A rapid and disturbance-reducing excavation method for a test section of a confined space structural surface.

By setting anti-vibration holes around the test section of the structural surface and combining them with hydraulic splitting equipment, the problem of rapid and less disturbed excavation in a limited space was solved, ensuring the accuracy of the structural surface parameters and supporting the scientific and rational nature of the engineering design.

CN120990609BActive Publication Date: 2026-11-17CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202511252578.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-09-03
Publication Date
2026-11-17
Estimated Expiration
2045-09-03

AI Technical Summary

Technical Problem

Existing technologies cannot quickly and with reduced disturbance, excavation test sections of structural surfaces in confined spaces, resulting in inaccurate acquisition of structural surface parameters and affecting the scientific validity and rationality of engineering design.

Method used

A combination of anti-vibration holes and hydraulic splitting equipment was used. Anti-vibration holes were set around the test section of the structural surface and precise blasting was carried out. Then, hydraulic splitting equipment was used to trim the blasting working surface to reduce the disturbance to the structural surface.

Benefits of technology

This technology enables rapid and low-disturbance excavation of structural test sections in confined spaces, ensuring the accuracy of test parameters and providing a reliable basis for engineering design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120990609B_ABST
    Figure CN120990609B_ABST
Patent Text Reader

Abstract

This invention discloses a rapid and low-disturbance excavation method for a test section of a structural surface in a confined space, ensuring the completion of steps including determining the orientation of the target structural surface, excavating the funnel-shaped opening, tunnel advance, and finishing the blasting face. The innovative aspects of this invention are the application of anti-vibration holes during blasting and the combination of blasting and handheld hydraulic rock splitting equipment in the entire excavation operation. This method utilizes both the rapid operation of blasting in excavation projects and the micro-disturbance of the target structural surface caused by hydraulic rock splitting equipment. Furthermore, the design of the anti-vibration holes effectively prevents the energy transfer of blast shock waves towards the target structural surface. The combination of anti-vibration holes, blasting, and hydraulic splitting ensures a rapid and low-disturbance excavation method for a test section of a structural surface in a confined space, which is an effective method for the current situation of heavy workloads and tight schedules in the hydropower and water conservancy engineering industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of geotechnical testing technology, and particularly relates to a rapid and disturbance-reducing excavation method for a test section of a confined space structural surface. Background Technology

[0002] Structural planes are geological interfaces with specific shapes and characteristics formed by various geological processes within a rock mass. They are an important component of the rock mass and have a significant impact on its physical and mechanical properties. The existence of structural planes has a wide-ranging and profound impact on underground engineering, compromising the integrity, stability, and impermeability of the rock mass. If the structural plane parameters do not reflect the actual working conditions, it can easily lead to engineering instability or increased project investment. Therefore, controlling the process of obtaining structural plane parameters is particularly important.

[0003] Currently, in-situ direct shear testing of structural surfaces is one of the most important means of obtaining effective structural surface strength parameters that reflect actual conditions. According to relevant research and regulations on structural surface testing at home and abroad, such as the "Standard for Test Methods of Rock Mass in Engineering" (GB / T 50266-2013), the "Code for Test of Rock Mass in Hydropower Engineering" (DL / T 5368-2024), and "The ISRMS suggested Methods for Rock Characterization, Testing and Monitoring: 2007-2014", all of these standards involve direct shear testing of structural surface strength, but do not mention methods for excavating the test section of the structural surface to reduce disturbance. In relevant specifications for underground engineering excavation, such as the "Code for Construction of Underground Excavation Engineering for Hydraulic Structures" (SL 378-2007) and the "Technical Specification for Blasting Construction of Hydropower and Water Conservancy Projects" (DL / T 5135-2015), the excavation methods mentioned, such as drill-and-blast methods, do not meet the disturbance requirements for structural surface test sections. Mechanical methods are slow, require large construction spaces, and are not effective for hard rock excavation. Currently, a new method using water-powered drills is being explored for refined excavation of structural surface test sections. Compared with mechanical methods, this method solves the problem of equipment portability, but it still suffers from low efficiency and unsatisfactory results in hard rock excavation. Therefore, there is a need to find a new method for rapid and less disturbed excavation of structural surface test sections in confined spaces.

[0004] Patent application CN105157492A discloses a double-pre-splitting controlled blasting structure and method for bedrock protection. Two rows of pre-splitting holes (construction pre-splitting and structural pre-splitting) are arranged at intervals on the excavation face, dividing the excavation face into two main blasting zones. Each zone independently forms a sequence of main blasting holes, buffer holes, and pre-splitting holes. During blasting, a micro-differential detonation network is used, and harmful factors such as blasting vibration are controlled. The two pre-splitting cracks are formed separately, and the two main blasting zones are detonated separately. The double-pre-splitting controlled blasting method reduces the main seismic wave, overcomes the convergence characteristics of pre-splitting cracks, and forms a better vibration reduction effect to protect the bedrock. Moreover, the excavation volume of one blasting cycle is large, effectively resolving the contradiction between efficient rock breaking and bedrock protection.

[0005] Patent application CN115929329A discloses a method for controlling damage in deep rock blasting based on multi-level energy regulation. This method employs a bench excavation technique to create upper and lower benches within the deep-buried cavern. By utilizing controlled wall protection and energy-dissipating cones, the blasting load is fully absorbed, minimizing damage to the pre-excavated rock mass while ensuring blasting effectiveness, thus controlling over-excavation.

[0006] Patent application CN117052408A discloses a construction method for underground facilities. By setting a rock protective layer between the rock strata corresponding to the area to be blasted and the existing tunnel, and setting vibration damping holes on the rock protective layer to absorb vibration, this construction method can reduce the impact of the vibration generated by the explosive on the existing tunnel, thereby minimizing the risk of structural damage and segment detachment in the existing tunnel.

[0007] However, the aforementioned patent application documents failed to solve the technical problem of reducing disturbance in the structural surface test section, and also lacked a method for repairing the blasting working face after blasting. Summary of the Invention

[0008] To address the aforementioned technical problems, this invention provides a rapid and disturbance-reducing excavation method for structural surface test sections in confined spaces. This method ensures rapid and streamlined excavation of the test section while minimizing disturbance to the test area of ​​the structural surface. It supports the reliability of obtaining structural surface strength test parameters, ensuring that engineering test parameters reflect actual working conditions and providing a guarantee for the scientific and rational design of subsequent engineering projects.

[0009] The present invention is achieved through the following technical solutions.

[0010] This invention provides a rapid and disturbance-reducing excavation method for a test section of a confined space structural surface, comprising the following steps: S1: Based on the exploration outline and confirmation from on-site geological personnel, determine the location of the target structural surface test section within the existing tunnel, and then predict its orientation based on the structural surface traces on the tunnel wall. S2: Excavate the funnel-shaped opening of the structural face. The upper and lower boundaries of the funnel-shaped opening are defined by the upper and lower boundaries of the structural face test section. During the excavation, anti-vibration holes and blasting holes are installed. Then, explosives are loaded and detonated to obtain the funnel-shaped opening of the structural face. S3: Excavate the structural surface test section based on the funnel-shaped opening of the structural surface, using the upper and lower boundaries of the structural surface test section as the boundaries. S4: Repair the blasting face.

[0011] Preferably, in step S1, the predicted orientation of the structural surface can be determined by the exposed structural surface in the tunnel wall. If there is no exposed structural surface, the orientation of the target structural surface can be inferred by the extension direction of the traces of the tunnel wall structural surface appearing on both sides of the tunnel wall.

[0012] Preferably, in step S2, the opening of the structural surface test section is funnel-shaped. First, anti-vibration holes are drilled in the rock mass, and then blasting holes are drilled. The depth of the anti-vibration holes is greater than that of the blasting holes.

[0013] Preferably, in step S2, the anti-vibration holes are arranged in three rows linearly along the direction of the structural surface marks on the tunnel wall. The anti-vibration holes are arranged in three rows from the nearest to the farthest from the structural surface marks on the tunnel wall, and the length of the arrangement of the three rows of anti-vibration holes covers the processing area of ​​the test specimen of the structural surface that needs to be retained.

[0014] Preferably, the second row of anti-vibration holes is staggered with the first row and the third row of anti-vibration holes.

[0015] Preferably, in step S3, after the explosive charge is detonated, new anti-vibration holes are drilled linearly towards the excavation direction of the test section of the structural surface on the remaining holes of the first row, second row, and third row of anti-vibration holes. The new anti-vibration holes have the same specifications and spacing as the anti-vibration holes in the extended row, forming a second round of anti-vibration holes.

[0016] Preferably, after setting the second round of anti-vibration holes, the second round of blasting holes is set in the same manner as in step S2, wherein the depth of the second round of anti-vibration holes is greater than that of the second round of blasting holes.

[0017] Preferably, in step S2, the blasting hole is set on the hanging wall rock mass between the upper boundary and the lower boundary of the structural surface test section. The blasting hole includes a central hole and surrounding peripheral holes. The anti-vibration hole is set between the blasting hole and the structural surface mark on the tunnel wall. The charging and detonation step includes setting explosives in the central hole and surrounding holes and then detonating.

[0018] Preferably, during the detonation process in step S2, the explosive in the central hole detonates before the explosive in the peripheral holes.

[0019] Preferably, in step S4, the blasting working face is trimmed by hydraulic splitting. The steps include inserting the splitting gun head of the hydraulic splitting equipment into the residual anti-vibration holes after detonation, and then splitting the holes one by one.

[0020] The beneficial effects of this invention are as follows: The innovations of this invention lie in the application of anti-vibration holes during blasting and the combination of blasting and handheld hydraulic rock splitting equipment in the entire excavation operation. This approach leverages the rapid operation of blasting in excavation projects, the micro-disturbance of the target structural surface caused by hydraulic rock splitting, and the design of the anti-vibration holes effectively prevents the transmission of blast shock waves towards the target structural surface. The combination of anti-vibration holes, blasting, and hydraulic splitting enables a rapid and minimally disturbed excavation method for structural surface test sections in confined spaces, which is an effective approach given the current demanding and time-sensitive nature of hydropower and water conservancy projects. Attached Figure Description

[0021] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 This invention relates to the arrangement of the anti-vibration holes and blasting holes; Figure 3 This is a diagram showing the effect of the test section of the structure surface after hydraulic splitting according to the present invention; In the diagram: 1-Tunnel axis, 2-Tunnel, 3-Structural surface rock mass, 4-Upper boundary of structural surface test section, 5-Lower boundary of structural surface test section, 6-Predicted direction of structural surface, 7-Structural surface traces in the tunnel wall, 8-Structural surface rock mass below the structural surface, 9-First row of anti-seismic holes, 10-Second row of anti-seismic holes, 11-Third row of anti-seismic holes, 12-Central hole, 13-Surrounding holes. Detailed Implementation

[0022] The technical solution of the present invention is further described below, but the scope of protection is not limited to what is described.

[0023] Example: In a tunnel construction project in Tibet, numerous direct shear tests of structural surfaces were conducted on-site. These tests were conducted within a mountain exploration tunnel, requiring the excavation of processing space for the target structural surface test sections. The excavation process needed to minimize disturbance to the target structural surface to reduce its impact on the reliability of the test results. The following are methods for rapid and disturbance-reducing excavation of the structural surface test sections under this condition: like Figures 1 to 3 As shown, a rapid and disturbance-reducing excavation method for a test section of a confined space structural surface includes the following steps: S1: Based on the survey outline document and the confirmation of the on-site geological personnel, determine the location of the target structural surface test section in the existing tunnel 2, and then predict its orientation 6 based on the structural surface traces 7 on the tunnel wall; S2: Excavate the funnel-shaped opening of the structural face. The upper and lower boundaries of the funnel-shaped opening of the structural face are defined by the upper boundary 4 and the lower boundary 5 of the structural face test section. During the excavation process, anti-vibration holes and blasting holes are set, and then explosives are loaded and detonated to obtain the funnel-shaped opening of the structural face. S3: Based on the structural face funnel opening, the structural face test section is excavated. The upper boundary 4 and the lower boundary 5 of the structural face test section are used as the boundary. The charging and detonation steps during the excavation are the same as those in S2. The area between the upper boundary 4 and the lower boundary 5 of the structural face test section in the excavated tunnel 2 is the structural face test section. The rock mass in this section is 30cm thick. The structural face trace 7 on the tunnel wall in the structural face test section is the target structural face. The side of the lower boundary 5 of the structural face test section away from the tunnel opening is the lower rock mass 8 of the structural face. S4: Repair the blasting face.

[0024] In step S1, the predicted orientation 6 of the structural surface can be determined by the exposed structural surface in the tunnel wall. Based on the arranged direct shear test points of the structural surface, a geological compass is used to locate the predicted orientation 6 of the tunnel's structural surface. If there is no exposed structural surface, the orientation of the target structural surface can be inferred from the extension direction of the structural surface traces 7 appearing on both sides of the tunnel wall. The exposed structural surface refers to the missing upper rock mass of the target structural surface in the tunnel wall, resulting in the exposure of the structural surface and revealing the orientation information of the target structural surface.

[0025] In step S2, the opening of the structural surface test section is funnel-shaped, and the opening depth should not be less than 1.5m. First, anti-vibration holes are drilled in the rock mass, followed by blasting holes. The purpose of the funnel-shaped excavation is to create a free face in the target rock mass of the structural surface test section, allowing subsequent blasting operations to occur along a predetermined contour. The predetermined contour is... Figure 1 The upper boundary 4 and the lower boundary 5 of the structural surface test section.

[0026] In step S2, the anti-vibration holes are arranged linearly in three rows along the direction of the structural surface mark 7 on the tunnel wall. The diameter of the anti-vibration holes is 42mm, and the depth is 2.5m. From near to far from the structural surface mark 7, the anti-vibration holes are arranged in three rows: the first row of anti-vibration holes 9, the second row of anti-vibration holes 10, and the third row of anti-vibration holes 11. The depth of the three rows of anti-vibration holes is 0.5m greater than the depth of the blasting holes. The length of the arrangement of the three rows of anti-vibration holes covers the processing area of ​​the structural surface test section specimen to be retained. The processing area of ​​the structural surface test section specimen is the rock mass between the lower boundary 5 of the structural surface test section and the structural surface mark 7 on the tunnel wall.

[0027] The distance between the first row of anti-vibration holes 9 and the structural surface mark 7 on the tunnel wall is 30cm, and the spacing between the holes in the first row of anti-vibration holes 9 is 10cm. The distance between the second row of anti-vibration holes 10 and the structural surface mark 7 on the tunnel wall is 40cm, and the spacing between the holes in the second row of anti-vibration holes 10 is 20cm. The distance between the third row of anti-vibration holes 11 and the structural surface mark 7 on the tunnel wall is 50cm, and the spacing between the holes in the third row of anti-vibration holes 11 is 30cm. The second row of anti-vibration holes 10 is staggered with the first row of anti-vibration holes 9 and the third row of anti-vibration holes 11. The purpose of the anti-vibration holes is to absorb the blasting energy during the blasting process, reduce the impact disturbance of the blasting energy on the structural surface, and at the same time, block the transmission of damage.

[0028] In step S3, after the explosive charge is detonated, new anti-vibration holes are drilled linearly in the direction of excavation of the test section of the structural surface on the remaining holes of the first row of anti-vibration holes 9, the second row of anti-vibration holes 10, and the third row of anti-vibration holes 11. The new anti-vibration holes have the same specifications and spacing as the anti-vibration holes in the extended row, forming the second round of anti-vibration holes.

[0029] After setting the second round of anti-vibration holes, set the second round of blasting holes in the same way as in step S2. The depth of the second round of anti-vibration holes is 0.5m deeper than that of the second round of blasting holes.

[0030] In step S2, the blasting holes are set on the hanging wall rock 3 between the upper boundary 4 and the lower boundary 5 of the structural surface test section. The distance between the blasting hole and the structural surface mark 7 on the tunnel wall is 1.8m. The blasting hole has a diameter of 42mm and a depth of 2.0m. The blasting holes include a central hole 12 and surrounding peripheral holes 13. The anti-vibration hole is set between the blasting hole and the structural surface mark 7 on the tunnel wall. The charging and detonation step includes placing explosives in the central hole 12 and the surrounding holes 13 and then detonating them. The charging and detonation process adopts a method of drilling multiple holes and loading a small amount of explosives into each hole. The purpose of this method is to avoid the damage to the target structural surface caused by excessive blasting shock waves from a single charging and detonation.

[0031] During the detonation process in step S2, the explosive in the central hole 12 detonates before the explosive in the peripheral holes 13. The purpose of detonating the central hole 12 first is to create a slot, thus creating a free surface for subsequent blasting operations. Consequently, the minimum resistance line for subsequent blasting changes from the minimum distance from the blasting hole to the target structural surface to the minimum distance from the center of the blasting hole 12 to the artificially created free surface, thereby reducing the disturbance impact of subsequent blasting on the target structural surface.

[0032] In step S4, the blasting face is modified using hydraulic splitting. This involves inserting the splitting nozzle of a handheld hydraulic splitting device into the residual anti-vibration holes after detonation, and then splitting the rock hole by hole. This device can utilize a 42mm pneumatic drill hole for rock splitting. The blasting face modified by hydraulic splitting can achieve the expected excavation effect of the structural surface test section.

Claims

1. A rapid and disturbance-reducing excavation method for a test section of a confined space structural surface, characterized in that, Includes the following steps: S1: Determine the location of the target structural surface test section within the existing tunnel (2), and then predict its orientation (6) based on the traces of the tunnel wall structural surface (7). S2: Excavate the funnel opening of the structural surface. The upper and lower boundaries of the funnel opening of the structural surface are the upper boundary (4) and the lower boundary (5) of the structural surface test section. During the excavation, anti-vibration holes and blasting holes are set, and then explosives are loaded and detonated to obtain the funnel opening of the structural surface. S3: On the basis of the flared opening of the structural surface, the structural surface test section is excavated, with the upper boundary (4) and the lower boundary (5) of the structural surface test section as the boundary; S4: Repair the blasting face; In step S2, the anti-vibration holes are arranged in three rows in a linear fashion along the direction of the structural surface trace (7) of the tunnel wall. The distance from the structural surface trace (7) of the tunnel wall includes the first row of anti-vibration holes (9), the second row of anti-vibration holes (10) and the third row of anti-vibration holes (11) from the nearest to the farthest. The length of the arrangement of the three rows of anti-vibration holes covers the processing area of ​​the test specimen of the structural surface test section that needs to be retained. The second row of anti-vibration holes (10) is staggered with the first row of anti-vibration holes (9) and the third row of anti-vibration holes (11); Step S3: After the charge is detonated, new anti-vibration holes are drilled linearly in the direction of excavation of the test section of the structural surface on the remaining holes of the first row of anti-vibration holes (9), the second row of anti-vibration holes (10), and the third row of anti-vibration holes (11). The new anti-vibration holes have the same specifications and spacing as the anti-vibration holes in the extended row, forming the second round of anti-vibration holes. After setting the second round of anti-vibration holes, set the second round of blasting holes in the same way as in step S2, wherein the depth of the second round of anti-vibration holes is greater than that of the second round of blasting holes; In step S4, the blasting working face is trimmed by hydraulic splitting. The steps include inserting the splitting gun head of the hydraulic splitting equipment into the residual anti-vibration holes after detonation, and then splitting the holes one by one.

2. The method for rapid and disturbance-reduced excavation of a test section of a confined space structural surface as described in claim 1, characterized in that: In step S1, the predicted orientation of the structural surface is determined by the exposed structural surface in the tunnel wall (6). If there is no exposed structural surface, the orientation of the target structural surface is inferred by the extension direction of the traces (7) of the tunnel wall structural surface that appear on both sides of the tunnel wall (2).

3. The method for rapid and disturbance-reduced excavation of a test section of a confined space structural surface as described in claim 1, characterized in that: In step S2, the opening of the structural surface test section is funnel-shaped. First, anti-vibration holes are drilled in the rock mass, and then blasting holes are drilled. The depth of the anti-vibration holes is greater than that of the blasting holes.

4. The method for rapid and disturbance-reduced excavation of a test section of a confined space structural surface as described in claim 1, characterized in that: In step S2, the blasting hole is set on the hanging wall rock mass (3) between the upper boundary (4) and the lower boundary (5) of the structural surface test section. The blasting hole includes a central hole (12) and surrounding peripheral holes (13). The anti-vibration hole is set between the blasting hole and the structural surface trace (7) of the tunnel wall. The charging and detonation step includes setting explosives in the central hole (12) and surrounding holes (13) and then detonating.

5. The method for rapid and disturbance-reduced excavation of a test section of a confined space structural surface as described in claim 4, characterized in that: During the detonation process in step S2, the explosive in the central hole (12) detonates before the explosive in the peripheral holes (13).

Citation Information

Patent Citations

  • Deep rock mass blasting damage control method based on multi-level energy regulation and control

    CN115929329A

  • Construction method for underground facilities