Construction protective fence for constructional engineering and protection method of construction protective fence
By designing a construction guardrail with adjustable height and a pulley structure, the problems of limited applicability and difficulty in movement of traditional guardrails are solved, flexible adjustment and easy transfer are achieved, labor and costs are reduced, and work efficiency and safety are improved.
Patent Information
- Application Number
- CN202511217812.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-28
- Publication Date
- 2025-10-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional construction guardrails are not height-adjustable, have limited scope of application and flexibility, and are difficult to move, increasing workload and safety risks.
Designed with height-adjustable construction guardrails, they can be easily moved using pulleys and retractable extension columns, while thumb screws and positioning holes simplify installation and removal.
It realizes flexible adjustment of the height of the guardrail, reduces labor and cost, improves applicability and work efficiency, and ensures the stability and safety of the installation.
Smart Images

Figure CN120739402A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building guardrails, and in particular to a construction guardrail for construction engineering and a protection method thereof. Background Art
[0002] During highway construction, the safety of construction workers is of paramount importance. To prevent people outside the construction area from accidentally entering the area and to protect construction workers from potential hazards during construction (such as falls from heights and splashing objects), construction guardrails have become an indispensable safety feature. However, traditional construction guardrails have the following problems: First, the height of traditional guardrails is not adjustable. They are fixed and cannot be adjusted to the actual conditions of the construction site (such as terrain changes or construction areas at different heights), limiting their applicability and flexibility. Second, the guardrails are difficult to move as a whole. Due to their large size and weight, moving them to other construction areas often requires the collaboration of multiple people or the use of mechanical equipment, increasing workload and safety risks. Summary of the Invention
[0003] The present invention is aimed at the above-mentioned problems and specifically designs a construction guardrail and a protection method for construction projects, which increases the adjustability of the guardrail height and uses pulleys to achieve easy transfer of the guardrail.
[0004] To achieve the above-mentioned purpose, the present invention provides a construction guardrail for construction projects, comprising a crossbeam rod 1, and sealing blocks symmetrically arranged at both ends of the crossbeam rod 1, the bottom end of the sealing block is fixedly connected to an extension column, the extension column is plugged into a column, the column is fixedly arranged on the top surface of a pad, a crossbeam rod 2 is fixedly connected between the two columns, a movably plug-in sleeve and a guardrail rod are arranged between the crossbeam rod 1 and the crossbeam rod 2; the extension column is fixedly connected to a support plate, the support plate is threaded with a hand screw, the hand screw passes through the support plate and is threadedly connected to the column; the support plate passes through the pad through a through hole, and a pulley is installed at the bottom of the support plate.
[0005] Furthermore, the side wall of the support plate is provided with a threaded hole, and the side wall of the column is provided with multiple positioning holes. The threaded holes and the positioning holes are matched with the hand screws, and the hand screws are threadedly connected to the threaded holes and the positioning holes in sequence. The multiple positioning holes are arranged in a linear array along the height direction of the column.
[0006] Preferably, the column is a hollow square tube structure, and the height of the extension column is greater than the height of the column.
[0007] Furthermore, an embedding groove is provided at the bottom end of the support plate, and a limiting shaft is rotatably connected between two opposite side walls of the embedding groove. The pulley is sleeved on the limiting shaft, and the pulley protrudes from the embedding groove.
[0008] Furthermore, the pad is a square plate structure, the top surface of the pad covers the bottom surface of the column, and the pad is provided with a completely penetrating countersunk hole, and mounting bolts are installed in the countersunk hole. The pad is fixed to the road surface at the construction site by the mounting bolts.
[0009] Furthermore, the blind hole portion in the countersunk hole is a U-shaped open groove.
[0010] Furthermore, the crossbeam 1 and the crossbeam 2 are arranged in parallel and have the same length, and the plurality of sleeves are arranged in a linear array along the length direction of the crossbeam 1, and the number of the guardrails corresponds to the number of the sleeves.
[0011] Preferably, the support plates are L-shaped and are symmetrically distributed about the extension column.
[0012] Furthermore, the side walls of the support plate are symmetrically provided with weight-reducing holes.
[0013] The present invention also includes a method for protecting a construction guardrail for a building project, comprising the following steps: 1) Use the mounting bolts to fix the pad to the road surface at the construction site. When the enclosure height needs to be adjusted, first unscrew the thumb screws inserted into the positioning holes to release the relative static state of the column and the extension column. Then, hold the sealing block and pull the extension column upward to the required height. Screw back the thumb screws and insert them into the adjacent positioning holes to restore the relative static state of the column and the extension column. 2) In the step 1, when the sealing block is extracted and moved, the sealing block slides based on the guardrail rod through the traction sleeve of the crossbeam rod 1, that is, the height adjustment of the protective structure between the crossbeam rod 1 and the crossbeam rod 2 is achieved; 3) When the guardrail needs to be dismantled and moved around at the construction site, first remove the mounting bolts in the countersunk holes to release the relative static state between the pad and the road surface, then unscrew the thumb screws that were inserted back into the positioning holes. The extension column moves down under its own weight and is inserted into the bottom of the column. Manually lift the pad so that the extension column is fully inserted into the column. At this time, the bend of the support plate overlaps the top surface of the column and the pulley protrudes through the opening. Screw back the thumb screws to complete the anti-slip braking of the column and the extension column, and finally use the pulley to push the guardrail to move.
[0014] In summary, the present invention has the following advantages and beneficial technical effects: 1. The present invention realizes flexible adjustment of the height of the guardrail by designing a retractable extension column and multiple sleeves, which can adapt to construction areas of different heights and improve the applicability and flexibility of the guardrail.
[0015] 2. The present invention provides a pulley and a through-hole on the pad. When the bent portion of the support plate overlaps the top surface of the column, the bottom end of the support plate is inserted into the through-hole, and the pulley surface is below the bottom surface of the pad, so that the guardrail can be easily pushed after removal, reducing the labor during the transportation process and thereby improving work efficiency.
[0016] 3. The present invention adopts the design of hand screws and positioning holes, which makes the disassembly and assembly process of the guardrail simple and quick, without the need for complicated tools and a lot of manpower, thus reducing construction costs and time costs.
[0017] 4. The present invention realizes a stable connection between the upright column and the extension column through the cooperation of the support plate, the hand screws and the positioning holes, ensures the stability of the guardrail installation, and reduces the risk of loosening or collapse. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The above and / or additional aspects and advantages of the present invention will become apparent and readily understood from the following description of the embodiments with reference to the accompanying drawings, in which: Figure 1 This is a three-dimensional schematic diagram of the present invention Figure 1 ; Figure 2 It is a front schematic diagram of the present invention; Figure 3 It is along Figure 2 The cross-sectional view at AA in the middle; Figure 4 It is along Figure 3 The local enlarged view of point A in the middle; Figure 5 It is along Figure 2 The cross-sectional view at the middle BB; Figure 6 It is along Figure 5 The local enlarged view of point B in the middle; Figure 7 It is a three-dimensional schematic diagram of the extension column after being lifted in the present invention; Figure 8 It is a three-dimensional schematic diagram of some structures in the present invention Figure 1 ; Figure 9 It is a three-dimensional schematic diagram of some structures in the present invention Figure 2 .
[0019] The reference numerals in the accompanying drawings are: 1. Pad; 2. Countersunk hole; 3. Column; 4. Extension column; 5. Sealing block; 6. Support plate; 7. Mounting groove; 8. Limiting shaft; 9. Pulley; 10. Threaded hole; 11. Positioning hole; 12. Thumb screw; 13. Crossbeam 1; 14. Crossbeam 2; 15. Sleeve; 16. Guardrail; 17. Through-hole. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solutions and advantages of the implementation of the present invention clearer, the technical solutions in the embodiments of the present invention will be described in more detail below in conjunction with the drawings in the embodiments of the present invention. In the drawings, the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions; the embodiments described are part of the embodiments of the present invention, not all of the embodiments; the embodiments and directional terms described below with reference to the drawings are exemplary and are intended to be used to explain the present invention, and cannot be understood as limitations on the present invention; based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. The embodiments of the present invention are described in detail below in conjunction with the drawings: The following is combined with Figures 1-9 The present invention is described in further detail: Example 1 like Figure 1-Figure 3 as well as Figure 7 As shown, this embodiment discloses a construction guardrail for construction projects, including a horizontally arranged crossbeam rod 13, and sealing blocks 5 symmetrically welded at both ends of the crossbeam rod 13, an extension column 4 is welded below the sealing block 5, the extension column 4 is inserted into the column 3, the column 3 is welded above the pad 1, a crossbeam rod 2 14 is welded between the two columns 3, a sleeve 15 is welded below the crossbeam rod 13, a guardrail rod 16 is welded above the crossbeam rod 2 14, and the guardrail rod 16 is movably inserted into the sleeve 15; a support plate 6 is welded to the side wall of the extension column 4, the support plate 6 is threaded with a hand screw 12, the hand screw 12 passes through the support plate 6 and is threadedly connected to the column 3; the pad 1 is provided with a through hole 17, the support plate 6 passes through the pad 1 through the through hole 17, and a pulley 9 is rotatably installed at the bottom of the support plate 6.
[0021] like Figure 4 as well as Figure 9 As shown, a threaded hole 10 is opened on the side wall of the support plate 6, and a plurality of positioning holes 11 are opened on the side wall of the column 3. The threaded hole 10 and the positioning holes 11 are matched with the hand screws 12. The hand screws 12 are threadedly connected to the threaded hole 10 and the positioning holes 11 in sequence. The plurality of positioning holes 11 are arranged in a linear array along the height direction of the column 3.
[0022] like Figure 5-Figure 9As shown, the column 3 is a hollow square tube structure, and the extension column 4 is the same height as the column 3. The bottom surface size of the sealing block 5 is equal to the top surface size of the column 3. The bottom end of the support plate 6 is provided with an embedding groove 7. A limit shaft 8 is rotatably mounted between the two opposite side walls of the embedding groove 7. A pulley 9 is mounted on the rod body of the limit shaft 8 and protrudes downward from the embedding groove 7. In this embodiment, two limit shafts 8 are provided at the bottom end of each support plate 6, and the two limit shafts 8 are distributed side by side in the embedding groove 7.
[0023] like Figure 1 As shown, the backing plate 1 is a square plate structure. The top surface of the backing plate 1 is larger than the bottom surface of the column 3. The backing plate 1 has a completely through-hole countersunk hole 2. The internal thread of the countersunk hole 2 is connected to the mounting bolt, and the backing plate 1 is fixed to the road surface at the construction site by the mounting bolt. The blind hole portion of the countersunk hole 2 is a U-shaped open slot.
[0024] like Figure 7 As shown, the crossbeam 13 and the crossbeam 2 14 are arranged in parallel and have the same length. A plurality of sleeves 15 are arranged in a linear array along the length direction of the crossbeam 13 , and the number of guardrails 16 corresponds to the number of sleeves 15 .
[0025] like Figure 5 as well as Figure 8 As shown, the support plate 6 is L-shaped. In this embodiment, two support plates 6 are symmetrically welded to one extension column 4. Two weight-reducing holes are symmetrically opened on the side wall of the support plate 6.
[0026] Example 2 A protection method for a construction guardrail for a building project of the present invention is as follows: Step 1: Use the mounting bolts to fix the pad 1 to the road surface at the construction site. When the height of the guardrail needs to be adjusted, first loosen the hand screw 12 and unscrew the hand screw 12 inserted into the positioning hole 11 to release the relative static state of the column 3 and the extension column 4. At this time, there is no brake between the column 3 and the extension column 4. Then, hold the sealing block 5 and pull the extension column 4 upward to the required height, re-tighten the hand screw 12 so that the hand screw 12 is inserted into the adjacent positioning hole 11. At this time, the hand screw 12 fixes the support plate 6 outside the column 3, restoring the anti-slip brake of the column 3 and the extension column 4; Step 2: In step 1, when the sealing block 5 is extracted and moved, the sealing block 5 slides along the guardrail 16 by pulling the sleeve 15 through the crossbeam 13, thereby achieving the height adjustment of the protective structure between the crossbeam 13 and the crossbeam 2 14; Step 3: When the guardrail needs to be dismantled and moved around at the construction site, first remove the mounting bolts in the countersunk holes 2 to release the relative static state between the pad 1 and the road surface, then unscrew the hand screws 12 that are inserted back into the positioning holes 11. The extension column 4 moves downward under its own weight and is inserted into the bottom of the column 3. Manually lift the pad 1 so that the extension column 4 is fully inserted into the column 3. At this time, the bend of the support plate 6 overlaps the top surface of the column 3, the pulley 9 protrudes from the through-hole 17, and the wheel surface of the pulley 9 contacts the road surface while the bottom surface of the pad 1 is above the road surface. After re-tightening the hand screws 12 to brake the column 3 and the extension column 4, the construction personnel use the pulley 9 to flexibly transfer the guardrail.
[0027] Finally, it should be noted that the above embodiments are intended only to illustrate the technical solutions of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art will appreciate that modifications may be made to the technical solutions described in the above embodiments, or that some of the technical features may be replaced with equivalents; such modifications or replacements do not deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.
Claims
1. A construction guardrail for construction engineering, characterized by: It includes a crossbeam rod 1 and sealing blocks symmetrically arranged at both ends of the crossbeam rod 1, the bottom end of the sealing block is fixedly connected to an extension column, the extension column is plugged into the column, the column is fixedly arranged on the top surface of the pad, and a crossbeam rod 2 is fixedly connected between the two columns, and a movably plug-in sleeve and a guardrail rod are arranged between the crossbeam rod 1 and the crossbeam rod 2; the extension column is fixedly connected to a support plate, the support plate is threaded with a hand screw, the hand screw passes through the support plate and is threadedly connected to the column; the support plate passes through the pad through a through hole, and a pulley is installed at the bottom of the support plate.
2. A construction guardrail for construction engineering according to claim 1, characterized in that: The side wall of the support plate is provided with a threaded hole, and the side wall of the column is provided with multiple positioning holes. The threaded holes and the positioning holes are matched with the hand screws, and the hand screws are threadedly connected to the threaded holes and the positioning holes in sequence. The multiple positioning holes are arranged in a linear array along the height direction of the column.
3. A construction guardrail for construction engineering according to claim 1, characterized in that: The column is a hollow square tube structure, and the height of the extension column is greater than the height of the column.
4. A construction guardrail for construction engineering according to claim 2, characterized in that: An embedding groove is provided at the bottom end of the support plate. A limiting shaft is rotatably connected between two opposite side walls of the embedding groove. The pulley is sleeved on the limiting shaft, and the pulley protrudes from the embedding groove.
5. A construction guardrail for construction engineering according to claim 4, characterized in that: The pad is a square plate structure, the top surface of the pad covers the bottom surface of the column, and the pad is provided with a completely penetrating countersunk hole, in which mounting bolts are installed, and the pad is fixed to the road surface at the construction site by the mounting bolts.
6. A construction guardrail for construction engineering according to claim 5, characterized in that: The blind hole portion in the countersunk hole is a U-shaped opening groove.
7. The construction guardrail for construction engineering according to claim 1, characterized in that: The crossbeam rod 1 and the crossbeam rod 2 are arranged in parallel and have the same length. The multiple sleeves are arranged in a linear array along the length direction of the crossbeam rod 1, and the number of the guardrail rods corresponds to the number of the sleeves.
8. The construction guardrail for construction engineering according to claim 1, characterized in that: The support plates are L-shaped and symmetrically distributed about the extension column.
9. The construction guardrail for construction engineering according to claim 1, characterized in that: The side walls of the support plates are symmetrically provided with weight-reducing holes.
10. A method for protecting a construction guardrail for a building project, characterized by: The protective steps of the construction guardrail for construction engineering described in claim 5 are: Step 1: Use the mounting bolts to fix the pad to the road surface at the construction site. When the enclosure height needs to be adjusted, first unscrew the thumb screws inserted into the positioning holes to release the relative static state of the column and the extension column. Then, hold the sealing block and pull the extension column upward to the required height. Screw back the thumb screws and insert them into the adjacent positioning holes to restore the relative static state of the column and the extension column. Step 2: In step 1, when the sealing block is extracted and moved, the sealing block slides based on the guardrail rod through the traction sleeve of the crossbeam rod 1, thereby achieving height adjustment of the protective structure between the crossbeam rod 1 and the crossbeam rod 2; Step 3: When the guardrail needs to be dismantled and moved around at the construction site, first remove the mounting bolts in the countersunk holes to release the relative static state between the pad and the road surface, then unscrew the thumb screws that were inserted back into the positioning holes. The extension column moves down under its own weight and is inserted into the bottom of the column. Manually lift the pad so that the extension column is fully inserted into the column. At this time, the bend of the support plate overlaps the top surface of the column and the pulley protrudes through the opening. Screw back the thumb screws to complete the anti-slip braking of the column and the extension column, and finally use the pulley to push the guardrail to move.