead spool 1-7 which are connected in sequence from top to bottom.

[0053] Example 3

[0054] On the basis of the above embodiments, the well repair tool string 8 includes a connector, a check valve, a mechanical release and a multi-hole sand flushing nozzle which are connected in sequence.

[0055] Example 4

[0056] Based on the above embodiments, Figure 1 As shown, the pumping device includes a liquid tank 1-10 and a pump truck 1-9 which are connected in sequence. The pump truck 1-9 is connected to the coiled tube 4 through at least one stopcock valve 1-13, and a pressure sensor 1-14 is provided on the pipeline connected to the coiled tube 4.

[0057] Example 5

[0058] Based on the above embodiments, Figure 2 A main pipeline can be provided, one end of which is connected to a pressure relief tee 1-5. Three branch pipelines can be provided at the other end of the main pipeline. One branch pipeline is connected in sequence to a plug valve 1-13, a pump truck 1-9, and a liquid tank 1-10. Another branch pipeline is connected in sequence to a plug valve 1-13, a throttle manifold 1-11, and a mud tank 1-12. Another branch pipeline is connected in sequence to a plug valve 1-13, a pressure sensor 1-14, and a continuous tubing. Several plug valves 1-13 can be installed in the pipe section before the branch.

[0059] In a specific embodiment, the construction is carried out for a coalbed methane horizontal well. The coalbed methane well completion method is that the first half is a PE pipe section 5-1 with a mesh, and regular rectangular holes are punched on the PE pipe. Figure 3 The second half of the branch well is the open hole section 5-2. The method for cleaning a horizontal multi-branch coalbed methane well based on coiled tubing provided by the present invention is used for cleaning, specifically comprising the following steps:

[0060] Step 1: Arrange the coiled tubing equipment according to the recommended practice for coiled tubing operations in oil and gas wells, dismantle the original wellhead equipment, and only retain the flat valves 1-6. Test the switch function of each gate of the four-gate blowout preventer 1-3 and make it fully open. Figure 2 As shown, after final installation, the wellhead assembly consists of, from top to bottom, the injection head 1-1, blowout preventer box 1-2, four-gate blowout preventer 1-3, lubricant pipe 1-4, pressure relief tee 1-5, flat valve 1-6, and wellhead spool 1-7. Connect the surface pipelines, including the choke manifold 1-11 and mud pit 1-12. Open the corresponding stopcocks and conduct pressure tests on the surface pipelines and wellhead. The pressure test requires increasing the pump pressure in steps of 10%, 50%, and 100% to 35 MPa. Maintain the pressure for 10 minutes, and a pressure drop of less than 0.7 MPa is considered acceptable. If any leaks are detected, immediately stop the pump, release the pressure, and rectify the problem.

[0061] Step 2: At the wellhead of horizontal well 5, pass the coiled tubing 4 through the injection head 1-1 and connect it to the workover tool string 8, which includes a connector, a check valve, a mechanical release, and a multi-hole sand flushing nozzle. Control the roller 1-8 to lift the coiled tubing and retract it into the blowout preventer 1-4, and connect it to the four-gate blowout preventer 1-3. Open the flat valve 1-6, slowly lower the tubing through the wellhead, and smoothly pass through the wellhead valve group at a low speed of no more than 3m / min. During the lowering process, pay attention to the changes in the pressure sensor 1-14. Then, lower the tool at a normal speed of less than 15m / min. When the tool reaches the liquid level, prepare the liquid in the liquid tank 1-10, control the pump truck 1-9 to start the pump at the specified displacement, and pump liquid to wash the well forward. Figure 4 As shown. Simultaneously, the screw pumps in the vertical well string 6 start pumping at the same rate, starting to draw liquid and establishing a fluid channel. The screw pumps lift the downhole liquid, and after gas is extracted, it passes through the gas-liquid separator 2 for further dehydration. The exhaust pipe of the gas-liquid separator is connected to the fan 3, which rapidly draws out the free gas downhole, reducing the downhole pressure and increasing the gas flow rate within the vertical well string 6, thereby enhancing its liquid-carrying capacity.

[0062] Step 3: Continue lowering at a speed of 5-8m / min to clean the wellbore pollutants until it is lowered to the vicinity of the completion method boundary line. Wash the well for two and a half weeks. At this time, it is necessary to ensure that the wellhead pressure difference between the vertical well 7 and the horizontal well 5 is greater than the sum of the hydrostatic pressure and friction pressure from the connection point to the end of the completion PE pipe 5-1, so as to ensure that the washed pollutants flow to the vertical well and do not flow to the open hole section 5-2 to pollute the formation. Then continue to lift the coiled tubing at 5-8m / min for reverse sand washing, such as Figure 5 As shown, until the liquid level approaches, pump trucks 1-9 and the screw pumps simultaneously reduce their displacement until the pumps shut down. The coiled tubing is raised to the wellhead, and the horizontal well is shut down. At this point, the contaminants are deposited in cave 9, and subsequent sand bailing operations are performed. It is important to note that each time the displacement of the pump trucks and the ESP in the vertical well is changed, the displacement must be adjusted simultaneously and maintained at the same level to ensure the liquid level remains constant.

[0063] Step 4: Remove all equipment above the four-gate BOP 1-3 at the wellhead of horizontal well 5, evacuate the coiled tubing equipment, close flat valves 1-6, and close the wellhead. Conduct sand bailing operations from the vertical well to remove bottomhole contaminants. Wait until the flowback fluid is nearly free of contaminants, then cease operations and restore the gas production at the wellhead of vertical well 6.

[0064] For CBM horizontal multi-branch wells in the Ordos Basin, the workover effect can be evaluated by comparing the daily gas production after commissioning with the daily gas production before and after the workover. In the recorded data of a specific workover, the daily gas production before the workover was reduced to 5755m3. 3 After the well repair, the daily gas production increased to 7030m 3 , close to the highest value of 7618m after production 3 The daily gas production shows that the well repair effect is good.

[0065] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing, characterized in that: include: Wellhead equipment (1); A continuous pipe (4) passing through the wellhead device (1) and extending into the horizontal well (5), wherein one end of the continuous pipe (4) is provided with a well repair tool string (8); Rollers (1-8) for lifting or lowering the coiled tubing (4); and a liquid pumping device connected to the other end of the continuous tube (4).

2. The system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing according to claim 1, characterized in that: The wellhead device (1) comprises an injection head (1-1), a blowout preventer box (1-2), a four-gate blowout preventer (1-3), a blowout preventer (1-4), a pressure relief tee (1-5), a flat valve (1-6) and a wellhead spool (1-7), which are sequentially connected from top to bottom.

3. The system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing according to claim 2, characterized in that: The well repair tool string (8) comprises a connector, a check valve, a mechanical release and a multi-hole sand flushing nozzle which are sequentially connected and arranged.

4. The system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing according to claim 3, characterized in that: The liquid pumping device comprises a liquid tank (1-10) and a pump truck (1-9) which are connected in sequence. The pump truck (1-9) is connected to the continuous pipe (4) via at least one stopcock valve (1-13), and a pressure sensor (1-14) is provided on the pipeline connected to the continuous pipe (4).

5. The system for cleaning coalbed methane horizontal multi-branch wells based on coiled tubing according to claim 4, characterized in that: The system for cleaning coalbed methane horizontal multi-branch wells based on continuous tubing is provided with a pressure relief device, which comprises a mud pool (1-12) and a throttle manifold (1-11) connected in sequence, and the throttle manifold (1-11) is connected to the pressure relief tee (1-5) through at least one plug valve (1-13).

6. A method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing, using the system of claim 5 for cleaning, characterized in that: The following steps are involved: 1) Assembling a wellhead device (1), a pumping device, and a pressure relief device at the inlet of a horizontal well (5), and conducting a pressure test on the wellhead device (1), the pumping device, and the pressure relief device. After the pressure test, the pressure relief device is opened to relieve pressure; 2) arranging the coiled tubing (4) and the workover tool string (8), then opening the flat valve (1-6), lowering the coiled tubing (4) until the workover tool string (8) reaches below the liquid level, and then starting the pumping device to pump liquid into the wellhead for forward washing. At the same time, the screw pump in the vertical well string (6) is simultaneously started at the same displacement to start sucking liquid, establish a fluid channel, and perform forward washing; 3) Continue lowering the coiled tubing (4) to clean the wellbore contaminants until it is lowered to the boundary line of the completion method, and then reverse sand flushing and cleaning is performed in the process of lifting the coiled tubing (4) to near the liquid surface, and the pump truck (1-9) and the screw pump simultaneously reduce the displacement until the pump is shut down, and then lift the coiled tubing (4) to the wellhead, shut down the horizontal well (5), and then carry out sand bailing operations for the contaminants deposited in the cave (9); 4) Dismantle the equipment, close the flat valve (1-6), close the wellhead, and continue the sand bailing operation from the vertical well (7). When the return fluid is free of pollutants, stop the operation and restore the gas production wellhead of the vertical well (7).

7. The method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing according to claim 6, characterized in that: In step 1): the pressure test requires increasing the pump pressure step by step by 10%, 50%, and 100% to 35MPa, and maintaining the pressure for at least 10 minutes. The pressure drop is less than 0.7MPa to be qualified.

8. The method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing according to claim 6, characterized in that: In step 2): The specific steps of configuring the coiled tubing (4) and the workover tool string (8) are as follows: opening the drum (1-8) to lower the coiled tubing (4), passing the coiled tubing (4) through the injection head (1-1), connecting the workover tool string (8), then lifting the coiled tubing (4) and storing it in the blowout preventer (1-4), and connecting it to the four-gate blowout preventer (1-3); After slowly lowering the pipe through the wellhead, it smoothly passes 10m below the wellhead at a low speed not exceeding 3m / min. During the lowering process, the speed is adjusted according to the value of the pressure sensor (1-14), and then the well repair tool string (8) is lowered at a speed less than 15m / min until the well repair tool string (8) reaches the liquid level.

9. The method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing according to claim 6, characterized in that: In step 3): During the well washing process, it is necessary to ensure that the wellhead pressure difference between the vertical well (7) and the horizontal well (5) is greater than the sum of the hydrostatic pressure and the friction pressure from the connection point to the tail end of the completion PE pipe (5-1); Lift the coiled tube (4) at a speed of 5-8 m / min to flush the sand in reverse to near the liquid surface; The liquid level remains unchanged.

10. The method for cleaning a coalbed methane horizontal multi-branch well based on coiled tubing according to any one of claims 6 to 9, characterized in that: After the well repair tool string (8) pumps liquid into the well for forward washing, the vertical well (7) sucks liquid at the same displacement to ensure that the liquid level at the bottom of the well remains unchanged and a fluid channel is formed; The fluid channel is routed from the well repair tool string (8) to the cave (9) and then to the vertical well string (6); A gas-liquid separator (2) and a fan (3) are sequentially provided at the discharge end of the vertical well pipe column (6).

Citation Information

Patent Citations

  • Operation device and method for cleaning near-well-bore polluted zone of coal-bed gas well

    CN111021970A

  • Concentric continuous pipe sand suction device

    CN113982511A