Project process supervision and early warning method and system

By integrating information from construction units, intermediary agencies, and construction companies through the project process monitoring and early warning system, and configuring early warning rules, the system solves the problems of information asymmetry and coordination difficulties in traditional engineering project management, and achieves efficient information sharing and management.

CN120912136APending Publication Date: 2025-11-07HENGFENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511075143.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-01
Publication Date
2025-11-07

AI Technical Summary

Technical Problem

Traditional engineering project management methods rely on manual processing and paper documents, resulting in low efficiency and information asymmetry, which increases the difficulty of management and coordination, especially in engineering projects with multiple participants where information is difficult to share.

Method used

This invention provides a project process monitoring and early warning system that integrates information from construction units, intermediary agencies, and construction companies. It configures early warning rules through a data decision unit, monitors and analyzes data in real time, and triggers early warning mechanisms in a timely manner.

Benefits of technology

It enables information sharing and collaborative work, improves management efficiency, can issue timely warnings, helps managers develop response strategies, reduces negative impacts, and ensures the smooth progress of projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120912136A_ABST
    Figure CN120912136A_ABST
Patent Text Reader

Abstract

The invention discloses a project process supervision and early warning method and system. The supervision and early warning system comprises a construction unit, an intermediary unit, a construction unit and a data decision unit. The construction unit is used for acquiring unit information, engineering project information, bid invitation information and contract information related to a construction unit; the intermediary unit is used for acquiring unit information related to an intermediary, bidding agent material information, scheme report compiling material information, investigation and exploration material information, construction drawing service material information and identification and detection material information; the construction unit unit is used for acquiring unit information, engineering project information, bid invitation information, contract information and rectification information related to a construction unit; and the data decision-making unit is used for configuring an early warning rule and carrying out early warning on a plurality of pieces of information acquired by the construction unit unit, the intermediary mechanism unit and the construction unit unit according to the early warning rule. Warning can be given out in time, and smooth progress of a project is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of software project management, in particular to a project process supervision and early warning method and system. BACKGROUND

[0002] With the development of society and the acceleration of urbanization process, various types of engineering projects are increasing, and the scale and complexity of projects are also increasing. The traditional engineering project management mode mainly relies on manual processing and paper documents, which is not only inefficient, but also prone to information asymmetry, poor communication and other problems. Engineering projects usually involve multiple participants, such as construction units, intermediaries, etc., and information is difficult to share, increasing the difficulty of management and coordination. SUMMARY

[0003] In view of the above problems, the present application provides a project process supervision and early warning method and system to solve the problems.

[0004] To achieve the above purpose, the present application provides a project process supervision and early warning system, comprising: a construction unit unit, an intermediary unit, a construction unit unit and a data decision unit;

[0005] The construction unit unit is used to obtain unit information, engineering project information, bidding information and contract information related to the construction unit;

[0006] The intermediary unit is used to obtain unit information related to the intermediary, as well as bidding agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information and identification and detection material information;

[0007] The construction unit unit is used to obtain unit information, engineering project information, bidding information, contract information and rectification information related to the construction unit;

[0008] The data decision unit is used to configure early warning rules, and to early warn the information obtained by the construction unit unit, the intermediary unit and the construction unit unit according to the early warning rules.

[0009] Further, the early warning rules include one or more of the following: fund use, bidding, subcontracting, contract performance, project progress, project quality, project safety.

[0010] Further, the contents of the early warning include one or more of the following: budget over-warning, illegal subcontracting warning, agent fee transfer payment warning, unreturned deposit within the specified time warning, payment cycle warning, uncontracted payment of construction funds warning, construction engineering wage special account allocation warning, task overtime completion warning, delayed fund allocation warning, incomplete construction procedures warning, sub-contractor qualification warning, over-allocation of engineering progress funds warning, pre-acceptance drawing warning, suspected misappropriation of special funds warning, ultra-low price bid warning, over-period submission of completion settlement report and settlement data warning, tenderer avoidance of tender or false tender warning, tender agent rate abnormality warning.

[0011] Further, it further includes a regulatory unit unit for obtaining construction market behavior information, daily inspection information, civil quality completion acceptance information, and irregular affairs information of the construction unit and the construction unit, and performing inspection to form inspection records, obtaining rectification notices according to the inspection records and sending them to the corresponding construction unit, construction unit or intermediary agency.

[0012] Further, the regulatory unit unit is also used to obtain the contract performance evaluation of the construction unit by the housing department and the human department.

[0013] Further, the regulatory unit unit is also used to obtain the construction settlement information, which includes the contract price, the completion acceptance qualified time, the settlement submission cost, the settlement submission time, the settlement audit cost, the settlement finalization time, the settlement audit after change, the cost of the increased part of the visa, the settlement audit unit, the settlement audit unit selection method, the settlement audit charge standard, the cost consulting fee, the auditor and his qualification certificate, and the professional category.

[0014] Further, the data decision unit is used to obtain the fund allocation situation, the rectification notice overview and the proportion of the project stage.

[0015] Further, the construction unit related project information includes project pre-materials;

[0016] The project pre-materials include one or more of the following: project proposal, site selection opinion, feasibility study report, engineering planning license, design scheme, budget estimate, construction project environmental impact report, construction land pre-audit opinion, construction land approval, land planning license, allocation decision, real estate certificate.

[0017] Further, it further includes a mobile terminal, which is used to obtain the fund allocation request of the intermediary agency and the construction unit and send it to the data decision unit.

[0018] To achieve the above object, the inventors also provide a project process supervision early warning method applied to the project process supervision early warning system of any one of the above embodiments, comprising the following steps:

[0019] Obtaining unit information, engineering project information, bidding information and contract information related to the construction unit;

[0020] Obtaining unit information related to the intermediary agency, as well as bidding agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information and identification and detection material information;

[0021] For obtaining unit information, engineering project information, bidding information, contract information and rectification information related to the construction unit;

[0022] According to the early warning rules, the information obtained by the construction unit, the intermediary agency unit and the construction unit is early warned.

[0023] Unlike the prior art, the above technical solution has the following beneficial effects:

[0024] Through the integrated information management system, information sharing and collaborative work are realized, and the management efficiency is improved. The warning can be sent in time, which helps the managers to develop response strategies, reduces negative impact and ensures the smooth progress of the project.

[0025] The above invention content related records are only summaries of the technical solutions of the present application. In order to enable those skilled in the art to more clearly understand the technical solutions of the present application, and then can be implemented according to the content recorded in the specification and drawings, and in order to make the above and other purposes, features and advantages of the present application more easily understood, the following is described in conjunction with the specific embodiments of the present application and the accompanying drawings. BRIEF DESCRIPTION OF DRAWINGS

[0026] The accompanying drawings are only used to show the principles, implementation methods, applications, characteristics and effects of the specific embodiments of the present application and other related contents, and cannot be considered as a limitation of the present application.

[0027] In the drawings of the specification:

[0028] Figure 1 The schematic diagram of the project process supervision early warning system described in the present embodiment. DETAILED DESCRIPTION

[0029] To explain the possible application scenarios, technical principles, specific implementation schemes, and the purposes and effects of the present application in detail, the following specific embodiments are combined with the accompanying drawings. The embodiments described herein are only used to more clearly illustrate the technical solutions of the present application, and therefore only serve as examples, but cannot limit the protection scope of the present application.

[0030] The processor described in the embodiments of the present application can be implemented by hardware, firmware, software or a combination thereof, and can use at least one of circuit, single or multiple application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), central processing units (CPU), controllers, microcontrollers, microprocessors, and other physical, biological or chemical structures with similar or equivalent functions, such as biological neurons, quantum computing units, DNA computing units, etc., so that the processor can execute part or all of the steps or any combination of the steps mentioned in the computer programs or methods of various embodiments of the present application.

[0031] The computer program involved in the embodiment can be stored in a computer device readable storage medium, including but not limited to magnetic disk, magnetic tape, magnetic card, floppy disk, flash memory, optical disc, optical card, read-only memory (ROM), random access memory (RAM), erasable programmable ROM (EPROM) and electrically erasable programmable ROM (EEPROM) and the like, and also includes other biological, physical or chemical structures that can realize the same or equivalent functions as the above-mentioned storage media, such as DNA, RNA, protein and the like units with information storage ability. In specific embodiments, the storage medium can be one of the above-mentioned medium types, or a combination of the above-mentioned medium types. In different embodiments, the computer program involved in the embodiment can be centrally stored in a single medium, or can be distributedly stored in multiple media. The storage medium containing the computer device readable storage medium can be a non-volatile memory or a random access memory. These computer device readable storage media can be built-in in the device, or connected with the device as an external device or part of the external device. In some embodiments, the storage medium with the computer device readable storage medium is deployed locally; in other embodiments, the storage medium can also be deployed remotely from the processor, such as network attached storage accessed via RF circuit or external port and communication network, wherein the communication network can be Internet, one or more intranets, local area network (LAN), wide area network (WAN), storage area network (SAN) and the like, or appropriate combination thereof, as long as the computer device can access the storage medium. In addition, the computer program involved in the embodiment can be stored in plaintext / ciphertext form, or can be designed as training data, and integrated and reorganized by model training to be implicitly saved in the parameter state of deep neural network or other machine learning model.

[0032] Please refer to Figure 1 The embodiment provides a project process supervision early warning system, comprising: a construction unit unit, an intermediary institution unit, a construction unit unit and a data decision unit.

[0033] The construction unit unit is used for acquiring unit information, engineering project information, bidding information and contract information related to the construction unit;

[0034] The intermediary institution unit is used for acquiring unit information related to the intermediary institution, and bidding agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information and identification and detection material information;

[0035] The construction unit unit is used for acquiring unit information, engineering project information, bidding information, contract information and rectification information related to the construction unit;

[0036] The data decision unit is configured to configure early warning rules and perform early warning on the information obtained by the construction unit unit, the intermediary agency unit, and the construction unit unit according to the early warning rules. The information includes but is not limited to the unit information related to the construction unit obtained by the construction unit unit, the engineering project information, the bidding information, and the contract information, and the unit information related to the intermediary agency obtained by the intermediary agency unit, the bidding agent material information, the scheme report preparation material information, the survey and exploration material information, the construction drawing service material information, the supervision material information, the measurement and mapping material information, and the identification and detection material information, and the unit information related to the construction unit, the engineering project information, the bidding information, the contract information, and the rectification information obtained by the construction unit unit.

[0037] The working principle of the project process supervision early warning system is as follows:

[0038] The system centrally manages the relevant information of the construction unit, the intermediary agency, and the construction unit through an integrated platform. Each unit is responsible for information collection and maintenance in its respective field, and synchronizes the data to the data decision unit. The data decision unit performs real-time monitoring and analysis on the collected data according to the preset early warning rules. Once an anomaly or potential risk is found, the early warning mechanism is triggered immediately, and early warning notifications are sent to relevant departments or responsible persons, prompting them to take appropriate measures to solve the problem or reduce the risk.

[0039] The project process supervision early warning system has the following beneficial effects:

[0040] Through the integrated information management system, information sharing and collaborative work are realized, and management efficiency is improved. Timely warnings can help managers develop coping strategies, reduce negative impacts, and ensure the smooth progress of the project.

[0041] In this embodiment, the project process supervision early warning system includes a project supervision PC end, which integrates a construction unit unit, an intermediary agency unit, a construction unit unit, and a data decision unit. After the construction unit user logs in to the project supervision PC end, the home page displays a workbench, including project announcements, common functions, project dynamics, project lists, early warning statistics, early warning lists, project statistics, etc. It supports quick positioning of projects according to project names, facilitates users to quickly understand current project dynamics and early warning situations, and provides quick access to each module for user operation.

[0042] After logging in, the construction unit user can manage relevant basic information in the construction unit information management, including unit name, credit code, legal representative, unit nature, unit qualification, etc. At the same time, the construction unit user can upload attachments such as social unified credit code certificate and qualification certificate to assist in verifying the authenticity and accuracy of the information.

[0043] In the embodiment, the project overview is displayed in a screen of the workbench, mainly displaying process data generated in the whole process of the project, including engineering basic information, pre-materials, bidding materials, contract and performance, completion acceptance, engineering settlement, and archive acceptance. Through the project overview, the construction unit user can quickly view the whole process data of the project.

[0044] In the embodiment, the early warning list includes early warning level, early warning reason, early warning type, etc., and is displayed in reverse chronological order. The number of project early warnings is counted by type and level, and information such as the number of early warnings of different types and the proportion of early warnings is displayed to facilitate managers to quickly locate the supervision direction. Early warnings can be searched in the early warning list according to the early warning type, online early warning elimination is supported, and the disposed early warnings need to have disposal records. Early warning information statistics realize the statistics of the total number of early warnings and the early warning type of the project associated with the currently logged-in user. The relevant responsible subjects can dispose the early warnings in the system, and the early warnings that have been eliminated can be disposed online. Early warning information processing needs to record the disposer to facilitate later tracing.

[0045] In the embodiment, the number of project rectification notices is counted, including the number of rectification notice sheets, the unit with the most rectification times, the project with the most rectification times, the number of units to be rectified, and the number of units that have been rectified, etc., to facilitate understanding of the key supervision units and projects.

[0046] In the embodiment, the early warning information viewing realizes the pushing of early warning information to the early warning related responsible subjects, and the construction unit user, the intermediary agency user, the construction unit user, and the supervision unit user can view the respective early warning information on the mobile terminal to facilitate quick understanding of the early warning information and timely processing.

[0047] In the embodiment, the early warning rules include one or more of the following: fund use, bidding, subcontracting, contract performance, project progress, project quality, and project safety. Appropriate measures can be taken to manage and process the process to avoid the expansion of risks and the occurrence of losses and improve management efficiency. Various information can be collected from each unit (construction unit, intermediary agency, and construction unit), including but not limited to fund use, bidding process, and subcontracting. The early warning rules are pre-set, for example, if the fund use exceeds a certain proportion, an over-budget early warning is triggered. Once the conditions are met, the data decision unit automatically generates an early warning signal and notifies the relevant personnel or departments through SMS, email or other means.

[0048] In the embodiment, the contents of the early warning include one or more of the following: budget overruns, illegal subcontracting, proxy fee transfer payment, failure to refund the deposit within the specified time, payment cycle, failure to pay the construction cost as agreed in the contract, construction engineering wage special account allocation, task overtime completion, delayed fund allocation, incomplete start-up procedures, sub-contractor qualification not up to standard, engineering progress payment over allocation, non-completion acceptance prior to drawing, suspected misappropriation of special funds, ultra-low price bid, late submission of completion settlement report and settlement data, tenderer avoiding tender or false tender, and tender agent rate anomaly.

[0049] In the embodiment, the budget overrun early warning is applicable to state-owned investment engineering construction single contract estimated price below 4 million yuan (important equipment and materials and other goods single procurement contract estimated price below 2 million yuan, survey, design, establishment, and other service procurement single contract estimated price below 1 million yuan, but the settlement price exceeds the above price, and the early warning signal (data decision unit SMS reminder) is sent in time, and the data decision unit prompts the relevant departments to dispose.

[0050] In the embodiment, the illegal subcontracting early warning refers to when the survey tender winner is inconsistent with the surveyor, the design tender winner is inconsistent with the designer, the construction tender winner is inconsistent with the construction contractor, the engineering general contractor winner is inconsistent with the engineering general contractor, and the supervision tender winner is inconsistent with the supervisor, the data decision unit prompts “the winner is inconsistent with the actual business taker, pay attention to whether there is a subcontracting situation”, and the early warning signal (data decision unit SMS reminder) is sent in time. Through the illegal subcontracting early warning, the engineering project market behavior supervision is realized.

[0051] In the embodiment, the proxy fee transfer payment early warning refers to when the proxy fee actual payer is inconsistent with the proxy contract entrustor, the data decision unit prompts “the proxy fee is not paid by the entrustor, pay attention to whether there is a transfer payment situation”, and the early warning signal (data decision unit SMS reminder) is sent in time. Through the proxy fee transfer early warning, the supervision of the authenticity of the fund payment is realized.

[0052] In the embodiment, the failure to refund the bid deposit within the specified time limit refers to that the data decision unit automatically calculates the time when the bid deposit refund date – contract signing date > 5 days, the data decision unit prompts “the bid deposit is not refunded within the specified time limit”, and the early warning signal (data decision unit SMS reminder) is sent in time to remind the relevant personnel. Through the bid deposit refund situation early warning, the tender market behavior supervision is realized.

[0053] In the embodiment, the payment cycle warning indicates that, for the project with the financial source being the finance or the finance funds being dominant and the payment cycle being greater than 1 month, the data decision unit performs the warning and timely sends the warning signal (the data decision unit SMS reminder). The payment cycle warning is used to realize the supervision on the payment of funds.

[0054] In the embodiment, the non-contractual payment of the construction cost warning is divided into two modes. One mode is that the data decision unit automatically determines that the actual payment time of the construction cost is greater than the latest payment time, the data decision unit prompts “non-contractual payment of the construction cost”, and timely sends the warning signal (the system SMS reminder). The payment time of the construction cost is used to realize the supervision on the contract performance. The other mode is that the warning information of the payment of the construction cost is imported by the supervisory department, and the system prompts the relevant department to deal with it.

[0055] In the embodiment, the construction engineering wage special account payment warning realizes the warning on the payment cycle, proportion and time of the wage special account, and the wage special account payment warning is used to realize the supervision on the payment of the labor personnel. The construction engineering wage special account payment warning includes: (1) the wage special account payment cycle warning: the wage special account payment account of the laborer is monitored through the connected labor real-name system of the Fujian Provincial Department of Human Resources and Social Security, when the wage special account payment cycle is greater than 1 month, the warning signal (SMS reminder) is timely sent to remind the relevant personnel. At the same time, the warning situation is tracked, and the relevant information and processing results are recorded for subsequent inspection. (2) the abnormal payment proportion warning of the construction engineering wage special account: the data decision unit performs the warning and prompts “abnormal payment proportion warning of the construction engineering wage special account” when the engineering category is construction and the payment proportion of the wage special account is less than 20%, or the engineering category is municipal and the payment proportion of the wage special account is less than 17%. (3) the non-contractual payment of the construction cost to the wage special account warning: the data decision unit performs the warning and prompts “non-contractual payment of the construction cost to the wage special account” when the amount of the wage special account / (the approved amount / progress payment proportion) is less than the payment proportion of the wage special account. (4) the wage special account payment cycle greater than 1 month warning: the data decision unit performs the warning when the wage special account payment cycle is greater than 1 month and the month of the actual payment time of the construction contract performance condition record is discontinuous.

[0056] In the embodiment, in the task overtime non-completion warning, the definition of the task overtime completion is based on whether there is uploaded achievement material within the contractually agreed completion period, and the data decision unit performs the overtime warning for the non-uploaded achievement material within the contractually agreed time. The task overtime warning is used to realize the supervision on the contract performance.

[0057] In the embodiment, the fund delay disbursement early warning is compared and judged according to the contract payment time agreed in the contract performance and the actual disbursement time, when the contract payment time agreed in the contract < the actual disbursement time, the data decision unit will determine that there is no fund delay disbursement, through the early warning of the fund disbursement period, the contract performance supervision is realized.

[0058] In the embodiment, the incomplete start-up procedure early warning refers to the monitoring of starting up without going through the procedures according to the process, which is judged by the data decision unit according to the engineering quality supervision procedure handling date, the start-up approval table (or the start-up order) reply time, the construction engineering construction license engineering handling time and the actual start-up date, when the start-up date is before the completion of the related procedure handling, the data decision unit will determine that the related start-up procedures are not handled, and the data decision unit will push the "starting up without handling the related start-up procedures" early warning information to the related responsible subject.

[0059] In the embodiment, the sub-contracting enterprise qualification not meeting the standard early warning refers to the supervision of the qualification of the sub-contracting enterprise, when the enterprise qualification owned by the sub-contracting enterprise < the enterprise qualification required for sub-contracting, the data decision unit will determine that the qualification is not enough for professional sub-contracting, and will push the "sub-contracting enterprise qualification does not match the sub-contracting engineering" early warning information to the related responsible person.

[0060] In the embodiment, the engineering progress payment over-disbursement early warning refers to the supervision of the disbursement progress of the engineering progress payment, when the engineering payment disbursement progress > the construction contract agreement, the data decision unit will determine that the engineering payment is over-disbursed, and will push the "engineering progress payment over-disbursement" early warning information to the related responsible person.

[0061] In the embodiment, the early drawing without acceptance early warning realizes the supervision of the project acceptance stage, when the as-built drawing drawing time < the as-built acceptance time, the data decision unit will determine that the drawing is drawn without acceptance, and will push the "drawing without acceptance" early warning information to the related responsible person.

[0062] In the embodiment, the special fund suspected misappropriation early warning realizes the supervision of the use of the special fund, when the special fund is disbursed to a non-designated bank account, the data decision unit will determine that the special fund is suspected to be misappropriated, and will push the "there may be special fund misappropriation, please verify" to the related responsible person, through the early warning judgment, the use of the special fund is supervised.

[0063] In the embodiment, the ultra-low price bid winning early warning realizes the supervision of the bidding market, when the third party detection agency fee is 0 yuan service and the bid winning price is extremely low, the data decision unit will determine that the bid winning price is ultra-low, and will push the "there may be ultra-low bid winning behavior" to the related responsible person, through the early warning of the bid winning price, the market behavior is supervised.

[0064] In this embodiment, the over-due submission of the completion settlement report and settlement data warning means that the contractor does not submit the completion settlement report and settlement data within 28 days after the completion acceptance is qualified, and the data decision unit will determine that the contractor does not submit the completion settlement report and settlement data within the specified time.

[0065] In this embodiment, the tenderer evades tender or false tender warning means that the tenderer's tender behavior is supervised, and when the following behaviors occur, it is determined that there is an evading tender or false tender behavior: (1) multiple projects use the same project code for contracting or the project construction address is consistent, and the data decision unit prompts the relevant departments to handle; (2) the project proposal reflects that the tender method is determined in the form of meeting research or summary, or the winning bidder is directly specified, and the data decision unit prompts the relevant departments to handle.

[0066] In this embodiment, the tender agent rate anomaly warning means that the data decision unit prompts the abnormal situation of the tender agent rate of a region or a unit; by comparing the engineering bidding information, the government investment projects that must be tendered according to law are prompted to use comparison and selection and other competitive methods to determine the tender agent.

[0067] In this embodiment, the evaluation expert bad behavior warning means that the construction unit provides a standard interface to connect to the municipal electronic bidding and tender transaction platform to obtain the evaluation expert score, and prompts the high and low score situation.

[0068] In this embodiment, the data decision unit carries out the process of data collection, arrangement, analysis and presentation of early warning signals or abnormal situations in the engineering project. Through statistical analysis of the early warning data of the engineering project, potential risks and problems can be found in time to help relevant departments and managers take measures to respond to risks and solve problems, thereby minimizing the adverse effects. Specifically, it includes: (1) Progress warning statistics: Monitor the progress of the engineering project, collect the difference data between the actual progress and the planned progress, analyze the delay situation and trend, and warn potential progress risks. (2) Fund warning statistics: Monitor the use of funds in the engineering project, collect the difference data between the actual cost and the budget cost (such as settlement exceeding budget, budget exceeding budget estimate, agent fee not paid by the principal, not refunding the bid bond within the specified time limit, and wage special account disbursement period > 1 month, etc.), analyze the cost increase situation and trend, and warn potential cost risks. (3) Quality warning statistics: Monitor the quality of the engineering project, collect data on quality abnormalities or unqualified items, analyze the frequency and trend of quality problems, and warn potential quality risks. (4) Safety warning statistics: Monitor the safety of the engineering project, collect data on accident rates, accident types and accident causes, analyze changes and trends in safety risks, and warn potential safety risks. (5) Contract warning statistics: Monitor the contract of the engineering project, collect data on contract performance, change, claim, etc., analyze changes and trends in contract risks, and warn potential contract risks.

[0069] In this embodiment, the construction unit related engineering project information includes engineering project basic information and engineering project pre-materials; the project basic information is automatically obtained by the system through the interface with the city housing and construction bureau construction engineering electronic data management platform, and the existing basic project information of the construction unit. For special projects, the construction unit user can maintain the project information by manually entering.

[0070] In this embodiment, the construction unit unit provides the function of maintaining and managing the project proposal information by the construction unit user, including project unit, approving unit, approving time, land area, total building area, underground building area, aboveground building area, total investment, construction fund source, and supporting uploading and previewing of project proposal approval documents and required material attachments to assist management personnel in verifying project proposal information.

[0071] In the embodiment, the construction unit unit provides the function of maintaining and managing the site selection opinion information for the construction unit user, including the construction project name, the construction unit name, the construction project basis, the proposed location, the proposed area, the proposed construction scale, the opinion number, the issuing authority, the issuing time, and supporting uploading and previewing the site selection opinion and the required materials for application, assisting the management personnel to verify the site selection opinion information.

[0072] In the embodiment, the construction unit unit provides the function of maintaining and managing the feasibility study report information for the construction unit user, including the project unit, the reply unit, the reply time, the land area, the total building area, the underground building area, the aboveground building area, the total project investment, the construction fund source, and supporting uploading and previewing the feasibility study report reply file and the required materials for application, assisting the management personnel to verify the feasibility study report information.

[0073] In the embodiment, the construction unit unit provides the function of maintaining and managing the engineering planning license information for the construction unit user, including the land unit, the construction project name, the construction location, the construction scale, the license number, the issuing authority, the issuing date, and supporting uploading and previewing the engineering planning license and the required materials for application.

[0074] In the embodiment, the construction unit unit provides the function of maintaining and managing the design scheme information for the construction unit user, including the construction unit, the reply unit, the reply date, and supporting uploading and previewing the design scheme reply file and the required materials for application.

[0075] In the embodiment, the construction unit unit provides the function of maintaining and managing the budget estimate information for the construction unit user, including the construction scale, the total project investment, the engineering cost, the construction fund source, the reply unit, the reply date, and supporting uploading and previewing the budget estimate reply file and the required materials for application.

[0076] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction project environmental impact report table information for the construction unit user, including the project name, the construction unit, the report table preparation unit, the approval unit, the approval file number, the approval date, and supporting uploading and previewing the construction project environmental impact report table approval file and the construction project environmental impact report table.

[0077] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0078] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0079] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0080] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0081] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0082] In the embodiment, the construction unit unit provides the function of maintaining and managing the construction land pre-examination opinions of the construction unit user, including the construction project name, land pre-examination applicant, land use, proposed land area, cultivated land area, proposed land method, opinion number, issuing authority, issuing time, and supporting uploading, previewing of the construction land pre-examination opinions, application required materials and the like.

[0083] In the embodiment, the construction unit unit provides the construction unit user with the function of construction drawing examination management, including engineering name, construction unit, survey unit, engineering category, engineering nature, examination agency, examination personnel, examination date, and supporting the uploading and previewing of the examination qualified book, examination report book, construction drawing examination opinion notice book and other attachments.

[0084] In the embodiment, the construction unit unit provides the construction unit user with the function of city new civil building air defense basement approval form information maintenance, including approval form number, construction unit, engineering name, engineering address, longitude and latitude, air defense engineering design qualification unit and contact person, air defense zone parking space number in peacetime, construction unit contact person, telephone, mobile phone and the like, and supporting the uploading and previewing of the city new civil building air defense basement approval form and attachments.

[0085] In the embodiment, the construction unit unit provides the construction unit user with the function of unit fire-fighting design examination information maintenance, including construction unit, examination unit, opinion number, examination date and the like, and supporting the uploading and previewing of the construction engineering fire-fighting design examination opinion, acceptance certificate and other attachments.

[0086] In the embodiment, the construction unit unit provides the construction unit user with the function of fire-fighting design record examination information maintenance, including construction unit, examination unit, examination certificate number, examination date and the like, and supporting the uploading and previewing of the construction engineering fire-fighting design record examination certificate, acceptance certificate and other attachments.

[0087] In the embodiment, the construction unit unit provides the construction unit user with the function of budget information maintenance, including preparation unit, preparation engineering cost, audit unit, audit cost and the like, and supporting the uploading and previewing of the budget audit result file and other attachments.

[0088] In the embodiment, the construction unit unit provides the construction unit user with the function of construction license information maintenance, including construction unit, engineering name, construction address, construction scale, survey unit, design unit, construction unit, supervision unit, survey unit project leader, design unit project leader, construction unit project leader, total supervision engineer, contract period, license number, issuing authority, issuing date and the like, and supporting the uploading and previewing of the construction license, application required materials and other attachments.

[0089] In the embodiment, the bidding information includes bidding stage (bidding for survey, bidding for design, bidding for construction, bidding for general contracting, bidding for supervision), project name, bidding project number, bidding method, evaluation method, bidding control price, opening date, bid validity period, tenderer, agency, bid deposit, bid deposit return date, winning bidder, winning date, winning price, winning bidder qualification, etc., and supports uploading and previewing of bidding announcement or invitation, bidding documents, clarification documents, objection processing documents, candidate bidder public documents, bid result public documents, bid notice, etc.

[0090] In the embodiment, the construction unit contract includes agency contract, construction engineering survey contract, design contract, general contracting contract, construction contract, supervision contract, etc.

[0091] In the embodiment, the agency contract information includes principal, trustee, bidding stage, agency fee, agreed payment person of agency fee, agency project leader, and the construction unit supports uploading and previewing of agency contract attachments.

[0092] In the embodiment, the construction engineering survey contract information includes contractor, surveyor, contract signing date, project name, project location, number of exploration holes, exploration footage, contract price, etc., and the construction unit supports uploading and previewing of construction engineering survey contract attachments.

[0093] In the embodiment, the design contract information includes contractor, designer, contract signing date, project name, project location, design unit project leader, design fee, etc., and the construction unit supports uploading and previewing of design contract attachments.

[0094] In the embodiment, the general contracting contract information includes contractor, contractor, contract signing date, project name, project location, total project investment, project cost limit, design fee, building and installation engineering cost, construction period requirement, contractor project manager, design leader, construction leader, technical leader, contract price form, advance payment, measurement period, payment period, progress payment ratio, defect warranty period, quality guarantee, etc., and the construction unit supports uploading and previewing of general contracting contract attachments.

[0095] In the embodiment, the construction contract information includes the contractor, the contractor, the contract signing date, the project name, the project location, the contract cost, the planned construction time, the planned completion time, the contract period, the contractor project manager, the contract price form, the advance payment, the construction payment guarantee amount, the measurement period, the payment period, the progress payment ratio, the salary special account allocation period, the salary special account allocation ratio, the defect warranty period, the quality guarantee, and the like. The construction unit supports the uploading of contract, construction payment guarantee, and the like.

[0096] In the embodiment, the supervision contract information includes the contractor, the contractor, the contract signing date, the project name, the project location, the project scale, the project cost, the general supervisor, the supervision fee, and the like. The construction unit supports the uploading of supervision contract attachments.

[0097] In the embodiment, the construction unit provides a contract performance information maintenance function, realizes the management of the performance records of the agency contract, the construction engineering survey contract, the design contract, the engineering general contracting contract, the construction contract, and the supervision contract, supports the manual entry mode of the user for the completed performance records, supports the application for payment initiated by the intermediary institution and the payment of funds by the construction party for the newly added performance records, forms a closed-loop management, and automatically generates the performance records by the system.

[0098] In the embodiment, the construction unit supports the maintenance of the performance records of the agency contract, including the actual fee payer, the actual payment amount, the payment date, and supports the uploading and previewing of payment voucher attachments.

[0099] In the embodiment, the construction unit supports the maintenance of the performance records of the construction engineering survey contract, including the actual exploration hole number, the actual exploration footage, the actual fee payment amount, the payment date, and supports the uploading of survey reports, payment vouchers, and the like.

[0100] In the embodiment, the construction unit supports the maintenance of the performance records of the design contract, including the fee payment amount, the payment date, and supports the uploading of construction drawings, payment vouchers, and the like.

[0101] In the embodiment, the construction unit supports the maintenance of the performance records of the engineering general contracting contract, including the payment category (design fee, advance payment, progress payment, settlement balance, and returned quality guarantee), the application amount, the approved amount, the amount into the salary special account, the latest payment time, the actual payment time, and supports the uploading of construction drawings, payment application and approval process materials, payment vouchers, and the like.

[0102] In the embodiment, the construction unit unit supports the maintenance of the construction contract performance record, including the payment category (advance payment, progress payment, settlement balance, return of quality guarantee), application amount, approved amount, amount into the wage special account, latest payment time, actual payment time, etc., and supports the uploading of the payment application and approval process materials, payment vouchers and other attachments.

[0103] In the embodiment, the construction unit unit supports the maintenance of the supervision contract performance record, including the actual payment amount, payment date, and supports the uploading of supervision materials, supervision fee payment vouchers and other attachments.

[0104] In the embodiment, the construction unit unit maintains the basic information of completion and acceptance, engineering completion and acceptance information, completion and acceptance planning information, engineering fire acceptance information, people's air defense engineering completion and acceptance record information, and public supporting facility acceptance information involved in the completion and acceptance.

[0105] In the embodiment, the basic information of completion and acceptance includes project name, project address, completion and acceptance date, actual construction period, actual completion date, actual construction period, etc.

[0106] In the embodiment, the engineering completion and acceptance information includes three types of housing construction engineering, road engineering and other engineering. The housing construction engineering includes total building area, underground building area, aboveground building area, building number, underground floor, aboveground floor, etc., and supports the uploading and previewing of the following attachment materials: completion and acceptance survey unit quality inspection report, design unit completion and acceptance quality qualification file, pile foundation sub-item acceptance quality self-evaluation report, completion and acceptance self-evaluation report, engineering quality evaluation report, completion and acceptance quality evaluation report, engineering completion and acceptance certificate, engineering completion and acceptance report, completion drawing, engineering completion record table, etc. The road engineering includes length, width, sidewalk width, green belt width, etc., and supports the uploading and previewing of related attachments.

[0107] In the embodiment, the completion and acceptance planning information includes opinion number, issuing unit, issuing date, etc., and supports the uploading and previewing of the construction engineering completion and planning condition verification and land verification opinion and other attachments.

[0108] In the embodiment, the engineering fire acceptance information includes special engineering, other engineering sampling results, acceptance conclusion, opinion number, opinion issuing unit, issuing date, etc., and supports the uploading and previewing of the following attachments: special building engineering fire acceptance opinion, other construction engineering completion and acceptance fire record sampling result notice letter, etc.

[0109] In this embodiment, the information of the completion acceptance of the civil air defense project includes the approval document number, the project name, the project code, the construction unit, the unified social credit code, the project location, the construction unit, the design unit, the supervision unit, the protection equipment enterprise, the chemical defense equipment enterprise, the design building area of the air defense basement, the completed building area of the air defense basement, the approval document number of the review opinion of the construction of the air defense basement, the supplement of the air defense basement construction fee (yuan), the quality supervision report book document number, the conclusion of the completion acceptance organized by the construction unit, the protection category, the total number of protection units, etc., and supports the uploading and previewing of the annexes of the approval document of the completion acceptance of the civil air defense project.

[0110] In this embodiment, the acceptance information of the public supporting facilities includes the acceptance report name, the acceptance report number, the acceptance conclusion, the issuing unit, and the issuing date, and supports the uploading and previewing of the annexes of the acceptance report.

[0111] In this embodiment, the construction unit unit supports displaying the historical project bidding information of the construction unit in a list, which can find the related bidding information according to the project, and supports viewing the bidding details. The bidding list can be displayed according to the bidding time sequence (forward order, reverse order), the bidding type of the project (residential building, commercial complex, municipal public facilities, etc.), and the bidding jurisdiction, and supports the bidding keyword search function.

[0112] In this embodiment, the construction unit unit supports recording and managing each link and related information details in the bidding process of the engineering project. Through the bidding detail management, the standardization and transparency of the bidding process can be improved, which helps to ensure the fairness and legality of the bidding procedure, and provides accurate reference and basis for subsequent contract signing and project implementation. Specifically includes: (1) Bidding project registration: realize the basic information recording of each bidding project, including the project name, the bidding document number, the bidding type, the bidding scope, the bidding deadline, etc. (2) Bid management: the construction unit should manage the received bid documents, including receiving, registering, numbering, archiving, etc., to ensure the integrity and security of the documents. (3) Evaluation process record: realize the management of the evaluation process of the bidding project, including the evaluation committee members, the evaluation meeting date, the evaluation standard, etc., so as to be queried and reviewed later. (4) Bidding result management: realize the management of the bidding result of the bidding project, including the winning bidder, the winning amount, the bid notice, etc., so as to be used for subsequent contract signing and project implementation. (5) Bidding project file management: establish the corresponding file, and archive and save the related bidding documents, bid documents, evaluation records, bid results, etc., for subsequent reference and audit.

[0113] In this embodiment, the construction unit cell supports the list of contracts signed by the construction unit, and can find the relevant contract information according to the project, and also supports viewing contract details. The contract list can be displayed according to the contract time sequence (forward, reverse), the contract type (residential building, commercial complex, municipal public facilities, etc.), the contract jurisdiction, etc. The contract keyword search function is supported. The contracts signed by the enterprise and the customer are managed, and through the contract list details, the specific terms and conditions of each contract can be clearly understood, and contract changes and renewals can be handled in a timely manner to avoid financial losses and legal risks due to poor contract management. Specifically includes: (1) Contract name: the name and identifier of the contract. (2) Contract type: the type of the contract, such as sales contract, purchase contract, service contract, etc. (3) Contract signing date: the date and time of contract signing. (4) Contract amount: the total amount involved in the contract and the payment method. (5) Contract period: the validity period and termination conditions of the contract. (6) Contract terms: specific terms and conditions contained in the contract, such as product / service specifications, quantity, price, payment method, delivery period, warranty period, etc. (7) Contract annexes: documents and files attached to the contract, such as technical specifications, price lists, warranty terms, standard terms, etc. (8) Contract signatory: the name and position of the signatory in the contract. (9) Contract approver: the approver and approval record in the contract approval process. (10) Contract change record: historical record and reason of contract change.

[0114] In this embodiment, the project process supervision and early warning system also includes a supervision unit cell for obtaining construction unit and construction unit building market behavior information, daily inspection information, civil quality completion acceptance information, and illegal intervention information and conducting inspection to form inspection records, obtaining rectification notices according to the inspection records and sending them to the corresponding construction unit, construction unit or intermediary organization.

[0115] Specifically, the supervision unit cell supervises and records the construction market behavior of the construction unit and the construction unit, uploads the corresponding attachments, and checks and registers the labor real-name system of the construction project. The supervision unit cell adds and queries daily inspections, and the inspection items include "daily service, dust prevention and control, city creation and health protection, flood prevention, fire safety, civil air defense engineering, and others". The supervision unit cell records the civil quality completion acceptance of the project and supports uploading related attachment materials, and supports quick query according to the project name, acceptance date, etc. The supervision unit cell establishes a violation intervention item registration function, which can be registered by the project construction subject and the industry supervisor and the supervision department, supports the real-time upload of relevant evidence and clue materials by administrative law enforcement, and compresses the space for appeal and greeting.

[0116] The regulatory unit cell can enable the law enforcement agency to perform a "double random" inspection, and the regulatory unit cell fills in the "double random inspection" information, including the order to correct, partial shutdown, and complete shutdown, to form a double random inspection record, upload the generated rectification notice, rectification feedback, and rework notice and other attachments, and the enterprise fills in the rectification reason, rectification period, and other information, and reports the rectification report and rectification pictures.

[0117] In this embodiment, the regulatory unit cell is also used to obtain the contract performance evaluation of the construction unit by the housing department and the human department. For example, the housing department supports the evaluation of contract performance, the system obtains the project basic information, the law enforcement agency fills in the right to tell the board, the real name information of construction workers, the contract registration situation, the real name information registration situation of project management personnel, and the project contract performance authenticity information, and uploads the related attachments. The human department supports the evaluation of contract performance, the system obtains the project basic information, the law enforcement agency fills in the construction worker wage payment situation, and uploads the evaluation table attachment.

[0118] In this embodiment, the regulatory unit cell can realize the list display of the four parties involved in the whole process of the engineering project, and supports quick search of enterprises and viewing of enterprise information. The regulatory agency imports the "double random, one public" inspection and reporting situation and score situation of the intermediary agency, and implements differentiated supervision on the intermediary agencies with poor credit.

[0119] In this embodiment, the regulatory unit cell lists the engineering construction project information, supports quick positioning of the project through the project stage, project name, and project type, and supports viewing of project details.

[0120] In this embodiment, the regulatory unit cell supports the law enforcement agency to input personnel change information, and supports querying of personnel change information of the project.

[0121] In this embodiment, the regulatory unit cell supports the law enforcement agency to add and query the responsibility unit change information of the project. Only the changed unit can view the project information, and the law enforcement agency and the supervision agency can view the responsibility unit change record at the project information. After the unit is changed, the corresponding unit is notified.

[0122] In this embodiment, the regulatory unit cell supports the law enforcement agency to view the project contract in the jurisdiction, supports quick positioning of the contract through the project name, contract type, contract signing date and other conditions, and supports viewing of contract details.

[0123] In this embodiment, the regulatory unit cell supports the law enforcement agency to view the project bidding information in the jurisdiction, supports quick positioning of the bidding content through the project name, bidding type, and bidding date, and supports viewing of bidding details.

[0124] In this embodiment, the regulatory unit cell supports the law enforcement agencies to fill in the consulting business bidding information, including the bidding stage, project name, bidding project number, bidding mode, evaluation method, bidding control price, opening date, bid validity period, tenderer, agent, winning bidder, winning price, and supports uploading related attachments.

[0125] In this embodiment, the regulatory unit cell supports the administrative service center management committee and the industry supervision department to import the evaluation expert bad behavior information, and implements key supervision on the above experts.

[0126] In this embodiment, the regulatory unit cell supports the law enforcement agencies to fill in the engineering settlement information, including the contract price, completion acceptance qualified time, settlement submission cost, settlement submission time, settlement determination cost, settlement finalization time, settlement determination after change, cost increase of visa part, settlement audit unit, settlement audit unit selection method, settlement audit charge standard, cost consulting fee, auditor and auditor qualification certificate, professional category, and supports reporting related attachments.

[0127] In this embodiment, the engineering project rectification reminder refers to the process of issuing a reminder notice to rectify and remind in the process of implementing the engineering project when it is found that there are violations of relevant regulations and standards of engineering construction. The data decision unit can find and handle problems in engineering construction in time through the engineering project rectification reminder, improve the quality and safety level of the engineering project, and ensure the smooth progress of engineering construction. The supervision and management unit enters the rectification information and reminds the relevant personnel.

[0128] In this embodiment, the regulatory unit cell is provided with a historical project information change reminder, which refers to the process of sending a reminder notification to relevant personnel when the historical project information changes. Through the historical project information change reminder, the relevant personnel can be timely notified of the changes in historical project information, ensuring the accuracy and completeness of the information, and also recording the change process and results to provide a basis for subsequent management and review. Specifically, it includes: (1) Monitor historical project information: Monitor changes in historical project information, such as project name, project type, project leader, etc. (2) Determine the change notification object: According to the change content and impact range, determine the relevant personnel who need to receive the change notification, such as project leader, project member, management personnel, etc. (3) Regularly send change notification: Regularly send historical project information change notification to relevant personnel, inform the change content and change time, and remind relevant personnel to pay attention. (4) Establish change record: Establish historical project information change record, record change content, change reason and change time, etc. for subsequent reference and review. (5) Check the effect after the change: Check the impact after the change of historical project information, ensure that the change measures are effectively implemented and implemented, and record the change situation. (6) Archive change record: Archive the historical project information change record for easy subsequent review and review.

[0129] In this embodiment, after the intermediary institution user logs in to the intermediary institution unit, the intermediary institution unit homepage displays the workbench, which includes project announcements, commonly used functions, project dynamics, project list, early warning statistics, early warning list, project statistics, etc. It supports quick positioning of projects according to project names, facilitates users to quickly understand current project dynamics, early warning situations, etc., and provides quick access to each module for user operation.

[0130] In this embodiment, the intermediary institution user can manage relevant information in enterprise basic information, including enterprise name, enterprise nature, enterprise code, registered capital, enterprise legal person, legal ID number, enterprise registration address, business scope, qualifications obtained, contact person and contact number, completed engineering projects, and credit joint punishment records. At the same time, it supports uploading attachments such as business license to assist in verifying the authenticity and accuracy of the information.

[0131] In this embodiment, the intermediary institution user can enter enterprise change history records in the intermediary institution unit, including change date, change content, etc., and support uploading change-related files.

[0132] In the present embodiment, the intermediary unit can support the bidding agent material management, mainly realizing four blocks of project basic information maintenance, project bidding agent contract information maintenance, bidding agent contract management, process change, and contract performance record, realizing the whole process management of the bidding agent from contract signing to contract completion. The list displays the project basic information undertaken by the bidding agent, including the project name, the central code, the project nature, the project type, the project address, the winning project leader, the leader qualification level, the leader qualification certificate number, etc., and supports the modification of the project basic information. The bidding agent contract information is input by the bidding agent, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, and the contract duration, and supports the uploading and previewing of the bidding documents, the winning notice and other attachments. The change information generated in the bidding process of the project is maintained by the bidding agent, including the change date and the change content, and supports the uploading of the change-related files and other attachments. The contract performance information state of the bidding agent mainly realizes the management of the bidding agent contract performance record, and the system supports the manual input mode for the completed performance record. For the new performance record, the bidding agent initiates the disbursement application, the construction party disburses the funds, forms a closed-loop management, and the performance record is automatically generated by the system.

[0133] In the present embodiment, the intermediary unit can support scheme report preparation material management, mainly realizing maintenance of various types of scheme preparation contracts, process change information, fund allocation information, and contract performance status information. The scheme types include project proposal preparation, feasibility study report preparation, preliminary design preparation, energy saving report preparation, construction project geological disaster risk assessment report preparation, project application report preparation, water resources demonstration report preparation, soil and water conservation scheme preparation, flood impact evaluation report preparation, construction project flood control evaluation report preparation, construction project site selection demonstration report preparation, construction project pressure and important mineral resources evaluation report preparation, sea area use demonstration report preparation, construction project traffic impact evaluation report preparation, construction project environmental impact evaluation report preparation, marine environmental impact report preparation, regional seismic safety evaluation and report preparation, construction project forest land feasibility report or forest land status survey table preparation, etc. The list displays the basic information of the projects undertaken by the design unit, including the project name, central code, project nature, project type, project address, winning project leader, leader qualification level, leader qualification certificate number, etc., and supports modification of the project basic information. Maintenance of contract information involved in the design process is supported, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and uploading and previewing of annexes such as the bidding document, the winning notice, the scheme, the report, etc. are supported. The design agency maintains the change information generated in the process of the project, including the change date and the change content, and supports uploading of annexes such as change-related documents. The design agency contract performance information state mainly realizes management of design contract performance records, and for the completed performance records, the system supports manual input mode; for the new performance records, the construction party allocates funds after the design unit initiates the allocation application, forming a closed-loop management, and the performance record is automatically generated by the system.

[0134] In the embodiment, the intermediary unit can support survey and exploration material management, mainly to realize the maintenance of the basic information of the project, the geological exploration report preparation contract, the process change, the fund allocation, and the contract performance state information. The list shows the basic information of the project undertaken by the survey and exploration agency, including the project name, the central code, the project nature, the project type, the project address, the winning project leader, the leader qualification level, the leader qualification certificate number, etc., and supports the modification of the basic information of the project. The intermediary unit supports the maintenance of the contract information involved in the survey and exploration process, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and supports the uploading and previewing of the annexes such as the bidding document, the winning notice, the contract, the scheme, the report, and the final preparation results. The survey and exploration agency maintains the change information generated in the process of the project, including the change date and the change content, and supports the uploading of the annexes such as the change-related files. The contract performance information state of the survey and exploration agency mainly realizes the management of the survey and exploration contract performance record. For the completed performance record, the system supports manual input; for the new performance record, the survey and exploration agency initiates the allocation application, and the construction party allocates funds to form a closed-loop management, and the performance record is automatically generated by the system.

[0135] In the embodiment, the intermediary unit can support construction drawing service material management, mainly to realize the maintenance of the basic information of the project, the construction drawing contract information maintenance, the process change, and the contract performance record, to realize the whole process management of the construction drawing service agency from the contract signing to the contract completion. The list shows the basic information of the project undertaken by the construction drawing service agency, including the project name, the central code, the project nature, the project type, the project address, the winning project leader, the leader qualification level, the leader qualification certificate number, etc., and supports the modification of the basic information of the project. The intermediary unit supports the maintenance of the contract information involved in the construction drawing service, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and supports the uploading and previewing of the annexes such as the bidding document, the winning notice, the contract, the scheme, the report, and the final preparation results of the engineering drawings. The survey and exploration agency maintains the change information generated in the process of the project, including the change date and the change content, and supports the uploading of the annexes such as the change-related files. The contract performance information state of the survey and exploration agency mainly realizes the management of the bidding agent contract performance record. For the completed performance record, the intermediary unit supports manual input; for the new performance record, the bidding agent initiates the allocation application, and the construction party allocates funds to form a closed-loop management, and the performance record is automatically generated by the intermediary unit.

[0136] In the present embodiment, the intermediary unit can support supervision of material management to mainly achieve four blocks of project basic information maintenance, supervision organization contract information maintenance, process change, and contract performance record, to realize the whole process management of the supervision organization from contract signing to contract completion. The list of project basic information undertaken by the supervision organization includes engineering name, central code, project nature, project type, project address, winning project leader, leader qualification level, leader qualification certificate number, etc., and supports modification of the project basic information. The intermediary unit supports maintenance of the engineering supervision contract information, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and supports uploading and previewing of the final compilation results attachments such as the bidding documents, the winning notice, the contract, the scheme, the report, and the engineering drawings. The supervision organization maintains the change information generated in the process of the project, including the change date and the change content, and supports uploading of the change-related files and other attachments. The supervision contract performance information state mainly realizes management of the supervision contract performance record, and for the completed performance record, the intermediary unit supports manual input mode; for the new performance record, the supervision organization initiates the disbursement application, the construction party performs the fund disbursement, to form a closed-loop management, and the performance record is automatically generated by the intermediary unit. The surveying and mapping material management mainly realizes four blocks of project basic information maintenance, surveying and mapping organization contract information maintenance, process change, and contract performance record, to realize the whole process management of the surveying and mapping organization from contract signing to contract completion.

[0137] In the embodiment, the intermediary unit can support surveying and mapping measurement material management, mainly realize four blocks of project basic information maintenance, surveying and mapping measurement agency contract information maintenance, process change, contract performance record, and realize the whole process management of surveying and mapping measurement agencies from contract signing to contract completion. The project basic information undertaken by the surveying and mapping measurement agency includes engineering name, central code, project nature, project type, project address, winning project leader, leader qualification level, leader qualification certificate number, etc., and supports modification of the project basic information. The surveying and mapping contract information is supported to be maintained, including the name of party A, the unified social credit code of party A, the name of party B, the unified social credit code of party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and the final preparation results annexes such as bidding documents, winning notice, contract, scheme, report, engineering drawings are supported to be uploaded and previewed. The change information generated in the process related to the project is maintained by the supervision agency, including change date and change content, and the change related files and the like are supported to be uploaded. The surveying and mapping contract performance information state mainly realizes management of surveying and mapping contract performance records, and for the completed performance records, the intermediary unit supports manual input mode; for the new performance records, the surveying and mapping agency initiates the disbursement application, the construction party makes fund disbursement, forms closed-loop management, and the performance record is automatically generated by the intermediary unit.

[0138] In the embodiment, the intermediary unit can support identification monitoring material management, mainly realize four blocks of project basic information maintenance, identification monitoring agency contract information maintenance, process change, contract performance record, and realize the whole process management of surveying and mapping measurement agencies from contract signing to contract completion. The project basic information undertaken by the identification monitoring agency includes engineering name, central code, project nature, project type, project address, winning project leader, leader qualification level, leader qualification certificate number, etc., and supports modification of the project basic information. The identification measurement contract information is supported to be maintained by the intermediary unit, including the name of party A, the unified social credit code of party A, the name of party B, the unified social credit code of party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and the final preparation results annexes such as bidding documents, winning notice, contract, scheme, report, engineering drawings are supported to be uploaded and previewed. The change information generated in the process related to the project is maintained by the identification monitoring agency, including change date and change content, and the change related files and the like are supported to be uploaded. The identification monitoring contract performance information state mainly realizes management of identification monitoring contract performance records, and for the completed performance records, the intermediary unit supports manual input mode; for the new performance records, the identification monitoring agency initiates the disbursement application, the construction party makes fund disbursement, forms closed-loop management, and the performance record is automatically generated by the intermediary unit.

[0139] The other agency material management mainly realizes four blocks of project basic information maintenance, other agency contract information maintenance, process change situation, and contract performance record, realizes the whole process management of the surveying and mapping agency from contract signing to contract completion. The basic information of the project undertaken by the other agency includes engineering name, central code, project nature, project type, project address, winning project leader, leader qualification level, leader qualification certificate number, etc., and supports modification of the project basic information. The intermediary agency unit supports maintenance of the appraisal measurement contract information, including the name of Party A, the unified social credit code of Party A, the name of Party B, the unified social credit code of Party B, the bidding mode, the winning amount, the winning date, the contract signing date, the contract duration, etc., and supports uploading and previewing of the final compilation achievements such as the bidding document, the winning notice, the contract, the scheme, the report, and the engineering drawings. The other agency maintains the change information generated in the project process, including the change date and the change content, and supports uploading of the change-related files and other attachments. The other agency contract performance information state mainly realizes management of the appraisal monitoring contract performance record, and the system supports manual entry for the completed performance record. For the newly added performance record, the other agency initiates the disbursement application, and the construction unit disburses the funds, forming a closed-loop management, and the performance record is automatically generated by the system.

[0140] The list of intermediary agency units displays the early warning list, which can search for early warnings according to early warning types, supports online early warning elimination, and the disposed early warnings need to have disposal records.

[0141] In this embodiment, after the construction unit user logs in the construction unit unit, the homepage displays the workbench, which displays the project announcement, the commonly used functions, the project dynamics, the project list, the early warning statistics, the early warning list, the project statistics, etc., supports quick positioning of the project according to the project name, facilitates the user to quickly understand the current project dynamics and early warning situation, and provides quick access to each module for user operation.

[0142] In this embodiment, the construction unit unit supports the construction unit user to perform enterprise information management, manages the related basic information including the name of the unit, the credit code, the legal representative, the nature of the unit, the unit qualification, etc., and simultaneously supports the construction unit user to upload the enterprise qualification certificate, the related personnel post certificate and the list, the project chapter use letter (including pile foundation and other professional sub-contracting) and other attachments, which are used to assist verification of the authenticity and accuracy of the information.

[0143] In this embodiment, the construction unit user fills in the enterprise performance information, and the construction unit unit supports list display of the related performance information required for the enterprise bidding, and supports search of the performance information. The construction unit maintains the engineering project leader and the field management personnel information, including the personnel name, the ID number, the professional certificate name, etc., and supports quick search.

[0144] In the embodiment, the construction unit unit provides a standard interface for docking the Fujian construction enterprise credit comprehensive evaluation system, and obtains construction unit enterprise credit reward and punishment information.

[0145] In the embodiment, the project information includes sub-contracting information, which is filled by the construction unit, including sub-contracting engineering, sub-contracting enterprise name, enterprise qualification, enterprise responsible person, sub-contracting cost, etc., and uploading sub-contracting contract attachments.

[0146] In the embodiment, the project information also includes the pre-construction conditions of the project, mainly realizing the basic information maintenance and related attachment uploading of the construction engineering planning license, the construction engineering license, the engineering construction approval form (or the order), and the engineering quality supervision procedures.

[0147] In the embodiment, the project information also includes the construction engineering planning license, which is filled by the construction unit, including the name of the construction engineering responsible person, the engineering planning license issuance date, and supports uploading the construction engineering planning license attachments.

[0148] In the embodiment, the project information also includes the construction engineering construction license, which is obtained by the construction unit unit, including the construction unit of the project, the engineering name, the construction address, the construction scale, the survey unit, the design unit, the construction unit, the supervision unit, the project responsible person of the survey unit, the project responsible person of the design unit, the project responsible person of the construction unit, the total supervision engineer, the contract period, the license number, the issuing authority, the issuing date, etc. The construction unit fills in the name of the construction engineering responsible person, the construction engineering construction license issuance date, and supports uploading the construction engineering construction license attachments.

[0149] In the embodiment, the project information also includes the engineering construction approval form (or the order), which is filled by the construction unit, including the construction unit, the engineering name, the issuance date, the receipt date, etc., and supports uploading related attachments.

[0150] In the embodiment, the project information also includes the engineering quality supervision procedures, which is filled by the construction unit, including the construction unit, the engineering name, the issuance date, the receipt date, the issuing unit, etc., and supports uploading related attachments.

[0151] In the embodiment, the project information also includes the construction management file, which is selected by the construction unit in the construction unit unit, including the enterprise qualification certificate, the related personnel post certificate and the list table, the project chapter activation letter (including pile foundation and other professional sub-contracting), the construction unit quality accident investigation record, the construction engineering quality accident report, the construction site quality management inspection record, the witness test detection record (whole process), the name of the recorder, and the uploading of attachments.

[0152] In the embodiment, the project information further includes progress cost files, and the construction unit selects a report type, including a project commencement report form (a pile foundation commencement date also needs to submit a commencement approval), a project resumption report form, and a project extension application form, fills in a report date, report content, and uploads relevant attachments.

[0153] In the embodiment, the project information further includes a construction material access retest report file, and the construction unit selects a construction retest report type, including a cement test report, a sand test report, a crushed (egg) stone test report, an additive test report, a brick, a block test report, a prestressed reinforcement retest report, a prestressed anchor, a clamp and a connector retest report, a steel structure steel material retest report, a steel structure fireproof coating material retest report, a steel structure welding material retest report, a steel structure high-strength large hexagonal head bolt connection pair retest report, a steel structure torsion shear type high-strength bolt connection pair retest report, a curtain wall aluminum plastic plate, stone, glass, structural adhesive retest report, a radiator, a heating system insulation material, a ventilation and air conditioning engineering insulation material, a fan coil unit, and a low-voltage power distribution system cable witnessed sampling retest report, fills in a third-party detection agency name, a detection list, a detection service fee, a detection date, an unqualified condition record, a rectification acceptance record and other information, and uploads relevant attachments.

[0154] In the embodiment, the project information further includes a construction record file, and the construction unit selects to fill in a construction record file type, including a concealed engineering acceptance record, a pile foundation engineering, a foundation and main structure reinforcement engineering, a steel structure engineering, an engineering positioning measurement record, a foundation trench line inspection record, a settlement observation record, a foundation trench inspection record, a foundation drill record, a large component hoisting record, a prestressed reinforcement tensioning record, a bonded prestressed structure grouting record, a net rack (cable membrane) construction record, and the system supports filling in an inspection unit, an inspection personnel name, an inspection date, an inspection content, a found problem, a rectification acceptance report and other information, and uploads relevant attachments.

[0155] In the embodiment, the project information further includes a construction test record and a detection file, and the construction unit selects a construction test record and a detection file type, including a foundation bearing capacity detection report, a pile foundation detection report, a soil compaction test report, a backfill soil test report (should be attached), a mortar compressive strength test report and an evaluation table, a concrete compressive strength test report and an evaluation table, a standard maintenance (bored pile), a same condition maintenance, a curtain wall and an external window physical property detection report (external window “three properties”, curtain wall “four properties” and post-embedded member pull-out test), a structural entity concrete strength acceptance report, a structural entity reinforcement protection layer thickness acceptance report, and an energy-saving performance detection report, and the system supports filling in a third-party detection agency name, a detection list, a detection service fee, a detection date, an unqualified condition record, a rectification acceptance record and other information, and uploads relevant attachments.

[0156] In this embodiment, the engineering project information further includes construction quality acceptance documents, and the construction unit fills in the construction quality acceptance basic information, including the acceptance unit, the name of the acceptance personnel, the acceptance date, the acceptance content, the found problems, the rectification acceptance report, and the like, and uploads the related quality acceptance attachments.

[0157] In this embodiment, the engineering project information further includes construction acceptance documents, and the construction unit selects the acceptance document type, including the unit (subunit) engineering completion pre-acceptance report, the unit (subunit) engineering quality completion acceptance record, the unit (subunit) engineering quality control data checking record, the unit (subunit) engineering safety and function inspection data checking and main function spot check record, and the unit (subunit) engineering visual quality inspection record, and the system supports filling in the acceptance unit, the name of the acceptance personnel, the acceptance date, the acceptance content, the found problems, the rectification acceptance report, and the like, and uploading the related quality acceptance attachments.

[0158] In this embodiment, the engineering project information further includes the completion drawings, and the construction unit selects the completion drawing type, including the pile foundation completion drawing, the building completion drawing, the structure completion drawing, the steel structure completion drawing, the curtain wall completion drawing, the building water supply and drainage and heating completion drawing, the building electrical completion drawing, the intelligent building completion drawing, the fire protection engineering completion drawing, the ventilation and air conditioning completion drawing, the outdoor engineering completion drawing, the outdoor water supply, drainage, heating, power supply, lighting pipeline completion drawing within the planning red line, and the road, landscaping, sprinkler facility completion drawing within the planning red line, and the system supports filling in the project name, the name of the subpart item engineering, the drawing date, and the name of the person drawing, and uploading the related attachments.

[0159] In this embodiment, the engineering project information further includes the completion record data, and the construction unit selects the completion record data type, fills in the project name, the project address, the completion acceptance date, the actual construction period, the actual completion date, the actual construction period, the responsible subject unit, the participating acceptance unit, and the like, and supports the attachment uploading.

[0160] In this embodiment, the engineering project information further includes the engineering image data, and the construction unit uploads the engineering process image data, including the pre-construction original appearance, the construction stage, the completion new appearance photo, the recording and video data of the engineering construction process, and the like.

[0161] In the embodiment, the contractor fills in the contract information of the contractor, the contractor, the contract signing date, the project name, the project location, the contract cost, the planned construction time, the planned completion time, the contract period, the project responsible person of the contractor, the contract price form, the advance payment, the construction payment guarantee amount, the measurement period, the payment period, the progress payment proportion, the salary special account allocation period, the salary special account allocation proportion, the defect warranty period, the quality guarantee, and uploads the contract signing attachments. The construction unit unit supports displaying the contract list of the projects under the construction unit, supports quick search, viewing details, attachment preview, etc.

[0162] In the embodiment, the tender information obtained by the construction unit unit refers to the information filled in by the construction unit user, such as the bidding time, the bidding website, the bidding guarantee fund transfer bank, the account, the bidding agent company, the tender, the bid amount, the bid position, and the like, and the tender notice and the like are uploaded.

[0163] The construction unit unit supports displaying the tender list under the construction unit, supports quick search of the tender information through the project, the date and the like, supports detail viewing, attachment preview, etc. The construction unit unit supports uploading the rectification feedback results by the construction unit for the rectification notice initiated by the supervision unit, supports the forms of pictures, attachments, etc.

[0164] In the embodiment, the construction unit unit displays the early warning list, can search the early warning according to the early warning type, supports online early warning elimination, and the disposed early warning needs to have a disposal record.

[0165] In the embodiment, the data decision unit is used to obtain the fund allocation situation, the rectification notice overview, and the proportion of the project stage. The data decision unit provides a data dashboard to display the project overview, realizes the fund allocation situation statistics (according to the district, according to the time, this month), the rectification notice overview (total number of rectification to be done, total number of rectification done, total number of overdue, rectification item overdue days ranking), the engineering project (proportion of each stage (investment decision design stage, construction and installation stage, completion stage), proportion of each type), project quantity ranking according to unit statistics, project quantity ranking of supervision unit statistics, project quantity ranking of construction unit statistics. The project classification statistics the number of projects in the jurisdiction, the type statistics the total number of each type of engineering project, the proportion of housing construction engineering, municipal engineering, other type engineering project, so as to facilitate the manager to understand the project situation in the jurisdiction.

[0166] In the embodiment, the project process supervision early warning system supports drawing the jurisdiction grid on the GIS map, and through the grid switching, the project overview, the engineering project type overview, etc. of different jurisdictions can be viewed in real time.

[0167] In this embodiment, the project process supervision and early warning system also interfaces with the construction engineering electronic data management platform, and checks and archives the materials of the construction engineering electronic data management platform, so as to facilitate the law enforcement units to determine the authenticity of the materials reported by the four parties.

[0168] In this embodiment, the project process supervision and early warning system statistically analyzes various documents and data in the engineering project, so as to better manage and utilize the project documents and data, and improve the efficiency and accuracy of document management. Specifically, it includes: (1) Document classification statistics: classifying and counting various documents in the engineering project, such as design files, construction drawings, contract files, and report documents. (2) Document quantity statistics: counting the number of documents under each category to understand the quantity distribution of different types of documents. (3) Document version statistics: counting the version of each document to understand the version evolution and change frequency of the document. (4) Document update statistics: counting the update of the document, including update date, update content, and update personnel. (5) Document access statistics: counting the access of the document to understand which documents are more concerned and used.

[0169] In this embodiment, the project process supervision and early warning system statistically analyzes the contract data in the engineering project, so as to better manage and utilize the project contract data. Specifically, it includes: (1) Contract classification statistics: classifying and counting the contracts in the engineering project, such as procurement contracts, construction contracts, and consulting contracts. (2) Contract quantity statistics: counting the number of contracts under each category to understand the quantity distribution of different types of contracts. (3) Contract amount statistics: counting the amount of each contract to understand the total amount of the project contract and the proportion of the amount of different types of contracts. (4) Contract period statistics: counting the period of each contract to understand the effective period and scope of the contract.

[0170] In this embodiment, the project process supervision and early warning system statistically analyzes various documents generated in the bidding process of the engineering project, including bidding announcements, bidding documents, and bidding files. Through statistical analysis of the bidding document data of the engineering project, relevant departments can be provided with decision-making basis, the bidding process can be optimized, and the fairness and transparency of the engineering project can be improved. When performing data statistics, the following aspects can be analyzed: (1) Bidding announcement quantity statistics: counting the number of published bidding announcements, including classification according to the jurisdiction, industry, and project type, and analyzing the distribution of different types of bidding announcements. (2) Bidding document type statistics: counting different types of bidding documents, including design documents, construction documents, and equipment procurement documents, and analyzing the proportion and distribution of various types of bidding documents.

[0171] In this embodiment, the project process supervision early warning system collects, organizes, analyzes and presents various data of the engineering project. Through statistical analysis of engineering project data, it can help relevant departments and managers understand the overall situation of the project, find problems, optimize resource allocation, and strengthen management control, so as to improve the efficiency, quality and safety of the engineering project. Specifically, it includes: (1) Project basic information statistics: including the collection and organization of basic information such as project name, location, scale, type, construction unit, supervision unit, etc., so as to classify, compare and analyze the project. (2) Fund use statistics: statistics on the fund use of the engineering project, including construction cost, material cost, equipment cost, labor cost, etc., so as to master the fund use of the project. (3) Construction period statistics: statistics on the construction period of the engineering project, including planned construction period, actual construction period, progress completion, etc., so as to evaluate the progress and progress control of the project. (4) Quality statistics: statistics on the quality data of the engineering project, including quality test results, qualified rate, unqualified items, etc., so as to evaluate the quality of the project and carry out quality control. (5) Safety statistics: statistics on the safety data of the engineering project, including accident rate, safety accident type, accident cause, etc., so as to evaluate the safety situation of the project and carry out safety management.

[0172] In this embodiment, the project process supervision early warning system also includes a mobile terminal for obtaining fund disbursement requests of intermediary institutions and construction units and sending them to the data decision unit. Fund disbursement management realizes fund disbursement whole-process control through the mobile terminal, and through fund disbursement whole-process control, online supervision of contract performance can be realized. Fund disbursement application can be initiated by an intermediary institution or a construction party to fill in the fund disbursement amount and the latest payment date signed in the contract. The construction party feeds back the fund disbursement situation, fills in the actual fund disbursement time and disbursement account number, and uploads the disbursement voucher. The fund disbursement party confirms the fund disbursement situation and fills in the actual fund disbursement time.

[0173] In this embodiment, the home page of the mobile terminal mainly displays the list of early warning message lists and to-do reminders, providing a quick entry for early warning disposal and fund disbursement.

[0174] This embodiment also provides a project process supervision early warning method applied to the project process supervision early warning system of any one embodiment, including the following steps:

[0175] Obtain unit information, engineering project information, bidding information and contract information related to the construction unit;

[0176] Obtaining unit information related to the intermediary, and tender agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information, and identification and detection material information;

[0177] Obtaining unit information related to the construction unit, project information, tender information, contract information, and rectification information;

[0178] According to the early warning rules, a number of information obtained by the construction unit unit, the intermediary unit, and the construction unit unit are early warned.

[0179] Finally, it should be noted that although the above embodiments have been described in the specification and drawings of the present application, the patent protection scope of the present application should not be limited. Any equivalent structure or equivalent process replacement or modification based on the essential concept of the present application, using the content described in the specification and drawings of the present application, and directly or indirectly implementing the technical solutions of the above embodiments in other related technical fields, etc. are all included in the patent protection scope of the present application.

Claims

1. A project process supervision early warning system, characterized in that, The application comprises: a construction unit unit, an intermediary agency unit, a construction unit unit and a data decision unit; the construction unit unit is used for obtaining unit information, engineering project information, bidding information and contract information related to the construction unit; the intermediary agency unit is used for obtaining unit information related to the intermediary agency, and bidding agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information and identification and detection material information; the construction unit unit is used for obtaining unit information, engineering project information, bidding information, contract information and rectification information related to the construction unit; the data decision unit is used for configuring early warning rules, and early warning is performed on the information obtained by the construction unit unit, the intermediary agency unit and the construction unit unit according to the early warning rules.

2. The project process supervision early warning system according to claim 1, characterized in that, The early warning rules include one or more of the following: fund use, bidding, subcontracting, contract performance, engineering project progress, engineering project quality and engineering project safety.

3. The project process supervision early warning system according to claim 1 or 2, characterized in that, The contents of the early warning include one or more of the following: over-budget early warning, illegal subcontracting early warning, agent fee transfer payment early warning, non-refund of deposit within the specified time early warning, payment cycle early warning, non-payment of engineering funds according to the contract early warning, construction engineering wage special account disbursement early warning, task overtime non-completion early warning, fund delay disbursement early warning, incomplete start-up procedures early warning, sub-contractor qualification non-compliance early warning, engineering progress fund over-disbursement early warning, non-inspection acceptance first drawing early warning, special fund suspected misappropriation early warning, ultra-low price bid winning early warning, over-period submission of completion settlement report and settlement data early warning, bidder avoiding bidding or false bidding early warning, abnormal bidding agent rate early warning.

4. The project process monitoring and early warning system of claim 1, wherein, It also comprises a supervision unit unit, which is used for obtaining the construction market behavior information, daily inspection information, civil engineering quality completion acceptance information and illegal affairs information of the construction unit and the construction unit, and performing inspection to form inspection records, obtaining rectification notices according to the inspection records and sending them to the corresponding construction unit, construction unit or intermediary agency.

5. The project process supervision early warning system according to claim 4, characterized in that, The supervision unit unit is also used for obtaining the contract performance evaluation of the construction unit by the housing department and the human department.

6. The project process supervision early warning system according to claim 4, characterized in that, The supervision unit unit is also used for obtaining the engineering settlement information, which includes the contract price, completion acceptance qualified time, settlement submission cost, settlement submission time, settlement audit cost, settlement finalization time, settlement audit after change, cost increase of visa part, settlement audit unit, settlement audit unit selection method, settlement audit charging standard, cost consulting fee, auditor and qualification certificate, professional category.

7. The project process supervision early warning system according to claim 2, characterized in that, The data decision unit is used for obtaining fund disbursement, rectification notice overview and engineering project stage proportion.

8. The project process monitoring and early warning system of claim 1, wherein, The construction unit related engineering project information includes engineering project pre-materials; The engineering project pre-materials include one or more of the following: project proposal, site selection opinion, feasibility study report, engineering planning license, design scheme, budget estimate, construction project environmental impact report, construction land pre-audit opinion, construction land approval, land use planning license, allocation decision, real estate certificate.

9. The project process monitoring and early warning system of claim 1, wherein, Also included is a mobile terminal for obtaining a fund disbursement request of the intermediary and the construction unit and sending it to the data decision unit.

10. A project process supervision early warning method, characterized in that, The project process supervision early warning system of any one of claims 1 to 9 comprises the following steps: Obtaining unit information, project information, bidding information and contract information related to the construction unit; Obtaining unit information related to the intermediary, and bidding agent material information, scheme report preparation material information, survey and exploration material information, construction drawing service material information, supervision material information, measurement and mapping material information and identification and detection material information; Obtaining unit information, project information, bidding information, contract information and rectification information related to the construction unit; According to the early warning rules, the information obtained by the construction unit, the intermediary unit and the construction unit is early warned.