Method and system for identifying incidence relation between distribution line and main transformer

By constructing a mapping relationship between the main transformer and the distribution lines and a load priority-based round-robin disconnection method, the problem of difficulty in identifying the connection relationship between the distribution lines and the main transformer was solved, thus achieving stable operation of the power system and precise load disconnection.

CN121149946APending Publication Date: 2025-12-16YUNNAN POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511222820.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-29
Publication Date
2025-12-16

AI Technical Summary

Technical Problem

The inability to accurately identify the connection between the distribution lines and the main transformer leads to unstable operation of the power system, especially when the substation operation mode changes, the main transformer cannot accurately disconnect the load of the distribution lines.

Method used

By using bus connection settings, distribution line disconnector positions, main transformer switch status, and bus tie section switch status, a topology search method is used to construct the mapping relationship between the main transformer and the distribution line. Combined with load priority, loads are cut off in rounds, and line protection devices and associated identification devices are used to achieve automatic identification and accurate disconnection.

Benefits of technology

After the operating mode of the main transformer, distribution lines and bus tie section equipment changes, there is no need to manually adjust the setting zone and trip matrix. The system automatically identifies the relationship between the main transformer and distribution lines, realizes the precise removal of overload loads, and improves the stability of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121149946A_ABST
    Figure CN121149946A_ABST
Patent Text Reader

Abstract

The invention discloses a method and a system for identifying an association relationship between a distribution line and a main transformer, and the method comprises the steps: obtaining an initial bus hitching position of the distribution line through a bus connection fixed value or a distribution line disconnecting link position, and obtaining an association relationship between the distribution line and the main transformer based on a bus number, a main transformer switch state, a main transformer current parameter and a buscouple section switch state; a topological search method is adopted to construct a mapping relation between a main transformer and a distribution line, when the main transformer is overloaded, the load of the distribution line is cut off in turns based on the mapping relation and the load priority, and after the operation modes of equipment such as the main transformer, the distribution line and a bus coupler segment are changed, a device constant value area and a tripping matrix do not need to be adjusted. The line protection device and the association identification device automatically identify the association relationship between the main transformer and the distribution line, provide a basis for the main transformer overload intertripping of the distribution line or other functions, provide a load dynamic weight formula and a multi-round load shedding decision scheme, and achieve accurate load shedding.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power distribution lines, and in particular to a method and system for identifying the relationship between power distribution lines and main transformers. Background Technology

[0002] As society places increasingly higher demands on power supply reliability, substations will be equipped with multiple transformers to ensure continuous power supply. As the power load gradually increases, when the transformer load rate exceeds the national standard, measures must be taken to cut off part of the load to ensure the normal operation of the transformer.

[0003] Electrical loads should be classified according to the requirements for power supply reliability and the degree of loss or impact on politics and the economy caused by power outages, and can be divided into primary loads, secondary loads, and tertiary loads. Transformers should take different disconnection measures for different levels of loads, therefore, identifying the loads connected to the transformer is crucial.

[0004] When a substation operates with a single busbar, all loads are connected to the same busbar, and the transformer does not need to identify the load connection. When the substation operates with a single busbar segmented, the operating transformer must consider the bus tie segmentation status. For example, if the #1 main transformer is connected to the load of busbar I, and the bus tie segmentation switch of busbar I and busbar II is closed, the load of busbar II is also connected to the #1 main transformer. In this case, the transformer must consider the load of busbar II when disconnecting the load. When the transformer has two branches, the situation is more complicated. For example, with three main transformers, and the #2 main transformer has two branches, there are a total of four busbars on the lower side. The lower branches of the #2 main transformer may both be in operation, or only one may be in operation, or both may be out of operation. Each change in the operating mode will cause the original load connection method to be adjusted, and the main transformer's load disconnection function will need to switch the setting zone, which is very troublesome. Summary of the Invention

[0005] Therefore, the technical problem to be solved by the present invention is that the connection between the distribution line and the main transformer cannot be confirmed, the main transformer cannot accurately cut off the load of the distribution line, and the power system cannot achieve stable operation.

[0006] The above-mentioned technical problems are solved by the following technical solution: This invention proposes a method for identifying the relationship between distribution lines and main transformers, which includes obtaining the initial busbar connection position of the distribution line through busbar connection settings or the position of the distribution line disconnector; constructing a mapping relationship between the main transformer and the distribution line based on the busbar number, the main transformer switch status, the main transformer current parameters, and the bus tie sectionalizing switch status, using a topology search method; and when the main transformer is overloaded, cutting off the distribution line load in rounds based on the mapping relationship and load priority.

[0007] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers described in this invention: obtaining the initial busbar connection position includes: when the double busbar is running, determining the connection busbar by the position of the switch on the power distribution line; when the single busbar is segmented, determining the busbar to which it belongs by the busbar connection setting value; when the setting value is set to 0, the corresponding power distribution line is in a non-operating state.

[0008] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers according to the present invention: the topology search method includes taking the low-voltage side circuit breaker of the main transformer as the starting node, determining whether the main transformer is in operation based on the current status of the main transformer, associating the busbars based on the bus tie section switch status index, and forming an electrical connection network between the main transformer and the power distribution lines.

[0009] In a preferred embodiment of the method and system for identifying the relationship between distribution lines and main transformers according to the present invention: the load priority is dynamically calculated through weighting factors, the weighting factors including load importance coefficient and load stability coefficient, and the disconnection order of distribution lines is determined based on the priority.

[0010] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers according to the present invention: the phased disconnection includes calculating the total load to be disconnected in each phase based on the overload of the main transformer, and disconnecting the power distribution lines in sequence according to the disconnection order until the main transformer load drops below the safety threshold.

[0011] To solve the above-mentioned technical problems, the present invention also provides the following technical solution: a line protection device for monitoring the operating status of distribution lines and outputting disconnector position and load information; an association identification device for establishing a communication connection with the line protection device to transmit real-time data, comprising: an initial positioning module communicating with the line protection device; a topology association module for receiving bus connection data from the initial positioning module; a load sorting module for classifying associated distribution lines according to load type and calculating disconnection priority scores based on the mapping relationship output by the topology association module; and a disconnection control module for real-time monitoring of whether the main transformer current exceeds the rated value. The system receives the position signal of the disconnector switch or the bus connection setting of the distribution line, parses the initial bus connection position, and transmits it to the topology association module. At the same time, the topology association module collects the open / closed status of the main transformer switch, the main transformer current signal, and the position of the bus tie section switch. It constructs a mapping relationship between the main transformer and the distribution line through topology search and sends the association result to the load sorting module. The load sorting module transmits the sorting result to the tripping control module. If the load is overloaded, the tripping control module calculates the load to be tripped in each round according to the priority order of the load sorting module, generates a tripping command, and sends it to the line protection device to control the corresponding distribution line to trip.

[0012] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers according to the present invention: the initial positioning module includes a disconnector detection unit and a setting value analysis unit. The disconnector detection unit communicates with the disconnector position sensor of the line protection device to obtain the opening and closing status of the double busbar disconnectors. The setting value analysis unit receives the busbar connection setting value issued by the line protection device, analyzes it, and determines the busbar to which the line belongs in the single busbar segmentation scenario. Both results are synchronized to the topology association module.

[0013] In a preferred embodiment of the method and system for identifying the relationship between distribution lines and main transformers according to the present invention: the topology association module includes a main transformer status unit that collects the low-voltage side current signal of the main transformer and determines whether the current exceeds 0.05In to determine the main transformer's on / off status. The topology association module also includes a topology construction unit that receives the bus data from the initial positioning module and, in conjunction with the on / off status of the bus tie sectionalizing switch, indexes the associated bus according to the topology search rules to form an electrical connection network between the main transformer and the distribution lines, and synchronizes the network relationship to the load sorting module.

[0014] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers according to the present invention: the load sorting module includes a load classification unit and a priority calculation unit. The load classification unit classifies power distribution lines into high-risk, important, secondary important and general loads based on the mapping relationship determined by the topology association module. The priority calculation unit calls a preset weight factor, combines the load type and stability parameters to calculate the cut-off priority score, sorts it in ascending order and transmits it to the cut-off control module.

[0015] In a preferred embodiment of the method and system for identifying the relationship between power distribution lines and main transformers according to the present invention: the load calculation unit of the cut-off control module receives the main transformer current monitoring data in real time. When an overload is detected, it calculates the difference between the current load and the safety threshold, determines the amount of load to be cut off according to the round, and the cut-off execution unit generates a cut-off command starting from the lowest priority line according to the priority order of the load sorting module. The command is sent to the line protection device through the communication interface to control the corresponding line to trip. At the same time, the amount of load cut off is accumulated until the main transformer load drops below the safety threshold.

[0016] The beneficial effects of this invention are as follows: after the operating mode of equipment such as main transformers, distribution lines, and bus tie sections changes, it is not necessary to adjust the device setting range and trip matrix. The relationship between the main transformer and the distribution line is automatically identified by the line protection device and the association identification device. This provides a basis for the main transformer to disconnect the distribution line or other functions when overloaded, and proposes a load dynamic weighting formula and a multi-round load shedding decision scheme to achieve accurate load shedding. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings of the embodiments of the present invention will be briefly described below. Obviously, the drawings described below only relate to some embodiments of the present invention and are not intended to limit the present invention. Wherein:

[0018] Figure 1 The system diagram showing the relationship between the main transformer circuit, line protection devices, and associated identification devices is presented.

[0019] Figure 2 The diagram shows the single-busbar segmented wiring diagram of the main transformer circuit;

[0020] Figure 3 The diagram shows the single-bus section double-branch wiring diagram of the main transformer circuit;

[0021] Figure 4 The wiring diagram of the main transformer circuit with a single busbar and two sections is shown.

[0022] Figure 5 The diagram shows the three-section wiring diagram of the main transformer circuit with a single busbar.

[0023] Figure 6 The diagram shows the double busbar wiring diagram of the main transformer circuit;

[0024] Figure 7 The overload switching logic diagram of the main transformer circuit is shown. Detailed Implementation

[0025] To enable those skilled in the art to better understand the present invention, the present invention will be further described in detail below with reference to specific embodiments and accompanying drawings.

[0026] The terminology used in this invention is that which is currently widely used in the art in consideration of the function of the invention; however, these terms may vary according to the intent of those skilled in the art, precedent, or new technology in the art. Furthermore, specific terms may be chosen by the applicant, and in such cases, their detailed meanings will be described in the detailed description of the invention. Therefore, the terms used in this specification should not be construed as simple names, but rather based on their meanings and the overall description of the invention.

[0027] Example 1

[0028] Reference Figures 1 to 7 This embodiment provides a method and system for identifying the relationship between a power distribution line and a main transformer. It includes a line protection device 1 and a relationship identification device 2, both of which are composed of CPUs. The line protection device 1 is used to monitor the position of the disconnect switch, load data and operating status of the power distribution line, and interacts with the relationship identification device 2 in real time through a communication interface. The relationship identification device 2 realizes automatic identification of the relationship between the power distribution line and the main transformer and accurate disconnection of overload load through modular design.

[0029] Furthermore, it specifically includes an initial positioning module 21, which is used to determine the initial busbar connection position of the power distribution line. The initial positioning module 21 obtains the initial busbar connection position of the power distribution line in two ways to adapt to different substation busbar configuration scenarios.

[0030] The line protection device 1 is used to monitor the operating status of the power distribution line. Specifically, it collects the position of the disconnect switch (through the disconnect switch position sensor) and load information (such as current and power) of the power distribution line, and transmits this real-time data to the associated identification device 2 through the communication interface. At the same time, it receives the disconnection command from the associated identification device 2, controls the corresponding power distribution line to open, provides basic data support for the associated identification device, and is the execution terminal for load disconnection. It ensures the real-time performance of data and the accuracy of control, establishes two-way communication with the associated identification device 2, transmits disconnect switch position and load data to it, receives its disconnection command and executes the opening operation.

[0031] The correlation identification device 2, as the core control device, works collaboratively with its internal modules to automatically identify the correlation between distribution lines and main transformers, and accurately disconnect loads when the main transformer is overloaded. It includes an initial positioning module 21, a topology correlation module 22, a load sorting module 23, and a disconnection control module 24. Without requiring manual adjustment of the setting range or trip matrix, it automatically adapts to changes in the operating modes of the main transformer, bus, and lines, achieving dynamic identification of correlation relationships and accurate disconnection of overloaded loads, thus improving power system stability. It communicates with the line protection device 1 to obtain real-time data, and the internal modules coordinate according to the data flow (initial positioning → topology correlation → load sorting → disconnection control), ultimately executing the disconnection operation through the line protection device.

[0032] Furthermore, the initial positioning module 21 in the association identification module 2 is used to determine the initial busbar connection position of the power distribution line, adapting to both double busbar and single busbar segmentation scenarios.

[0033] Specifically, in a dual busbar scenario: the open / closed status of the disconnector is obtained through the disconnector detection unit 211 to determine the connected busbar.

[0034] In a single-bus segmentation scenario: the bus connection setting is received by the setting value parsing unit 212, and the bus to which the line belongs is parsed (when the setting value is 0, the line is determined to be in a non-operating state). This is used to quickly and accurately determine the initial connection position of the line, provide basic data for subsequent topology association, adapt to different substation bus configurations, improve compatibility, and receive the disconnector position signal and bus connection setting value of the line protection device 1. The parsed initial bus connection data is then transmitted to the topology association module 22.

[0035] Furthermore, the disconnector detection unit 211 (a subunit of the initial positioning module) is used to communicate with the disconnector position sensor of the line protection device 1 to obtain the disconnector's open / closed status in a dual-busbar scenario (such as the closed / open position of disconnector 1 and disconnector 2), thereby determining the busbar connected to the line (e.g., if disconnector 1 is closed, then busbar 1 is connected), accurately identifying the real-time connection position of the line in a dual-busbar scenario, supporting disconnector abnormal status alarms (e.g., triggering an interconnection alarm when both disconnectors are closed), and transmitting the disconnector open / closed status data to the initial positioning module 21, which integrates the data and sends it to the topology association module 22.

[0036] Furthermore, the setting value parsing unit 212 (a subunit of the initial positioning module) is used to receive the bus connection setting values ​​issued by the line protection device 1, parse the bus to which the line belongs in the single bus segmentation scenario (e.g., setting value 1 corresponds to bus 1, setting value 2 corresponds to bus 2), and identify the non-operating state (setting value is 0). The setting value parsing unit 212 is adapted to the single bus segmentation scenario, and quickly locates the bus to which the line belongs through the setting values, avoiding errors in manual judgment. The parsed bus attribution data is transmitted to the initial positioning module 21, which integrates it and sends it to the topology association module 22.

[0037] Furthermore, the topology association module 22, based on the bus data from the initial positioning module 21, and combined with the main transformer switch status, main transformer current parameters, and bus tie sectionalizing switch status, constructs a mapping relationship between the main transformer and the distribution lines using a topology search method:

[0038] The main transformer status unit 221 determines whether the main transformer is in operation. The topology construction unit 222 combines the status index of the bus tie section switch with the associated busbars to form an electrical connection network.

[0039] Specifically, the system dynamically constructs the relationship between the main transformer and the line, adapting to scenarios such as main transformer commissioning / decommissioning and changes in the status of bus tie switches (e.g., associating multiple bus line segments when the bus tie is in operation), without requiring manual reconfiguration. It also receives bus data from the initial positioning module 21, collects the status data of the main transformer and bus tie switches, and transmits the constructed mapping relationship to the load sorting module 23.

[0040] Furthermore, the main transformer status unit 221 (a sub-unit of the topology association module) is used to collect the low-voltage side current signal of the main transformer. By judging whether the current exceeds 0.05In (In is the rated current), the main transformer's on / off status is determined (if the current is ≥0.05In or the circuit breaker is closed, it is put into operation; otherwise, it is taken out of operation). This can accurately identify whether the main transformer is participating in operation, avoid non-operating main transformers from participating in the association relationship construction, reduce invalid calculations, and transmit the main transformer on / off status data to the topology construction unit 222 as the basic condition for topology search.

[0041] Furthermore, the topology construction unit 222 (a sub-unit of the topology association module) is used to receive the bus data from the initial positioning module 21, combine the opening and closing status of the bus tie section switch, index the associated bus according to the topology search rules (such as associating adjacent bus when the bus tie is in position), form an electrical connection network of "main transformer-bus-distribution line", dynamically generate the association relationship network, and support multiple main transformers and multiple bus tie sections (such as 3 main transformers + 4 bus tie sections) to ensure that the association relationship is updated in real time, and transmit the electrical connection network data to the load sorting module 23 as the basis for load priority calculation.

[0042] Furthermore, the load sorting module 23, based on the mapping relationship of the topology association module 22, classifies the distribution lines according to load type and calculates the disconnection priority:

[0043] The load classification unit 231 divides loads into high-risk, important, secondary important, and general loads. The priority calculation unit 232 calculates the cutoff priority score using weighting factors (load importance coefficient, stability coefficient, etc.) and sorts them in ascending order (the lower the score, the higher the priority for cutoff). Furthermore, the load cutoff order is clearly defined to ensure that low-priority loads (such as residential areas) are cut off first during overload, while high-priority loads (such as hospitals) are preserved, thus improving power supply reliability. The unit receives the mapping relationship from the topology association module 22 and transmits the sorting results to the cutoff control module 24.

[0044] Furthermore, the load classification unit 231 (a sub-unit of the load sorting module) divides the power distribution lines into high-risk (e.g., hospitals), important (e.g., schools), secondary important (e.g., commercial buildings), and general loads (e.g., residential communities) based on the mapping relationship of the topology association module 22. This provides a basic classification for priority calculation, clarifies the load importance level, ensures the rationality of priority calculation, and transmits the classification results to the priority calculation unit 232 for weight factor calculation.

[0045] Furthermore, the priority calculation unit 232 (a sub-unit of the load sorting module) calls preset weight factors (such as importance coefficient and stability coefficient), and calculates the shedding priority score (formula: Wi=α·Pi+β·Si+γ·Fi, α+β+γ=1) in combination with load type and stability parameters. The score is sorted in ascending order to dynamically quantify the load shedding priority, avoid subjective judgment, ensure sorting accuracy, and transmit the sorting result to the load sorting module 23. After integration, it is sent to the shedding control module 24.

[0046] Furthermore, the disconnection control module 24 monitors the main transformer current in real time, and when overloaded, disconnects the load in batches based on the priority of the load sequencing module 23:

[0047] The load calculation unit 241 calculates the overload and the load to be cut off in each cycle. Specifically, when a main transformer overload is detected (the current flowing through the transformer exceeds the set value of the first cycle), it synchronously calculates the total load to be cut off ΔS (current load - safety threshold, safety threshold = 0.9 * rated value). The cut-off target is ΔS1 = ΔS * 0.3 (cut off 30% of the overload). i Start with the smallest line and disconnect them sequentially, accumulating the disconnected load until the cumulative disconnected load is ≥ ΔS1. Record the disconnected lines and remove them from the distribution lines to be disconnected.

[0048] The disconnection execution unit 242 generates disconnection commands according to priority, controls the line to trip until the load drops below the safety threshold, thereby achieving precise and phased disconnection of overload loads, avoiding disconnection of too much load at once, balancing system stability and power supply continuity, and receiving priority sorting from the load sorting module 23 to send disconnection commands to the line protection device 1 to complete the tripping control.

[0049] Furthermore, the load calculation unit 241 (a subunit of the cut-off control module) is used to receive the main transformer current monitoring data in real time, calculate the difference between the current load and the safety threshold when an overload is detected, determine the amount of load to be cut off according to the round (e.g., cut off 30% of the overload in the first round, and add up to 50% in the second round, etc.), scientifically quantify the amount of cut-off in each round, avoid over-cutting or under-cutting, ensure that the main transformer load returns to the safe range quickly, and transmit the amount of cut-off in each round to the cut-off execution unit 242 as the basis for instruction generation.

[0050] Furthermore, the disconnection execution unit 242 (a sub-unit of the disconnection control module) generates disconnection commands starting from the lowest priority line according to the priority order of the load sorting module 23, and sends them to the line protection device 1 through the communication interface to control the corresponding line to trip. At the same time, it accumulates the amount of load disconnected until the main transformer load drops below the safety threshold. It executes the disconnection operation precisely according to priority to ensure that the load gradually returns to the safe range after each round of disconnection, avoiding system fluctuations. It also receives the disconnection amount data from the load calculation unit 241 and sends commands to the line protection device 1 to complete the tripping control.

[0051] Specifically, the process is as follows: Line protection device 1 → Initial positioning module 21 → Topology association module 22 → Load sequencing module 23 → Disconnection control module 24 → Line protection device 1. The line protection device provides basic data → The initial positioning module determines the initial connection position of the line → The topology association module constructs the dynamic association between the main transformer and the line → The load sequencing module determines the disconnection sequence → The disconnection control module executes the disconnection in rounds. Finally, the line protection device completes the tripping, realizing the overload protection of the main transformer. All devices, modules, and units work seamlessly together, automatically adapting to changes in operating mode without manual intervention, accurately identifying the correlation relationship and disconnecting the load, ensuring the stable operation of the power system.

[0052] Example 2

[0053] In a dual-busbar operation scenario, each distribution line is equipped with one bus disconnector and two bus disconnectors. The disconnector detection unit 211 of the initial positioning module 21 communicates with the disconnector position sensor of the line protection device 1 to obtain the disconnector's open / closed status. For example:

[0054] Figure 6 For a dual-busbar operation scenario:

[0055] If bus 1 disconnect switch is closed and bus 2 disconnect switch is open, it is determined that bus 1 is connected to the line.

[0056] If both disconnect switches are in the open position, the line is determined to be under maintenance.

[0057] If both disconnectors are closed, a bus interconnection alarm is triggered, prompting operators to check.

[0058] Single-parent segmentation scenario:

[0059] The setting analysis unit 212 of the initial positioning module 21 receives the "bus connection setting" issued by the line protection device 1. The setting can be adjusted according to the actual situation on site. For example, a setting of 0 indicates that the line is under maintenance or has not yet been constructed, 1 indicates the first busbar, and 2 indicates the second busbar.

[0060] When the set value is 1, the corresponding line is connected to bus 1; when the set value is 2, bus 2 is connected; and so on.

[0061] When the value is 0, the line is determined to be out of operation and will not participate in subsequent association identification logic.

[0062] Furthermore, the main transformer's on / off status is determined as follows: The main transformer status unit 221 collects the low-voltage side current signal of the main transformer. If the current value is <0.05In (In is the transformer's secondary rated current) and the circuit breaker is in the tripped position, the main transformer is determined to be out of operation, and the indexing process of the main transformer is terminated; if the current value is ≥0.05In or the circuit breaker is in the closed position, the main transformer is determined to be in operation, and the topology search is started.

[0063] Furthermore, based on the topology index of the bus tie switch status (taking 3 main transformers as an example, #2 main transformer has two branches, such as...), Figure 4 ).

[0064] Specifically, Case 1: Bus tie 1 and bus tie 2 are both in the same position: Starting from the low-voltage side circuit breaker of the #1 main transformer, if its current is ≥0.05In, it is determined to be in operation and is connected to bus I. Since bus tie 1 is in the same position, bus I and bus 3 are not related, so the #1 main transformer is only associated with the distribution lines on bus 1.

[0065] #2 main transformer has a lower branch current ≥ 0.05In, connected to bus 2A; lower branch current ≥ 0.05In, connected to bus 2B. Since the bus tie is at point 2, bus 2B is not connected to bus 3, therefore the lines on bus 2A and bus 2B are connected to the main transformer #2.

[0066] Specifically, Case 2: Mother couple 1 combined position, mother couple 2 separated position:

[0067] After the #1 main transformer is indexed to bus 1, because bus connection 1 is closed, it continues to index bus 2A and bus 2B (which are associated with bus 2A through the branch of the #2 main transformer). Therefore, the #1 main transformer and the #2 main transformer are jointly associated with the lines on bus 1, bus 2A and bus 2B; the #3 main transformer is still independently associated with the lines on bus 3.

[0068] Furthermore, the mapping relationship is output:

[0069] The topology building unit 222 organizes the index results into a "main transformer-bus-distribution line" association table, for example: #1 main transformer → {(line 1, line 2)(1 bus), (line 3, line 4)(2A bus)}, and synchronizes it to the load sorting module 23.

[0070] Load sorting module 23: Calculation of cut-off priority based on weight factor.

[0071] The load sorting module 23 sorts the power distribution lines according to the "disconnection priority" based on the mapping relationship of the topology association module 22.

[0072] Specifically, the core logic includes:

[0073] Load classification:

[0074] Load classification unit 231 divides the line into high-risk loads (such as hospitals), important loads (such as schools), secondary important loads (such as commercial buildings), and general loads (such as residential communities), with corresponding importance coefficients of 1, 0.8, 0.6, and 0.1, respectively.

[0075] Specifically, priority score calculation:

[0076] Priority calculation unit 232 calculates the cut-off priority score of each line using a dynamic weighting formula (the smaller the value, the higher the priority for cut-off).

[0077] The following calculation method is further provided:

[0078] W i =α·P i +β·S i +γ·F i

[0079] Where α, β, and γ are adjustable weighting coefficients (default α = 0.7, β = 0.2, γ = 0.1, satisfying α + β + γ = 1).

[0080] Among them W i : The cut-off priority score of line i (the smaller the value, the higher the priority for cut-off);

[0081] P i Importance coefficient of load i (fixed value, 1 for high-risk loads, 0.8 for important loads, 0.6 for minor loads, and 0.1 for general loads); S i : The priority score for line i to be removed (the smaller the value, the higher the priority for removal); F i The priority score for line i is determined by its smaller value (F). i Large indicates large load fluctuations (such as impact loads), which should be retained. F i Smaller values ​​indicate a stable workload, and these cells are prioritized for removal.

[0082] Furthermore, if a main transformer overload is detected (the current flowing through the transformer exceeds the first-round set value), the total load ΔS to be cut off is calculated synchronously (current load - safety threshold, safety threshold = 0.9 * rated value). The cut-off target is ΔS1 = ΔS * 0.3 (cut off 30% of the overload). i Start with the smallest line and disconnect them sequentially, accumulating the disconnected load until the cumulative disconnected load is ≥ ΔS1. Record the disconnected lines and remove them from the distribution lines to be disconnected.

[0083] Furthermore, after the first round of actions, it continues to determine whether the main transformer is still overloaded (the current flowing through the transformer exceeds the set value of the second round). If it is still overloaded, the total load to be cut off ΔS (current load - safety threshold, safety threshold = 0.9 * rated value) is calculated synchronously, and the cut-off target is ΔS2 = ΔS * 0.5 (cut off 50% of the overload) from W. i Start with the smallest line and disconnect them sequentially, accumulating the disconnected load until the cumulative disconnected load is ≥ ΔS1. Record the disconnected lines and remove them from the distribution lines to be disconnected.

[0084] Furthermore, after the second round of action, it continues to determine whether the main transformer is still overloaded (the current flowing through the transformer exceeds the set value of the third round). If it is still overloaded, the total load to be cut off ΔS (current load - safety threshold, safety threshold = 0.9 * rated value) is calculated simultaneously. The cut-off target is ΔS3 = ΔS * 0.7 (cut off 70% of the overload). i Start with the smallest line and disconnect them sequentially, accumulating the disconnected load until the cumulative disconnected load is ≥ ΔS3. Record the disconnected lines and remove them from the distribution lines to be disconnected.

[0085] Furthermore, by analogy, the device can support up to 5 rounds of continuous cutting, and the overload setpoint and time for each round can be set independently, which can be selected according to the site conditions.

[0086] like Figure 2 The diagram shows the single busbar segmented wiring of the main transformer circuit: The single busbar segmented structure only includes two busbars, I busbar and II busbar, which are connected by a bus tie segmented switch. The number of main transformers is 2 (#1 and #2 main transformers), and each main transformer is connected to a separate busbar (#1→1 busbar, #2→2 busbar).

[0087] Initial positioning: The connection position of the power distribution line is determined by the busbar connection setting (setting 1 → bus 1, setting 2 → bus 2).

[0088] Topology search: If the bus tie sectionalizing switch is in the open position: the #1 main transformer is only associated with the I bus line, and the #2 main transformer is only associated with the 2 bus line. If the bus tie sectionalizing switch is in the closed position: the #1 main transformer and the #2 main transformer are jointly associated with all lines on the 1 and 2 buses (forming an electrical connection).

[0089] Overload cut-off: When the #1 main transformer is overloaded, the general load with the lowest Wi value on bus 1 (such as residential lines) will be cut off first. If the bus joint is broken, the low priority loads on bus 2 will need to be cut off in addition.

[0090] like Figure 3 The diagram shows the single busbar segmented double branch connection of the main transformer circuit: single busbar segmented + main transformer double branch structure (taking #2 main transformer as an example, including low branch 1 and low branch 2), the branch busbars are 2A bus (low branch 1) and 2B bus (low branch 2), which are connected to bus 1 and bus 3 through bus tie switch.

[0091] Connection identification logic: When bus tie 1 is closed and bus tie 2 is open: #1 main transformer is associated with bus 1 and bus 2A (through bus tie 1); #2 main transformer is associated with bus 2A and bus 2B.

[0092] Main transformer commissioning / decommissioning judgment: If the current of any branch of the #2 main transformer is less than 0.05In, the branch is determined to be out of operation (e.g., when the lower 2 branch is out of operation, the 2B bus line is not involved in the connection).

[0093] Topology search: When bus tie 1 is closed and bus tie 2 is open: #1 main transformer is associated with bus 1 and bus 2A (through bus tie 1); #2 main transformer is associated with bus 2A and bus 2B. When bus tie 1 and 2 are evenly open: each main transformer is only associated with the line directly connected to the bus (#1→bus 1, #2→bus 2A / 2B).

[0094] Overload Trial Case: When the #2 main transformer has a double branch overload, press W. i Prioritize disconnecting secondary loads (such as commercial building lines) on bus 2B.

[0095] In summary, after the operating mode of equipment such as main transformers, distribution lines, and bus tie sections changes, there is no need to adjust the device setting range and trip matrix. It automatically identifies the relationship between the main transformer and the distribution lines, provides a basis for the main transformer to disconnect the distribution lines or other functions when overloaded, proposes a load dynamic weighting formula and a multi-round load shedding decision scheme, and achieves accurate load shedding.

[0096] As shown in Figure 5, when the main transformer circuit is connected in a three-section single busbar configuration:

[0097] Operating scenario: The busbar is divided into four sections: busbar 1, busbar 2, busbar 3, and busbar 4, which are connected by bus tie 1 (1-2), bus tie 2 (2-3), and bus tie 3 (3-4).

[0098] Relationship identification logic:

[0099] Multi-level topology search: Bus tie 1 tertiary, bus tie 2 tertiary, bus tie 3 tertiary: #1 main transformer associated with bus 1; #2 main transformer associated with bus 2; #3 main transformer associated with bus 3; #4 main transformer associated with bus 4.

[0100] Bus tie 1 (closed), Bus tie 2 (open), Bus tie 3 (open): Main transformer #1 and main transformer #2 are associated with bus line 1 and bus line 2; main transformer #3 is associated with bus line 3; main transformer #4 is associated with bus line 4.

[0101] Bus tie 1 closed, bus tie 2 open, bus tie 3 closed: #1 main transformer and #2 main transformer are associated with bus 1 and bus 2 lines; #3 main transformer and #4 main transformer are associated with bus 3 and bus 4 lines.

[0102] Bus tie 1 closed, bus tie 2 closed, bus tie 3 open: #1 main transformer, #2 main transformer, #3 main transformer are associated with bus 1, bus 2 and bus 3 lines; #4 main transformer is associated with bus 4 line.

[0103] Bus tie 1, bus tie 2, and bus tie 3 are all connected: all main transformers are jointly connected to all four bus line sections.

[0104] Bus tie 1 (partial), Bus tie 2 (partial), Bus tie 3 (combined): #1 main transformer is associated with bus 1; #2 main transformer is associated with bus 2; #3 main transformer and #4 main transformer are associated with bus 3 and bus 4 lines.

[0105] Bus tie 1 (single position), bus tie 2 (combined position), bus tie 3 (single position): #1 main transformer is associated with bus 1; #2 and #3 main transformers are associated with bus 2 and bus 3 lines; #4 main transformer is associated with bus 4 line.

[0106] Bus tie 1 (partial), Bus tie 2 (combined), Bus tie 3 (combined): #1 main transformer is associated with bus 1; #2 main transformer, #3 main transformer, #4 main transformer are associated with bus 2, bus 3, and bus 4.

[0107] Overload shedding case: When the #3 main transformer is overloaded, if the bus tie 2 is open, only the general load on the 3 bus is shedding; if the bus tie 2 is closed, the low priority load on the 2 buses (2A bus and 2B bus) must be shedding simultaneously.

[0108] like Figure 7 As shown:

[0109] Round control: In the first round, 30% of the overload (ΔS1) is removed, with priority given to removing W. i For lines with a value <0.3, a second round of additional cut-off is performed to bring the cut-off rate up to 50% (ΔS2), covering W. i Lines with a strength of <0.5.

[0110] Dynamic weight adjustment: Example: Hospital line (P) i =1,F i W = 0.9) i =0.71 + 0.20.9 + 0.1*0 = 0.88 (high priority reserved), residential line (P) i =0.1,F i W = 0.2) i =0.70.1+0.20.2+0.1*0=0.11 (priority cut-off). Note that the output of load classification unit 211 must clearly display the classification thresholds for the four types of loads (e.g., high-risk load current > 100A).

[0111] Finally, it should be noted that the methods and devices described in detail above are merely embodiments, and those skilled in the art can modify these embodiments in different ways as long as they do not depart from the scope of the present invention.

Claims

1. A method for identifying the relationship between power distribution lines and main transformers, characterized in that: include, The initial busbar connection position of the power distribution line can be obtained by using the busbar connection setting or the position of the disconnect switch of the power distribution line. Based on the busbar number, main transformer switch status, main transformer current parameters, and bus tie section switch status, a topology search method is used to construct the mapping relationship between the main transformer and the distribution line. When the main transformer is overloaded, the load on the distribution line is cut off in batches based on the mapping relationship and load priority.

2. The method for identifying the relationship between power distribution lines and main transformers according to claim 1, characterized in that: The acquisition of the initial busbar connection position includes: when the double busbar is running, the connection position is determined by the position of the switch on the distribution line; when the single busbar is segmented, the busbar to which it belongs is determined by the busbar connection setting. When the set value is set to 0, the corresponding power distribution line is in a non-operational state.

3. The method for identifying the relationship between power distribution lines and main transformers according to claim 1, characterized in that: The topology search method includes taking the low-voltage side circuit breaker of the main transformer as the starting node and determining whether the main transformer is in operation based on the current status of the main transformer. Based on the bus tie section switch status index associated with the bus, an electrical connection network between the main transformer and the distribution lines is formed.

4. The method for identifying the relationship between power distribution lines and main transformers according to claim 1, characterized in that: The load priority is dynamically calculated through weighting factors, which include load importance coefficient and load stability coefficient. The order of disconnection of distribution lines is determined based on the priority.

5. The method for identifying the relationship between power distribution lines and main transformers according to claim 1, characterized in that: The phased disconnection process includes calculating the total load to be disconnected in each phase based on the overload of the main transformer, and disconnecting the distribution lines sequentially according to the disconnection order until the main transformer load drops below the safety threshold.

6. A system for identifying the relationship between power distribution lines and main transformers, characterized in that: The method for identifying the relationship between power distribution lines and main transformers as described in any one of claims 1 to 5; and, Line protection device (1) is used to monitor the operating status of power distribution lines and output switch position and load information; The association identification device (2) establishes a communication connection with the line protection device (1) to transmit real-time data, and includes, An initial positioning module (21) that is communicatively connected to the line protection device (1); The topology association module (22) receives the bus connection data from the initial positioning module (21); The load sorting module (23) classifies the associated power distribution lines according to load type and calculates the cut-off priority score based on the mapping relationship output by the topology association module (22). Disconnect the control module (24) and monitor in real time whether the main transformer current exceeds the rated value. The initial positioning module (21) receives the position signal of the switch of the distribution line or the bus connection setting, parses the initial bus connection position and transmits it to the topology association module (22). At the same time, the topology association module (22) collects the opening and closing status of the main transformer switch, the main transformer current signal and the position of the bus tie section switch, constructs the mapping relationship between the main transformer and the distribution line through topology search, and sends the association result to the load sorting module (23). The load sorting module (23) transmits the sorting result to the disconnection control module (24). If the load is overloaded, the cut-off control module (24) calculates the load to be cut off in each round according to the priority order of the load sorting module (23), generates a cut-off command and sends it to the line protection device (1) to control the corresponding distribution line to trip.

7. The system for identifying the association between power distribution lines and main transformers according to claim 6, characterized in that: The initial positioning module (21) includes a switch detection unit (211) and a set value analysis unit (212); The disconnector detection unit (211) communicates with the disconnector position sensor of the line protection device (1) to obtain the opening and closing status of the double bus disconnector. The set value analysis unit (212) receives the bus connection set value issued by the line protection device (1), and determines the bus to which the line belongs in the single bus segment scenario after analysis. Both results are synchronized to the topology association module (22).

8. The system for identifying the association between power distribution lines and main transformers according to claim 6, characterized in that: The topology association module (22) includes a main transformer status unit (221) that collects the low-voltage side current signal of the main transformer and determines whether the current exceeds 0.05In to determine the main transformer's on / off status. The topology association module (22) also includes a topology construction unit (222) that receives bus data from the initial positioning module (21), and, in conjunction with the opening and closing status of the bus tie section switch, indexes the associated bus according to the topology search rules to form an electrical connection network between the main transformer and the distribution line, and synchronizes the network relationship to the load sorting module (23).

9. The system for identifying the association between power distribution lines and main transformers according to claim 6, characterized in that: The load sorting module (23) includes a load classification unit (231) and a priority calculation unit (232). The load classification unit (231) classifies the power distribution lines into high-risk, important, secondary important and general loads based on the mapping relationship determined by the topology association module (22). The priority calculation unit (232) calls the preset weight factor, combines the load type and stability parameters to calculate the cut-off priority score, sorts it in ascending order, and transmits it to the cut-off control module (24).

10. The system for identifying the association between power distribution lines and main transformers according to claim 6, characterized in that: The load calculation unit (241) of the cut-off control module (24) receives the main transformer current monitoring data in real time. When an overload is detected, it calculates the difference between the current load and the safety threshold and determines the amount of load to be cut off according to the cycle. The disconnection execution unit (242) generates disconnection commands starting from the lowest priority line according to the priority order of the load sorting module (23), sends them to the line protection device (1) through the communication interface, controls the corresponding line to trip, and accumulates the amount of load disconnected until the main transformer load drops below the safety threshold.