Anti-sliding structure of indoor snow yard slideway plate and construction method of anti-sliding structure

By constructing a multi-layered structure and embedding steel bars on the indoor ski slope, the problem of slippage and damage to the slope base layer was solved, achieving anti-slip effect without increasing costs.

CN120925387APending Publication Date: 2025-11-11SHANGHAI BAOYE GRP CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202511333635.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-18
Publication Date
2025-11-11

AI Technical Summary

Technical Problem

The base layer of indoor ski slopes slips and breaks under the influence of sliding force and temperature changes, resulting in structural damage.

Method used

The structure employs a multi-layered design, including a waterproof reinforced concrete base slab, a waterproof layer, C20 fine aggregate concrete, a textured vapor barrier membrane, XPS extruded polystyrene board, geotextile, waterproof membrane, and a cold coil pipe layer. This is combined with the insertion of reinforcing steel to form an anti-slip structure, and the construction is carried out through special adhesive bonding and overlapping connections.

Benefits of technology

It effectively resists the slippage force between the heat coil layer and the structural base plate, avoids slippage and damage to the base structural layer, simplifies construction without increasing construction costs, and reduces construction difficulty and risk.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120925387A_ABST
    Figure CN120925387A_ABST
Patent Text Reader

Abstract

The invention relates to the field of snowfield slideway plates, in particular to an indoor snowfield slideway plate anti-sliding structure which comprises a waterproof reinforced concrete bottom plate, a waterproof layer is arranged on the top of the waterproof reinforced concrete bottom plate, first C20 fine aggregate concrete is laid on the top of the waterproof layer, and a pitted surface vapor barrier film is laid on the top of the first C20 fine aggregate concrete. An XPS extruded polystyrene board is arranged at the top of the pitted surface vapor barrier film, geotechnical cloth is arranged at the top of the XPS extruded polystyrene board, and second C20 fine aggregate concrete is laid at the top of the geotechnical cloth; the invention further discloses a construction method of the indoor snowfield slideway plate anti-sliding structure. Aiming at the problem that each structural layer of the base layer generates slippage damage under the action of the gliding force of the snowway, the invention provides the following technical scheme: the structure is simple, the construction is easy, embedded parts are not required to be embedded, the construction efficiency is improved, the waterproof property between the base layers is not damaged, and the slippage damage of each structural layer of the base layer caused by the gliding force of the snowway is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of ski slopes in snow parks, and more particularly to an anti-slip structure for indoor ski slopes and its construction method. Background Technology

[0002] The construction of the base layer for indoor ski slopes is quite complex. It mainly consists of various structural and bonding materials, including pre-embedded anti-condensation heating pipes, a waterproof layer, an insulation layer, a cement mortar protective layer, and a concrete layer. Because the base layer generates significant sliding forces, and due to the initial stages of snowmaking and the annual temperature variations outdoors, substantial deformation occurs between the main structure's floor and the base layer. Under the influence of these sliding forces, the various structural layers of the base layer can slip and fail. Summary of the Invention

[0003] The purpose of this invention is to solve the problem of slippage and damage to the various structural layers of the base layer under the action of ski slope sliding force.

[0004] The technical solution of this invention: An anti-slip structure for indoor ski slopes, comprising a waterproof reinforced concrete base slab, a waterproof layer on top of the waterproof reinforced concrete base slab, a first C20 fine aggregate concrete layer on top of the waterproof layer, a textured vapor barrier membrane on top of the first C20 fine aggregate concrete layer, an XPS extruded polystyrene board on top of the textured vapor barrier membrane, a geotextile on top of the XPS extruded polystyrene board, a second C20 fine aggregate concrete layer on top of the geotextile, a waterproof membrane on top of the second C20 fine aggregate concrete, a cold coil pipe layer on top of the waterproof membrane, and a snow layer on top of the cold coil pipe layer.

[0005] This invention also provides a construction method for an anti-slip structure for indoor ski slopes, comprising the following steps: Step 1: Cleaning the working surface: Clean the top surface of the waterproof reinforced concrete base slab to ensure there are no protruding foreign objects, and insert anti-slip components. 10 steel bars; Step 2, Waterproofing measures: Apply polyurethane waterproof coating to the top of the waterproof reinforced concrete base slab to form a waterproof layer; Step 3: Installation of the first C20 fine aggregate concrete: Lay the first C20 fine aggregate concrete on top of the waterproof layer and place a steel mesh inside the first C20 fine aggregate concrete, with the bottom heat pipe embedded inside; Step 4: Setting up the textured vapor barrier membrane: Lay a special textured vapor barrier membrane on top of the first C20 fine aggregate concrete, and attach it with special adhesive, with overlaps at the joints. Step 5: XPS extruded polystyrene board installation: Lay a 150mm thick B1 grade XPS extruded polystyrene board on top of the textured vapor barrier membrane, and lay it in three layers with staggered joints. Step 6: Geotextile installation: Cover the top of the XPS extruded polystyrene board with geotextile, overlapping at the joints; Step 7: Protective Layer Installation: A 40mm thick second layer of C20 fine aggregate concrete is installed on top of the geotextile, with a 20mm thickness at anti-slip locations. The second C20 fine aggregate concrete contains... 4@250 steel wire mesh; Step 8, Secondary Waterproofing: Adhere a 4mm thick bridge-specific SBS modified bitumen waterproof membrane (polyester-based type II) to the top of the second C20 fine aggregate concrete. Step 9, Cold Coil Layer Installation: Install a cold coil layer on top of the waterproof membrane and pour a 120mm thick C30 antifreeze concrete. Step 10, Snow layer setup: Lay a 400mm thick snow layer on top of the cold coil layer.

[0006] Optionally, in step one, the cleaning of the waterproof reinforced concrete base slab must ensure that there are no stones or loose soil, so as to provide a working surface for the next layer of waterproofing and to implant anti-slip elements. 10 steel bars are used to resist the slippage force between the hot coil layer and the structural base plate.

[0007] Optionally, in step two, two coats of polyurethane waterproof coating are applied to a thickness of 1.5mm, and the implanted... Special attention should be paid to the location of the 10 rebars.

[0008] Optionally, in step three, the reinforcing mesh is... 6. Steel mesh, the heating coil is fixed to the steel mesh, and a 60mm thick first C20 fine stone concrete is poured.

[0009] Optionally, in step four, after the first C20 fine aggregate concrete has solidified, the top of the first C20 fine aggregate concrete should be cleaned before laying a rough-surface vapor barrier membrane.

[0010] Optionally, in step five, the three 50mm thick B1 grade XPS extruded polystyrene boards laid on top of the textured vapor barrier membrane are laid with staggered joints, and each layer is fully coated with special adhesive to ensure that there are no gaps between each layer of XPS extruded polystyrene boards.

[0011] Optionally, in step seven, first lay the top layer of geotextile. 4. Reinforcing mesh, then pour the second C20 fine aggregate concrete.

[0012] Optionally, in step eight, after the second C20 fine stone concrete of the protective layer has solidified, clean the top of the second C20 fine stone concrete and then paste a 4mm thick bridge-specific SBS modified bitumen waterproof membrane polyester type II. The waterproof membrane on both sides of the slide plate is turned up to 250mm above the snow surface.

[0013] Optionally, in step nine, the cold coil layer is equipped with... 8. Double-layer, bidirectional steel reinforcement with a center-to-center spacing of 200mm, installed at anti-slip locations. 10 steel bars reinforced, every 6m after concrete hardening Cut a 6m seam, 20mm wide and 25mm deep, and fill the seam with weather-resistant sealant.

[0014] In summary, this application includes at least one of the following beneficial technical effects: This invention has a simple structure, is easy to construct, does not require pre-embedded parts, improves construction efficiency, and does not damage the waterproofing between the base layers. Furthermore, the present invention involves implantation. The 10 steel bars form an anti-slip structure, which can effectively resist the slippage force between the heat coil layer and the structural base plate. It effectively solves the slippage damage caused by the sliding force of the ski slope to the various structural layers of the base. Moreover, the anti-slip structure is simple and easy to install, and will not increase the construction cost, bringing significant anti-slip capability at a low construction cost. Attached Figure Description

[0015] Figure 1 A cross-sectional view of the overall structure of the anti-slip structure of the indoor ski slope; Figure 2 This is a schematic diagram illustrating the construction process of an anti-slip structure for indoor ski slopes.

[0016] Figure label: 1. Waterproof reinforced concrete base slab; 2. Waterproof layer; 3. First C20 fine aggregate concrete; 4. Textured vapor barrier membrane; 5. XPS extruded polystyrene board; 6. Geotextile; 7. Second C20 fine aggregate concrete; 8. Waterproof membrane; 9. Cold coil pipe layer; 10. Snow layer. Detailed Implementation

[0017] The technical solution of the present invention will now be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments.

[0018] The components of the embodiments of the invention described and shown in the accompanying drawings can typically be arranged and designed in a variety of different configurations. Therefore, the following detailed description of the embodiments of the invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention.

[0019] Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0020] In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing the invention and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0021] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances.

[0022] Example 1: As Figure 1 As shown, an anti-slip structure for an indoor ski slope includes a waterproof reinforced concrete base slab 1, a waterproof layer 2 on top of the waterproof reinforced concrete base slab 1, a first C20 fine aggregate concrete 3 on top of the waterproof layer 2, a textured vapor barrier membrane 4 on top of the first C20 fine aggregate concrete 3, an XPS extruded polystyrene board 5 on top of the textured vapor barrier membrane 4, a geotextile 6 on top of the XPS extruded polystyrene board 5, a second C20 fine aggregate concrete 7 on top of the geotextile 6, a waterproof membrane 8 on top of the second C20 fine aggregate concrete 7, a cold coil pipe layer 9 on top of the waterproof membrane 8, and a snow layer 10 on top of the cold coil pipe layer 9.

[0023] Example 2: Figure 2 As shown, the present invention also provides a construction method for an anti-slip structure for indoor ski slopes, comprising the following steps: Step 1: Cleaning the working surface: Clean the top surface of the waterproof reinforced concrete base slab 1 to ensure there are no protruding foreign objects, and insert anti-slip components. 10 steel bars; Step 2, Waterproofing measures: Apply polyurethane waterproof coating to the top of the waterproof reinforced concrete base slab 1 to form a waterproof layer 2; Step 3: Setting up the first C20 fine aggregate concrete 3: Lay the first C20 fine aggregate concrete 3 on top of the waterproof layer 2 and arrange the steel mesh in the first C20 fine aggregate concrete 3, and embed the bottom heat pipe. Step 4: Setting up the textured vapor barrier membrane 4: Cover the top of the first C20 fine aggregate concrete 3 with a special textured vapor barrier membrane 4, and stick it with special adhesive. The joints are connected by overlapping. Step 5: Install XPS extruded polystyrene board 5: Lay a 150mm thick B1 grade XPS extruded polystyrene board 5 on top of the textured vapor barrier membrane 4, and lay it in three layers with staggered joints. Step 6, Geotextile 6 installation: Cover the top of XPS extruded polystyrene board 5 with geotextile 6, and overlap at the joints; Step 7, Protective Layer Installation: A 40mm thick second C20 fine aggregate concrete 7 is installed on top of the geotextile 6, with a 20mm thickness at anti-slip locations. The second C20 fine aggregate concrete 7 contains... 4@250 steel wire mesh; Step 8, Secondary Waterproofing: Adhere a 4mm thick bridge-specific SBS modified bitumen waterproof membrane (polyester type II) to the top of the second C20 fine aggregate concrete 7. Step 9, Installation of cold coil layer 9: Install cold coil layer 9 on top of waterproof membrane 8 and pour 120mm thick C30 antifreeze concrete; Step 10, Snow layer 10 setup: Lay a 400mm thick snow layer 10 on top of the cold coil layer 9.

[0024] In step one, the cleaning of the waterproof reinforced concrete base slab 1 must ensure that there are no stones or loose soil, so as to provide a working surface for the next layer of waterproofing and to implant anti-slip elements. 10 steel bars are used to resist the slippage force between the heat pipe layer and the structural base plate. In step two, two coats of polyurethane waterproof coating are applied to a thickness of 1.5mm. Special attention should be paid to the location of the 10 rebars. In step three, the rebar mesh is... 6. Reinforcing mesh, heating coil fixed to the reinforcing mesh, pour 60mm thick first C20 fine aggregate concrete 3. In step four, after the first C20 fine aggregate concrete 3 has solidified, clean the top of the first C20 fine aggregate concrete 3 and then lay the rough-surface vapor barrier membrane 4. In step five, three layers of 50mm thick B1 grade XPS extruded polystyrene board 5 are laid on top of the rough-surface vapor barrier membrane 4. While ensuring staggered laying, special adhesive is fully applied between each layer to ensure no gaps between each layer of XPS extruded polystyrene board 5. In step seven, first lay on top of the geotextile 6 4. Reinforcing mesh, then pour the second C20 fine aggregate concrete 7. In step eight, after the second C20 fine aggregate concrete 7 of the protective layer has solidified, clean the top of the second C20 fine aggregate concrete 7 and then paste 4mm thick bridge-specific SBS modified bitumen waterproof membrane 8 polyester type II. The waterproof membrane 8 on both sides of the slide plate is turned up 250mm above the snow surface. In step nine, the cold coil layer 9 is filled with... 8. Double-layer, bidirectional steel reinforcement with a center-to-center spacing of 200mm, installed at anti-slip locations. 10 steel bars reinforced, every 6m after concrete hardening Cut a 6m seam, 20mm wide and 25mm deep, and fill the seam with weather-resistant sealant.

[0025] In this embodiment, the indoor ski slope is constructed using a 10-layer structure. Each layer is simple and easy to construct. (The last sentence appears to be incomplete and possibly refers to a specific method or feature.) The 10 steel bars form an anti-slip structure, which can effectively resist the slip force between the heat coil layer and the structural base plate, thereby preventing the base layer from slipping and causing damage due to the snow slide. The anti-slip structure is simple and easy to install, and will not increase the construction cost. It brings significant anti-slip capability at a low construction cost. At the same time, there is no need to pre-embed embedded parts, which further reduces the construction difficulty. In addition, the waterproofing between the base layers will not be damaged during the construction process, reducing the construction risk.

[0026] The above specific embodiments are merely optional embodiments of the present invention. Based on the technical solutions of the present invention and the relevant teachings of the above embodiments, those skilled in the art can make various alternative improvements and combinations to the above specific embodiments.

Claims

1. An anti-slip structure for indoor ski slopes, comprising a waterproof reinforced concrete base slab (1), characterized in that: The waterproof reinforced concrete base slab (1) is provided with a waterproof layer (2) on top, a first C20 fine stone concrete (3) is laid on top of the waterproof layer (2), a rough-surface vapor barrier membrane (4) is laid on top of the first C20 fine stone concrete (3), an XPS extruded polystyrene board (5) is laid on top of the rough-surface vapor barrier membrane (4), a geotextile (6) is laid on top of the XPS extruded polystyrene board (5), a second C20 fine stone concrete (7) is laid on top of the geotextile (6), a waterproof membrane (8) is laid on top of the second C20 fine stone concrete (7), a cold coil pipe layer (9) is laid on top of the waterproof membrane (8), and a snow layer (10) is laid on top of the cold coil pipe layer (9).

2. A construction method for an anti-slip structure for indoor ski slopes, applied to the anti-slip structure for indoor ski slopes according to claim 1, characterized in that, Includes the following steps: Step 1: Cleaning the working surface: Clean the top surface of the waterproof reinforced concrete base slab (1), ensuring there are no protruding foreign objects, and insert anti-slip components. 10 steel bars; Step 2, Waterproofing measures: Apply polyurethane waterproof coating to the top of the waterproof reinforced concrete base slab (1) to form a waterproof layer (2). Step 3, First C20 fine stone concrete (3) setting: First C20 fine stone concrete (3) is laid on top of waterproof layer (2) and steel mesh is arranged in the first C20 fine stone concrete (3), and the bottom heat pipe is embedded in the inner layer; Step 4, Setting up the textured vapor barrier membrane (4): Cover the top of the first C20 fine stone concrete (3) with a special textured vapor barrier membrane (4), and stick it with special adhesive. The joints are connected by overlapping. Step 5, XPS extruded polystyrene board (5) installation: Lay a 150mm thick B1 grade XPS extruded polystyrene board (5) on top of the rough-surfaced vapor barrier membrane (4), and lay it in three layers with staggered joints; Step 6, Geotextile (6) installation: Cover the top of XPS extruded polystyrene board (5) with geotextile (6) and overlap at the joints; Step 7, Protective Layer Installation: A 40mm thick second C20 fine aggregate concrete (7) is installed on top of the geotextile (6), with a 20mm thickness at the anti-slip location. The second C20 fine aggregate concrete (7) is filled with... 4@250 steel wire mesh; Step 8, Secondary Waterproofing: 4mm thick bridge-specific SBS modified bitumen waterproof membrane (8) polyester type II is pasted on the top of the second C20 fine stone concrete (7). Step 9, Setting up the cold coil layer (9): Set up the cold coil layer (9) on top of the waterproof membrane (8) and pour 120mm thick C30 antifreeze concrete; Step 10, Snow layer (10) setting: Lay a 400mm thick snow layer (10) on top of the cold coil layer (9).

3. The construction method of an anti-slip structure for an indoor ski slope as described in claim 2, characterized in that, In step one, the cleaning of the waterproof reinforced concrete base slab (1) must ensure that there are no stones or loose soil, so as to provide a working surface for the next layer of waterproofing, and the anti-slip position is implanted. 10 steel bars are used to resist the slippage force between the hot coil layer and the structural base plate.

4. The construction method of an anti-slip structure for an indoor ski slope as described in claim 2, characterized in that, In step two, two coats of polyurethane waterproof coating are applied to a thickness of 1.5mm, and the implanted... Special attention should be paid to the location of the 10 rebars.

5. The construction method of an anti-slip structure for an indoor ski slope as described in claim 2, characterized in that, In step three, the steel mesh is 6. The steel mesh is fixed to the heating coil, and a 60mm thick first C20 fine stone concrete is poured (3).

6. The construction method of an anti-slip structure for an indoor ski slope according to claim 2, characterized in that, In step four, after the first C20 fine stone concrete (3) has solidified, the top of the first C20 fine stone concrete (3) is cleaned and then a rough-surface vapor barrier membrane (4) is laid.

7. The construction method of an anti-slip structure for an indoor ski slope as described in claim 2, characterized in that, In step five, the three layers of 50mm thick B1 grade XPS extruded polystyrene boards (5) laid on top of the textured vapor barrier membrane (4) are laid with staggered joints, and each layer is fully coated with special adhesive to ensure that there are no gaps between each layer of XPS extruded polystyrene board (5).

8. The construction method of an anti-slip structure for an indoor ski slope according to claim 2, characterized in that, In step seven, first lay on top of the geotextile (6) 4. Reinforcing mesh, then pour the second C20 fine aggregate concrete (7).

9. The construction method of an anti-slip structure for an indoor ski slope according to claim 2, characterized in that, In step eight, after the second C20 fine stone concrete (7) of the protective layer has solidified, the top of the second C20 fine stone concrete (7) is cleaned and then 4mm thick bridge-specific SBS modified bitumen waterproof membrane (8) polyester tire type II is pasted. The waterproof membrane (8) on both sides of the slide plate is turned up to 250mm above the snow surface.

10. A construction method for an anti-slip structure for an indoor ski slope according to claim 2, characterized in that, In step nine, the cold coil layer (9) is equipped with 8. Double-layer, bidirectional steel reinforcement with a center-to-center spacing of 200mm, installed at anti-slip locations. 10 steel bars reinforced, every 6m after concrete hardening Cut a 6m seam, 20mm wide and 25mm deep, and fill the seam with weather-resistant sealant.

Citation Information

Patent Citations

  • Indoor skiing ramp construction process

    CN114562135A

  • Trail anti -sliding structure and indoor ski run

    CN206015469U

  • Snow track temperature control structure

    CN217844387U

  • Floor part construction of artificial indoor skiing ground