Tunnel stratum grouting method and device, electronic equipment and storage medium
Through geological sensors and monitoring devices combined with automated control systems, tunnel stratigraphic data is collected and monitored in real time, and the target grouting location and process are determined, which solves the problems of cumbersome operation, limited flexibility and insufficient effect monitoring in tunnel grouting technology, achieving efficient and safe grouting effect.
Patent Information
- Application Number
- CN202511056895.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-30
- Publication Date
- 2025-08-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing tunnel grouting technology has problems such as cumbersome operating procedures, limited flexibility, scenario limitations and insufficient effect monitoring, especially in special tunnels with low construction efficiency and unsatisfactory grouting effect.
Geological sensors are used to collect geological data in real time, combine the grouting process database to determine the target grouting position and process, monitor the grouting process in real time through monitoring devices, and integrate automated control systems to adjust parameters, including electric drive and wireless communication modules to achieve precise control and real-time feedback.
The grouting accuracy and quality are improved, construction efficiency is enhanced, construction risks and costs are reduced, construction safety and adaptability are improved, real-time monitoring and dynamic adjustment are achieved, and the grouting effect is ensured to meet the design requirements.
Smart Images

Figure CN120556944A_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the technical field of tunnel grouting, and in particular to a tunnel stratum grouting method, device, electronic device and storage medium. Background Art
[0002] One or more rows of steel pipes are set at the top of the tunnel excavation range, and two sets of movable grouting units are symmetrically arranged in the steel pipes. The two grouting units are movably connected by a piston distance control rod, and can be moved as a whole in the steel pipe to the reinforcement area of the tunnel that needs to be reinforced and locked. A compensation grouting cavity is formed between the two grouting units, and grouting holes are provided on the steel pipe of the compensation grouting cavity; the grouting unit may include a grouting stop piston arranged at the end of the compensation grouting cavity and at least two grouting devices fixedly connected to the grouting stop piston. The grouting device may be a nipple-shaped structure, which is placed in the compensation grouting cavity through the grouting stop piston to continuously provide mortar for the compensation grouting cavity. The mortar is injected into the soil in the area to be reinforced through the grouting holes and solidifies, thereby realizing compensation grouting reinforcement of the reinforcement area.
[0003] However, the above solution still suffers from cumbersome operational procedures, limited flexibility, limited scenarios, and insufficient monitoring of results. Specifically, the series of operations, from pre-drilling the steel pipe to positioning the grouting unit, flushing the inner wall, grouting, re-flushing, and moving to the next work location, must be performed in a strict sequence, and various parameters and equipment status must be closely monitored during operation, which is quite cumbersome. In addition, the system requires pre-drilling the steel pipe within the tunnel excavation, which may be limited in some special tunnels (such as shallow tunnels or tunnels with very large cross-sections). For large or irregularly shaped reinforcement areas, multiple grouting unit movements may be required, affecting construction efficiency. At the same time, the system is designed to be applicable to different types of tunnel construction, but it has certain limitations in certain special tunnel scenarios (such as tunnels with very large cross-sections and shallow tunnels). Finally, there is currently no real-time monitoring method, which may make it impossible to timely evaluate the grouting effect, affecting subsequent construction decisions. In addition, due to the lack of a real-time feedback mechanism, the adjustment of grouting parameters may lag behind the actual changes in the formation, resulting in suboptimal grouting results. Summary of the Invention
[0004] In order to solve the above technical problems or at least partially solve the above technical problems, the embodiments of the present application provide a tunnel stratum grouting method, device, electronic device and storage medium to solve the problems of current grouting schemes such as cumbersome operating procedures, limited flexibility, scenario limitations, and insufficient effect monitoring.
[0005] In order to achieve the above objectives, the technical solutions provided in the embodiments of the present application are as follows: In a first aspect, an embodiment of the present application provides a tunnel stratum grouting method, which is applied to a tunnel stratum grouting system, wherein the tunnel stratum grouting system includes at least: a geological sensor, a grouting device, and a monitoring device. The tunnel stratum grouting method includes: using the geological sensor to collect target geological data of the tunnel stratum in real time; Determining target grouting data corresponding to the target geological data according to a pre-stored geological parameter and grouting process database, wherein the target grouting data at least includes: a target grouting position and a target grouting process; According to the target grouting process, controlling the grouting device to perform grouting at the target grouting position; The monitoring device is used to monitor the grouting data and geological data of the grouting device in real time to obtain real-time grouting results.
[0006] As an optional embodiment, in the first aspect of the embodiment of the present application, the tunnel stratum grouting system further includes: an electric drive device and a position acquisition device, and before the grouting device is controlled to grout at the target grouting position according to the target grouting process, the method further includes: The posture data of the grouting device are collected in real time by the posture collection device; According to the target grouting position, the grouting device is controlled by the electric drive device to adjust the posture data to the target grouting position.
[0007] As an optional implementation, in the first aspect of the embodiment of the present application, the tunnel stratum grouting system further includes: a pressure and flow sensor, the grouting device includes: an electric valve and a grouting pump, and the grouting device is controlled to perform grouting at the target grouting position according to the target grouting process, including: According to the target grouting process, controlling the grouting device to perform grouting at the target grouting position, and obtaining feedback data from the pressure and flow sensors in real time; When the feedback data indicates that the grouting pressure and flow rate are lower than the preset values, increasing the opening of the electric valve and / or the output power of the grouting pump; When the feedback data indicates that the grouting pressure and flow rate are higher than the preset values, the opening of the electric valve and / or the output power of the grouting pump are reduced.
[0008] As an optional embodiment, in the first aspect of the embodiment of the present application, a plurality of grouting holes are provided on the grouting steel pipe, each grouting hole is provided with an electric valve and a grouting pump, and the grouting device is controlled to perform grouting at the target grouting position according to the target grouting process, including: Determining at least one grouting hole to be grouted according to the target grouting process and the target grouting position; Open the electric valve corresponding to the at least one grouting hole, and perform grouting through the grouting pump corresponding to the at least one grouting hole.
[0009] As an optional implementation, in the first aspect of the embodiment of the present application, after the grouting data and geological data of the grouting device are monitored in real time by the monitoring device and the real-time grouting results are obtained, the method further includes: When it is detected that the real-time grouting result indicates that the formation deformation and / or the slurry diffusion exceeds a preset range, the grouting is stopped and a warning message is output.
[0010] As an optional implementation manner, in the first aspect of the embodiments of the present application, the method further includes: Pre-acquiring tunnel stratum data of various geological environments, and determining target grouting strategies corresponding to the tunnel stratum data of the various geological environments; The tunnel stratum data and the target grouting strategy are stored in correspondence to obtain the geological parameter and grouting process database.
[0011] As an optional implementation, in the first aspect of the embodiment of the present application, the tunnel stratum grouting system further includes: a wireless communication module, and the method further includes: The wireless communication module is used to realize data transmission and control instruction transmission in the tunnel stratum grouting system.
[0012] In a second aspect, an embodiment of the present application provides a tunnel stratum grouting device, which is applied to a tunnel stratum grouting system. The tunnel stratum grouting system includes at least: a geological sensor, a grouting device, and a monitoring device. The tunnel stratum grouting device includes: an acquisition module for collecting target geological data of the tunnel stratum in real time through the geological sensor; A processing module is used to determine target grouting data corresponding to the target geological data according to a pre-stored geological parameter and grouting process database, wherein the target grouting data at least includes: a target grouting position and a target grouting process; The processing module is further configured to control the grouting device to perform grouting at the target grouting position according to the target grouting process; The processing module is further used to monitor the grouting data and geological data of the grouting device in real time through the monitoring device to obtain real-time grouting results.
[0013] As an optional implementation, in the second aspect of the embodiment of the present application, the tunnel stratum grouting system further includes: an electric drive device and a posture acquisition device, and the acquisition module is further used to collect the posture data of the grouting device in real time through the posture acquisition device; The processing module is further configured to control the grouting device to adjust the posture data to the target grouting position through the electric drive device according to the target grouting position.
[0014] As an optional implementation, in the second aspect of the embodiment of the present application, the tunnel stratum grouting system further includes: a pressure and flow sensor, the grouting device includes: an electric valve and a grouting pump, and the processing module is specifically used to control the grouting device to grout at the target grouting position according to the target grouting process, and obtain feedback data from the pressure and flow sensor in real time; The processing module is specifically configured to increase the opening of the electric valve and / or the output power of the grouting pump when the feedback data indicates that the grouting pressure and flow rate are lower than preset values; The processing module is specifically used to reduce the opening of the electric valve and / or the output power of the grouting pump when the feedback data indicates that the grouting pressure and flow rate are higher than the preset values.
[0015] As an optional implementation, in the second aspect of the embodiment of the present application, a plurality of grouting holes are provided on the grouting steel pipe, each grouting hole is provided with an electric valve and a grouting pump, and the processing module is specifically used to determine at least one grouting hole to be grouted according to the target grouting process and the target grouting position; The processing module is specifically used to open the electric valve corresponding to the at least one grouting hole, and perform grouting through the grouting pump corresponding to the at least one grouting hole.
[0016] As an optional embodiment, in the second aspect of the embodiment of the present application, the processing module is also used to stop grouting and output a warning message when it is detected that the real-time grouting results indicate that the formation deformation and / or slurry diffusion exceeds a preset range.
[0017] As an optional implementation, in the second aspect of the embodiment of the present application, the acquisition module is further used to pre-acquire tunnel stratum data of multiple geological environments and determine the target grouting strategies corresponding to the tunnel stratum data of the multiple geological environments respectively; The processing module is further used to store the tunnel stratum data and the target grouting strategy in correspondence to obtain the geological parameter and grouting process database.
[0018] As an optional implementation, in the second aspect of the embodiment of the present application, the tunnel formation grouting system further includes: a wireless communication module, The processing module is further used to realize data transmission and control instruction transmission in the tunnel formation grouting system through the wireless communication module.
[0019] In a third aspect, an embodiment of the present application provides an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the tunnel formation grouting method in the first aspect of the embodiment of the present application.
[0020] In a fourth aspect, embodiments of the present application provide a computer-readable storage medium storing a computer program that causes a computer to execute the tunnel grouting method of the first aspect of the embodiments of the present application. The computer-readable storage medium includes a ROM / RAM, a magnetic disk, or an optical disk.
[0021] In a fifth aspect, an embodiment of the present application provides a computer program product, which, when executed on a computer, enables the computer to execute part or all of the steps of any one of the methods of the first aspect.
[0022] In a sixth aspect, an embodiment of the present application provides an application publishing platform, which is used to publish a computer program product, wherein when the computer program product runs on a computer, the computer executes part or all of the steps of any one of the methods of the first aspect.
[0023] Compared with the prior art, the embodiments of the present application have the following beneficial effects: The present application provides a tunnel stratum grouting method, device, electronic device, and storage medium. The tunnel stratum grouting system includes at least: a geological sensor, a grouting device, and a monitoring device. The geological sensor collects target geological data of the tunnel stratum in real time; based on a pre-stored geological parameter and grouting process database, the target grouting data corresponding to the target geological data is determined, and the target grouting data includes at least: a target grouting position and a target grouting process; according to the target grouting process, the grouting device is controlled to grout at the target grouting position; the grouting data and geological data of the grouting device are monitored in real time by the monitoring device to obtain real-time grouting results. In this solution, the grouting status of the grouting unit can be accurately controlled according to the real-time monitored geological parameters and preset design requirements, and the grouting parameters can be automatically adjusted in response to changes in geological conditions without frequent manual intervention. In addition, a real-time monitoring device is integrated to provide real-time feedback on the grouting effect, providing a basis for dynamic adjustment of the system, and effectively improving the grouting efficiency and grouting effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0026] Figure 1 This is a schematic diagram of the structure of a tunnel stratum grouting system provided in an embodiment of the present application. Figure 1 ; Figure 2 This is a schematic diagram of a tunnel grouting method provided in an embodiment of the present application. Figure 1 ; Figure 3 This is a schematic diagram of the structure of a tunnel stratum grouting system provided in an embodiment of the present application. Figure 2 ; Figure 4 This is a schematic diagram of a tunnel grouting method provided in an embodiment of the present application. Figure 2 ; Figure 5 This is a schematic structural diagram of a tunnel stratum grouting device provided in an embodiment of the present application; Figure 6 This is a structural diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0027] In order to more clearly understand the above-mentioned purposes, features and advantages of the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other in the absence of conflict. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0028] The terms "first" and "second" and the like in the description and claims of this application are used to distinguish different objects rather than to describe a specific order of the objects.
[0029] The terms "including" and "having" and any variations thereof in the embodiments of the present application are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus that includes a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products or apparatus.
[0030] It should be noted that in the embodiments of this application, words such as "exemplary" or "for example" are used to indicate examples, illustrations, or descriptions. Any embodiment or design described as "exemplary" or "for example" in the embodiments of this application should not be interpreted as being more preferred or advantageous over other embodiments or designs. Rather, the use of words such as "exemplary" or "for example" is intended to present the relevant concepts in a concrete manner.
[0031] Commonly used methods for controlling stratum loss are: pre-drilling one or more rows of steel pipes at the top of the tunnel excavation range, symmetrically provided with two sets of movable grouting units in the steel pipes, and the two grouting units are movably connected by a piston distance control rod, and can be moved as a whole in the steel pipe to the reinforcement area of the tunnel that needs to be reinforced and locked, and a compensation grouting cavity is formed between the two grouting units, and grouting holes are provided on the steel pipe of the compensation grouting cavity; the grouting units have the same structure, including a grouting stop piston provided at the end of the compensation grouting cavity and at least two grouting devices fixedly connected to the grouting stop piston, the grouting device is a nipple-shaped structure, which is placed in the compensation grouting cavity through the grouting stop piston to continuously provide mortar for the compensation grouting cavity, and the mortar is injected into the soil of the area to be reinforced through the grouting holes and solidifies, thereby realizing compensation grouting reinforcement of the reinforcement area. The existing separated tunnel stratum compensation grouting system has the following problems: (1) The operation process is cumbersome: starting from pre-drilling the steel pipe, to positioning the grouting unit, flushing the inner wall, grouting, flushing again, and moving to the next work position, each step needs to be carried out strictly in order, and various parameters and equipment status need to be closely monitored during the operation. For example, forgetting to flush the inner wall may cause the grouting holes to be blocked, affecting subsequent grouting operations; improper control of grouting pressure or flow may cause uneven slurry diffusion or damage to the tunnel structure.
[0032] (2) Limited flexibility: The system requires pre-drilling steel pipes within the tunnel excavation range, which may be limited in some special tunnels (such as shallow tunnels or tunnels with extra-large cross-sections). For example, shallow tunnels may be difficult to pre-drill steel pipes due to ground conditions, or the layout of steel pipes may interfere with other construction processes. In addition, the grouting range is limited by the layout of the steel pipes and the distribution of the grouting holes. For large or irregularly shaped reinforcement areas, it may be necessary to move the grouting unit multiple times, affecting construction efficiency.
[0033] (3) Applicability and limitations: Although the system is designed to be applicable to different types of tunnel construction, its applicability in some special tunnels (such as ultra-large cross-section tunnels and shallow tunnels) may need further verification. For example, shallow tunnels may be difficult to pre-drill steel pipes due to limited ground conditions. In addition, the system mainly focuses on the precise positioning and operation of the grouting process, but the real-time monitoring and feedback mechanism for the grouting effect is not perfect. In actual construction, it is difficult to evaluate the grouting effect in a timely manner, which may lead to untimely adjustments to subsequent reinforcement measures.
[0034] (4) Insufficient monitoring of grouting effects: No real-time monitoring methods for grouting effects, such as monitoring of ground deformation and slurry diffusion during the grouting process, were mentioned. This may result in an inability to timely assess the grouting effect, affecting subsequent construction decisions. In addition, due to the lack of a real-time feedback mechanism, the adjustment of grouting parameters may lag behind the actual changes in the ground, resulting in unsatisfactory grouting results.
[0035] In order to solve some or all of the above-mentioned technical problems, the embodiments of the present application provide a tunnel stratum grouting method, device, electronic device and storage medium. The tunnel stratum grouting system includes at least: a geological sensor, a grouting device, and a monitoring device. The target geological data of the tunnel stratum is collected in real time through the geological sensor; the target grouting data corresponding to the target geological data is determined according to the pre-stored geological parameters and grouting process database, and the target grouting data includes at least: a target grouting position and a target grouting process; according to the target grouting process, the grouting device is controlled to perform grouting at the target grouting position; the grouting data and geological data of the grouting device are monitored in real time through the monitoring device to obtain real-time grouting results.
[0036] (1) Improve grouting accuracy and quality. The automated control system can accurately control the movement and positioning of the grouting unit based on real-time monitored geological parameters (such as formation pressure, permeability, etc.) and preset design requirements, ensuring the accuracy of the grouting position. At the same time, the system can automatically adjust the grouting pressure and flow rate to ensure that the slurry is evenly distributed in the reinforcement area, avoiding insufficient or excessive grouting, thereby significantly improving the grouting quality.
[0037] (2) Enhanced construction efficiency: Automated control reduces the complexity and time consumption of manual operations. The system can quickly respond to changes in geological conditions and automatically adjust grouting parameters without frequent manual intervention, significantly shortening construction preparation and adjustment time. In addition, automated equipment can operate continuously, further improving construction efficiency and shortening project schedules.
[0038] (3) Reduce construction risks and costs. Through automated control, the grouting process is more stable and reliable, reducing the risk of grouting failure due to human error or equipment failure. At the same time, precise grouting control can reduce slurry waste and reduce material costs. In addition, the automated system reduces dependence on skilled workers and reduces labor costs.
[0039] (4) Improve construction safety and environmental applicability. The automated control system can operate stably under complex geological conditions (such as high water pressure and high permeability strata) and harsh construction environments, reducing the exposure time of construction workers in dangerous areas and improving construction safety. At the same time, the system can dynamically adjust grouting parameters based on real-time monitoring data to adapt to different geological conditions, ensuring the safety and environmental friendliness of the construction process.
[0040] (5) Real-time monitoring and dynamic adjustment. The system integrates real-time monitoring devices, such as geological radar and fiber optic sensors, to monitor ground deformation and slurry diffusion during the grouting process. These monitoring devices can provide real-time feedback on the grouting effect, providing a basis for dynamic adjustment of the system. Combined with the automated control system, the grouting pressure and flow rate are dynamically adjusted based on real-time monitoring data to ensure that the grouting effect meets the design requirements and improve the scientificity and timeliness of construction decisions.
[0041] (6) Enhance system adaptability and flexibility. By optimizing the steel pipe pre-installation technology and the design of the grouting unit, the system can better adapt to different types of tunnel construction, including shallow tunnels and ultra-large cross-section tunnels. Flexible steel pipe layout schemes and multi-point grouting technology can expand the grouting range, reduce the number of grouting unit movements, improve construction efficiency, and reduce interference with other construction processes.
[0042] like Figure 1 As shown, Figure 1 This is a structural diagram of a tunnel stratum grouting system, which may include at least: a geological sensor, a grouting device, and a monitoring device. Figure 2 A flow chart of a tunnel grouting method provided in an embodiment of the present application can be applied to Figure 1 The tunnel grouting system shown in FIG. 1 may include the following steps: 201. Through geological sensors, target geological data of tunnel strata are collected in real time.
[0043] In an embodiment of the present application, the geological sensor can be installed in the tunnel construction area to collect various geological data of the tunnel strata in real time. The geological sensor can specifically include a seismic wave sensor, a groundwater sensor, a soil sensor, a stress sensor, a gas sensor, etc. The data collected by these sensors can be considered as geological data. Specifically, the formation pressure can be detected by the stress sensor, and the soil permeability can be detected by the soil sensor.
[0044] 202. Determine target grouting data corresponding to target geological data based on a pre-stored geological parameter and grouting process database.
[0045] In an embodiment of the present application, the geological parameter and grouting process database can be a database that has been created and stored in advance. The geological parameter and grouting process database can store the correspondence between geological parameters and grouting processes, and can also store the optimal grouting parameters and construction process cases under different geological conditions, which can be used for reference by operators and automatically called by the system. Therefore, after obtaining the target geological data, the target grouting data corresponding to the target geological data can be directly retrieved from the geological parameter and grouting process database.
[0046] Among them, the target grouting data may at least include: a target grouting position and a target grouting process. The target grouting position can indicate the specific position for grouting, while the target grouting process can indicate how to grout at that position. Due to different geological environments, the position, angle, flow rate, pressure and other parameters during grouting are different. Therefore, the target grouting data can be directly obtained through the pre-stored geological parameters and grouting process database.
[0047] In some embodiments, the system can automatically match grouting processes and parameters to preset tunnel geological parameters (such as formation type, thickness, and strength), and perform optimization calculations. For example, in weak formations, the system automatically adjusts grouting pressure and flow rate, using lower pressure and slower grouting to prevent excessive formation deformation.
[0048] 203. According to the target grouting process, control the grouting device to perform grouting at the target grouting position.
[0049] In an embodiment of the present application, the grouting device can be a device that can be moved in a steel pipe. A valve can be provided on the grouting device. When grouting starts, the valve can be opened and the slurry flows from the grouting device into the steel pipe. The target grouting process will indicate the specific grouting method. For example, for soft formations, the system will automatically adjust the grouting pressure and flow rate, and adopt a lower pressure and slower speed grouting method to prevent excessive deformation of the formation.
[0050] 204. Through the monitoring device, the grouting data and geological data of the grouting device are monitored in real time to obtain real-time grouting results.
[0051] In the embodiment of the present application, the monitoring device can be used to monitor the formation deformation and slurry diffusion range during the grouting process in real time, and provide real-time feedback on the grouting results to provide a basis for dynamic adjustment of the system.
[0052] The monitoring device may include geological radar, fiber optic sensors, etc., which will provide immediate feedback when formation deformation or slurry diffusion is detected.
[0053] A tunnel stratum grouting method provided in an embodiment of the present application can accurately control the grouting situation of the grouting unit according to the real-time monitored geological parameters and preset design requirements, and can quickly respond to changes in geological conditions and automatically adjust the grouting parameters without frequent manual intervention. In addition, a real-time monitoring device is integrated for real-time feedback on the grouting effect, providing a basis for dynamic adjustment of the system, and effectively improving the grouting efficiency and grouting effect.
[0054] like Figure 3 As shown, Figure 3 Another structural diagram of a tunnel stratum grouting system provided in an embodiment of the present application, the tunnel stratum grouting system may further include: an electric drive device, a posture acquisition device and a pressure and flow sensor, and the grouting device may specifically include: an electric valve and a grouting pump, such as Figure 4 As shown, Figure 4 A flow chart of a tunnel grouting method provided in an embodiment of the present application can be applied to Figure 3 The tunnel stratum grouting system shown in FIG. 1 may further include the following steps: 401. Pre-acquire tunnel stratum data of various geological environments, and determine target grouting strategies corresponding to the tunnel stratum data of various geological environments.
[0055] In an embodiment of the present application, the tunnel stratum data may include stratum type, thickness, strength, etc. Since there are many types of tunnels in the actual environment, in addition to conventional tunnels, there may also be special tunnels, such as super-large cross-section tunnels, shallow buried tunnels, etc. Among them, shallow buried tunnels may be difficult to pre-drill steel pipes due to ground conditions, or the layout of steel pipes may interfere with other construction procedures. Therefore, these tunnels require special processes during the grouting process. In order to avoid the need to conduct research, modeling, testing, etc. every time grouting is performed in actual applications, tunnel stratum data for various geological environments and the corresponding target grouting strategy for each geological environment can be collected in advance. The target grouting strategy can be data such as the process for grouting the tunnel at that time, that is, it can be a strategy that can achieve the optimal grouting effect.
[0056] 402. Tunnel stratum data and target grouting strategies are stored in correspondence to obtain a geological parameter and grouting process database.
[0057] In an embodiment of the present application, the tunnel stratum data and the target grouting strategy are stored correspondingly, so that the geological parameter and grouting process database obtained can store a large number of grouting processes for tunnels of various types and environments. Later, in the actual construction process, the data in the database can be directly retrieved.
[0058] 403. Use geological sensors to collect target geological data of tunnel strata in real time.
[0059] 404. Determine target grouting data corresponding to the target geological data based on a pre-stored geological parameter and grouting process database.
[0060] In the embodiment of the present application, for the description of steps 403 and 404, please refer to the detailed description of steps 201 and 202 in the above embodiment, which will not be repeated in the embodiment of the present application.
[0061] 405. The posture data of the grouting device is collected in real time through the posture collection device.
[0062] In the embodiment of the present application, since grouting has a fixed position, and the grouting device does not necessarily start at the fixed position and may need to be moved, the real-time position data of the grouting device can be determined through the position acquisition device.
[0063] 406. According to the target grouting position, the grouting device is controlled by the electric drive device to adjust the posture data to the target grouting position.
[0064] In an embodiment of the present application, after obtaining real-time posture data, the deviation between the posture data and the target grouting position can be calculated, and the grouting device can be controlled by an electric drive device to perform precise position adjustment to ensure the accuracy of the grouting position. For example, a fuzzy control algorithm is used to continuously adjust the output of the motor so that the grouting device can reach the specified position quickly and accurately.
[0065] In some embodiments, the tunnel grouting system can be equipped with an electric drive device, such as a motor-driven roller or slider, to move and position the grouting device. An automated control system controls the motor's speed and direction, enabling precise movement and positioning of the grouting device within the steel pipe. The motor should have high-precision speed regulation and positioning capabilities to meet the requirements of different construction locations.
[0066] 407. Determine at least one grouting hole to be grouted according to the target grouting process and the target grouting position.
[0067] In an embodiment of the present application, multiple grouting holes can be set on the grouting steel pipe that needs grouting, and each grouting hole can be grouting. If the range of grouting required is large, grouting can be carried out from multiple grouting holes at the same time. Therefore, after determining the target grouting process and target grouting position, at least one grouting hole to be grouted can be determined.
[0068] In some embodiments, if more target grouting positions are detected, or the target grouting process indicates that the threshold of the grouting pressure is high, then it can be considered that the current grouting steel pipe can withstand simultaneous grouting of multiple grouting holes, so at least one specific grouting hole can be determined according to the target grouting position.
[0069] 408. Open the electric valve corresponding to at least one grouting hole, and perform grouting through the grouting pump corresponding to at least one grouting hole.
[0070] It should be noted that a plurality of grouting holes are provided on the grouting steel pipe. In order to ensure that each grouting hole can be grouted smoothly, timely and simultaneously, an electric valve and a grouting pump can be provided on each grouting hole. The electric valve can be understood as a switch. When the electric valve is open, the slurry flows out, and when the electric valve is closed, the slurry stops. The grouting pump can electrically promote the flow of the slurry.
[0071] In an embodiment of the present application, after determining at least one grouting hole, the electric valve of the at least one grouting hole can be opened, and then the grouting pump corresponding to the at least one grouting hole is used to make the slurry flow out from the electric valve of the at least one grouting hole, thereby realizing grouting.
[0072] In some implementations, flexible pre-installation techniques for steel pipes can be developed for shallow or extra-large cross-section tunnels. Steel pipe layouts can be optimized based on geological conditions, and adjustable steel pipe supports can be used to reduce reliance on ground conditions. Furthermore, multi-point grouting technology can be introduced to increase the number and density of grouting holes, expand the grouting range, reduce the number of grouting unit movements, and improve construction efficiency.
[0073] In some embodiments, high-performance sealing materials and dynamic pressure control systems can be used in high-pressure, high-permeability formations to optimize the design of the stop piston, enhancing sealing and grouting pressure regulation. For tunnels with very large cross-sections or shallow depths, flexible pre-installed steel pipe technology can be developed, combined with tools such as geological radar to optimize steel pipe layout and ensure efficient application of the system under complex conditions.
[0074] 409. Obtain feedback data from pressure and flow sensors in real time.
[0075] In the embodiments of this application, pressure sensors and flow sensors are installed on the grouting pipes and grouting equipment to monitor the slurry pressure and flow rate in real time during the grouting process. The pressure sensor provides feedback on whether the grouting pressure meets the design requirements, and the flow sensor accurately controls the grouting volume, ensuring the stability and accuracy of the grouting process. Through these pressure and flow sensors, the grouting pressure and grouting flow rate can be obtained in real time.
[0076] 410. When the feedback data indicates that the grouting pressure and flow rate are lower than the preset values, increase the opening of the electric valve and / or the output power of the grouting pump.
[0077] In an embodiment of the present application, the preset value can be determined based on the target grouting process. The preset value can be a benchmark value that can ensure grouting safety and grouting efficiency, or a range. The current pressure and flow can be monitored in real time through the pressure and flow sensor, and then compared with the preset value. When the grouting pressure or flow is lower than the preset value, the output power of the grouting pump can be automatically increased or the opening of the electric valve can be increased to increase the grouting pressure.
[0078] 411. When the feedback data indicates that the grouting pressure and flow rate are higher than the preset values, reduce the opening of the electric valve and / or the output power of the grouting pump.
[0079] In an embodiment of the present application, the preset value can be determined based on the target grouting process. The preset value can be a benchmark value that can ensure grouting safety and grouting efficiency, or a range. The current pressure and flow can be monitored in real time through the pressure and flow sensor, and then compared with the preset value. When the grouting pressure or flow is higher than the preset value, the output power of the grouting pump is reduced or the opening of the electric valve is reduced accordingly to ensure that the grouting pressure fluctuates within a safe and effective range, while ensuring that the grouting flow meets the design requirements.
[0080] 412. Through the monitoring device, the grouting data and geological data of the grouting device are monitored in real time to obtain real-time grouting results.
[0081] In the embodiment of the present application, for the description of step 412, please refer to the detailed description of step 204 in the above embodiment, and the embodiment of the present application will not be repeated.
[0082] 413. When it is detected that the real-time grouting results indicate that the formation deformation and / or slurry diffusion exceeds a preset range, the grouting is stopped and a warning message is output.
[0083] In the embodiment of the present application, since the entire grouting process is carried out in the tunnel, and the tunnel will be affected by various environmental factors during the construction process, in addition, after the slurry flows into the steel pipe, it may also affect the tunnel or the surrounding geology. In addition, the slurry should in principle only flow in the steel pipe. If the steel pipe breaks, the slurry will diffuse out. Therefore, if the real-time grouting results detect the presence of stratum deformation, and / or the slurry diffusion exceeds the preset range, it can be said that there is a problem with the current tunnel, steel pipe, and geology, so it is necessary to stop the grouting immediately and output a warning message so that the staff can immediately carry out maintenance.
[0084] In some embodiments, the monitoring device can be combined with an automated control system to dynamically adjust the grouting pressure and flow rate based on real-time monitoring data, ensuring that the grouting effect meets design requirements and improving the scientific and timely nature of construction decisions. This automated control system can enable intelligent operation of the grouting process. Through pre-set programs, the system can automatically control parameters such as the movement, positioning, grouting pressure, and flow rate of the grouting unit based on tunnel geological parameters and design requirements, reducing human operational errors. Furthermore, equipped with a remote monitoring function, operators can monitor the equipment's operating status and the grouting process in real time from a distance from the construction site, allowing for timely parameter adjustments.
[0085] In some embodiments, as Figure 3 As shown, the tunnel grouting system can also include a wireless communication module, which can be used to realize data transmission and control instruction transmission in the tunnel grouting system, and realize real-time transmission of sensor data and communication between the automatic control system and the remote monitoring terminal. In other words, each module and each sensor in the tunnel grouting system can be wirelessly transmitted through the wireless communication module, ensuring high-speed, stable and reliable data transmission.
[0086] The present invention provides a tunnel stratum grouting method that improves grouting accuracy and quality. The automated control system precisely controls the movement and positioning of grouting units based on real-time monitored geological parameters (such as formation pressure and permeability) and preset design requirements, ensuring accurate grouting placement. Furthermore, the system automatically adjusts grouting pressure and flow rate to evenly distribute the slurry throughout the reinforced area, avoiding under- or over-grouting and significantly improving grouting quality.
[0087] Improved construction efficiency: Automated control reduces the complexity and time consumption of manual operations. The system rapidly responds to changing geological conditions and automatically adjusts grouting parameters, eliminating the need for frequent manual intervention and significantly reducing construction preparation and adjustment time. Furthermore, automated equipment can operate continuously, further improving construction efficiency and shortening project schedules.
[0088] Reduce construction risks and costs. Automated control makes the grouting process more stable and reliable, reducing the risk of grouting failures due to human error or equipment failure. Furthermore, precise grouting control reduces slurry waste and lowers material costs. Furthermore, the automated system reduces reliance on skilled workers, lowering labor costs.
[0089] Improving construction safety and environmental suitability, the automated control system can operate stably in complex geological conditions (such as high water pressure and high-permeability formations) and harsh construction environments, reducing construction workers' exposure time in hazardous areas and improving construction safety. Furthermore, the system can dynamically adjust grouting parameters based on real-time monitoring data to adapt to different geological conditions, ensuring a safe and environmentally friendly construction process.
[0090] Real-time monitoring and dynamic adjustment: The system integrates real-time monitoring devices, such as geological radar and fiber optic sensors, to monitor ground deformation and slurry diffusion during the grouting process. These monitoring devices provide real-time feedback on grouting results, providing a basis for dynamic system adjustments. Combined with an automated control system, grouting pressure and flow are dynamically adjusted based on real-time monitoring data, ensuring that grouting results meet design requirements and enhancing the scientific and timely nature of construction decisions.
[0091] Enhanced system adaptability and flexibility. By optimizing the pre-installed steel pipe technology and grouting unit design, the system can better adapt to different types of tunnel construction, including shallow tunnels and tunnels with very large cross-sections. Flexible steel pipe layout and multi-point grouting technology can expand the grouting range, reduce the number of grouting unit movements, improve construction efficiency, and minimize interference with other construction processes.
[0092] like Figure 5 As shown, the embodiment of the present application provides a tunnel stratum grouting device, which is applied to a tunnel stratum grouting system. The tunnel stratum grouting system includes at least: a geological sensor, a grouting device, and a monitoring device. The tunnel stratum grouting device may include: An acquisition module 501 is used to collect target geological data of the tunnel strata in real time through geological sensors; The processing module 502 is used to determine target grouting data corresponding to the target geological data according to the pre-stored geological parameters and grouting process database, where the target grouting data at least includes: a target grouting position and a target grouting process; The processing module 502 is further used to control the grouting device to perform grouting at the target grouting position according to the target grouting process; The processing module 502 is also used to monitor the grouting data and geological data of the grouting device in real time through the monitoring device to obtain real-time grouting results.
[0093] In some embodiments, the tunnel stratum grouting system further includes: an electric drive device and a posture acquisition device, and the acquisition module 501 is further used to collect the posture data of the grouting device in real time through the posture acquisition device; The processing module 502 is further configured to control the grouting device through the electric drive device to adjust the posture data to the target grouting position according to the target grouting position.
[0094] In some embodiments, the tunnel formation grouting system further includes: a pressure and flow sensor; the grouting device includes: an electric valve and a grouting pump; and the processing module 502 is specifically used to control the grouting device to grout at the target grouting position according to the target grouting process, and obtain feedback data from the pressure and flow sensor in real time; The processing module 502 is specifically configured to increase the opening of the electric valve and / or the output power of the grouting pump when the feedback data indicates that the grouting pressure and flow rate are lower than a preset value; The processing module 502 is specifically configured to reduce the opening of the electric valve and / or the output power of the grouting pump when the feedback data indicates that the grouting pressure and flow rate are higher than preset values.
[0095] In some embodiments, a plurality of grouting holes are provided on the grouting steel pipe, and each grouting hole is provided with an electric valve and a grouting pump. The processing module 502 is specifically used to determine at least one grouting hole to be grouted according to a target grouting process and a target grouting position; The processing module 502 is specifically used to open the electric valve corresponding to at least one grouting hole, and perform grouting through the grouting pump corresponding to at least one grouting hole.
[0096] In some embodiments, the processing module 502 is further configured to stop grouting and output a warning message when it is detected that the real-time grouting results indicate that the formation is deformed and / or the slurry has spread beyond a preset range.
[0097] In some embodiments, the acquisition module 501 is further configured to pre-acquire tunnel stratum data of various geological environments and determine target grouting strategies corresponding to the tunnel stratum data of the various geological environments; The processing module 502 is further used to store the tunnel stratum data and the target grouting strategy in correspondence, and obtain a geological parameter and grouting process database.
[0098] In some embodiments, the tunnel stratum grouting system further includes: a wireless communication module, and the processing module 502 is further used to realize data transmission and control instruction transmission in the tunnel stratum grouting system through the wireless communication module.
[0099] In the embodiments of the present application, each module can implement the tunnel stratum grouting method provided by the above method embodiments and can achieve the same technical effect. To avoid repetition, it will not be described here.
[0100] like Figure 6 As shown, an embodiment of the present application further provides an electronic device, which may include: A memory 601 storing executable program code; a processor 602 coupled to the memory 601; The processor 602 calls the executable program code stored in the memory 601 to execute the tunnel formation grouting method executed by the electronic device in the above-mentioned method embodiments.
[0101] An embodiment of the present application provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it implements the various processes of the tunnel formation grouting method in the above-mentioned method embodiment and can achieve the same technical effect. To avoid repetition, it will not be repeated here.
[0102] An embodiment of the present application also provides a computer program product, which stores a computer program. When the computer program is executed by a processor, it implements the various processes of the tunnel grouting method in the above-mentioned method embodiment and can achieve the same technical effect. To avoid repetition, it will not be repeated here.
[0103] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present application may take the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program code.
[0104] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely illustrative. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architectures, functions, and operations of the devices, methods, and computer program products according to the multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment, or a portion of code, and the module, program segment, or a portion of code contains one or more executable instructions for implementing the specified logical functions. It should also be noted that in some alternative implementations, the functions marked in the boxes can also occur in an order different from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, as well as the combination of boxes in the block diagram and / or flowchart, can be implemented using a dedicated hardware-based system that performs the specified functions or actions, or can be implemented using a combination of dedicated hardware and computer instructions.
[0105] In this application, a processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor.
[0106] In this application, memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. Memory is an example of a computer-readable medium.
[0107] In this application, persons of ordinary skill in the art will understand that all or part of the steps in the various methods of the above embodiments can be performed by a program instructing related hardware. The program can be stored in a computer-readable storage medium, including permanent and non-permanent, removable and non-removable storage media. The storage medium can use any method or technology to store information, and the information can be computer-readable instructions, data structures, program modules, or other data. Examples of computer storage media include, but are not limited to, Parallel Random Access Memory (PRAM), Static Random Access Memory (SRAM), Dynamic Random Access Memory (DRAM), Programmable Read-only Memory (PROM), Erasable Programmable Read Only Memory (EPROM), other types of Random Access Memory (RAM), Read-Only Memory (ROM), One-time Programmable Read-Only Memory (OTPROM), Electrically-Erasable Programmable Read-Only Memory (EEPROM), flash memory or other memory technology, Compact Disc Read-Only Memory (CD-ROM), Digital Versatile Disc (DVD) or other optical storage, magnetic cassettes, magnetic disk storage or other magnetic storage devices, or any other non-transmission medium that can be used to store information that can be accessed by a computing device. According to the definition in this article, computer-readable media does not include transitory media such as modulated data signals and carrier waves.
[0108] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprises" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article or device. In the absence of further limitations, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device that includes the element.
[0109] It should be understood that “one embodiment” or “an embodiment” mentioned throughout the specification means that the specific features, structures or characteristics related to the embodiment are included in at least one embodiment of the present application. Therefore, “in one embodiment” or “in an embodiment” appearing throughout the specification does not necessarily refer to the same embodiment. In addition, these specific features, structures or characteristics can be combined in one or more embodiments in any suitable manner. Those skilled in the art should also know that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required for this application. The above-mentioned multiple embodiments are not necessarily multiple independent embodiments. Dividing them into multiple embodiments is only used to highlight the different technical features in different embodiments. Those skilled in the art should know that the above-mentioned multiple embodiments can also be combined in any combination.
[0110] In the various embodiments of the present application, it should be understood that the size of the serial numbers of the above-mentioned processes does not necessarily mean the order of execution. The order of execution of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0111] The units described above as separate components may or may not be physically separate, and the components shown as units may or may not be physical units, i.e., they may be located in one place or distributed across multiple network units. Some or all of these units may be selected based on actual needs to achieve the objectives of this embodiment.
[0112] In addition, the functional units in the embodiments of the present application may be integrated into a single processing unit, or each unit may exist physically separately, or two or more units may be integrated into a single unit. The aforementioned integrated units may be implemented in the form of hardware or software functional units.
[0113] If the above-mentioned integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-accessible memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a memory and includes several requests for causing a computer device (which can be a personal computer, server, or network device, etc., specifically a processor in the computer device) to execute some or all of the steps of the above-mentioned methods in various embodiments of the present application.
[0114] The above are merely specific embodiments of the present application, intended to enable those skilled in the art to understand or implement the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application is not limited to these embodiments herein, but is intended to be construed in the broadest manner consistent with the principles and novel features disclosed herein.
Claims
1. A tunnel stratum grouting method, characterized in that: Applied to a tunnel stratum grouting system, the tunnel stratum grouting system at least includes: a geological sensor, a grouting device, and a monitoring device, and the method includes: The target geological data of the tunnel stratum is collected in real time by the geological sensor; Determining target grouting data corresponding to the target geological data according to a pre-stored geological parameter and grouting process database, wherein the target grouting data at least includes: a target grouting position and a target grouting process; According to the target grouting process, controlling the grouting device to perform grouting at the target grouting position; The monitoring device is used to monitor the grouting data and geological data of the grouting device in real time to obtain real-time grouting results.
2. The method according to claim 1, characterized in that The tunnel stratum grouting system further includes: an electric drive device and a position acquisition device. Before the grouting device is controlled to grout at the target grouting position according to the target grouting process, the method further includes: The posture data of the grouting device are collected in real time by the posture collection device; According to the target grouting position, the grouting device is controlled by the electric drive device to adjust the posture data to the target grouting position.
3. The method according to claim 1, characterized in that The tunnel stratum grouting system further includes: a pressure and flow sensor; the grouting device includes: an electric valve and a grouting pump; and according to the target grouting process, controlling the grouting device to perform grouting at the target grouting position includes: According to the target grouting process, controlling the grouting device to perform grouting at the target grouting position, and obtaining feedback data from the pressure and flow sensors in real time; When the feedback data indicates that the grouting pressure and flow rate are lower than the preset values, increasing the opening of the electric valve and / or the output power of the grouting pump; When the feedback data indicates that the grouting pressure and flow rate are higher than the preset values, the opening of the electric valve and / or the output power of the grouting pump are reduced.
4. The method according to claim 3, characterized in that A plurality of grouting holes are provided on the grouting steel pipe, and each grouting hole is provided with an electric valve and a grouting pump. According to the target grouting process, the grouting device is controlled to perform grouting at the target grouting position, including: Determining at least one grouting hole to be grouted according to the target grouting process and the target grouting position; Open the electric valve corresponding to the at least one grouting hole, and perform grouting through the grouting pump corresponding to the at least one grouting hole.
5. The method according to claim 1, characterized in that After the grouting data and geological data of the grouting device are monitored in real time by the monitoring device and a real-time grouting result is obtained, the method further comprises: When it is detected that the real-time grouting result indicates that the formation deformation and / or the slurry diffusion exceeds a preset range, the grouting is stopped and a warning message is output.
6. The method according to claim 1, characterized in that The method further comprises: Pre-acquiring tunnel stratum data of various geological environments, and determining target grouting strategies corresponding to the tunnel stratum data of the various geological environments; The tunnel stratum data and the target grouting strategy are stored in correspondence to obtain the geological parameter and grouting process database.
7. The method according to claim 1, characterized in that The tunnel stratum grouting system further includes: a wireless communication module, and the method further includes: The wireless communication module is used to realize data transmission and control instruction transmission in the tunnel stratum grouting system.
8. A tunnel stratum grouting device, characterized in that: Applicable to a tunnel stratum grouting system, the tunnel stratum grouting system at least includes: a geological sensor, a grouting device, and a monitoring device, and the tunnel stratum grouting device includes: An acquisition module, configured to collect target geological data of the tunnel strata in real time through the geological sensor; A processing module is used to determine target grouting data corresponding to the target geological data according to a pre-stored geological parameter and grouting process database, wherein the target grouting data at least includes: a target grouting position and a target grouting process; The processing module is further configured to control the grouting device to perform grouting at the target grouting position according to the target grouting process; The processing module is further used to monitor the grouting data and geological data of the grouting device in real time through the monitoring device to obtain real-time grouting results.
9. An electronic device, characterized in that: include: a memory storing executable program code; and a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the tunnel formation grouting method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that include: The computer-readable storage medium stores computer instructions, and when the computer instructions are executed by a processor, the tunnel stratum grouting method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Complex geological region intelligent grouting system and method
CN107956483A
Tunnel grouting method based on numerical simulation fault fracture zone
CN118378332A
Grouting construction method for super-long large pipe shed of shallow-buried loess stratum tunnel
CN118979760A
Tunnel grouting method and device
CN119957262A
Earth surface deep grouting process
WO2022188436A1