Pipe replacement expansion device, cutting device, pipe replacement system and pipe replacement method

By combining a linkage-type expansion device and a rotary ring cutting device, the problems of large measurement errors and time-consuming and labor-intensive processes in traditional pipeline emergency repairs have been solved, achieving an efficient and accurate pipeline replacement process and improving construction efficiency and safety.

CN120969597APending Publication Date: 2025-11-18TIANJIN JIUAN MASCH MFG CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202511137452.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2025-04-07
Filing Date
2025-08-14
Publication Date
2025-11-18

AI Technical Summary

Technical Problem

Traditional pipeline repair methods suffer from problems such as large measurement errors, time-consuming and labor-intensive processes, low construction efficiency, difficulty in ensuring the accuracy of manual operations, harsh environments, tool limitations, and large and cumbersome mechanisms, resulting in complex and costly pipeline replacement processes.

Method used

The system employs a linkage-type expansion device and a rotary ring cutting device. Through a floating cylinder structure and spherical bearings, it achieves efficient expansion and precise cutting of the inner wall of the pipe, ensuring that the pipe end face forms a standard parallelogram. The plasma gun head is used for cutting, and combined with the central connecting pipe and angle positioning structure, it achieves coaxial docking and high-precision welding of the pipe end face.

Benefits of technology

It achieves consistent pipe end face cutting angles, reduces human error, improves construction efficiency and precision, reduces labor intensity and material waste, enhances equipment portability and safety, and shortens construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120969597A_ABST
    Figure CN120969597A_ABST
Patent Text Reader

Abstract

The invention discloses a pipe replacement expansion device, a cutting device, a pipe replacement system and a pipe replacement method.The pipe replacement expansion device comprises a linkage type expansion driving mechanism, a first-stage expansion mechanism and a second-stage expansion mechanism, and the first-stage expansion mechanism and the second-stage expansion mechanism are connected with the linkage type expansion driving mechanism; the linkage type expansion driving mechanism is of a floating oil cylinder structure, the floating oil cylinder structure comprises an expansion oil cylinder, a front end cover and a piston rod arranged in the expansion oil cylinder in a sliding mode, the piston rod penetrates out of the expansion oil cylinder through the front end cover and then is connected with the first-stage expansion mechanism, and the piston rod is further connected with the installation shaft in a sliding mode. By the adoption of the pipe replacement expansion device, the cutting device, the pipe replacement system and the pipe replacement method, the two base discs are driven through the linkage type expansion driving mechanism, the working efficiency is improved, the reliability and safety of equipment are enhanced, and the pipe replacement efficiency is improved. Therefore, the tool is suitable for pipeline end face groove machining in narrow spaces in oil and gas long-distance pipelines and urban pipeline repair pipeline projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of oil and gas pipeline replacement technology, and in particular to a pipe replacement expansion device, cutting device, pipe replacement system and pipe replacement method. Background Technology

[0002] In urban gas, water, and other media transmission networks, a vast and interconnected system of pipes has been formed. However, due to prolonged use, these pipes gradually wear down internally and are susceptible to erosion by external microorganisms, resulting in leaks of varying degrees in some sections. To address this issue, pipeline repair companies need to replace leaking pipes with new ones as quickly as possible to minimize disruption to residents' lives.

[0003] Traditional pipeline emergency repair methods mainly include the following steps: 1. Locating the leak point: Locate the leaking section of the pipeline. 2. Closing valves: Locate and close the upstream and downstream control valves to cut off the fluid supply. 3. Evacuating the pipeline: Extract water or gas from the pipeline to ensure safe operation. 4. Cutting off the leaking section: Use cutting tools to cut off the damaged section of the pipeline. 5. Measuring the distance between the two ends: The plumber measures the distance between the two ends and determines the length of the new pipeline based on the measurement results. 6. Fabricating the new pipe: Fabricate the new pipe according to the measurement data. 7. Installing the new pipe: Install the new pipe in place and weld it in place.

[0004] Although the above methods can replace pipelines, they have the following significant drawbacks: (1) The core operation object of pipeline maintenance and repair is the in-service pipeline. In actual working conditions, affected by multiple factors such as pipeline residual stress, medium pressure, temperature fluctuation and foundation settlement, once the pipeline breaks, its original shape cannot be restored, and it will inevitably produce different degrees of deformation and misalignment. Among them, deformation causes the pipeline to change from the initial circular cross-section to an irregular shape cross-section (such as Figure 2The pipe shown has protrusions and depressions), and the irregular shape of the cross section makes it difficult to accurately determine the axis of the pipe. Misalignment causes the two ends of the pipe to not be on the same center line, which in turn leads to inaccurate data measured by pipe fitters. Usually, an additional length of 5 to 10 mm is needed to compensate for the error, but this still cannot guarantee a perfect match. In general, deviations in the shape of the pipe opening will cause measurement errors, deviations in the selection of the sampling point of the pipe opening will cause errors in the axial positioning dimension, and the errors in the pipe opening marking operation and pipe opening cutting processing, etc., the accumulation of the above errors will make it difficult to meet the requirements of the pipe section cutting dimension accuracy (such as the method and system for realizing rapid pipe connection disclosed in CN102407393B; the oblique cutting device disclosed in KR200444617Y1, both of which are based on the assumption that the pipe opening is circular, and cannot guarantee the coaxial connection of the upstream and downstream pipes, resulting in a large error). (2) Time-consuming and labor-intensive: The dimensions of the new pipe are difficult to be accurate at one time, and repeated grinding and measurement are often required, which increases the construction time and labor intensity. (3) Low construction efficiency: The whole process takes a long time, especially in emergency repair tasks, which seriously affects the recovery speed.

[0005] To ensure a seamless connection between the old and new pipes, precise beveling of the pipe ends is essential. The angle between the end face and the pipe center must be less than 5 degrees, and both ends should be beveled into parallelograms. Traditionally, this involves manually grinding and measuring the pipe ends after cutting the pipe with a split-type cutter. However, this manual operation has several drawbacks:

[0006] 1. Time-consuming: Manually grinding the pipe end face is an extremely laborious and time-consuming process. Typically, a skilled pipe fitter may need several hours or even longer to complete the grinding and measurement of a single pipe end face. In emergency repair tasks, time is of the essence; any delay will hinder the entire project's progress, increasing repair time and costs.

[0007] 2. High labor intensity: Manual polishing requires continuous physical exertion, especially in narrow, damp or poorly ventilated environments, which not only increases the labor intensity of workers, but also easily causes fatigue, thereby affecting work efficiency.

[0008] 3. Difficulty in ensuring high precision: During the manual measurement and grinding of pipe end faces, errors from human eyes and hands are unavoidable, making it difficult to ensure that each pipe end face meets strict geometric requirements. For example, the angle between the end face and the center of the pipe is difficult to control within 5 degrees, and the shape of the parallelogram may be irregular, all of which will affect the quality of subsequent welding.

[0009] 4. Reliance on individual experience: The skill levels and experience of different workers vary significantly. Even with detailed operating procedures, substantial deviations can still occur in actual operation. This is especially true in complex emergency repair environments, where inexperienced workers are more prone to making mistakes, further reducing the quality of work.

[0010] 5. Harsh working environment: Manual grinding usually needs to be carried out in small, damp spaces, which poses a potential threat to the health and safety of workers. Long-term exposure to such an environment can easily lead to respiratory diseases and other occupational diseases.

[0011] 5. Tool limitations: Traditional hand tools such as grinding wheels and polishing machines generate a lot of dust and noise during operation, increasing the possibility of accidents and also polluting the surrounding environment.

[0012] 7. High labor costs: Due to the time-consuming and difficult nature of manual grinding and measurement, more manpower is required, leading to a significant increase in labor costs. Especially in some large-scale emergency repair projects, multiple workers are working simultaneously, increasing management complexity and coordination difficulties.

[0013] 8. Material waste: Due to the low precision of manual operation, the pipe end face may be cut unevenly, which may require re-grinding or replacement of the pipe section, thus increasing material waste and additional repair costs.

[0014] Furthermore, traditional pipe end beveling machines used in pipe replacement typically employ a hydraulic cylinder piston rod to push two base plates for pipe tightening. Specifically, the piston rod in the hydraulic cylinder, through a pressing elastic mechanism, pushes the front and rear base plates, causing the connecting rods on the base plates and the tightening rods in the tightening plates to extend and retract outwards, thereby achieving uniform tightening of the pipe. However, this traditional design has several significant drawbacks:

[0015] 1. Excessive Mechanism Length: Since the expansion and tightening device for pipe replacement relies entirely on the movement of the hydraulic cylinder piston rod, the entire mechanism is quite long, resulting in a large size of the beveling machine. This makes it difficult to adapt to narrow operating spaces, especially in urban emergency pipeline repair projects. When the problem pipe is cut off to a very short length, the operating space is extremely limited, and traditional end face beveling machines cannot be used effectively.

[0016] 2. Complex parts: Traditional designs contain a large number of parts, such as elastic mechanisms, multiple linkages and tension rods, which not only increases the weight of the equipment, but also increases manufacturing costs and maintenance difficulty.

[0017] 3. Unstable hoisting: Due to the long and heavy structure, instability is prone to occur during hoisting, increasing the safety hazards of construction. Summary of the Invention

[0018] The purpose of this invention is to provide a tightening device, a cutting device, a pipe changing system, and a pipe changing method for pipe replacement, thereby solving the aforementioned technical problems.

[0019] To achieve the above objectives, the present invention provides a pipe-changing expansion and tightening device, including a linkage expansion and tightening drive mechanism and a primary expansion and tightening mechanism and a secondary expansion and tightening mechanism respectively connected to the linkage expansion and tightening drive mechanism. The linkage expansion and tightening drive mechanism is a floating cylinder structure, which includes an expansion cylinder, a front end cover fixed to the end of the expansion cylinder, and a piston rod slidably disposed inside the expansion cylinder. The piston rod passes through the front end cover and exits the expansion cylinder and is connected to the primary expansion and tightening mechanism. The piston rod is also slidably connected to the mounting shaft.

[0020] The front cover is fixedly connected to the secondary expansion mechanism.

[0021] Preferably, both the primary and secondary tensioning mechanisms include a base plate and a positioning shell covering the outer circumference of the base plate. Multiple tensioning components are evenly arranged in a circular pattern on the base plate. Each tensioning component includes a connecting rod rotatably connected to the base plate at one end and a tensioning rod rotatably connected to the other end of the connecting rod. The other end of the tensioning rod is opened through a telescopic channel passing through the positioning shell and is fixedly connected to the tensioning shoe. A movement gap is left between the tensioning rod and the inner wall of the telescopic channel.

[0022] The base plate of the primary tensioning mechanism is fixedly connected to the piston rod, and the base plate of the secondary tensioning mechanism is fixedly connected to the front end cover via a dragon-shaped positioning sleeve;

[0023] The positioning shell of the first-stage tensioning mechanism is fixedly connected to the mounting shaft and the connecting cover respectively. The connecting cover is fixedly connected to the positioning shell of the second-stage tensioning mechanism. The positioning shell of the second-stage tensioning mechanism is fixedly connected to the front end cover.

[0024] The connecting rods of the primary tensioning mechanism and the secondary tensioning mechanism are arranged axially symmetrically.

[0025] In the initial state, the connecting rods of the first-stage tensioning mechanism and the second-stage tensioning mechanism are both arranged at an angle, and the tensioning shoe connected to the tensioning rod is in a contracted state.

[0026] A cutting device includes an upstream rotating annular cutting mechanism coaxially arranged in an upstream pipeline via a pipe-changing expansion device and a downstream rotating annular cutting mechanism coaxially arranged in a downstream pipeline. The upstream and downstream rotating annular cutting mechanisms are used to cut the end face of the upstream pipeline and the end face of the downstream pipeline into bevels of the same angle, so that the bevel of the upstream pipeline, the extension line of the top end of the upstream pipeline, the bevel of the downstream pipeline, and the extension line of the bottom end of the downstream pipeline are connected in sequence to form a parallelogram.

[0027] Preferably, both the upstream rotary annular cutting mechanism and the downstream rotary annular cutting mechanism include a positioning disk and a rotating disk rotatably connected to the positioning disk via a rotating bearing. The positioning disk is also positioned and connected to the tube-changing expansion device via an angle positioning structure and a joint bearing, respectively.

[0028] The rotary disk is equipped with a rotary drive unit and a moving cutting unit. The rotary drive unit is used for circumferential cutting of the upstream or downstream pipe, and the moving cutting unit is used for performing feed cutting.

[0029] The rotation drive unit includes a first geared motor fixed on the rotating disk. The output shaft of the first geared motor is connected to a rotation drive gear, and the rotation drive gear meshes with an internal gear ring formed on the inner wall of the positioning disk.

[0030] The mobile cutting unit includes a second geared motor fixed on a rotating disk. The output end of the second geared motor is fixedly connected to the plasma gun head via a belt conveyor structure and a rotating moving structure.

[0031] The belt conveyor structure includes a drive wheel that is rotatably mounted on a rotating disk via a support plate and a driven wheel that is connected to the drive wheel via a conveyor belt;

[0032] The rotating and moving structure includes a lead screw connected to the driven wheel and a slider threaded onto the lead screw. The slider is fixedly connected to the plasma gun head via a suspension rod.

[0033] A central shaft is fixed at the center of the rotating disk, and the central shaft is arranged perpendicular to the rotating disk.

[0034] Preferably, the inner circumferential side of the positioning disk is movably connected to the mounting shaft of the tube-changing expansion device via a spherical bearing, the end face side of the positioning disk is rotatably connected to the rotating disk via a rotating bearing, and multiple sets of angle positioning structures are evenly arranged on the outer circumferential side of the positioning disk.

[0035] The angle positioning structure includes a telescopic rod whose two ends are respectively movably connected to the positioning plate and the tube-changing expansion device, and the outer tube and inner tube of the telescopic rod are positioned and connected by positioning screws;

[0036] Both the first geared motor and the second geared motor include a stepper motor and a right-angle reducer fixedly connected to the output end of the stepper motor.

[0037] The rotary drive unit and the mobile cutting unit are arranged symmetrically.

[0038] A pipe replacement system includes a split-type cutting machine for cutting a leaking pipe, an expansion end face cutting device for processing upstream and downstream pipes after cutting the leaking pipe, an external pipe alignment device for aligning the two ends of a new pipe with the upstream and downstream pipes respectively after processing the upstream and downstream pipes, and a welding device for welding the new pipe to the upstream or downstream pipe; wherein two sets of expansion end face cutting devices are coaxially arranged inside the upstream and downstream pipes respectively, and the two sets of expansion end face cutting devices are connected by a central connecting pipe, which is used to adjust the cutting angle of the expansion end face cutting devices so that the end faces of the upstream and downstream pipes are cut at the same angle;

[0039] Both sets of expansion end face cutting equipment include a pipe-changing expansion device and a rotary ring cutting mechanism. The rotary ring cutting mechanism is connected to the pipe-changing expansion device via a joint bearing and an angle positioning structure. The pipe-changing expansion device is used to coaxially position the cutting device inside the upstream or downstream pipe, and simultaneously round the pipe opening of the upstream or downstream pipe under the expansion action. The joint bearing is used to adjust the cutting angle of the cutting device so that the end faces of the upstream and downstream pipes are cut at the same angle. The angle positioning structure is used to position the cutting angle of the cutting device.

[0040] Preferably, the two ends of the central connecting pipe are respectively connected to the central shaft of the cutting device of the two sets of expansion end face cutting equipment, and the central connecting pipe is a telescopic pipe structure.

[0041] A pipe replacement method for a pipe replacement system includes the following steps:

[0042] S1. Determine the location of the pipeline leak and close the upstream and downstream valves at the leak location;

[0043] S2. Use a split-type cutting machine to cut the leaking pipe at the location of the leak, forming an upstream pipe and a downstream pipe with openings on opposite sides;

[0044] S3. Hoist the two sets of expansion end face cutting equipment into the upstream and downstream pipes respectively, and use the expansion device for pipe replacement of the expansion end face cutting equipment to expand the inner wall of the upstream or downstream pipe to position the cutting device. At the same time, the upstream and downstream pipes are rounded. At this time, the upstream or downstream pipe, the expansion device for pipe replacement and the cutting device are all arranged coaxially.

[0045] S4. Remove the positioning screws and connect both ends of the central connecting pipe to the central shafts of the cutting devices of the two sets of expansion end face cutting equipment respectively. Use the central connecting pipe to adjust the cutting angles of the two sets of expansion end face cutting equipment in sequence. That is, the central shaft of the expansion end face cutting equipment in the upstream pipeline, the central connecting pipe, and the central shaft of the expansion end face cutting equipment in the downstream pipeline are on the same reference axis, so that the cutting devices of the two sets of expansion end face cutting equipment arranged perpendicular to both ends of the reference axis are parallel, thereby making the cutting angles of the two sets of expansion end face cutting equipment the same.

[0046] S5. Tighten the positioning screws and remove the center connecting tube;

[0047] S6. Use the cutting devices of two sets of expansion end face cutting equipment to cut the end faces of the upstream and downstream pipes respectively until the cutting is completed. Remove the two sets of expansion end face cutting equipment. At this time, the upstream and downstream pipes form bevels at the same angle.

[0048] S7. Take three pairs of measurement points at the slope from top to bottom. Each pair of measurement points is located on the same axis, so as to obtain three sets of distance values.

[0049] S8. Take the average of the three sets of distance values ​​as the length of the new pipe, and cut the new pipe according to the obtained length value;

[0050] S9. Hoist the new pipe between the upstream and downstream pipes, and use the pipe alignment tool to align both ends of the new pipe with the upstream and downstream pipes respectively.

[0051] S10. Use welding equipment to weld both ends of the new pipe to the upstream and downstream pipes respectively.

[0052] Preferably, step S3 specifically includes the following steps:

[0053] S31. Use hoisting equipment to hoist the expansion device for pipe replacement to the upstream or downstream pipeline, and ensure that the installation shaft of the expansion device for pipe replacement is concentrically arranged with the upstream or downstream pipeline.

[0054] S32. Start the expansion cylinder. Driven by hydraulic oil, the piston rod extends. During the extension of the piston rod, it drives the base plate of the first-stage expansion mechanism to move, which in turn drives the connecting rod of the first-stage expansion mechanism to rotate. This causes the expansion rod of the first-stage expansion mechanism to extend out of the telescopic channel until the expansion shoe of the first-stage expansion mechanism presses against the inner wall of the upstream or downstream pipe. During this process, the base plate drives multiple sets of expansion components to expand synchronously, that is, the extension amount of multiple sets of expansion components is the same, thereby ensuring that the base plate of the first-stage expansion mechanism is adjusted to a position concentric with the upstream or downstream pipe, and at the same time, the same extension amount is used to round the upstream or downstream pipe.

[0055] S33. The hydraulic oil continues to drive the system. At this time, the primary tightening mechanism does not move under the pressure of the inner wall of the pipe to be repaired, so the piston rod does not move. Under the action of the hydraulic oil, the tightening cylinder and the front end cover move in the opposite direction, which in turn drives the base plate of the secondary tightening mechanism to move, drives the connecting rod of the secondary tightening mechanism to rotate, and thus drives the tightening rod of the secondary tightening mechanism to pass through the telescopic channel until the tightening shoe of the secondary tightening mechanism presses against the inner wall of the upstream or downstream pipe. During this process, the amount of movement of the base plate of the secondary tightening mechanism is the same as that of the base plate of the primary tightening mechanism, so that the secondary tightening mechanism and the primary tightening mechanism are coaxially arranged and both are located on the axis of the upstream or downstream pipe. At the same time, the secondary tightening mechanism is used to re-circle the upstream or downstream pipe.

[0056] Preferably, step S4 specifically includes the following steps:

[0057] S41. Loosen the positioning screws of the angle positioning structure, adjust the angle of the positioning plate using the central connecting tube, thereby adjusting the angle of the upstream and downstream rotating ring cutting mechanisms so that the positioning plates of the upstream and downstream rotating ring cutting mechanisms are parallel. Then tighten the positioning screws again to fix the current angle of the positioning plate.

[0058] S42. Turn on the plasma gun head, then turn on the second reduction motor. The second reduction motor drives the lead screw to rotate through the belt transmission structure. With the cooperation of the screw, the slider moves along the lead screw, thereby driving the plasma gun head to feed in. After it reaches the position, turn off the second reduction motor.

[0059] S43. Turn on the first reduction motor. The first reduction motor drives the rotating gear to rotate. Under the meshing of the internal gear ring, it drives the rotating disk to rotate, which in turn drives the plasma gun head on the rotating disk to rotate, performing circumferential cutting until a slit is formed.

[0060] Therefore, the present invention, employing the above-mentioned expansion and tightening device, cutting device, pipe changing system, and pipe changing method for pipe replacement, has the following beneficial effects:

[0061] 1. The use of an expansion joint has the following beneficial effects:

[0062] (1) High-efficiency linkage expansion: The expansion cylinder is used as the linkage expansion drive mechanism. The hydraulic oil drives the first and second expansion mechanisms to act separately, ensuring that the inner wall of the pipeline is gradually compressed at different stages, which improves the expansion effect. At the same time, by controlling the first and second expansion mechanisms to maintain the same elongation, the first and second expansion mechanisms are coaxially positioned with the upstream or downstream pipeline and the entire circle is achieved.

[0063] (2) Shortened mechanism length: Compared with the traditional tensioning device, the elastic mechanism is removed, and the length of the tensioning device is shortened by half, which greatly reduces the volume of the entire beveling machine, allowing it to operate flexibly in a narrower space; at the same time, due to the reduction in the number of parts, the weight of the equipment is reduced, improving portability and installation stability; in addition, the shortened mechanism length makes hoisting more stable, significantly improving the safety during construction.

[0064] 2. The cutting device has the following beneficial effects:

[0065] (1) Improve work efficiency: It completely replaces manual grinding and measurement, and greatly shortens the time for pipe end face beveling;

[0066] (2) Improve cutting accuracy: By setting the joint bearing, the cutting angle of the pipe end face can be set, ensuring that the pipe end face forms a standard parallelogram, reducing human error and improving the subsequent welding quality.

[0067] 3. The pipe replacement system has the following beneficial effects:

[0068] (1) Consistent end face cutting angle: Through the coordinated action of two sets of expansion end face cutting equipment and central connecting pipe, it is ensured that the end faces of the upstream and downstream pipes are cut at the same angle (2°), which improves the docking accuracy of the new pipe with the upstream and downstream pipes.

[0069] (2) Three pairs of measurement points were taken and the average value was calculated as the new pipe length, which further ensured the accuracy of the new pipe length and reduced the possible errors during welding;

[0070] In summary, this invention can quickly determine the cutting surface without being limited by pipeline deformation and displacement, and ensures that the cutting angles of the upstream and downstream pipes are the same, which facilitates high-precision material cutting, effectively avoids the accumulation of errors in traditional measurement, scribing, and cutting processes, and achieves efficient and accurate alignment of pipe ends in the maintenance and repair of large-diameter pipelines, significantly improving the accuracy and efficiency of the operation.

[0071] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0072] Figure 1 This is a half-sectional view of a pipe-changing system of the present invention in its assembled state;

[0073] Figure 2 This is an external view of the pipe-changing system of the present invention in its assembled state;

[0074] Figure 3 This is a perspective view of a pipe-changing system of the present invention in its unassembled state;

[0075] Figure 4This is a half-sectional schematic diagram of the expansion end face cutting device for a pipe replacement system according to the present invention;

[0076] Figure 5 This is a perspective view of the rotating annular cutting mechanism of the expansion end face cutting device for a pipe changing system according to the present invention;

[0077] Figure 6 This is a schematic diagram of the end face cutting principle of a pipe replacement system according to the present invention;

[0078] Figure 7 This is a schematic diagram of the radial cross-section model of an in-service pipe after cutting.

[0079] Figure Labels

[0080] 1. Upstream pipe; 2. Central connecting pipe; 3. Downstream pipe; 4. Expansion end face cutting equipment; 41. Expansion device for pipe replacement; 411. Expansion cylinder; 412. Front end cover; 413. Piston rod; 414. Base plate; 415. Positioning shell; 416. Connecting rod; 417. Expansion rod; 418. Expansion shoe; 419. Connecting cover; 420. Dragon-shaped positioning sleeve; 42. Cutting device; 421. Positioning plate; 422. Rotary bearing; 423. Rotating plate; 424. First geared motor; 425. Rotary drive gear; 426. Second geared motor; 427. Plasma gun head; 428. Drive wheel; 429. Driven wheel; 4210. Lead screw; 4211. Slider; 4212. Central shaft; 4213. Spherical bearing; 4214. Telescopic rod; 4215. Positioning screw. Detailed Implementation

[0081] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are merely illustrative of the embodiments of the present invention and are not intended to limit the embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of this application. Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout.

[0082] It should be noted that the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion, such as a process, method, system, product, or server that includes a series of steps or units, not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such process, method, product, or device.

[0083] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings.

[0084] like Figures 1-6 As shown, a pipe-changing expansion and tightening device 41 (which cites CN202510422260.6, which discloses a pipe-changing expansion and tightening device 41 for oil and gas transmission pipelines and its working method) includes a linkage expansion and tightening drive mechanism and a primary expansion and tightening mechanism and a secondary expansion and tightening mechanism respectively connected to the linkage expansion and tightening drive mechanism. The linkage expansion and tightening drive mechanism is a floating cylinder structure. The floating cylinder structure includes an expansion cylinder 411, a front end cover 412 fixed to the end of the expansion cylinder 411, and a piston rod 413 slidably disposed inside the expansion cylinder 411. The piston rod 413 passes through the front end cover 412 and exits the expansion cylinder 411 before being connected to the primary expansion and tightening mechanism. The piston rod 413 is also slidably connected to the mounting shaft. The front end cover 412 is fixedly connected to the secondary expansion and tightening mechanism.

[0085] Both the primary and secondary tensioning mechanisms include a base plate 414 and a positioning shell 415 covering the outer circumference of the base plate 414. Multiple tensioning components are evenly arranged in a circular pattern on the base plate 414. Each tensioning component includes a connecting rod 416 rotatably connected to the base plate 414 at one end and a tensioning rod 417 rotatably connected to the other end of the connecting rod 416. The other end of the tensioning rod 417 passes through a telescopic channel on the positioning shell 415 and is fixedly connected to a tensioning shoe 418. A clearance is left between the tensioning rod 417 and the inner wall of the telescopic channel. The base plate 414 of the primary tensioning mechanism is fixedly connected to the piston rod 413, and the secondary tensioning mechanism… The base plate 414 of the mechanism is fixedly connected to the front cover 412 via the dragon-shaped positioning sleeve 420; the positioning shell 415 of the first-stage tensioning mechanism is fixedly connected to the mounting shaft and the connecting cover 419 respectively, the connecting cover 419 is fixedly connected to the positioning shell 415 of the second-stage tensioning mechanism, and the positioning shell 415 of the second-stage tensioning mechanism is fixedly connected to the front cover 412; the connecting rods 416 of the first-stage tensioning mechanism and the connecting rods 416 of the second-stage tensioning mechanism are arranged axially symmetrically; in the initial state, the connecting rods 416 of the first-stage tensioning mechanism and the connecting rods 416 of the second-stage tensioning mechanism are both arranged at an inclination, and the tensioning shoe 418 connected to the tensioning rod 417 is in a contracted state.

[0086] A cutting device 42 (referencing CN202510413779.8, which discloses an oil and gas pipeline cutting device and its working method) includes an upstream rotating annular cutting mechanism coaxially arranged in an upstream pipeline 1 via a pipe-changing expansion and tightening device 41, and a downstream rotating annular cutting mechanism coaxially arranged in a downstream pipeline 3. The upstream and downstream rotating annular cutting mechanisms are used to cut the end faces of the upstream pipeline 1 and the downstream pipeline 3 into bevels of the same angle, respectively, so that the bevels of the upstream pipeline 1, the extended top line of the upstream pipeline 1, the bevels of the downstream pipeline 3, and the extended bottom line of the downstream pipeline 3 are sequentially connected to form a parallelogram. In this embodiment, the bevels of the upstream pipeline 1, the extended top line of the upstream pipeline 1, the bevels of the downstream pipeline 3, and the extended bottom line of the downstream pipeline 3 are sequentially connected to form a parallelogram. Figure 7 The rectangle shown.

[0087] Both the upstream and downstream rotary annular cutting mechanisms include a positioning disk 421 and a rotating disk 423 rotatably connected to the positioning disk 421 via a rotating bearing 422. The positioning disk 421 is also positioned and connected to the pipe-changing expansion device via an angle positioning structure and a joint bearing 4213. A rotation drive unit and a movable cutting unit are respectively provided on the rotating disk 423. The rotation drive unit is used for circumferential cutting of the upstream pipe 1 or the downstream pipe 3, and the movable cutting unit is used for performing feed cutting. The rotation drive unit includes a first reduction motor 424 fixed on the rotating disk 423. The output shaft of the first reduction motor 424 is connected to a rotation drive gear 425, and the rotation drive gear 425 is connected to a gear formed on the inner wall of the positioning disk 421. The internal gear ring meshes; the mobile cutting unit includes a second reduction motor 426 fixed on the rotating disk 423, the output end of the second reduction motor 426 is fixedly connected to the plasma gun head 427 via a belt conveyor structure and a rotating moving structure; the belt conveyor structure includes a drive wheel 428 rotatably mounted on the rotating disk 423 via a support plate and a driven wheel 429 connected to the drive wheel 428 via a conveyor belt; the rotating moving structure includes a lead screw 4210 connected to the driven wheel 429 and a slider 4211 threadedly connected to the lead screw 4210, the slider 4211 is fixedly connected to the plasma gun head 427 via a suspension rod; a central shaft 4212 is fixed at the center of the rotating disk 423, and the central shaft 4212 is arranged perpendicularly to the rotating disk 423.

[0088] The inner circumference of the positioning disk 421 is movably connected to the mounting shaft of the tube-changing expansion device 41 via a spherical bearing 4213, and the end face of the positioning disk 421 is rotatably connected to the rotating disk 423 via a rotating bearing 422. Multiple sets of angle positioning structures are evenly arranged on the outer circumference of the positioning disk 421. The angle positioning structure includes a telescopic rod 4214 whose two ends are movably connected to the positioning disk 421 and the tube-changing expansion device, respectively. The outer tube and inner tube of the telescopic rod 4214 are positioned and connected by a positioning screw 4215. The first reduction motor 424 and the second reduction motor 426 both include a stepper motor and a right-angle reducer fixedly connected to the output end of the stepper motor. The rotation drive unit and the mobile cutting unit are arranged axially symmetrically.

[0089] A pipe replacement system (referencing CN202510406332.8, which discloses an oil and gas pipeline replacement system and method) includes a split-type cutting machine for cutting leaking pipes, an expansion end face cutting device 4 for processing upstream pipe 1 and downstream pipe 3 after cutting the leaking pipe, an external pipe alignment device for aligning the two ends of the new pipe with the upstream pipe 1 and downstream pipe 3 respectively after processing the upstream pipe 1 and downstream pipe 3, and a welding device for welding the new pipe to the upstream pipe 1 or downstream pipe 3; wherein two sets of expansion end face cutting devices 4 are coaxially arranged inside the upstream pipe 1 and downstream pipe 3, and the two sets of expansion end face cutting devices 4 are connected by a central connecting pipe 2, which is used to adjust the cutting angle of the expansion end face cutting devices 4 so that the end faces of the upstream pipe 1 and downstream pipe 3 are cut at the same angle;

[0090] Both sets of expansion end face cutting equipment 4 include a pipe-changing expansion device 41 and a rotary ring cutting mechanism. The rotary ring cutting mechanism is connected to the pipe-changing expansion device 41 via a joint bearing 4213 and an angle positioning structure. The pipe-changing expansion device 41 is used to coaxially position the cutting device 42 inside the upstream pipe 1 or the downstream pipe 3, and simultaneously rounds the pipe opening of the upstream pipe 1 or the downstream pipe 3 under the expansion action. The joint bearing 4213 is used to adjust the cutting angle of the cutting device 42 so that the end faces of the upstream pipe 1 and the downstream pipe 3 are cut at the same angle. The angle positioning structure is used to position the cutting angle of the cutting device 42.

[0091] The two ends of the central connecting pipe 2 are respectively connected to the central shaft 4212 of the cutting device 42 of the two sets of expansion end face cutting equipment 4. The central connecting pipe 2 is a telescopic pipe structure.

[0092] A pipe replacement method for a pipe replacement system includes the following steps:

[0093] S1. Determine the location of the pipeline leak and close the upstream and downstream valves at the leak location;

[0094] S2. Use a split-type cutting machine to cut the leaking pipe where the leak is located, forming an upstream pipe 1 and a downstream pipe 3 with opposite side openings;

[0095] S3. The two sets of expansion end face cutting equipment 4 are respectively hoisted into the upstream pipe 1 and the downstream pipe 3, and the expansion device 41 for pipe replacement of the expansion end face cutting equipment 4 is used to expand the inner wall of the upstream pipe 1 or the downstream pipe 3 to position the cutting device 42. At the same time, the upstream pipe 1 and the downstream pipe 3 are rounded. At this time, the upstream pipe 1 or the downstream pipe 3, the expansion device 41 for pipe replacement and the cutting device 42 are all arranged coaxially.

[0096] Step S3 specifically includes the following steps:

[0097] S31. Use hoisting equipment to hoist the expansion and tightening device 41 for pipe replacement to the upstream pipe 1 or the downstream pipe 3, and ensure that the installation axis of the expansion and tightening device 41 for pipe replacement is concentrically arranged with the upstream pipe 1 or the downstream pipe 3.

[0098] S32. Start the expansion cylinder 411. Driven by hydraulic oil, the piston rod 413 extends. During the extension of the piston rod 413, it drives the base plate 414 of the first-stage expansion mechanism to move, which in turn drives the connecting rod 416 of the first-stage expansion mechanism to rotate. This causes the expansion rod 417 of the first-stage expansion mechanism to extend out of the telescopic channel until the expansion shoe 418 of the first-stage expansion mechanism presses against the inner wall of the upstream pipe 1 or the downstream pipe 3. During this process, the base plate 414 drives multiple sets of expansion components to expand synchronously, that is, the extension amount of multiple sets of expansion components is the same, thereby ensuring that the base plate 414 of the first-stage expansion mechanism is adjusted to a position concentric with the upstream pipe 1 or the downstream pipe 3, and at the same time, the same extension amount is used to make the upstream pipe 1 or the downstream pipe 3 round.

[0099] S33. The hydraulic oil continues to drive. At this time, the primary tightening mechanism does not move under the pressure of the inner wall of the pipe to be repaired, so the piston rod 413 does not move. Under the action of the hydraulic oil, the tightening cylinder and the front cover 412 move in the opposite direction, which in turn drives the base plate 414 of the secondary tightening mechanism to move, drives the connecting rod 416 of the secondary tightening mechanism to rotate, thereby driving the tightening rod 417 of the secondary tightening mechanism to pass through the telescopic channel until the tightening shoe 418 of the secondary tightening mechanism presses against the inner wall of the upstream pipe 1 or the downstream pipe 3. During this process, the movement of the base plate 414 of the secondary tightening mechanism is the same as that of the base plate 414 of the primary tightening mechanism, so that the secondary tightening mechanism and the primary tightening mechanism are arranged coaxially and are both located on the axis of the upstream pipe 1 or the downstream pipe 3. At the same time, the secondary tightening mechanism is used to re-circle the upstream pipe 1 or the downstream pipe 3.

[0100] S4. Remove the positioning screw 4215 and connect both ends of the central connecting pipe 2 to the central shaft 4212 of the cutting device 42 of the two sets of expansion end face cutting devices 4 respectively. Use the central connecting pipe 2 to adjust the cutting angle of the cutting device 42 of the two sets of expansion end face cutting devices 4 in sequence. That is, the central shaft 4212 of the expansion end face cutting device 4 in the upstream pipe 1, the central connecting pipe 2, and the central shaft 4212 of the expansion end face cutting device 4 in the downstream pipe 3 are on the same reference axis, so that the cutting devices 42 of the two sets of expansion end face cutting devices 4 arranged perpendicular to the two ends of the reference axis are parallel, thereby making the cutting angle of the two sets of expansion end face cutting devices 4 the same.

[0101] Step S4 specifically includes the following steps:

[0102] S41. Loosen the positioning screw 4215 of the angle positioning structure, adjust the angle of the positioning disk 421 using the central connecting tube 2, thereby adjusting the angle of the upstream rotating ring cutting mechanism and the downstream rotating ring cutting mechanism, so that the positioning disk 421 of the upstream rotating ring cutting mechanism and the positioning disk 421 of the downstream rotating ring cutting mechanism are parallel, and then tighten the positioning screw 4215 again to fix the current angle of the positioning disk 421.

[0103] S42. Open the plasma gun head 427, and then open the second reduction motor 426. The second reduction motor 426 drives the lead screw 4210 to rotate through the belt transmission structure. With the cooperation of the threaded lead screw, the slider 4211 moves along the lead screw 4210, thereby driving the plasma gun head 427 to feed in. After it reaches the position, close the second reduction motor 426.

[0104] S43. Turn on the first reduction motor 424. The first reduction motor 424 drives the rotating gear to rotate. Under the meshing of the internal gear ring, it drives the rotating disk 423 to rotate, which in turn drives the plasma gun head 427 on the rotating disk 423 to rotate, performing circumferential cutting until a slit is formed.

[0105] S5. Tighten the positioning screw 4215 and remove the center connecting tube 2;

[0106] S6. Use the cutting devices 42 of the two sets of expansion end face cutting equipment 4 to cut the end faces of the upstream pipe 1 and the downstream pipe 3 respectively until the cutting is completed. Take out the two sets of expansion end face cutting equipment 4. At this time, the upstream pipe 1 and the downstream pipe 3 form bevels with the same angle.

[0107] S7. Take three pairs of measurement points at the slope from top to bottom. Each pair of measurement points is located on the same axis, so as to obtain three sets of distance values.

[0108] S8. Take the average of the three sets of distance values ​​as the length of the new pipe, and cut the new pipe according to the obtained length value;

[0109] S9. Hoist the new pipe between the upstream pipe 1 and the downstream pipe 3, and use the pipe alignment tool to align the two ends of the new pipe with the upstream pipe 1 and the downstream pipe 3 respectively.

[0110] S10. Use welding equipment to weld both ends of the new pipe to the upstream pipe 1 and the downstream pipe 3 respectively.

[0111] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the technical solutions of the present invention, and these modifications or equivalent substitutions cannot cause the modified technical solutions to deviate from the spirit and scope of the technical solutions of the present invention.

Claims

1. A pipe-changing expansion device, characterized in that: It includes a linkage tension drive mechanism and a primary tension mechanism and a secondary tension mechanism respectively connected to the linkage tension drive mechanism. The linkage tension drive mechanism is a floating cylinder structure. The floating cylinder structure includes a tension cylinder, a front end cover fixed to the end of the tension cylinder, and a piston rod slidably disposed inside the tension cylinder. The piston rod passes through the front end cover and exits the tension cylinder and is connected to the primary tension mechanism. The piston rod is also slidably connected to the mounting shaft. The front cover is fixedly connected to the secondary expansion mechanism.

2. The expansion and tightening device for pipe replacement according to claim 1, characterized in that: Both the primary and secondary tensioning mechanisms include a base plate and a positioning shell covering the outer circumference of the base plate. Multiple tensioning components are evenly arranged in a circular pattern on the base plate. Each tensioning component includes a connecting rod rotatably connected to the base plate at one end and a tensioning rod rotatably connected to the other end of the connecting rod. The other end of the tensioning rod is opened through a telescopic channel passing through the positioning shell and is fixedly connected to the tensioning shoe. A movement gap is left between the tensioning rod and the inner wall of the telescopic channel. The base plate of the primary tensioning mechanism is fixedly connected to the piston rod, and the base plate of the secondary tensioning mechanism is fixedly connected to the front end cover via a dragon-shaped positioning sleeve; The positioning shell of the first-stage tensioning mechanism is fixedly connected to the mounting shaft and the connecting cover respectively. The connecting cover is fixedly connected to the positioning shell of the second-stage tensioning mechanism. The positioning shell of the second-stage tensioning mechanism is fixedly connected to the front end cover. The connecting rods of the primary tensioning mechanism and the secondary tensioning mechanism are arranged axially symmetrically. In the initial state, the connecting rods of the first-stage tensioning mechanism and the second-stage tensioning mechanism are both arranged at an angle, and the tensioning shoe connected to the tensioning rod is in a contracted state.

3. A cutting device, characterized in that: The device includes an upstream rotating annular cutting mechanism and a downstream rotating annular cutting mechanism, coaxially arranged in the upstream pipeline and coaxially arranged in the downstream pipeline, respectively, as described in claim 2. The upstream rotating annular cutting mechanism and the downstream rotating annular cutting mechanism are used to cut the end face of the upstream pipeline and the end face of the downstream pipeline into bevels of the same angle, so that the bevel of the upstream pipeline, the extension line of the top end of the upstream pipeline, the bevel of the downstream pipeline, and the extension line of the bottom end of the downstream pipeline are connected in sequence to form a parallelogram.

4. A cutting device according to claim 3, characterized in that: Both the upstream and downstream rotary ring cutting mechanisms include a positioning plate and a rotating plate that is rotatably connected to the positioning plate via a rotating bearing. The positioning plate is also positioned and connected to the tube changing expansion device via an angle positioning structure and a spherical bearing, respectively. The rotary disk is equipped with a rotary drive unit and a moving cutting unit. The rotary drive unit is used for circumferential cutting of the upstream or downstream pipe, and the moving cutting unit is used for performing feed cutting. The rotation drive unit includes a first geared motor fixed on the rotating disk. The output shaft of the first geared motor is connected to a rotation drive gear, and the rotation drive gear meshes with an internal gear ring formed on the inner wall of the positioning disk. The mobile cutting unit includes a second geared motor fixed on a rotating disk. The output end of the second geared motor is fixedly connected to the plasma gun head via a belt conveyor structure and a rotating moving structure. The belt conveyor structure includes a drive wheel that is rotatably mounted on a rotating disk via a support plate and a driven wheel that is connected to the drive wheel via a conveyor belt; The rotating and moving structure includes a lead screw connected to the driven wheel and a slider threaded onto the lead screw. The slider is fixedly connected to the plasma gun head via a suspension rod. A central shaft is fixed at the center of the rotating disk, and the central shaft is arranged perpendicular to the rotating disk.

5. A cutting device according to claim 4, characterized in that: The inner circumference of the positioning disk is movably connected to the mounting shaft of the tube-changing expansion device via a spherical bearing, and the end face of the positioning disk is rotatably connected to the rotating disk via a rotating bearing. Multiple sets of angle positioning structures are evenly arranged on the outer circumference of the positioning disk. The angle positioning structure includes a telescopic rod whose two ends are respectively movably connected to the positioning plate and the tube-changing expansion device, and the outer tube and inner tube of the telescopic rod are positioned and connected by positioning screws; Both the first geared motor and the second geared motor include a stepper motor and a right-angle reducer fixedly connected to the output end of the stepper motor. The rotary drive unit and the mobile cutting unit are arranged symmetrically.

6. A pipe replacement system, characterized in that: The system includes a split-type cutting machine for cutting leaking pipes, an expansion end face cutting device for processing upstream and downstream pipes after cutting the leaking pipes, a pipe alignment device for aligning the two ends of the new pipe with the upstream and downstream pipes respectively after processing the upstream and downstream pipes, and a welding device for welding the new pipe to the upstream or downstream pipes; wherein two sets of expansion end face cutting devices are coaxially arranged inside the upstream and downstream pipes respectively, and the two sets of expansion end face cutting devices are connected by a central connecting pipe, which is used to adjust the cutting angle of the expansion end face cutting devices so that the end faces of the upstream and downstream pipes are cut at the same angle; Both sets of expansion end face cutting equipment include the expansion device for pipe replacement as described in claim 2 and the rotary annular cutting mechanism as described in claim 5. The rotary annular cutting mechanism is connected to the expansion device for pipe replacement via a joint bearing and an angle positioning structure. The expansion device for pipe replacement is used to coaxially position the cutting device inside the upstream or downstream pipe and simultaneously round the pipe opening of the upstream or downstream pipe under the expansion action. The joint bearing is used to adjust the cutting angle of the cutting device so that the end faces of the upstream and downstream pipes are cut at the same angle. The angle positioning structure is used to position the cutting angle of the cutting device.

7. A pipe-changing system according to claim 6, characterized in that: The two ends of the central connecting pipe are respectively connected to the central shaft of the cutting device of the two sets of expansion end face cutting equipment. The central connecting pipe is a telescopic pipe structure.

8. A pipe replacement method based on the pipe replacement system according to claim 7, characterized in that: Includes the following steps: S1. Determine the location of the pipeline leak and close the upstream and downstream valves at the leak location; S2. Use a split-type cutting machine to cut the leaking pipe at the location of the leak, forming an upstream pipe and a downstream pipe with openings on opposite sides; S3. Hoist the two sets of expansion end face cutting equipment into the upstream and downstream pipes respectively, and use the expansion device for pipe replacement of the expansion end face cutting equipment to expand the inner wall of the upstream or downstream pipe to position the cutting device. At the same time, the upstream and downstream pipes are rounded. At this time, the upstream or downstream pipe, the expansion device for pipe replacement and the cutting device are all arranged coaxially. S4. Remove the positioning screws and connect both ends of the central connecting pipe to the central shafts of the cutting devices of the two sets of expansion end face cutting equipment respectively. Use the central connecting pipe to adjust the cutting angles of the two sets of expansion end face cutting equipment in sequence. That is, the central shaft of the expansion end face cutting equipment in the upstream pipeline, the central connecting pipe, and the central shaft of the expansion end face cutting equipment in the downstream pipeline are on the same reference axis, so that the cutting devices of the two sets of expansion end face cutting equipment arranged perpendicular to both ends of the reference axis are parallel, thereby making the cutting angles of the two sets of expansion end face cutting equipment the same. S5. Tighten the positioning screws and remove the center connecting tube; S6. Use the cutting devices of two sets of expansion end face cutting equipment to cut the end faces of the upstream and downstream pipes respectively until the cutting is completed. Remove the two sets of expansion end face cutting equipment. At this time, the upstream and downstream pipes form bevels at the same angle. S7. Take three pairs of measurement points at the slope from top to bottom. Each pair of measurement points is located on the same axis, so as to obtain three sets of distance values. S8. Take the average of the three sets of distance values ​​as the length of the new pipe, and cut the new pipe according to the obtained length value; S9. Hoist the new pipe between the upstream and downstream pipes, and use the pipe alignment tool to align both ends of the new pipe with the upstream and downstream pipes respectively. S10. Use welding equipment to weld both ends of the new pipe to the upstream and downstream pipes respectively.

9. The tube replacement method according to claim 8, characterized in that: Step S3 specifically includes the following steps: S31. Use hoisting equipment to hoist the expansion device for pipe replacement to the upstream or downstream pipeline, and ensure that the installation shaft of the expansion device for pipe replacement is concentrically arranged with the upstream or downstream pipeline. S32. Start the expansion cylinder. Driven by hydraulic oil, the piston rod extends. During the extension of the piston rod, it drives the base plate of the first-stage expansion mechanism to move, which in turn drives the connecting rod of the first-stage expansion mechanism to rotate. This causes the expansion rod of the first-stage expansion mechanism to extend out of the telescopic channel until the expansion shoe of the first-stage expansion mechanism presses against the inner wall of the upstream or downstream pipe. During this process, the base plate drives multiple sets of expansion components to expand synchronously, that is, the extension amount of multiple sets of expansion components is the same, thereby ensuring that the base plate of the first-stage expansion mechanism is adjusted to a position concentric with the upstream or downstream pipe, and at the same time, the same extension amount is used to round the upstream or downstream pipe. S33. The hydraulic oil continues to drive the system. At this time, the primary tightening mechanism does not move under the pressure of the inner wall of the pipe to be repaired, so the piston rod does not move. Under the action of the hydraulic oil, the tightening cylinder and the front end cover move in the opposite direction, which in turn drives the base plate of the secondary tightening mechanism to move, drives the connecting rod of the secondary tightening mechanism to rotate, and thus drives the tightening rod of the secondary tightening mechanism to pass through the telescopic channel until the tightening shoe of the secondary tightening mechanism presses against the inner wall of the upstream or downstream pipe. During this process, the amount of movement of the base plate of the secondary tightening mechanism is the same as that of the base plate of the primary tightening mechanism, so that the secondary tightening mechanism and the primary tightening mechanism are coaxially arranged and both are located on the axis of the upstream or downstream pipe. At the same time, the secondary tightening mechanism is used to re-circle the upstream or downstream pipe.

10. The tube replacement method according to claim 8, characterized in that: Step S4 Specifically, the following steps are included: S41. Loosen the positioning screws of the angle positioning structure, adjust the angle of the positioning plate using the central connecting tube, thereby adjusting the angle of the upstream and downstream rotating ring cutting mechanisms so that the positioning plates of the upstream and downstream rotating ring cutting mechanisms are parallel. Then tighten the positioning screws again to fix the current angle of the positioning plate. S42. Turn on the plasma gun head, then turn on the second reduction motor. The second reduction motor drives the lead screw to rotate through the belt transmission structure. With the cooperation of the screw, the slider moves along the lead screw, thereby driving the plasma gun head to feed in. After it reaches the position, turn off the second reduction motor. S43. Turn on the first reduction motor. The first reduction motor drives the rotating gear to rotate. Under the meshing of the internal gear ring, it drives the rotating disk to rotate, which in turn drives the plasma gun head on the rotating disk to rotate, performing circumferential cutting until a slit is formed.

Citation Information

Patent Citations

  • Method and system for realizing quick connection of pipes

    CN102407393B

  • Method and system for realizing quick connection of pipes

    CN102407393A

  • Internal expanding type clamping mechanism of large-caliber hot bend bevelling machine

    CN103358144A

  • Method for rapidly repairing submarine pipeline through replacement pipe section

    CN105864509A

  • Underwater unmanned oil and gas pipeline repairing device

    CN116398740A