blowout prevention device

By designing a blowout control device, the lifting and rotating motion of the boom is used to automatically align and install the plug assembly, solving the problems of high difficulty and high risk in plug valve operation during blowouts, and realizing safe and convenient plug assembly installation.

CN120719944BActive Publication Date: 2026-06-30XINJIANG QINGLAN TECHNOLOGY CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
XINJIANG QINGLAN TECHNOLOGY CO LTD
Filing Date
2025-08-11
Publication Date
2026-06-30

AI Technical Summary

Technical Problem

Installing a plug valve during a blowout presents significant challenges and risks.

Method used

A blowout prevention device was designed, including a vertical shaft, a horizontal arm, a horizontal arm lifting drive mechanism, and a plug switch drive mechanism. Through the lifting and rotating motion of the horizontal arm, the plug assembly is automatically aligned and installed, avoiding manual operation.

Benefits of technology

This reduces the difficulty of installing the plug assembly and avoids the risk of workers being injured by blowout liquids or gases during handling and placement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120719944B_ABST
    Figure CN120719944B_ABST
Patent Text Reader

Abstract

This invention relates to the field of well workover equipment technology, specifically a blowout prevention device. It includes a vertical shaft, a horizontal arm, a horizontal arm lifting drive mechanism, a plug assembly, and a plug switch drive mechanism. The vertical shaft has a horizontal arm that can rotate around the shaft and move up and down. The plug assembly is rotatably mounted on the horizontal arm. The horizontal arm lifting drive mechanism is connected to the horizontal arm to drive its up and down movement. The plug switch drive mechanism is connected to the plug assembly to drive it to open or close. This invention has a reasonable structure and ingenious design. Through the design of this application, during the installation of the plug assembly, it is no longer necessary for operators to manually carry the plug assembly to the wellhead. This not only greatly reduces the difficulty of plug assembly installation but also avoids injuries to operators from blowout-induced liquids and gases during the handling and placement of the plug assembly.