Automobile door hinge production line dynamic scheduling method and system based on digital twinning

By constructing a dual-loop reward agent using digital twin technology and reinforcement learning algorithms, the problems of simulation-actual deviation and multi-objective optimization in the scheduling system of automotive door hinge production lines were solved, achieving dynamic scheduling for efficient and green production.

CN121936869BActive Publication Date: 2026-06-02DIJING SEMICON TECH (SUZHOU CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Patents(China)
Current Assignee / Owner
DIJING SEMICON TECH (SUZHOU CO LTD
Filing Date
2026-03-30
Publication Date
2026-06-02

Smart Images

  • Figure CN121936869B_ABST
    Figure CN121936869B_ABST
Patent Text Reader

Abstract

The application discloses a dynamic scheduling method and system for an automobile door hinge production line based on digital twinning, and comprises the following steps: S1, collecting original production state data of the automobile door hinge production line, performing data cleaning and preprocessing on the original production state data to obtain production state data; S2, obtaining a production line digital twinning model by combining a preset mechanism model and a real-time data driving function, inputting the production state data into the production line digital twinning model for simulation initialization to obtain simulation prediction results; S3, constructing a double-loop reward intelligent agent combined with a reinforcement learning intelligent agent and a double-loop reward function, inputting the simulation prediction results into the double-loop reward intelligent agent for online learning optimization to output optimal scheduling strategy parameters; and S4, issuing the optimal scheduling strategy parameters to an execution mechanism at a bottom layer of the production line to realize real-time dynamic scheduling of the automobile door hinge production line.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • Industrial green micro-grid multi-target flexible job shop dynamic intelligent scheduling method

    CN118966715A

  • Intelligent scheduling method for optimizing time distribution of different grouping batches in tobacco shred production

    CN119151095A