Drilling and completion integrated tool and drilling and completion operation method
By designing an integrated drilling and completion tool, using scraper rings and magnetic blocks to remove filter hole blockages, the problem of easy clogging of filter holes after drilling was solved, enabling smooth oil and gas collection and continuous oil production.
Patent Information
- Application Number
- CN202510982853.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-10
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2045-09-10
AI Technical Summary
After drilling is completed, the filter holes are easily blocked by mud and gravel, making it difficult for oil and gas to enter the tubing smoothly and affecting the normal operation of oil production.
Design an integrated drilling and completion tool, including a drill bit and an inlet pipe. A telescopic cover and an electric push rod are fitted on the outside of the inlet pipe. The scraper ring is driven by the electric push rod to scrape off the attached materials. The magnetic block generates negative pressure to suck up mud and gravel, ensuring that the filter hole is unobstructed.
It effectively prevents filter hole clogging, ensures smooth entry of oil and gas into the inlet pipe, guarantees continuous oil production, reduces the risk of wellbore collapse, and improves recovery rate.
Smart Images

Figure CN120906476A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application belongs to the technical field of drilling and oil production equipment, in particular to a drilling and completion integrated tool and a drilling and completion operation method. BACKGROUND
[0002] Drilling and oil production is the core link of the oil industry, and its significance and role are: obtaining oil and gas resources (drilling is the core means to confirm the existence and scale of underground oil and gas reservoirs, and to verify the geological exploration conclusion through drilling to provide basis for subsequent exploitation), expanding resource development range (directional drilling, horizontal well technology can accurately drill complex reservoirs (such as thin oil layers, fractured oil and gas reservoirs), significantly increase the contact area of wellbore and reservoir, and improve the control range and recovery rate of single well), and supporting economic development (oil is the core energy of industrial production and transportation, and its stable supply is directly related to the lifeline of the national economy).
[0003] When drilling is completed and oil and gas is collected, a filtering mechanism is used to filter the mud and debris in the oil and gas entering the oil pipe. As the filtering proceeds, the accumulated mud and debris will adhere to the outside of the oil pipe, thereby plugging the filter holes, which will make it difficult for oil and gas to pass through the filter holes into the oil pipe, thereby interrupting the collection of oil and gas and making it difficult for oil production to proceed normally.
[0004] Therefore, the present application provides a drilling and completion integrated tool and a drilling and completion operation method. SUMMARY
[0005] In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background art.
[0006] The technical scheme adopted by the present application to solve its technical problems is: the drilling and completion integrated tool of the present application comprises a drill bit, the top of the drill bit is fixedly connected with an oil inlet pipe, and a filter hole is formed in the oil inlet pipe; A pair of telescopic covers are arranged on the outside of the oil inlet pipe, a pair of symmetrical electric push rods I are fixedly connected to the surface of the oil inlet pipe, and the telescopic ends of the electric push rods I are fixedly connected with the telescopic covers; A vertical groove is formed in the inner wall of the telescopic cover, an electric push rod II is fixedly connected to the inner top wall of the vertical groove, and an installation block is fixedly connected to the telescopic end of the electric push rod II; A spring I is fixedly connected to the side surface of the installation block, and a scraper ring is fixedly connected to the end of the spring I away from the installation block. In the initial state, the spring I is in a contracted state, and a pair of scraper rings are arranged on the outside of the oil inlet pipe.
[0007] Preferably, an insertion rod is fixedly connected to the side surface of the installation block, and an insertion slot is formed in the scraper ring and matched with the insertion rod.
[0008] Preferably, the plug-in rod is inserted in the plug-in slot and spring one, the bottom of the scraping ring is in abutment with the top of the drill bit.
[0009] Preferably, the surface of the plug-in rod is in contact with the inner wall of the spring one, the inner diameter of the spring one is larger than the diameter of the plug-in slot.
[0010] Preferably, the surface of the oil inlet pipe is fixedly connected with a sleeve ring, the outer side of the sleeve ring is fixedly connected with a pair of connecting rods, the bottom of the pair of connecting rods is fixedly connected with the same elastic ring.
[0011] Preferably, the inner wall of the elastic ring is in abutment with the outer side of the oil inlet pipe, and the elastic ring is located above the scraping ring.
[0012] Preferably, the top of the drill bit is provided with a pair of reinforcing grooves, and the bottom of the telescopic cover is fixedly connected with reinforcing blocks in sliding connection with the reinforcing grooves.
[0013] Preferably, a plurality of connecting grooves and rolling grooves are formed in the inner wall of the scraping ring, a magnetic block is fixedly connected to the inner side wall of the connecting groove, a discharge groove is formed in the inner bottom wall of the connecting groove, a rolling column is rotatably connected in the rolling groove, a plurality of sliding grooves are formed in the rolling column, a metal block is slidably connected in the sliding groove, a spring two is fixedly connected to the side surface of the metal block, a push-pull rod one and a push-pull rod two are movably inserted in the rolling column, the push-pull rod one is provided with an adjusting groove, the push-pull rod two is movably inserted in the adjusting groove, and in the vertical direction, the pair of metal blocks and the push-pull rod two are fixedly connected, and in the horizontal direction, the pair of metal blocks and the push-pull rod one are fixedly connected.
[0014] Preferably, the end of the spring two away from the metal block is fixedly connected to the inner side wall of the sliding groove, the outer sides of the push-pull rod one and the push-pull rod two are in contact with the inner wall of the spring two, the rolling column is provided with a push-pull groove one and a push-pull groove two in which the push-pull rod one and the push-pull rod two are movably inserted, in the horizontal direction, the pair of sliding grooves and the push-pull groove one are communicated, and in the vertical direction, the pair of sliding grooves and the push-pull groove two are communicated.
[0015] A well drilling and completion method, which adopts the well drilling and completion integrated tool, comprises the following steps: S1: after the drilling is completed, the telescopic cover is in abutment with the hole wall, and the oil and gas enters the oil inlet pipe through the filter hole; S2: the electric push rod one is started, and the scraping ring moves on the oil inlet pipe to scrape off the dirt and foreign matters adhered thereto; S3: when the scraping ring moves upward, the magnetic block attracts the metal block, and the negative pressure is formed in the sliding groove to dredge the filter hole.
[0016] The beneficial effects of the present application are as follows: 1. The drilling and completion integrated tool and drilling and completion operation method of the present application utilizes a drill bit to drill a well, after drilling is completed, one side of the telescopic cover is attached to the well wall, during the process of inserting the oil inlet pipe into the well, the telescopic cover can wrap the filter hole, so that foreign matter is not easy to enter the filter hole, after drilling is completed, the telescopic cover is opened, which can support the well wall, so that the well wall is not easy to collapse, then oil and gas will enter the filter hole between the pair of telescopic covers, and then the mixed mud and gravel in the filter hole are filtered and enter the oil inlet pipe, during the process of filtering and collecting oil and gas, the personnel need to regularly start the electric push rod two, so that the telescopic end pulls the mounting block and all the mechanisms thereon to move upward together, and then the scraping ring moves upward tightly attached to the oil inlet pipe, the mud and gravel attached to the filter hole are scraped by the scraping ring, so that the filter hole is not easy to be blocked by mud and gravel, and then oil and gas can smoothly enter the oil inlet pipe, thereby ensuring the smooth progress of oil production work.
[0017] 2. The drilling and completion integrated tool and drilling and completion operation method of the present application, when the scraping ring pushes the mud and gravel attached to the outside of the oil inlet pipe upward, the top of the scraping ring will push the elastic ring to produce elastic deformation and expansion, when it expands, the bottom slope will rub with the top of the scraping ring, thereby scraping the mud and gravel accumulated on the top of the scraping ring, and then the mud and debris can quickly separate from the scraping ring and fall, thereby facilitating the cleaning of the mud and gravel on the scraping ring.
[0018] 3. The drilling and completion integrated tool and drilling and completion operation method of the present application, when the metal block rotates to a position horizontally opposite to the magnetic block, under the magnetic attraction of the magnetic block to the metal block, the push-pull rod one or the push-pull rod two will move to the side close to it, thereby making the push-pull rod one or the push-pull rod two move together with the metal block at the other end, at this time, since the chute far away from the magnetic block is opposite to the filter hole due to being horizontally opposite to the magnetic block, when the metal block moves in the chute and approaches the magnetic block, negative pressure will be generated in the chute on the side close to the oil inlet pipe, under the action of the negative pressure, the mud and gravel in the filter hole can be sucked into the chute, thereby being not easy to cause the phenomenon that the speed of oil and gas entering the oil inlet pipe is reduced and the filter hole is blocked by mud and gravel due to the mud and gravel entering the filter hole. BRIEF DESCRIPTION OF DRAWINGS
[0019] The present application will be further described below in conjunction with the drawings.
[0020] Figure 1 is a perspective view of the present application; Figure 2 is a movement schematic view of the telescopic cover in the present application; Figure 3is Figure 2 Enlarged view at A in Figure Figure 4 is a cross-sectional view of the oil inlet pipe in the application; Figure 5 is a schematic view of the plug-in slot in the application Figure 4 Enlarged view at B in Figure Figure 6 is a schematic view of the push-pull rod one in the application; Figure 7 is a schematic view of the plug-in slot in the application; Figure 8 is a schematic view of the vertical slot in the application; Figure 9 is Figure 8 Enlarged view at C in Figure Figure 10 is a schematic view of the method of the application.
[0021] In the figure: 1, drill bit; 2, oil inlet pipe; 3, filter hole; 4, telescopic cover; 5, electric push rod one; 6, vertical slot; 7, electric push rod two; 8, mounting block; 9, spring one; 10, scraping ring; 11, plug-in rod; 12, plug-in slot; 13, sleeve ring; 14, connecting rod; 15, elastic ring; 16, reinforcing groove; 17, reinforcing block; 18, magnetic block; 19, roller; 20, sliding groove; 21, metal block; 22, spring two; 23, push-pull rod one; 24, push-pull rod two; 25, adjusting groove; 26, push-pull groove one; 27, push-pull groove two; 28, connecting groove; 29, discharge groove; 30, rolling groove. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, purposes and effects realized by the application easy to understand, the application will be further described below in conjunction with specific embodiments.
[0023] Embodiment one: as shown in Figures 1-2 As shown in Figure 3 and Figure 8 The drilling and completion integrated tool described in the embodiments of the application comprises a drill bit 1, the top of the drill bit 1 is fixedly connected with an oil inlet pipe 2, and the oil inlet pipe 2 is provided with filter holes 3; A pair of telescopic covers 4 are arranged on the outer side of the oil inlet pipe 2, and a pair of symmetrically distributed electric push rods one 5 are fixedly connected to the surface of the oil inlet pipe 2, and the telescopic ends of the electric push rods one 5 are fixedly connected with the telescopic covers 4; The inner wall of the telescopic cover 4 is provided with a vertical slot 6, the inner top wall of the vertical slot 6 is fixedly connected with an electric push rod two 7, and the telescopic end of the electric push rod two 7 is fixedly connected with a mounting block 8; A spring 9 is fixedly connected to the side of the mounting block 8. A scraper ring 10 is fixedly connected to the end of the spring 9 away from the mounting block 8. When the scraper ring 10 abuts against the outside of the oil inlet pipe 2, the spring 9 is still in a contracted state. Therefore, it can continuously push the scraper ring 10 so that the scraper ring 10 fits tightly against the oil inlet pipe 2, thereby ensuring the scraper ring 10's scraping effect on the oil inlet pipe 2. In the initial state, the spring 9 is in a contracted state, and the pair of scraper rings 10 are both sleeved on the outside of the oil inlet pipe 2 and are symmetrically distributed on both sides of the oil inlet pipe 2.
[0024] In the existing technology, when collecting oil and gas after drilling, a filtration mechanism is used to filter mud and foreign objects such as gravel in the oil and gas that enter the tubing. As filtration proceeds, the accumulated mud and gravel will adhere to the outside of the tubing, which will block the filter hole 3. This will make it difficult for oil and gas to pass through the filter hole 3 and enter the tubing, thus interrupting the collection of oil and gas and making it difficult for oil production to proceed normally. In use, this invention utilizes drill bit 1 for drilling. After drilling is completed, the electric push rod 5 is activated, causing its telescopic end to push the telescopic cover 4 to move away from the oil inlet pipe 2 (in conjunction with...). Figure 2 As shown), this causes the telescopic cover 4 to move toward the well wall until the side of the telescopic cover 4 away from the oil inlet pipe 2 is in contact with the well wall; During the process of inserting the inlet pipe 2 into the well, the telescopic cover 4 can wrap the filter hole 3 to prevent foreign objects from entering it. After drilling is completed, the telescopic cover 4 can be opened to support the well wall and prevent it from collapsing. Afterwards, the oil and gas will enter the filter hole 3 between a pair of telescopic shields 4, and then filter the mud and gravel mixed inside through the filter hole 3 before entering the oil inlet pipe 2. During the oil and gas filtration and collection process, personnel need to periodically activate the electric push rod 7, causing its telescopic end to pull the mounting block 8 and all its mechanisms upwards together. This causes the scraper ring 10 to move upwards on the oil inlet pipe 2. The scraper ring 10 is used to scrape the mud and gravel adhering to the filter holes 3, making the filter holes 3 less likely to be blocked by mud and gravel. This allows oil and gas to enter the oil inlet pipe 2 smoothly, thus ensuring the smooth progress of oil extraction.
[0025] like Figure 7 and Figure 9 As shown, a plug rod 11 is fixedly connected to the side of the mounting block 8, and a plug groove 12 adapted to the plug rod 11 is provided on the scraper ring 10. When the scraper ring 10 is moved together by the spring 9, the plug rod 11 can support both of them, improving their stability during movement.
[0026] like Figure 7 andFigure 9 As shown in the figure, the plug-in rod 11 is inserted in the plug-in groove 12 and the spring 9, the bottom of the scraping ring 10 abuts against the top of the drill bit 1, so as to improve the stability of the scraping ring 10, and the scraping ring 10 is not easy to rotate on the plug-in rod 11 when moving.
[0027] As shown in the figure, Figure 7 As shown in the figure, Figure 9 As shown in the figure, the surface of the plug-in rod 11 is in contact with the inner wall of the spring 9, the inner diameter of the spring 9 is greater than the diameter of the plug-in groove 12, so as to facilitate the scraping ring 10 to extrude the spring 9, and the spring 9 is contracted between the mounting block 8 and the scraping ring 10.
[0028] As shown in the figure, Figure 4 As shown in the figure, the surface of the oil inlet pipe 2 is fixedly connected with a sleeve ring 13, the outer side of the sleeve ring 13 is fixedly connected with a pair of connecting rods 14, the bottom of the pair of connecting rods 14 is fixedly connected with the same elastic ring 15; The outer side of the scraping ring 10 is trapezoidal, and the inner ring of the elastic ring 15 is a conical surface structure (combined with Figure 4 As shown in the figure, Figure 5 As shown in the figure), so that under the thrust of the scraping ring 10, the elastic ring 15 is more likely to be elastically deformed and expanded, thereby facilitating the scraping ring 10 to move up and down through the elastic ring 15; When the scraping ring 10 pushes the mud and gravel attached to the outer side of the oil inlet pipe 2 upward, the top of the scraping ring 10 will push the elastic ring 15 to produce elastic deformation and expansion, and when it expands, the bottom slope will rub with the top of the scraping ring 10, thereby scraping off the mud and gravel accumulated on the top of the scraping ring 10, and then the mud and debris can be quickly separated from the scraping ring 10 and fall down.
[0029] As shown in the figure, Figure 2 As shown in the figure, the inner wall of the elastic ring 15 abuts against the outer side of the oil inlet pipe 2, and the elastic ring 15 is located above the scraping ring 10.
[0030] As shown in the figure, Figure 3 As shown in the figure, the top of the drill bit 1 is provided with a pair of reinforcing grooves 16, and the bottom of the telescopic cover 4 is fixedly connected with a reinforcing block 17 which is in sliding connection with the reinforcing grooves 16, when the telescopic cover 4 moves, the reinforcing block 17 will be driven to move in the reinforcing grooves 16, and the reinforcing block 17 can improve the stability of the telescopic cover 4 when moving above the drill bit 1.
[0031] In other embodiments, the telescopic cover 4 can be designed as a complete cylindrical structure, so that it will not expand radially, and the telescopic cover 4 moves axially and covers the filter hole 3 when drilling; after drilling is completed, the telescopic cover 4 can be moved upward to expose the filter hole 3, which can also play a role in scraping the filter hole 3.
[0032] Embodiment two: as shown in the figure, Figures 5-6As shown, the comparative example one, wherein another embodiment of the present application is: the inner wall of the scraping ring 10 is provided with a plurality of connecting grooves 28 and rolling grooves 30, the inner side wall of the connecting groove 28 is fixedly connected with the magnetic block 18, the inner bottom wall of the connecting groove 28 is provided with a discharge groove 29, the inside of the rolling groove 30 is rotatably connected with the roller 19, the roller 19 is provided with a plurality of sliding grooves 20, the inside of the sliding groove 20 is slidably connected with the metal block 21, the side of the metal block 21 is fixedly connected with the spring two 22, the inside of the roller 19 is movably inserted with the push-pull rod one 23 and the push-pull rod two 24, the push-pull rod one 23 is provided with an adjusting groove 25, the push-pull rod two 24 is movably inserted in the inside of the adjusting groove 25, a pair of the metal block 21 and the push-pull rod two 24 are fixedly connected in the vertical direction, a pair of the metal block 21 and the push-pull rod one 23 are fixedly connected in the horizontal direction.
[0033] When the scraping ring 10 moves on the oil inlet pipe 2, under the action of friction between the roller 19 and the oil inlet pipe 2, the roller 19 will rotate in the connecting groove 28, when the roller 19 rotates, it will drive all the mechanisms in it to rotate; When the metal block 21 rotates to the position horizontally opposite to the magnetic block 18, under the magnetic attraction of the magnetic block 18 to the metal block 21, the push-pull rod one 23 or the push-pull rod two 24 will be pulled to move towards the side close to it, thereby making the push-pull rod one 23 or the push-pull rod two 24 move the metal block 21 at the other end together, at this time, since the sliding groove 20 opposite to the magnetic block 18 and away from the magnetic block 18 will be directly opposite to the filter hole 3, when the metal block 21 moves in the sliding groove 20 and approaches the magnetic block 18, negative pressure will be generated in the sliding groove 20 close to the oil inlet pipe 2 side, under the action of negative pressure, the mud and gravel in the filter hole 3 can be sucked into the sliding groove 20, thereby the phenomenon that the speed of oil gas entering the oil inlet pipe 2 and the mud and gravel plugging the filter hole 3 are reduced due to the mud and gravel entering the filter hole 3 can be avoided; After the mud and gravel are sucked into the sliding groove 20, when the sliding groove 20 rotates to the position directly below or above the roller 19, the inner wall of the rolling groove 30 will block the mud and gravel, so that they are not easy to move out of the sliding groove 20, when the sliding groove 20 rotates to the position directly opposite to the magnetic block 18, under the magnetic attraction of the magnetic block 18, the metal block 21 will push the mud and gravel to move towards the magnetic block 18, then the mud and gravel will fall into the discharge groove 29, and then pass through the discharge groove 29 to be discharged from the scraping ring 10, so that the mud and gravel sucked in the sliding groove 20 can be conveniently cleaned.
[0034] As Figures 5-6As shown, the spring two 22 is fixedly connected with the inner side wall of the sliding groove 20 away from one end of the metal block 21, the stability of the spring two 22 is improved when moving, the inner part of the roller 19 is provided with a push-pull slot one 26 and a push-pull slot two 27, which are movably inserted with the push-pull rod one 23 and the push-pull rod two 24, a pair of the sliding grooves 20 in the horizontal direction are communicated with the push-pull slot one 26, and a pair of the sliding grooves 20 in the vertical direction are communicated with the push-pull slot two 27.
[0035] As Figure 10 shown, the drilling and completion integrated tool of the present application is used in a drilling and completion operation method, which comprises the following steps: S1: after drilling is completed, the telescopic cover 4 is abutted against the hole wall, and oil and gas will enter into the oil inlet pipe 2 through the filter hole 3; S2: the electric push rod one 5 is started, the scraping ring 10 is moved on the oil inlet pipe 2, so as to scrape off the dirt and foreign matters adhered thereto; S3: when the scraping ring 10 is moved upward, the magnetic block 18 will attract the metal block 21, so that the negative pressure is formed in the sliding groove 20, and the filter hole 3 is dredged.
[0036] The above, front, back, left, right, up and down are based on the Figure 1 in the drawings, according to the standard of the human observation angle, the side of the device facing the observer is defined as front, the left side of the observer is defined as left, and the like.
[0037] In the description of the present application, it should be understood that the terms "center", "longitudinal", "transverse", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, therefore it cannot be understood as a limitation on the scope of protection of the present application.
[0038] The basic principles, main features and advantages of the present application are shown and described above. It should be understood by those skilled in the art that the present application is not limited by the above examples, the above examples and descriptions in the specification are only to illustrate the principles of the present application, and various changes and improvements can be made without departing from the spirit and scope of the present application, which all fall within the scope of the present application. The scope of protection of the present application is defined by the appended claims and their equivalents.
Claims
1. A drilling and completion integrated tool comprising a drill bit (1), characterized in that: The top of the drill bit (1) is fixedly connected with an oil inlet pipe (2), and the oil inlet pipe (2) is provided with filter holes (3); The outer side of the oil inlet pipe (2) is provided with a pair of telescopic covers (4), and the surface of the oil inlet pipe (2) is fixedly connected with a pair of symmetrically distributed electric push rods (5), and the telescopic end of the electric push rod (5) is fixedly connected with the telescopic cover (4); The inner wall of the telescopic cover (4) is provided with a vertical groove (6), the inner top wall of the vertical groove (6) is fixedly connected with an electric push rod (7), and the telescopic end of the electric push rod (7) is fixedly connected with a mounting block (8); The side of the mounting block (8) is fixedly connected with a spring (9), and the end of the spring (9) away from the mounting block (8) is fixedly connected with a scraping ring (10); In the initial state, the spring (9) is in the contracted state, and a pair of scraping rings (10) are sleeved on the outer side of the oil inlet pipe (2).
2. The integrated drilling and completion tool of claim 1, wherein: The side of the mounting block (8) is fixedly connected with a plug-in rod (11), and the scraping ring (10) is provided with a plug-in groove (12) matched with the plug-in rod (11).
3. The drill-in completion integrated tool of claim 2, wherein: The plug-in rod (11) is inserted into the plug-in groove (12) and the spring (9), and the bottom of the scraping ring (10) abuts against the top of the drill bit (1).
4. The drill-in completion integrated tool of claim 2, wherein: The surface of the plug-in rod (11) is in contact with the inner wall of the spring (9), and the inner diameter of the spring (9) is greater than the diameter of the plug-in groove (12).
5. The drill-in completion integrated tool of claim 1, wherein: The surface of the oil inlet pipe (2) is fixedly connected with a sleeve ring (13), the outer side of the sleeve ring (13) is fixedly connected with a pair of connecting rods (14), and the bottom of the pair of connecting rods (14) is fixedly connected with the same elastic ring (15).
6. The drill-in completion integrated tool of claim 5, wherein: The inner wall of the elastic ring (15) abuts against the outer side of the oil inlet pipe (2), and the elastic ring (15) is located above the scraping ring (10).
7. The drill-in completion integrated tool of claim 1, wherein: The top of the drill bit (1) is provided with a pair of reinforcing grooves (16), and the bottom of the telescopic cover (4) is fixedly connected with a reinforcing block (17) in sliding connection with the reinforcing grooves (16).
8. The drill-in completion integrated tool of claim 1, wherein: A plurality of connecting grooves (28) and rolling grooves (30) are formed in the inner wall of the scraping ring (10), a magnetic block (18) is fixedly connected to the inner side wall of the connecting groove (28), an outlet groove (29) is formed in the inner bottom wall of the connecting groove (28), a rolling cylinder (19) is rotatably connected in the rolling groove (30), a plurality of sliding grooves (20) are formed in the rolling cylinder (19), a metal block (21) is slidably connected in the sliding groove (20), a spring (22) is fixedly connected to the side of the metal block (21), a push-pull rod (23) and a push-pull rod (24) are movably inserted into the rolling cylinder (19), an adjusting groove (25) is formed in the push-pull rod (23), the push-pull rod (24) is movably inserted into the adjusting groove (25), and a pair of metal blocks (21) and push-pull rods (24) are fixedly connected in the vertical direction, and a pair of metal blocks (21) and push-pull rods (23) are fixedly connected in the horizontal direction.
9. The drill-in completion integrated tool of claim 8, wherein: The second spring (22) is fixedly connected with the inner side wall of the sliding groove (20) at one end away from the metal block (21), the outer side of the first push-pull rod (23) and the second push-pull rod (24) are in contact with the inner wall of the second spring (22), the inside of the roller (19) is provided with the first push-pull groove (26) and the second push-pull groove (27) in which the first push-pull rod (23) and the second push-pull rod (24) are movably inserted, one pair of the sliding grooves (20) in the horizontal direction are communicated with the first push-pull groove (26), and one pair of the sliding grooves (20) in the vertical direction are communicated with the second push-pull groove (27).
10. A method of drilling and completing a well using the integrated drilling and completion tool of claim 9, characterized by: The method comprises the following steps: S1: after drilling, the telescopic cover (4) is abutted against the hole wall, and oil and gas will enter into the oil inlet pipe (2) through the filter hole (3); S2: the electric push rod (5) is started, the scraping ring (10) is moved on the oil inlet pipe (2) to scrape off the dirt and foreign matters adhered thereto; S3: when the scraping ring (10) is moved upward, the magnetic block (18) will attract the metal block (21), a negative pressure is formed in the sliding groove (20), and the filter hole (3) is dredged.
Citation Information
Patent Citations
Power tongs for petroleum machinery drill rod
CN105971533A
Drilling rig for geological exploration and using method thereof
CN116291419A
Exploration equipment for geotechnical engineering
CN117888817A
Diamond drill bit with chip removal structure
CN219638775U
Construction structure for sealing joints in trenches excavated for poorly constructed foundation pits
JP3248661U