Floating type fan platform and mounting method thereof

The floating wind turbine platform, with its modular design and variable-length connection mechanism, resolves the contradiction between stability and ease of transportation, enabling efficient assembly and low-cost rapid construction of offshore wind power. It is suitable for the offshore wind power sector, particularly for the installation method of floating wind turbine platforms.

CN121317042APending Publication Date: 2026-01-13CRRC TECH INNOVATION (BEIJING) CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511903216.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-12-16
Publication Date
2026-01-13

AI Technical Summary

Technical Problem

The existing design of floating wind turbine platforms presents a contradiction between stability and ease of transportation, making it difficult to meet the needs of rapid construction and efficient operation and maintenance.

Method used

The modular design of the floating platform, combined with a variable-length connecting mechanism and mooring system, achieves a balance between stability and ease of transportation. Modular production and transportation by ordinary cargo ships reduce costs and shorten the construction cycle.

Benefits of technology

It improves the assembly efficiency of floating wind turbine platforms, ensures stable operation of wind turbines, reduces transportation and installation costs, and meets the needs of rapid construction of offshore wind farms.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121317042A_ABST
    Figure CN121317042A_ABST
Patent Text Reader

Abstract

The invention discloses a floating type fan platform and a mounting method thereof, and relates to the technical field of offshore wind power, the floating type fan platform comprises a floating body platform, a ballast part, a connecting mechanism and a mooring system; the floating body platform comprises a central stand column and a plurality of side column assemblies distributed around the central stand column, each side column assembly comprises a side stand column, a bypass floating body and a transition piece, the side stand column is connected with one end of the bypass floating body through the transition piece, and the other end of the bypass floating body is connected with the central stand column; the ballast part is connected to the lower portion of the floating body platform through a connecting mechanism, and the connecting mechanism can drive the ballast part to move in the direction close to or away from the floating body platform. The mooring system is connected with the transition piece. According to the application, the ballast piece can be switched between the contraction position for transportation and the extension position for in-place work through the connecting mechanism, so that the stability of the floating type fan platform and the transportation convenience are both considered. In addition, the floating body platform of the floating type draught fan platform is designed in a modularized mode, and the assembling efficiency of the floating type draught fan platform is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of offshore wind power technology, and more specifically, to a floating wind turbine platform and its installation method. Background Technology

[0002] The design and construction of floating wind turbine platforms often rely on large fixed platforms or semi-submersible platforms. Although these platforms can provide good stability and resistance to wind and waves, traditional floating platform designs often require complex on-site assembly and commissioning, have long production cycles, and present significant challenges during transportation and installation.

[0003] Furthermore, as the scale of offshore wind farms continues to expand, existing design and construction methods are struggling to meet the demands for rapid construction and efficient operation and maintenance.

[0004] Therefore, how to improve the assembly efficiency of floating wind turbine platforms while taking into account both stability and ease of transportation has become a technical problem that urgently needs to be solved by those skilled in the art. Summary of the Invention

[0005] In view of this, the purpose of this application is to provide a floating wind turbine platform that improves the assembly efficiency of the floating wind turbine platform while taking into account its stability and ease of transportation.

[0006] Another objective of this application is to provide a floating wind turbine platform installation method applicable to the above-mentioned floating wind turbine platform.

[0007] To achieve the above objectives, this application provides the following technical solution:

[0008] A floating wind turbine platform, comprising:

[0009] A floating platform, the floating platform including a central column for connection with a wind turbine and a plurality of side column assemblies, wherein each of the side column assemblies is distributed around the central column, and each side column assembly includes a side column, a bypass float and a transition piece, wherein the side column is connected to one end of the bypass float through the transition piece, and the other end of the bypass float is connected to the central column;

[0010] Ballast components are located below the floating platform;

[0011] A connecting mechanism, which is variably connected between the ballast and the floating platform, and which is capable of moving the ballast toward or away from the floating platform;

[0012] A mooring system, which is connected to the transition piece.

[0013] Optionally, in the above-mentioned floating wind turbine platform, the connecting mechanism includes a telescopic drive component, one end of which is used to connect with the ballast component, and the other end of which is used to connect with the central column.

[0014] Optionally, in the above-mentioned floating wind turbine platform, the connecting mechanism includes a traction member and a retrieval device for retrieving and deploying the traction member. One end of the traction member is used to connect with the ballast member, and the other end of the traction member is used to connect with the central column.

[0015] Optionally, in the above-mentioned floating wind turbine platform, the central column, the side columns, the bypass float and the transition component are all tubular structures, and adjacent tubular structures are connected by connecting flanges or welding.

[0016] Optionally, in the above-mentioned floating wind turbine platform, at least one of the side columns and the bypass float is provided with a ballast compartment.

[0017] Optionally, in the above-mentioned floating wind turbine platform, the ballast component includes concrete or steel components.

[0018] Optionally, in the above-mentioned floating wind turbine platform, the top of the central column is provided with a mounting flange for connecting to the wind turbine.

[0019] A method for installing a floating wind turbine platform, applicable to any of the floating wind turbine platforms described above, comprising:

[0020] The assembly wind turbine platform is formed by assembling the various modules of the floating wind turbine platform. The modules include the central column, the side columns, the bypass float, the transition piece, the ballast piece, and the connecting mechanism, and the connecting mechanism is in a shortened state.

[0021] The transport wind turbine platform is used to transport the floating wind turbine platform to the target location, and the connecting mechanism extends to lower the ballast member to the target depth;

[0022] Install the mooring system and connect it to the transition piece.

[0023] Optionally, in the above-described floating wind turbine platform installation method, before the step of assembling the wind turbine platform, the method further includes:

[0024] Transport wind turbine platform modules: Transport the various modules of the floating wind turbine platform to the target assembly location by transport ship.

[0025] Optionally, in the above-described floating wind turbine platform installation method, during the step of transporting the wind turbine platform, the floating wind turbine platform is towed to the target location by wet towing.

[0026] The floating wind turbine platform provided in this application can be connected to a wind turbine via a central column of the floating platform. Multiple side column assemblies can be arranged around the central column, and one end of a bypass float is connected to the side column via a transition piece, while the other end of the bypass float is connected to the central column, ensuring that the wind turbine can float on the water surface via the floating platform. Simultaneously, ballast components are connected to the floating platform via a connecting mechanism to ensure the stability of the floating platform. A mooring system can also be connected to the transition piece to prevent the floating platform from drifting, thus ensuring the stable operation of the wind turbine. As can be seen from the above example, the floating wind turbine platform provided in this application allows the ballast components to move towards or away from the floating platform via the connecting mechanism. This allows the ballast components to switch between a retracted position for transportation and an extended position for in-situ operation, thereby balancing the stability of the floating wind turbine platform with the convenience of transportation. In addition, the floating platform of the floating wind turbine platform adopts a modular design, which enables factory and parallel production, shortens the construction cycle, and can be transported over long distances using ordinary cargo ships, further reducing costs and improving the assembly efficiency of the floating wind turbine platform.

[0027] The technical features mentioned above, those to be mentioned below, and those shown individually in the accompanying drawings can be combined arbitrarily, provided that the combined technical features are not contradictory. All feasible combinations of features are the technical content explicitly described herein. Any one of the multiple sub-features contained in the same statement can be applied independently, without necessarily being applied together with other sub-features. Attached Figure Description

[0028] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of this application. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0029] Figure 1 This is a schematic diagram of the structure of the floating wind turbine platform provided in the embodiments of this application;

[0030] Figure 2 This is an assembly diagram of the floating wind turbine platform provided in Embodiment 1 of this application;

[0031] Figure 3 This is an assembly diagram of the floating wind turbine platform provided in Embodiment 2 of this application;

[0032] Figure 4 A schematic diagram of the ballast component in a retracted state provided in the embodiments of this application;

[0033] Figure 5 This is a schematic diagram of module transportation provided in an embodiment of this application.

[0034] Among them, 100 is a floating wind turbine platform, 10 is a floating body platform, 11 is a central column, 12 is a side column assembly, 121 is a side column, 122 is a bypass float, 123 is a transition piece, 13 is a connecting flange, 20 is a ballast piece, 30 is a connecting mechanism, 31 is a telescopic drive piece, 32 is a traction piece, and 200 is a transport vessel. Detailed Implementation

[0035] The core of this application is to provide a floating wind turbine platform that improves the assembly efficiency of the floating wind turbine platform while taking into account its stability and ease of transportation.

[0036] Another core aspect of this application is to provide a floating wind turbine platform installation method applicable to the aforementioned floating wind turbine platform.

[0037] The technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, and not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0038] The design and construction of floating wind turbine platforms largely rely on large fixed platforms or semi-submersible platforms. While these platforms offer good stability and resistance to wind and waves, traditional floating platform designs often require complex on-site assembly and commissioning, resulting in long production cycles and significant challenges during transportation and installation. Furthermore, as offshore wind farms continue to expand, existing design and construction methods are struggling to meet the demands for rapid construction and efficient operation and maintenance.

[0039] Therefore, such as Figure 1 As shown in the illustration, this application discloses a floating wind turbine platform 100, including a floating platform 10, a ballast component 20, a connecting mechanism 30, and a mooring system. The connecting mechanism 30 drives the ballast component 20 to move towards or away from the floating platform 10, allowing the ballast component 20 to switch between a retracted position for transportation and an extended position for in-situ operation. This balances the stability of the floating wind turbine platform 100 with ease of transportation. Furthermore, the floating platform 10 of the floating wind turbine platform 100 adopts a modular design, enabling factory-based and parallel production, shortening the construction cycle, and allowing for long-distance transportation using ordinary cargo ships, further reducing costs and improving the assembly efficiency of the floating wind turbine platform 100.

[0040] The following will combine Figures 1 to 5 The floating wind turbine platform 100 disclosed in the embodiments of this application will be explained and described in detail.

[0041] like Figure 1 As shown, the floating platform 10 can adopt a semi-submersible platform structure to provide sufficient buoyancy and initial stability for the wind turbine. The floating platform 10 may include a central column 11 that can be connected to the wind turbine and multiple side column assemblies 12, and there may be three, four or more side column assemblies 12, which may be radially distributed around the central column 11. The central column 11 may adopt a hollow tubular structure, and a mounting flange is provided at the top of the central column 11 so that it can be rigidly connected to the tower of the wind turbine, thereby transferring the weight of the wind turbine and the environmental loads it experiences to the entire floating platform.

[0042] like Figure 1 As shown, the side column assembly 12 may include a side column 121, a bypass float 122, and a transition member 123. The side column 121 may be located at the outermost end of the side column assembly 12, and may be a hollow tubular structure to provide waterline area for the floating platform 10, ensuring the heel and pitch stability of the floating platform 10 under various draft conditions. The bypass float 122 may be a horizontally arranged tubular structure, with one end rigidly connected to the central column 11 and the other end connected to the transition member 123. The transition member 123 is also rigidly connected to the lower part of the side column 121. Through these connections, the central column 11, side column 121, bypass float 122, and transition member 123 together constitute a complete floating platform 10 with high rigidity and strength.

[0043] In some embodiments, such as Figure 2 and Figure 3As shown, to achieve modular manufacturing and convenient transportation, the main components of the floating platform 10, including but not limited to the central column 11, side columns 121, bypass floats 122, and transition pieces 123, can all adopt tubular structures. This facilitates standardized production in a factory environment using steel plate rolling and welding processes. Simultaneously, the diameter of the central column 11 is larger than the diameter of each bypass float 122 to ensure that the connections between the bypass floats 122 and the central column 11 do not interfere with each other. A complete side column 121 can be formed by connecting several side column segment modules using bolts or other fasteners via connecting flanges 13; a complete bypass float 122 can also be formed by splicing several bypass float segment modules using bolts or other fasteners via connecting flanges 13. The bypass floats 122 and the side columns 121 are connected via transition pieces 123, which can also be connected using connecting flanges 13. By employing a rigid connection method using connecting flange 13, not only is the strength and watertightness of the connection ensured, but on-site installation and assembly work is also simplified, thereby shortening the construction cycle. Of course, permanent rigid connections can also be made between the modules through on-site welding.

[0044] In some embodiments, to achieve precise attitude adjustment of the floating platform 10, such as compensating for uneven loads during installation or operation, ballast compartments can be provided inside at least one of the side pillars 121 and the bypass floats 122. Ballast compartments can be provided inside either the side pillars 121 or the bypass floats 122, or simultaneously in both. Specifically, the internal spaces of the side pillars 121 and the bypass floats 122 can be divided into several independent ballast compartments. By pumping seawater into or out of each ballast compartment, the weight, center of gravity, and tilt attitude of the floating platform 10 can be actively changed, thereby achieving precise leveling of the floating platform 10.

[0045] In some embodiments, the central column 11 may also be provided with cable channels that can communicate with each ballast compartment. This allows the fans on the central column 11 to be connected to the water pumps and other electrical equipment in each ballast compartment via cables, enabling the fans to generate electricity to power the equipment in each ballast compartment. This eliminates the need for an external power supply, simplifies the structure of the floating platform 10, and saves costs. It should be noted that each ballast compartment may have an independent equipment compartment for housing water pumps and other electrical equipment, and the cable channels may be sealed to the equipment compartments to prevent water from entering the cable channels and affecting the operation of the electrical equipment.

[0046] In some embodiments, to stably anchor the floating platform 10 in a designated sea area, the mooring cables of the mooring system can be connected to the floating platform 10 to prevent the floating platform 10 from drifting or other movements. Specifically, the mooring system can be connected to the mooring point of the transition member 123. Meanwhile, because the load transmitted by the mooring system is enormous and complex, the mooring point area on the transition member 123 can be structurally reinforced, for example, by increasing the local plate thickness or adding internal reinforcing ribs, to ensure that the mooring point area has sufficient strength and fatigue resistance, thereby safely transferring the environmental load borne by the mooring system to the entire floating wind turbine platform 100.

[0047] like Figures 1 to 4 As shown, the ballast component 20 can be located directly below the floating platform 10 and connected to the floating platform 10 via the connecting mechanism 30 to ensure the stability of the floating platform 10. The ballast component 20 can be made of concrete, specifically high-performance concrete cast in a dock, to provide significant counterweight to the floating platform 10, thereby significantly lowering the overall center of gravity of the entire floating wind turbine platform 100. Alternatively, the ballast component 20 can be made of steel to provide significant counterweight to the floating platform 10. It should be noted that the shape of the ballast component 20 can be, but is not limited to, circular, triangular, or quadrilateral shapes.

[0048] like Figures 1 to 4 As shown, the connecting mechanism 30 is connected between the floating platform 10 and the ballast member 20 with variable length, thereby driving the ballast member 20 to move toward or away from the floating platform 10, so that the ballast member 20 can switch between a retracted position for transportation and an extended position for in-situ operation, thereby meeting the different needs of the floating wind turbine platform 100 in both transportation and operation states.

[0049] When the floating wind turbine platform 100 needs to be transported, such as Figure 4 As shown, the connecting mechanism 30 is shortened to its minimum length, and the lower ballast member 20 is lifted upwards, so that it is close to or adjacent to the bottom of the floating platform 10. At this time, the overall center of gravity of the floating wind turbine platform 100 is higher, but the total draft is reduced, so that the floating wind turbine platform 100 can enter and exit ports and docks with limited water depth. Moreover, when carrying out wet towing transportation at sea, the hydrodynamic resistance is smaller, which helps to reduce the power requirements of tugboats and transportation costs.

[0050] Once the floating wind turbine platform 100 is towed to the designated working area, the connecting mechanism 30 can extend, and the lower ballast member 20 can be lowered to a preset working depth. At this point, the floating wind turbine platform 100 can enter its in-situ working state. Figure 1As shown. In this operating state, the lower ballast component 20 is located at a deeper underwater position, lowering the overall center of gravity of the floating wind turbine platform 100 to a position far below its center of buoyancy. This helps enhance the floating wind turbine platform 100's ability to resist the overturning moment of wind and waves, giving it good stability in pitching and rolling motions. Simultaneously, the deep-submerged ballast component 20 also significantly increases the added mass and hydrodynamic damping of the floating wind turbine platform 100 in heave motion, effectively suppressing the vertical motion amplitude of the floating wind turbine platform 100 in waves, thus ensuring the safe and efficient power generation of the wind turbine in high sea states.

[0051] In some embodiments, such as Figure 2 As shown, the connecting mechanism 30 may include a telescopic drive member 31, one end of which can be connected to the ballast member 20, and the other end of which can be connected to the central column 11. Specifically, the telescopic drive member 31 may be a telescopic hydraulic rod, one end of which can be connected to the bottom of the central column 11, and the other end of which can be connected to the top center of the ballast member 20. The telescopic hydraulic rod may have a multi-stage sleeve structure inside, and its internal piston is driven by a hydraulic power unit to move, thereby realizing the extension and retraction of the entire telescopic hydraulic rod in length. This causes the ballast member 20 to move towards or away from the floating platform 10, so that the ballast member 20 can switch between a retracted position for transportation and an extended position for in-situ operation, thereby meeting the different needs of the floating wind turbine platform 100 in both transportation and operation states.

[0052] In some embodiments, such as Figure 3 As shown, the connecting mechanism 30 may also include a traction member 32 and a take-up and put-down device capable of taking up and putting down the traction member 32. One end of the traction member 32 may be connected to the ballast member 20, and the other end of the traction member 32 may be connected to the central column 11. Specifically, the traction member 32 may consist of three, four, or more high-performance steel cables, and the upper end of the high-performance steel cables may be connected to the take-up and put-down device installed inside or at the bottom of the central column 11. The lower end of the high-performance steel cables may be connected to the upper surface of the ballast member 20 through connectors such as shackles. The take-up and put-down device may consist of one or more high-power synchronous winch systems, and the winch system may include a drive motor, a reducer, a drum, and a braking system. The integrated central control system can control the synchronous rotation of each winch system, thereby achieving synchronous take-up and put-down of all high-performance steel cables to drive the ballast member 20 to move toward or away from the floating platform 10. This allows the ballast member 20 to switch between a retracted position for transportation and an extended position for in-situ operation, thus meeting the different needs of the floating wind turbine platform 100 in both transportation and operation states.

[0053] The floating wind turbine platform 100 disclosed in this application embodiment can be connected to a wind turbine via a central column 11 of the floating platform 10. Multiple side column assemblies 12 can be arranged around the central column 11, and one end of a bypass float 122 is connected to the side column 121 via a transition piece 123, while the other end of the bypass float 122 is connected to the central column 11, ensuring that the wind turbine can float on the water surface via the floating platform 10. Simultaneously, a ballast member 20 is connected to the floating platform 10 via a connecting mechanism 30 to ensure the stability of the floating platform 10. Furthermore, a mooring system can be connected to the transition piece 123 to prevent the floating platform 10 from drifting, thus ensuring the stable operation of the wind turbine.

[0054] The floating wind turbine platform 100 disclosed in this application embodiment allows the ballast member 20 to move towards or away from the floating platform 10 via a connecting mechanism 30. This enables the ballast member 20 to switch between a retracted position for transportation and an extended position for in-situ operation, thus balancing the stability of the floating wind turbine platform 100 with ease of transportation. Furthermore, the floating platform 10 of the floating wind turbine platform 100 adopts a modular design, enabling factory-based and parallel production, shortening the construction cycle, and allowing for long-distance transportation using ordinary cargo ships, further reducing costs and improving the assembly efficiency of the floating wind turbine platform 100.

[0055] This application also discloses a method for installing a floating wind turbine platform, applicable to the floating wind turbine platform 100 disclosed in the above embodiments. Therefore, it possesses all the technical effects of the aforementioned floating wind turbine platform 100, which will not be elaborated upon here. The method for installing the floating wind turbine platform may include the following steps:

[0056] Step A: Assemble the wind turbine platform;

[0057] The various modules of the floating wind turbine platform 100 are assembled. The modules include a central column 11, side columns 121, bypass floats 122, transition pieces 123, ballast pieces 20, and connecting mechanisms 30, with the connecting mechanisms 30 in a shortened state. Specifically, the ballast pieces 20 are first fabricated in the dock by casting. After the ballast pieces 20 are formed, the connecting mechanisms 30 are rigidly connected to the ballast pieces 20, and the connecting mechanisms 30 are shortened to their minimum length. Then, the central column 11 is connected to the connecting mechanisms 30 by hoisting. Subsequently, the bypass floats 122, transition pieces 123, side columns 121, and other modules are hoisted and assembled in sequence. It should be noted that if the floating wind turbine platform 100 needs to be transported over long distances, a transport module for the wind turbine platform can be included before the final assembly step. This means that the various modules of the manufactured floating wind turbine platform 100 can be transported to the target assembly location, such as a port in the target sea area, using a transport vessel 200. Once at the target assembly location, final assembly can be performed according to the assembly sequence described in the above embodiment. For example... Figure 5 As shown, since the floating wind turbine platform 100 is transported in modular form, there is no need to use a dedicated wind turbine vessel or an ultra-large semi-submersible barge. Only an ordinary transport vessel 200 needs to be selected, which can significantly save on transportation costs.

[0058] Step B: Transport the wind turbine platform;

[0059] The floating wind turbine platform 100 is transported to the target location, and the connecting mechanism 30 extends to lower the ballast member 20 to the target depth. Specifically, it can be towed to the target location by wet towing, that is, a tugboat is used to tow the floating wind turbine platform 100, which is in shallow draft, from the dock to the designated deep-sea target location. Upon arrival at the target location, the connecting mechanism 30 extends to lower the ballast member 20 to the working depth, thus transforming the floating wind turbine platform 100 into a highly stable working state.

[0060] Step C, Install the mooring system;

[0061] The mooring system is connected to the transition piece 123. Specifically, multiple mooring cables pre-laid on the seabed are connected to the mooring points on the transition piece 123 of the floating platform 10, and the final positioning and fixation of the floating wind turbine platform 100 is completed by tensioning the mooring cables, thereby completing the installation of the entire floating wind turbine platform 100.

[0062] The terminology used in the above embodiments is for the purpose of describing specific embodiments only and is not intended to be limiting of this application. As used in the specification and appended claims of this application, the singular expressions "a," "an," "the," "the," "the," and "this" are intended to also include expressions such as "one or more," unless the context clearly indicates otherwise. It should also be understood that in the embodiments of this application, "one or more" refers to one, two, or more; "and / or" describes the relationship between related objects, indicating that three relationships may exist; for example, A and / or B can represent: A alone, A and B simultaneously, or B alone, where A and B can be singular or plural. The character " / " generally indicates that the preceding and following related objects are in an "or" relationship.

[0063] References to "one embodiment" or "some embodiments" as described in this specification mean that one or more embodiments of this application include a specific feature, structure, or characteristic described in connection with that embodiment. Therefore, the phrases "in one embodiment," "in some embodiments," "in other embodiments," "in still other embodiments," etc., appearing in different parts of this specification do not necessarily refer to the same embodiment, but rather mean "one or more, but not all, embodiments," unless otherwise specifically emphasized. The terms "comprising," "including," "having," and variations thereof mean "including but not limited to," unless otherwise specifically emphasized.

[0064] In this application, "multiple" refers to two or more embodiments. It should be noted that in the description of the embodiments of this application, terms such as "first" and "second" are used only for descriptive purposes and should not be construed as indicating or implying relative importance, nor as indicating or implying order.

[0065] The terms "parallel" and "perpendicular" used in this application refer to "basically parallel" and "basically perpendicular" in practical operation. "Basically parallel" can be understood as parallelism with a certain degree of error, and similarly, "basically perpendicular" can be understood as perpendicularity with a certain degree of error.

[0066] The above description of the disclosed embodiments enables those skilled in the art to make or use this application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this application. Therefore, this application is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A floating wind turbine platform, characterized in that, include: A floating platform (10) includes a central column (11) for connection with a wind turbine and a plurality of side column assemblies (12), and each of the side column assemblies (12) is distributed around the central column (11). Each side column assembly (12) includes a side column (121), a bypass float (122) and a transition piece (123). The side column (121) is connected to one end of the bypass float (122) through the transition piece (123), and the other end of the bypass float (122) is connected to the central column (11). Ballast (20), the ballast (20) being located below the floating platform (10); A connecting mechanism (30) is connected between the ballast (20) and the floating platform (10) with a variable length, and the connecting mechanism (30) can drive the ballast (20) to move toward or away from the floating platform (10); A mooring system, which is connected to the transition piece (123).

2. The floating wind turbine platform according to claim 1, characterized in that, The connecting mechanism (30) includes a telescopic drive (31), one end of which is used to connect with the ballast (20), and the other end of which is used to connect with the central column (11).

3. The floating wind turbine platform according to claim 1, characterized in that, The connecting mechanism (30) includes a traction member (32) and a take-up and take-down device for taking up and taking down the traction member (32). One end of the traction member (32) is used to connect with the ballast member (20), and the other end of the traction member (32) is used to connect with the central column (11).

4. The floating wind turbine platform according to claim 1, characterized in that, The central column (11), the side column (121), the bypass float (122), and the transition piece (123) are all tubular structures, and adjacent tubular structures are connected by a connecting flange (13) or by welding.

5. The floating wind turbine platform according to claim 4, characterized in that, At least one of the side pillar (121) and the bypass float (122) is provided with a ballast compartment.

6. The floating wind turbine platform according to claim 1, characterized in that, The ballast component (20) may be a concrete component or a steel component.

7. The floating wind turbine platform according to any one of claims 1 to 6, characterized in that, The top of the central column (11) is provided with a mounting flange for connecting to the fan.

8. A method for installing a floating wind turbine platform, characterized in that, Suitable for the floating wind turbine platform (100) as described in any one of claims 1 to 7, comprising: The assembly of the wind turbine platform involves assembling the various modules of the floating wind turbine platform (100). The modules include the central column (11), the side columns (121), the bypass float (122), the transition piece (123), the ballast piece (20), and the connecting mechanism (30), with the connecting mechanism (30) in a shortened state. Transport wind turbine platform, transport the floating wind turbine platform (100) to the target location, and extend the connecting mechanism (30) to lower the ballast (20) to the target depth; Install the mooring system and connect the mooring system to the transition piece (123).

9. The method for installing a floating wind turbine platform according to claim 8, characterized in that, Prior to the step of assembling the wind turbine platform, the following steps are also included: Transport wind turbine platform modules, by transporting each module of the floating wind turbine platform (100) to the target assembly position via transport vessel (200).

10. The method for installing a floating wind turbine platform according to claim 8, characterized in that, In the step of transporting the wind turbine platform, the floating wind turbine platform (100) is towed to the target location by wet towing.