Water making and air extracting system

By introducing a refrigeration subsystem and an absorber into the water extraction system, and using lithium bromide solution to absorb water vapor, the system complexity and high energy consumption caused by the independent operation of the extraction equipment and the refrigeration unit are solved, thus simplifying the system and improving operational efficiency.

CN121974423APending Publication Date: 2026-05-05CHINA STATE SHIPBUILDING CORP LTD RESEARCH INSTITUTE 719
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610241450.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-02-28
Publication Date
2026-05-05

AI Technical Summary

Technical Problem

In existing technologies, the independent operation of the air extraction equipment and the refrigeration unit leads to problems such as complex system structure, equipment redundancy, high auxiliary energy consumption, and large size and weight.

Method used

Design a water generation and gas extraction system that combines a refrigeration subsystem and an absorber. By absorbing water vapor with lithium bromide solution, it can achieve simultaneous refrigeration and gas extraction, simplifying the system structure and eliminating redundant equipment and high energy consumption.

Benefits of technology

It enables simultaneous operation of air extraction and cooling, simplifies the system structure, reduces the number of devices and auxiliary energy consumption, and reduces the system size and weight.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121974423A_ABST
    Figure CN121974423A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of nuclear power, and provides a water making and air extracting system which comprises a water making subsystem, a refrigeration subsystem and an absorber, and the water making subsystem is used for converting fresh water or seawater into purified water; the refrigeration subsystem is used for converting the saturated steam into water vapor; the absorber is connected with an exhaust pipe and an exhaust pipe, the exhaust pipe is connected with an outlet of the water making subsystem and used for sucking air and water vapor in the water making subsystem into the absorber, and a lithium bromide solution is arranged in the absorber and used for absorbing the water vapor. According to the water making and air exhausting system, water vapor can be absorbed, refrigeration and air exhausting are achieved at the same time, the air exhausting requirement of a water making subsystem is met, meanwhile, the refrigeration requirement is also considered, and the problems that due to the fact that an air extractor and a refrigerating unit operate independently, the system is complex, equipment is numerous, auxiliary energy consumption is high, and the size and the weight are large are solved; the whole composition of the power conversion device is simplified, and the operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of nuclear power technology, and more particularly to a water-generating and gas-pumping system. Background Technology

[0002] The power conversion unit in a nuclear power plant is the central link in converting nuclear thermal energy into electrical energy. Within this unit, the water production system heats and evaporates tap water, then condenses it into purified water to supply the power conversion unit. To ensure the continuous and stable operation of the water production system, its condenser needs to be evacuated to maintain a necessary vacuum. Therefore, the power conversion unit is typically equipped with steam jet ejectors, water jet ejectors, or vacuum pumps to extract the mixture of air and steam.

[0003] Meanwhile, nuclear power plant power conversion units contain a large number of high-temperature devices, and the surrounding ambient temperature is high, requiring continuous cooling from refrigeration units to ensure the safe operation of the equipment. Currently, the extraction equipment and refrigeration units usually operate independently, resulting in problems such as complex system structure, equipment redundancy, high auxiliary energy consumption, and large size and weight. Summary of the Invention

[0004] This invention provides a water-generating air extraction system to solve the defects of existing technologies, such as complex system structure, redundant equipment, high auxiliary energy consumption, and large size and weight caused by the independent operation of air extraction equipment and refrigeration unit.

[0005] This invention provides a water production and aeration system, comprising: a water production subsystem for converting fresh water or seawater into pure water; a refrigeration subsystem for converting saturated steam into water vapor; an absorber connected to the refrigeration subsystem to form a circulation loop; a first inlet of the absorber connected to an aeration pipe connected to the outlet of the water production subsystem; the aeration pipe being used to draw air and water vapor from the water production subsystem into the absorber; a first outlet of the absorber connected to an exhaust pipe for discharging air; and a lithium bromide solution disposed within the absorber for absorbing the water vapor.

[0006] According to the present invention, a water production and air extraction system is provided, wherein the water production subsystem includes: a water production unit for converting fresh water or seawater into dry steam; a first condenser, wherein the inlet of the first condenser is connected to the water production unit, the outlet of the first condenser is connected to the air extraction pipe, the first condenser is used to convert the dry steam into pure water, and the air and water vapor in the first condenser are drawn into the absorber by the air extraction pipe.

[0007] According to the present invention, a water production and steam extraction system is provided, wherein the water production unit comprises: a first pump for pumping fresh water or seawater; a first evaporator connected to the outlet of the first pump, the first evaporator being used to heat fresh water or seawater to generate pure steam; and a steam-water separator, the inlet of the steam-water separator being connected to the first evaporator, and the outlet of the steam-water separator being connected to the first condenser.

[0008] According to a water-generating and steam-extraction system provided by the present invention, the first condenser is provided with a first cooling pipe, and a first cooling medium flows in the first cooling pipe. The first cooling medium is used to exchange heat with the dry steam to form pure water.

[0009] According to a water generation and gas extraction system provided by the present invention, the refrigeration subsystem includes: a refrigeration unit for generating water vapor and cooling the surrounding environment, the outlet of the refrigeration unit being connected to the second inlet of the absorber; and a heating unit, the inlet of the heating unit being connected to the second outlet of the absorber, the first outlet of the heating unit being connected to the inlet of the refrigeration unit, the heating unit being used to heat a lithium bromide solution to generate saturated steam, the saturated steam entering the refrigeration unit.

[0010] According to a water-generating and vapor-extraction system provided by the present invention, the refrigeration unit includes: a second condenser, the inlet of which is connected to a first outlet of the heating unit, the second condenser being used to condense the saturated steam to produce condensate; a first throttling valve connected to the outlet of the second condenser; and a second evaporator, the inlet of which is connected to the first throttling valve, and the outlet of which is connected to a second inlet of the absorber; wherein the condensate enters the second evaporator after passing through the first throttling valve to form water vapor.

[0011] According to a water-generating and gas-pumping system provided by the present invention, the heating unit includes: a first pipeline, the first end of the first pipeline being connected to the second outlet of the absorber; and a steam generator, the inlet of the steam generator being connected to the second end of the first pipeline, and the first outlet of the steam generator being connected to the inlet of the second condenser. The steam generator is used to heat a lithium bromide solution to generate saturated steam.

[0012] According to a water generation and gas extraction system provided by the present invention, the heating unit further includes a second pump, which is disposed in the first pipeline and is used to pump the lithium bromide solution in the absorber to the steam generator.

[0013] According to a water-generating and air-pumping system provided by the present invention, the heating unit further includes: a second pipeline, the two ends of which are respectively connected to the second outlet of the steam generator and the third inlet of the absorber, so that the lithium bromide solution flows back from the steam generator to the absorber; and a second throttle valve disposed in the second pipeline.

[0014] According to the present invention, a water-generating and air-pumping system further includes a third pump, which is disposed in the exhaust pipe.

[0015] The water production and air extraction system provided by this invention, by setting up a refrigeration subsystem and an absorber, can draw air and water vapor entering the water production subsystem into the absorber, where the absorber absorbs the water vapor and discharges the air, realizing simultaneous operation of refrigeration and air extraction. While meeting the air extraction needs of the water production subsystem, it also takes into account the refrigeration needs. It eliminates the original auxiliary systems, equipment, pipelines, and supporting facilities such as the main condenser air extraction system, as well as the supporting facilities such as ejector steam, ejector water, cooling water, and electric vacuum pumps. It also eliminates the problems of system complexity, numerous equipment, high auxiliary energy consumption, and large size and weight caused by the independent operation of the air extractor and refrigeration unit. It simplifies the overall composition of the power conversion device and improves its operating efficiency. Attached Figure Description

[0016] To more clearly illustrate the technical solutions in this invention or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this invention. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0017] Figure 1 This is a schematic diagram of the water-generating and air-pumping system provided by the present invention.

[0018] Figure label: 110. Absorber; 111. Extraction pipe; 112. Exhaust pipe; 113. Third cooling pipe; 120. Second condenser; 121. Second cooling pipe; 130. First throttle valve; 140. Second evaporator; 150. Steam generator; 151. First pipeline; 152. Second pump; 153. Second pipeline; 154. Second throttle valve; 160. Third pump; 200. First condenser; 201. First cooling pipe; 210. First pump; 220. First evaporator; 230. Steam-water separator. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of this invention clearer, the technical solutions of this invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some, not all, of the embodiments of this invention. All other embodiments obtained by those skilled in the art based on the embodiments of this invention without creative effort are within the scope of protection of this invention.

[0020] The following is combined Figure 1 The present invention describes a water-generating and air-pumping system.

[0021] like Figure 1 As shown, in an embodiment of the present invention, the water production and air extraction system includes: a water production subsystem, a refrigeration subsystem, and an absorber 110. The water production subsystem is used to convert fresh water or seawater into pure water, and the refrigeration subsystem is used to convert saturated steam into water vapor. The absorber 110 is connected to the refrigeration subsystem to form a circulation loop. The first inlet of the absorber 110 is connected to an extraction pipe 111, and the first outlet of the absorber 110 is connected to an exhaust pipe 112. The extraction pipe 111 is connected to the outlet of the water production subsystem and is used to draw air and water vapor from the water production subsystem into the absorber 110. The absorber 110 contains a lithium bromide solution, which is used to absorb water vapor. The exhaust pipe 112 is used to discharge air.

[0022] Specifically, the water production subsystem heats fresh water or seawater to produce pure steam. After steam-water separation, the dry steam is condensed into pure water. Leaking water vapor and air are drawn into the absorber 110 by the exhaust pipe 111. The air and water vapor do not condense in the absorber 110. The air is discharged through the exhaust pipe 112. The water vapor is dissolved in the lithium bromide solution to extract air from the water production subsystem.

[0023] The refrigeration subsystem condenses saturated vapor into water, then evaporates the water into water vapor. During evaporation, the water absorbs heat to cool the surrounding environment. The water vapor enters absorber 110 and is absorbed by the lithium bromide solution. The lithium bromide solution is then heated, causing some of the water to evaporate into saturated vapor. This saturated vapor is then condensed back into water, continuing the cycle.

[0024] In this embodiment, the absorber 110 operates under a high vacuum, enabling it to draw steam and air from low-vacuum or positive-pressure equipment. The circulation loop consisting of the refrigeration subsystem and the absorber 110 utilizes absorption refrigeration technology to cool low-grade heat sources, making it particularly suitable for nuclear power plant environments.

[0025] In an embodiment of the present invention, the absorber 110 contains a lithium bromide solution. The lithium bromide solution has an extremely strong absorption capacity for water vapor. At normal pressure, the boiling point of the lithium bromide solution is as high as 1265°C. Therefore, when heated, the solution itself will not boil; only the water (refrigerant) within it will evaporate, forming saturated vapor to achieve working fluid separation. Furthermore, the partial pressure of water vapor on the surface of the lithium bromide solution is much lower than that of pure water, thus enabling it to strongly absorb water vapor at lower temperatures.

[0026] The water production and air extraction system provided in this invention, by setting up a refrigeration subsystem and an absorber, can draw air and water vapor entering the water production subsystem into the absorber, where the absorber absorbs the water vapor and discharges the air. This achieves simultaneous operation of refrigeration and air extraction, meeting the air extraction requirements of the water production subsystem while also taking into account the refrigeration requirements. It eliminates the need for auxiliary systems, equipment, pipelines, and supporting facilities such as the original condenser main air extraction system, as well as the supporting facilities such as ejector steam, ejector water, cooling water, and electric vacuum pumps. It also eliminates the problems of system complexity, numerous equipment, high auxiliary energy consumption, and large size and weight caused by the independent operation of the air extractor and refrigeration unit. This simplifies the overall composition of the power conversion device and improves its operational efficiency.

[0027] like Figure 1 As shown, in an embodiment of the present invention, the water production subsystem includes a water production unit and a first condenser 200. The water production unit heats fresh water or seawater to generate pure steam and performs steam-water separation on the pure steam, allowing dry steam to enter the first condenser 200. The outlet of the first condenser 200 is connected to an extraction pipe 111. When the dry steam enters the first condenser 200, it carries some water vapor and air. The water vapor and air do not condense in the first condenser 200. The water vapor and air are drawn into the absorber 110 by the extraction pipe 111, the air is discharged by the exhaust pipe 112, and the water vapor is absorbed by the lithium bromide solution, thereby ensuring that the first condenser 200 always operates under a vacuum.

[0028] like Figure 1 As shown, in an embodiment of the present invention, the water production unit includes: a first pump 210, a first evaporator 220, and a steam-water separator 230. The first pump 210 is used to pump fresh water or seawater. The first evaporator 220 is connected to the outlet of the first pump 210 and is used to heat the fresh water or seawater to generate pure steam. The inlet of the steam-water separator 230 is connected to the outlet of the first evaporator 220, and the outlet of the steam-water separator 230 is connected to the first condenser 200. The pure steam undergoes steam-water separation in the steam-water separator 230. The separated dry steam enters the first condenser 200 and is condensed into pure water, which serves as makeup water for the power conversion device. Air and water vapor leaking into the first condenser 200 are drawn away by the exhaust pipe 111, so that water production and air extraction can be carried out simultaneously.

[0029] Furthermore, the first condenser 200 is provided with a first cooling pipe 201, and a first cooling medium flows in the first cooling pipe 201. The first cooling medium is used to exchange heat with dry steam to form pure water.

[0030] like Figure 1 As shown, in an embodiment of the present invention, the refrigeration subsystem includes a refrigeration unit and a heating unit. The refrigeration unit is used to generate water vapor and cool the surrounding environment, and its outlet is connected to the second inlet of the absorber 110. The inlet of the heating unit is connected to the second outlet of the absorber 110, and its first outlet is connected to the inlet of the refrigeration unit. The heating unit is used to heat the lithium bromide solution to generate saturated vapor.

[0031] Specifically, the refrigeration unit, absorber 110, and heating unit form a refrigeration extraction circulation loop. The refrigeration unit is used to cool the surrounding environment inside the power conversion device. Saturated vapor condenses in the refrigeration unit to form condensate, which absorbs heat to become water vapor, simultaneously cooling the surrounding environment. The water vapor enters the absorber 110 and is absorbed by the lithium bromide solution. The non-condensable air in the absorber 110 is discharged through the exhaust pipe 112. The lithium bromide solution enters the heating unit and is heated, where some water evaporates into saturated vapor. The saturated vapor enters the refrigeration unit and re-forms into water vapor, achieving a cyclical transformation of water vapor and saturated vapor, while simultaneously cooling the surrounding environment.

[0032] In this embodiment, the circulation loop consisting of the refrigeration unit, the absorber 110 and the heating unit is used to cool the surrounding environment. The absorber 110 simultaneously evacuates the first condenser 200, realizing simultaneous operation of refrigeration and evacuation. While cooling the surrounding environment inside the power conversion device, it also ensures that the first condenser 200 always operates under a vacuum.

[0033] Specifically, such as Figure 1 As shown, in an embodiment of the present invention, the refrigeration unit includes: a second condenser 120, a first throttling valve 130, and a second evaporator 140. The inlet of the second condenser 120 is connected to the first outlet of the heating unit, the outlet of the second condenser 120 is connected to the inlet of the first throttling valve 130, the outlet of the first throttling valve 130 is connected to the inlet of the second evaporator 140, and the outlet of the second evaporator 140 is connected to the second inlet of the absorber 110.

[0034] The second condenser 120 is equipped with a second cooling pipe 121, through which a second cooling medium flows. Saturated steam exchanges heat with the second cooling medium and condenses into condensate. The condensate is then throttled, depressurized, and cooled by a first throttling valve 130 before entering the second evaporator 140. In the second evaporator 140, the condensate absorbs heat and evaporates into water vapor, simultaneously providing a cooling effect to the surrounding environment. The water vapor enters the absorber 110, which is equipped with a third cooling pipe 113, through which a third cooling medium flows. The water vapor dissolves in the lithium bromide solution, and the heat of the water vapor is carried away by the third cooling medium. At this point, the concentration of the lithium bromide solution decreases. The lithium bromide solution with the decreased concentration enters the heating unit and is heated, where some water evaporates into saturated steam. The saturated steam then enters the second condenser 120 and condenses again into condensate for the next cycle. At this point, the concentration of the lithium bromide solution in the heating unit increases.

[0035] like Figure 1 As shown, in an embodiment of the present invention, the heating unit includes a steam generator 150 and a first pipe 151. A first end of the first pipe 151 is connected to the second outlet of the absorber 110, and a second end of the first pipe 151 is connected to the inlet of the steam generator 150. The lithium bromide solution in the absorber 110 enters the steam generator 150 through the first pipe 151. The steam generator 150 is equipped with a heating tube, under the action of the heating tube, some of the water in the lithium bromide solution evaporates into saturated steam. The first outlet of the steam generator 150 is connected to the inlet of a second condenser 120, so that the generated saturated steam enters the second condenser 120 and is converted into condensate.

[0036] Furthermore, in an embodiment of the present invention, the heating unit further includes a second pump 152, which is disposed in the first pipeline 151 and is used to pump the lithium bromide solution in the absorber 110 to the steam generator 150.

[0037] like Figure 1 As shown, in an embodiment of the present invention, the heating unit further includes a second pipe 153 and a second throttle valve 154. The two ends of the second pipe 153 are respectively connected to the second outlet of the steam generator 150 and the third inlet of the absorber 110, so that the lithium bromide solution with increased concentration can flow back from the steam generator 150 to the absorber 110. The second throttle valve 154 is disposed in the second pipe 153 and is used to depressurize the lithium bromide solution with increased concentration, allowing the depressurized lithium bromide solution to flow back to the absorber 110. Water vapor generated again by the refrigeration unit enters the absorber 110, further reducing the concentration of the lithium bromide solution. The reduced-concentration lithium bromide solution then re-enters the steam generator 150 for heating, generating saturated steam.

[0038] That is, in the embodiments of the present invention, the second condenser 120, the first throttle valve 130, the second evaporator 140, the absorber 110, and the steam generator 150 form a water vapor-saturated steam conversion loop; the absorber 110, the second pump 152, the steam generator 150, and the second throttle valve 154 form a lithium bromide dilute solution-lithium bromide viscous solution conversion loop. Both loops operate simultaneously to achieve simultaneous refrigeration and vacuuming.

[0039] like Figure 1 As shown, in an embodiment of the present invention, the water-generating air extraction system further includes a third pump 160, which is disposed in the exhaust pipe 112. The third pump 160 is used to draw air from the absorber 110 and discharge it outside the absorber 110 through the exhaust pipe 112.

[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, and not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A water-generating and air-pumping system, characterized in that, include: A water production subsystem is used to convert freshwater or seawater into pure water. The refrigeration subsystem is used to convert saturated steam into water vapor. An absorber is connected to the refrigeration subsystem to form a circulation loop. The first inlet of the absorber is connected to an exhaust pipe, which is connected to the outlet of the water production subsystem. The exhaust pipe is used to draw air and water vapor from the water production subsystem into the absorber. The first outlet of the absorber is connected to an exhaust pipe, which is used to discharge air. The absorber contains a lithium bromide solution, which is used to absorb the water vapor.

2. The water-generating and aeration system according to claim 1, characterized in that, The water production subsystem includes: A water production unit is used to convert fresh water or seawater into dry steam. The first condenser has its inlet connected to the water-making unit and its outlet connected to the exhaust pipe. The first condenser is used to convert the dry steam into pure water. The air and water vapor in the first condenser are drawn into the absorber by the exhaust pipe.

3. The water-generating and aeration system according to claim 2, characterized in that, The water production unit includes: The first pump is used to pump fresh water or seawater; The first evaporator is connected to the outlet of the first pump and is used to heat fresh water or seawater to produce pure steam. A steam-water separator, wherein the inlet of the steam-water separator is connected to the first evaporator, and the outlet of the steam-water separator is connected to the first condenser.

4. The water-generating and aeration system according to claim 2, characterized in that, The first condenser is provided with a first cooling pipe, and a first cooling medium flows in the first cooling pipe. The first cooling medium is used to exchange heat with the dry steam to form pure water.

5. The water-generating and aeration system according to claim 1, characterized in that, The refrigeration subsystem includes: A refrigeration unit is used to generate water vapor and cool the surrounding environment, and the outlet of the refrigeration unit is connected to the second inlet of the absorber; The heating unit has its inlet connected to the second outlet of the absorber and its first outlet connected to the inlet of the refrigeration unit. The heating unit is used to heat the lithium bromide solution to generate saturated vapor, which enters the refrigeration unit.

6. The water-generating and aeration system according to claim 5, characterized in that, The refrigeration unit includes: The second condenser has its inlet connected to the first outlet of the heating unit. The second condenser is used to condense the saturated steam to produce condensate. The first throttle valve is connected to the outlet of the second condenser; The second evaporator has its inlet connected to the first throttle valve and its outlet connected to the second inlet of the absorber. The condensate enters the second evaporator after passing through the first throttling valve, forming water vapor.

7. The water-generating and air-pumping system according to claim 6, characterized in that, The heating unit includes: A first conduit, the first end of which is connected to the second outlet of the absorber; A steam generator, wherein the inlet of the steam generator is connected to the second end of the first pipeline, and the first outlet of the steam generator is connected to the inlet of the second condenser, the steam generator being used to heat the lithium bromide solution to generate saturated steam.

8. The water-generating and air-pumping system according to claim 7, characterized in that, The heating unit further includes a second pump, which is disposed in the first pipeline, and is used to pump the lithium bromide solution in the absorber to the steam generator.

9. The water-generating and aeration system according to claim 7, characterized in that, The heating unit also includes: The second pipeline has its two ends connected to the second outlet of the steam generator and the third inlet of the absorber, respectively, so that the lithium bromide solution can flow back from the steam generator to the absorber. The second throttle valve is installed in the second pipeline.

10. The water-generating and aeration system according to claim 1, characterized in that, It also includes a third pump, which is disposed in the exhaust pipe.