A liquid cooling system for charging piles

By using a liquid cooling system to cycle through cooling and heating, the problem of temperature control in charging piles under high power density is solved, achieving rapid cooling and heating and ensuring charging efficiency and safety.

CN120462188BActive Publication Date: 2026-06-23铁塔能源有限公司 +1
2 Cites 0 Cited by

Patent Information

Application Number
CN202510791950.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-06-13
Publication Date
2026-06-23
Estimated Expiration
2045-06-13

AI Technical Summary

Technical Problem

Existing charging stations struggle to effectively control temperature under high power density and high heat flux density, resulting in insufficient heat dissipation that affects charging efficiency, or excessively low temperatures that prevent the equipment from starting normally.

Method used

A liquid cooling system was designed, which uses parallel cooling and heating cycles and temperature sensors and heaters to control the switching of fluid between different channels to achieve rapid cooling or heating and ensure that the power module temperature is within the normal range.

Benefits of technology

It enables rapid cooling or heating, avoiding equipment failures caused by excessively high or low temperatures, and ensuring charging efficiency and safety.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present application relates to liquid cooling heat dissipation technical field, specifically propose a kind of liquid cooling cooling system of charging pile, comprising: liquid cooling part, transfer part and heat removal part;Liquid cooling part is set on power module, and it is provided with flow channel for fluid passing in it;Transfer part is provided with transfer cavity for fluid passing, and the water inlet of flow channel is communicated with transfer cavity, and the water outlet of flow channel and transfer cavity are connected in parallel with first channel and second channel;Heating assembly is provided in transfer cavity;Heat removal part is set on first channel;When the temperature of fluid is higher than first preset temperature, first channel opens, and second channel closes;When the temperature of fluid is lower than second preset temperature, second channel opens, and first channel closes.Overcome the problem of waiting for temperature to rise, avoid the temperature of power module too low and cannot normally start, improve cooling efficiency, also can avoid temperature too low, so as to maintain the temperature of power module in normal range, to ensure charging efficiency.
Need to check novelty before this filing date? Find Prior Art