By using automation and matching with preset standards, as well as remote surveying methods, the problems of low efficiency and low accuracy in business expansion and installation service testing have been solved. This enables rapid identification of abnormal services and provision of rectification suggestions, thereby improving testing efficiency and accuracy.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- GUANGDONG POWER GRID CO LTD DONGGUAN POWER SUPPLY BUREAU
- Filing Date
- 2026-01-09
- Publication Date
- 2026-05-08
AI Technical Summary
The existing compliance testing for business expansion and installation services is inefficient and inaccurate, relying mainly on manual review and on-site inspection, which is time-consuming, labor-intensive, and has a high false alarm rate.
By acquiring business expansion and installation applications and electricity metering data from target power users, the system automatically matches these data with preset standards, identifies abnormal business operations, and utilizes remote technology to conduct investigations and provide rectification suggestions.
It enables rapid identification of potential abnormal business operations, reduces the workload of manual screening, lowers the possibility of detection errors, improves the efficiency and accuracy of compliance testing, and reduces the time and cost of manual on-site investigation.
Smart Images

Figure CN121998319A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of power technology, and in particular to a method, apparatus and electronic equipment for compliance testing of business expansion application services. Background Technology
[0002] Business expansion application services involve various changes and needs of electricity users in their electricity consumption, mainly including new electricity installations and capacity expansion applications. Because business expansion application services are linked to changes in electricity demand and the reallocation of grid resources, regular compliance checks are necessary to ensure the safety of the power system and the rational allocation of resources.
[0003] Existing testing methods primarily rely on manual review and on-site inspection. Manual review involves verifying the electricity application materials and historical electricity usage records, focusing on checking whether information such as electricity capacity, type of electricity use, and address matches the actual situation, thereby determining the rationality of the applied-for business expansion application. On-site inspection mainly involves physically measuring the electrical equipment and inspecting the power lines and distribution facilities, specifically verifying whether their capacity, model, and quantity are consistent with the application materials.
[0004] However, manual inspection is time-consuming and costly, and the false alarm rate of manual inspection is relatively high. Therefore, the existing technology has technical problems of low efficiency and low accuracy in compliance inspection of business expansion and installation business. Summary of the Invention
[0005] This application provides a method, apparatus, and electronic device for compliance testing of business expansion and installation services, in order to solve the technical problems of low efficiency and low accuracy in compliance testing of business expansion and installation services in the prior art.
[0006] Firstly, this application provides a compliance testing method for business expansion and installation services, including:
[0007] The document describes the process by which a target power user applies to a power company for a new power connection or to expand its existing power supply.
[0008] The power service parameters stipulated in the business expansion application are determined, as well as the electricity metering data of the target power user; the power service parameters are used to indicate the basic electricity requirements proposed by the power company to the target power user; the electricity metering data is the data after the target power user completes the business expansion application.
[0009] The power service parameters and / or the electricity metering data are matched with preset standards to conduct compliance checks on the business expansion application.
[0010] For abnormal business expansion applications that fail compliance testing, conduct remote surveys of the abnormal business expansion applications based on preset remote technology, and provide target rectification suggestions to the corresponding target power users based on the survey results.
[0011] In one possible design, matching the power service parameters and / or the electricity metering data with preset standards to perform compliance checks on the business expansion application includes:
[0012] Based on the electricity metering data, it is determined whether the target electricity user is in a state of electricity use after completing the business expansion application.
[0013] The business expansion application and electricity metering data of the target power user who is in a state of electricity consumption are respectively determined as the target business expansion application and the target electricity metering data; the power service parameters specified in the target business expansion application are determined as the target power service parameters.
[0014] The target power service parameters and / or the target electricity metering data are matched with preset standards to conduct compliance checks on the target business expansion application.
[0015] In one possible design, the target power service parameters include power capacity and voltage level;
[0016] The step of matching the target power service parameters and / or the target electricity metering data with preset standards to conduct compliance checks on the target business expansion application includes:
[0017] If the power consumption capacity is less than the first preset capacity, the current transformer installed at the target site location will be set to an inactive state; wherein, the target site location represents the geographical location corresponding to the business expansion application service applied for by the target power user.
[0018] If the voltage level is not equal to the preset voltage when the current transformer is not in operation, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the first abnormal information.
[0019] In one possible design, the target power service parameters further include the overall ratio and the current transformer ratio, and the method further includes:
[0020] If the power consumption is greater than or equal to the first preset capacity and less than the second preset capacity, the current transformer will still be set to an inactive state; wherein the second preset capacity is greater than the first preset capacity.
[0021] If the overall ratio is not equal to 1 and the current transformer ratio is not empty and not equal to 1 when the current transformer is not in operation, then it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the second abnormal information.
[0022] The comprehensive ratio represents the total ratio when the current transformer and voltage transformer are used in combination, and the current transformer ratio represents the ratio between the primary current and the secondary current of the current transformer.
[0023] In one possible design, the target electricity service parameters further include electricity consumption categories, and the target electricity metering data includes total monthly electricity consumption; wherein, the electricity consumption categories include residential electricity consumption and non-residential electricity consumption;
[0024] The step of matching the target power service parameters and / or the target electricity metering data with preset standards to conduct compliance checks on the target business expansion application includes:
[0025] If the electricity consumption category is residential electricity consumption and the total monthly electricity consumption is greater than or equal to the first preset electricity consumption, then determine the number of the first month corresponding to the total monthly electricity consumption that is greater than or equal to the first preset electricity consumption;
[0026] If the number in the first month is greater than the total number in the first preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with third abnormal information.
[0027] In one possible design, the method further includes:
[0028] If the electricity consumption category is non-residential electricity consumption and the total monthly electricity consumption is greater than or equal to the second preset threshold, then determine the number of the second month corresponding to the total monthly electricity consumption that is greater than or equal to the second preset threshold;
[0029] If the number in the second month is greater than the total number in the second preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the fourth abnormal information.
[0030] In one possible design, the remote survey of the abnormal business expansion application based on preset remote technology, and the provision of target rectification suggestions to the corresponding target power user based on the survey results, includes:
[0031] Determine the on-site location corresponding to the abnormal business expansion and installation application;
[0032] Based on preset remote technology, the on-site location corresponding to the abnormal business expansion application is remotely surveyed, and the non-compliance reason of the abnormal business expansion application is determined according to the survey results;
[0033] Based on the aforementioned reasons for non-compliance, targeted rectification suggestions are provided to the target power users corresponding to the abnormal business expansion and installation applications.
[0034] Secondly, this application provides a compliance testing device for business expansion and installation services, comprising:
[0035] The acquisition module is used to acquire the business expansion application service submitted by the target power user to the power company; the business expansion application service represents the process by which the target power user applies to the power company for a new power connection or to expand the existing power supply.
[0036] The determination module is used to determine the power service parameters stipulated in the business expansion application, as well as the electricity metering data of the target power user; the power service parameters are used to indicate the basic electricity requirements proposed by the power company to the target power user; the electricity metering data is the data after the target power user completes the business expansion application.
[0037] The detection module is used to match the power service parameters and / or the electricity metering data with preset standards to perform compliance detection on the business expansion application.
[0038] The determining module is also used to determine abnormal business expansion and installation applications that have failed the compliance test;
[0039] The survey module is used to conduct remote surveys of the abnormal business expansion application services based on preset remote technology, and provide target rectification suggestions to the corresponding target power users based on the survey results.
[0040] In one possible design, the determining module is further configured to:
[0041] Based on the electricity metering data, it is determined whether the target electricity user is in a state of electricity use after completing the business expansion application.
[0042] The business expansion application and electricity metering data of the target power user who is in a state of electricity consumption are respectively determined as the target business expansion application and the target electricity metering data; the power service parameters specified in the target business expansion application are determined as the target power service parameters.
[0043] The detection module is also used to match the target power service parameters and / or the target electricity metering data with preset standards to perform compliance detection on the target business expansion application.
[0044] In one possible design, the target power service parameters include power capacity and voltage level;
[0045] The detection module further includes: a setting module, used to set the current transformer installed at the target site location to an inactive state if the power consumption capacity is less than a first preset capacity; wherein, the target site location represents the geographical location corresponding to the business expansion application service applied for by the target power user;
[0046] The determining module is further configured to: if the voltage level is not equal to the preset voltage when the current transformer is in an inactive state, determine that the target business expansion application has failed the compliance test, and mark the target business expansion application with the first abnormal information.
[0047] In one possible design, the target power service parameters also include the overall ratio and the current transformer ratio;
[0048] The setting module is further configured to set the current transformer to an inactive state if the power consumption capacity is greater than or equal to the first preset capacity and less than the second preset capacity; wherein the second preset capacity is greater than the first preset capacity.
[0049] The determining module is further configured to, when the current transformer is in an inactive state, if the comprehensive multiplier is not equal to 1 and the current transformer multiplier is not empty and not equal to 1, determine that the target business expansion application has failed the compliance test and mark the target business expansion application with second abnormal information.
[0050] The comprehensive ratio represents the total ratio when the current transformer and voltage transformer are used in combination, and the current transformer ratio represents the ratio between the primary current and the secondary current of the current transformer.
[0051] In one possible design, the target electricity service parameters further include electricity consumption categories, and the target electricity metering data includes total monthly electricity consumption; wherein, the electricity consumption categories include residential electricity consumption and non-residential electricity consumption;
[0052] The determining module is further configured to:
[0053] If the electricity consumption category is residential electricity consumption and the total monthly electricity consumption is greater than or equal to the first preset electricity consumption, then determine the number of the first month corresponding to the total monthly electricity consumption that is greater than or equal to the first preset electricity consumption;
[0054] If the number in the first month is greater than the total number in the first preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with third abnormal information.
[0055] In one possible design, the determining module is further configured to:
[0056] If the electricity consumption category is non-residential electricity consumption and the total monthly electricity consumption is greater than or equal to the second preset threshold, then determine the number of the second month corresponding to the total monthly electricity consumption that is greater than or equal to the second preset threshold;
[0057] If the number in the second month is greater than the total number in the second preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the fourth abnormal information.
[0058] In one possible design, the determining module is further configured to determine the on-site location corresponding to the abnormal business expansion application;
[0059] The survey module is also used to conduct remote surveys of the on-site locations corresponding to the abnormal business expansion and installation services based on preset remote technology.
[0060] The determining module is also used to determine the non-compliance reasons of the abnormal business expansion application based on the survey results;
[0061] The survey module further includes a rectification module, which is used to provide target rectification suggestions to the target power users corresponding to the abnormal business expansion application based on the reasons for non-compliance.
[0062] Thirdly, embodiments of this application provide an electronic device, including: at least one processor and a memory; the memory stores computer-executable instructions; the at least one processor executes the computer-executable instructions stored in the memory, causing the at least one processor to perform the method described in the first aspect above and various possible designs.
[0063] Fourthly, embodiments of this application provide a computer-readable storage medium storing computer-executable instructions, which, when executed by a processor, implement the methods described in the first aspect above and various possible designs.
[0064] Fifthly, embodiments of this application provide a computer program product, including a computer program that, when executed by a processor, implements the method described in the first aspect and various possible designs of the first aspect.
[0065] This application provides a compliance testing method, device, and electronic equipment for business expansion application services. It acquires business expansion application requests submitted by target power users to power companies, whereby such requests represent the process of a target power user applying for a new power connection or expanding existing power supply. Subsequently, it determines the power service parameters stipulated in the business expansion application and the target power user's electricity metering data. The power service parameters and / or electricity metering data are then matched against preset standards to perform compliance testing on the business expansion application. This method can automatically screen for potential problems, thereby quickly identifying potentially abnormal business expansion application services and reducing the workload of manual screening. Furthermore, it identifies abnormal business expansion application services that fail the compliance test, conducts remote inspections of these abnormal applications based on preset remote technology, and provides targeted rectification suggestions to the corresponding target power users based on the inspection results. Through preset remote technology, it is possible to monitor the electricity consumption behavior of target power users corresponding to abnormal business expansion application services in real time and continuously, while avoiding the need for manual on-site inspections to cover all business expansion application services, significantly reducing the time and cost required for manual on-site inspections. This demonstrates that automation reduces the need for manual inspection, further decreasing the possibility of errors and shortening inspection time, thereby improving the efficiency and accuracy of compliance inspections for business expansion and installation applications. Attached Figure Description
[0066] The accompanying drawings, which are incorporated in and form part of this specification, illustrate embodiments consistent with this application and, together with the description, serve to explain the principles of this application.
[0067] Figure 1 A flowchart illustrating the compliance testing method for business expansion and installation services provided in this application embodiment. Figure 1 ;
[0068] Figure 2 A flowchart illustrating the compliance testing method for business expansion and installation services provided in this application embodiment. Figure 2 ;
[0069] Figure 3 A schematic diagram of the structure of the compliance testing device for business expansion and installation services provided in this application embodiment;
[0070] Figure 4 This is a hardware structure diagram of the electronic device provided in the embodiments of this application.
[0071] The accompanying drawings illustrate specific embodiments of this application, which will be described in more detail below. These drawings and descriptions are not intended to limit the scope of the concept in any way, but rather to illustrate the concept of this application to those skilled in the art through reference to particular embodiments. Detailed Implementation
[0072] Exemplary embodiments will now be described in detail, examples of which are illustrated in the accompanying drawings. When the following description relates to the drawings, unless otherwise indicated, the same numbers in different drawings denote the same or similar elements. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with this application. Rather, they are merely examples of apparatuses and methods consistent with some aspects of this application as detailed in the appended claims.
[0073] The terms "first," "second," "third," "fourth," etc. (if present) in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that embodiments of the invention described herein can be implemented, for example, in orders other than those illustrated or described herein.
[0074] In this application, the terms "exemplary" or "for example" are used to indicate examples, illustrations, or descriptions. Any embodiment or design described as "exemplary" or "for example" in this application should not be construed as being more preferred or advantageous than other embodiments or designs. Specifically, the use of terms such as "exemplary" or "for example" is intended to present the relevant concepts in a specific manner.
[0075] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, data stored, data displayed, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties. Furthermore, the collection, use and processing of the relevant data must comply with relevant laws, regulations and standards, and corresponding operation entry points are provided for users to choose to authorize or refuse.
[0076] The business expansion application service reflects the diverse electricity needs of users. Any expansion or new demand related to electricity consumption falls within the scope of the business expansion application service, which mainly includes new electricity installation services and electricity capacity expansion services. New electricity installation services refer to new electricity users applying for grid connection and starting to use electricity services; electricity capacity expansion services refer to existing electricity users needing to increase their electricity supply capacity to meet higher electricity demands.
[0077] Whether it's new electricity users connecting to the grid or existing users increasing their electricity capacity, both will lead to changes in electricity demand. To adapt to these changes, power companies need to reallocate grid resources, such as upgrading transformers, expanding power lines, and adding distribution facilities. However, electricity demand and user behavior may change over time, therefore, it is necessary to conduct regular compliance checks on new business expansion applications to help power companies maintain an understanding of the grid's operational status and ensure the continuous and stable operation of the power system.
[0078] Traditional compliance checks for business expansion applications primarily rely on manual review and on-site inspections. Manual review involves manually verifying the electricity application materials and historical electricity usage records submitted by the user during the application process. The focus of manual review is to confirm whether the electricity capacity, type of electricity use, and address match the actual situation, aiming to determine the rationality of the user's application. On-site inspections involve physically measuring and inspecting the user's electrical equipment, power lines, and distribution facilities to verify that the capacity, model, and quantity of these facilities are consistent with the application materials.
[0079] Manual review and on-site inspection cover all business expansion and installation applications submitted by electricity users. This requires a significant investment of manpower and time, especially when the number of electricity users is large or their geographical distribution is wide. This high cost and time-consuming nature leads to low inspection efficiency. Furthermore, manual inspection relies on the judgment of staff, making it susceptible to human error and lack of experience, resulting in a high false alarm rate. For example, it may incorrectly classify some applications as non-compliant or fail to identify actual problems.
[0080] To address the aforementioned technical issues, the inventors, to avoid manual intervention, opted for online methods to acquire necessary parameters or data. Combined with relevant standards, this automatically identifies potentially abnormal business expansion and installation applications. For these abnormal applications, remote inspection is then conducted. This avoids manual involvement in compliance checks and allows for inspection only of abnormal applications, rather than all applications. The entire inspection process eliminates manual checks, reducing the possibility of errors and time required, and improving the efficiency and accuracy of compliance checks for business expansion and installation applications.
[0081] The technical solution of this application and how the technical solution of this application solves the above-mentioned technical problems are described in detail below with specific embodiments. These specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described again in some embodiments. The embodiments of this application will now be described with reference to the accompanying drawings.
[0082] This application provides a method for compliance testing of business expansion and installation services. Figure 1 A flowchart illustrating the compliance testing method for business expansion and installation services provided in this application embodiment. Figure 1 ,like Figure 1 As shown, the compliance testing methods for this business expansion application service include:
[0083] S101. Obtain the business expansion application submitted by the target power user to the power company.
[0084] Among them, the business expansion application service represents the process by which a target power user applies to a power company for a new power connection or to expand the existing power supply.
[0085] Applications for power expansion from target electricity users are typically stored in the power company's business software platform. This platform helps the power company manage and monitor the entire application process, ensuring smooth operation from application submission, approval, installation to final power connection. It also provides necessary data analysis and reporting capabilities to optimize business processes and improve customer service quality.
[0086] It should be noted that the target electricity users in this embodiment are all low-supply, low-metering electricity users. Low-supply refers to the power company providing electricity to the target electricity users through the low-voltage grid, typically applicable to residential users, small commercial users, and some small industrial users. Low-metering refers to the electricity consumption data of the target electricity users being measured by metering devices (such as smart meters) installed on the low-voltage side. These metering devices are usually single-phase or three-phase meters, depending on the electricity demand of the target electricity user.
[0087] S102. Determine the power service parameters stipulated in the business expansion application, as well as the electricity metering data of the target power user.
[0088] The electricity service parameters are set to meet the basic electricity requirements of the target electricity users. When applying for business expansion services, target electricity users will have some basic electricity requirements, such as how much electricity they need, where they need it, and what billing method they want. The power company uses these electricity service parameters to ensure that the basic electricity requirements of the target electricity users are met. Electricity service parameters may include voltage level, power capacity, electricity category, access point location, power quality, and billing method.
[0089] Electricity metering data refers to data collected after a target electricity user has obtained a new power connection or expanded their existing power supply, i.e., after completing the business expansion application process. Electricity metering data may include electricity consumption, electricity consumption time, and peak-valley electricity consumption patterns.
[0090] Electricity metering data is crucial for power companies. Therefore, power companies need to collect and record this data from target electricity users for purposes such as billing, load management, and grid design. Specifically, this data can be read using metering devices such as smart meters installed at the target electricity user's metering point. The metering point is typically located where the target electricity user's electrical facilities connect to the power company's power supply network; it generally refers to the location where the smart meter is installed.
[0091] S103. Match the power service parameters and / or electricity metering data with preset standards to conduct compliance testing on business expansion application services.
[0092] It should be noted that when conducting compliance testing on business expansion applications, it is necessary to confirm that the target electricity user is currently using electricity. This is because compliance testing typically involves verifying the actual usage and relevant parameters of the electrical connection to ensure compliance with technical standards or safety requirements.
[0093] If the target electricity user is not in use, that is, the target electricity user has not started using electricity after completing the business expansion application, the compliance test of the business expansion application depends on the actual electricity consumption data, and the test may be planned to be carried out after the target electricity user starts using electricity.
[0094] Specifically, based on the electricity metering data of the target electricity user, it can be determined whether the user is currently consuming electricity after completing the business expansion application. For example, after the target electricity user completes the business expansion application, a baseline time period can be set to observe the user's electricity consumption. This baseline time period can range from a few days to several weeks, depending on the user's electricity consumption characteristics and the power company's management strategy. Then, by analyzing the user's electricity metering data, the trend of electricity consumption changes can be analyzed. If there are significant electricity consumption records within the baseline time period, it indicates that the user has resumed electricity consumption. If the user has a history of electricity consumption, the current data can be compared with historical data to identify changes in electricity consumption status.
[0095] Furthermore, the business expansion application and electricity metering data of the target electricity users currently in use are respectively identified as target business expansion application and target electricity metering data, and the electricity service parameters specified in the target business expansion application are identified as target electricity service parameters. Next, the target electricity service parameters and / or target electricity metering data are matched with preset standards to conduct compliance checks on the target business expansion application.
[0096] In one possible implementation, Figure 2A flowchart illustrating the compliance testing method for business expansion and installation services provided in this application embodiment. Figure 2 ,like Figure 2 As shown, the target power service parameters and / or target electricity metering data are matched with preset standards, specifically including the following four aspects:
[0097] S201. Obtain the target power service parameters and target power metering data of low-power users who are in a power consumption state.
[0098] It should be noted that although the electricity consumption of target users with low supply and low metering is relatively small, and can be accurately measured directly by the electricity meter, the current capacity that ordinary electricity meters can directly measure is limited. Therefore, to avoid situations where the electricity consumption exceeds the direct measurement capacity of the meter, target users will choose to install current transformers at the site as backup equipment, which can be activated when future electricity demand increases. Current transformers convert large currents into smaller standard currents for safe and accurate meter measurement. Under normal circumstances, the current transformers for users with low supply and low metering are set to an inactive state.
[0099] Since the target power service parameters include power capacity and voltage level, the first matching process includes:
[0100] If the power capacity is less than the first preset capacity, the current transformer installed at the target site location will be set to an inactive state. If the voltage level is not equal to the preset voltage while the current transformer is in an inactive state, the target business expansion application is determined to have failed the compliance test, and the target business expansion application is marked with the first abnormal information. Here, the target site location represents the geographical location corresponding to the business expansion application submitted by the target power user.
[0101] It should be noted that, generally speaking, users with a total single-phase electrical equipment capacity of less than 12kW can use 220V power supply. The first matching process can be restated as:
[0102] If S202 has a power capacity of less than 12kW and a voltage level not equal to 220V;
[0103] S203: Determine that the target business expansion application has failed the compliance test, and mark the target business expansion application as "abnormal meter configuration".
[0104] Explanatoryly, since the power capacity is less than 12kW, the current transformer is not in operation. In this case, if the voltage level is not equal to 220V, it means that the design of the meter may not meet the conventional power supply standard, that is, the configuration of the meter does not match the actual needs.
[0105] In addition, the target power service parameters also include the overall ratio and current transformer ratio, and the second matching process includes:
[0106] If the power consumption capacity is greater than or equal to the first preset capacity but less than the second preset capacity, the current transformer will still be set to an inactive state, where the second preset capacity is greater than the first preset capacity. If, while the current transformer is in an inactive state, the overall multiplier is not equal to 1, and the current transformer multiplier is not empty and not equal to 1, then the target business expansion application has failed the compliance test, and the target business expansion application will be marked with a second abnormal information.
[0107] Explanatory, the overall ratio characterizes the total ratio when current transformers and voltage transformers are used in combination, while the current transformer ratio characterizes the ratio between the primary current and the secondary current of the current transformer.
[0108] Since the target electricity users are those with low supply and low metering, power companies typically stipulate a maximum electricity capacity for them, known as the second preset capacity. Assuming the second preset capacity is set at 20kW, the second matching process can be restated as follows:
[0109] If S204, the power consumption capacity is greater than or equal to 12kW and less than 20kW, the comprehensive multiplier is not equal to 1, and the current transformer multiplier is not empty and is not equal to 1;
[0110] S205: Determine that the target business expansion application has failed the compliance test, and mark the target business expansion application as "abnormal current transformer configuration".
[0111] Under normal circumstances, the electricity consumption capacity of target power users with low supply and low metering is relatively small, and both current transformers and voltage transformers should be in an inactive state. In the inactive state, the ratio of each current transformer and voltage transformer is 1, so the combined ratio is also 1. If the combined ratio is not 1, it indicates that at least one of the current transformer and voltage transformer is working.
[0112] In this situation, if the current transformer ratio is not empty and not equal to 1, it indicates that the current transformer is in operation. However, when the power consumption is greater than or equal to 12kW and less than 20kW, the current transformer should normally be in a non-operational state. Therefore, the fact that the current transformer is in operation when it should be in a non-operational state indicates an abnormal configuration of the current transformer.
[0113] Furthermore, the target electricity service parameters also include electricity consumption categories, and the target electricity metering data includes total monthly electricity consumption, where electricity consumption categories include residential and non-residential electricity consumption. Therefore, the third matching process includes:
[0114] If the electricity consumption category is residential electricity and the total monthly electricity consumption is greater than or equal to the first preset electricity consumption, then the quantity for the first month corresponding to the total monthly electricity consumption greater than or equal to the first preset electricity consumption is determined. If the quantity for the first month is greater than the total quantity for the first preset month, then it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with third abnormal information.
[0115] Assuming the first preset power consumption is set to 100kW and the first preset monthly total is set to 3 months, the third matching process can be restated as follows:
[0116] If S206, if the electricity consumption category is residential electricity and the number of months with a total monthly electricity consumption greater than or equal to 100kW is greater than 3 months;
[0117] S207. It is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked as "residential electricity application for small but large capacity".
[0118] The requirement of a monthly electricity consumption of 100kW or more means that the target electricity user's total electricity consumption within a single month reaches or exceeds 100kW. If the monthly electricity consumption reaches or exceeds 100kW for more than three months within a year, it indicates that the target electricity user's electricity demand is high across multiple time periods, rather than being an occasional peak. This sustained high electricity consumption means that the target electricity user's actual electricity demand is higher than the applied demand, i.e., the reported demand exceeds the actual demand.
[0119] The "reporting too small and using too large" situation in the business expansion application refers to a situation where the electricity capacity applied for by the target electricity user does not match the actual electricity demand. In other words, the applied electricity capacity is too small, while the actual electricity consumption exceeds the applied electricity capacity, which will have an adverse impact on the stable operation of the power system and the electricity safety of the target electricity user.
[0120] Building upon the third matching process, the fourth matching process includes:
[0121] If the electricity consumption category is non-residential electricity and the total monthly electricity consumption is greater than or equal to the second preset threshold, then the quantity for the second month corresponding to the total monthly electricity consumption greater than or equal to the second preset threshold is determined. If the quantity for the second month is greater than the total quantity for the second preset month, then it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the fourth abnormal information.
[0122] Assuming the second preset power consumption is set to 200kW and the first preset monthly total is set to 6 months, the fourth matching process can be restated as follows:
[0123] If S208, if the electricity consumption category is non-residential electricity and the number of months with a total monthly electricity consumption greater than or equal to 200kW is greater than 6 months;
[0124] S209: Determine that the target business expansion application has failed the compliance test, and mark the target business expansion application as "non-residential electricity application for small but large capacity".
[0125] Understandably, different types of electricity meters can record electricity consumption over different time periods. Some traditional electricity meters can record the total monthly electricity consumption, while some smart meters have higher accuracy and more functions and can record daily electricity consumption.
[0126] If the electricity meter used in this embodiment records daily electricity consumption, then it is necessary to automatically record the daily electricity metering data and store the daily electricity metering data for later use.
[0127] It should be noted that if the target business expansion application does not meet any of the above four matching processes, it indicates that the target business expansion application has passed the compliance test. The target business expansion application that has passed the compliance test, S210, is stored in the corresponding historical business expansion application table.
[0128] For target business expansion applications that fail the compliance test, they will be identified as abnormal business expansion applications and stored in the corresponding business abnormality list.
[0129] S104. Identify abnormal business expansion applications that have failed compliance testing, conduct remote surveys of the abnormal business expansion applications based on preset remote technology, and provide target rectification suggestions to the corresponding target power users based on the survey results.
[0130] Specifically, the system retrieves abnormal business expansion and installation applications that failed compliance checks from the business anomaly list and determines the corresponding on-site locations. Based on pre-set remote technologies, it conducts remote surveys of the on-site locations corresponding to these abnormal applications. These pre-set remote technologies may include drone surveys, smart sensors, data analysis, and artificial intelligence.
[0131] Understandably, remote surveys based on pre-set remote technology refer to surveying abnormal business expansion / installation applications remotely without physically being present at the corresponding on-site location. Compared to traditional manual on-site surveys, remote surveys can reduce the time and cost of manual on-site surveys, and improve efficiency and accuracy.
[0132] Subsequently, based on the survey results, the reasons for non-compliance in abnormal business expansion applications are determined. Based on these reasons, targeted rectification suggestions are provided to the target electricity users corresponding to the abnormal applications. These suggestions may include replacing equipment, adjusting installation methods, re-specifying electricity demand, and improving safety measures.
[0133] The target electricity user shall rectify the abnormal business expansion application according to the target rectification suggestions. If the rectified abnormal business expansion application passes the compliance test, it shall be removed from the abnormal business list and stored in the historical business expansion application table. If the rectified abnormal business expansion application still fails the compliance test, the rectification shall continue.
[0134] The compliance testing method for business expansion applications provided in this application obtains the business expansion application submitted by the target power user to the power company, and simultaneously determines the power service parameters stipulated in the business expansion application, as well as the target power user's electricity metering data. Then, the power service parameters and / or electricity metering data corresponding to the target power user in power consumption status are matched with preset standards to conduct compliance testing on the target business expansion application of the target power user in power consumption status. This method can automatically screen out potential problems, thereby quickly identifying potentially abnormal business expansion applications and reducing the workload of manual screening. Furthermore, it identifies abnormal business expansion applications that fail the compliance test and their corresponding on-site locations. Based on preset remote technology, a remote survey is conducted on the on-site locations corresponding to the abnormal business expansion applications, and the reasons for non-compliance are determined based on the survey results. Targeted rectification suggestions are then provided to the corresponding target power user based on the reasons for non-compliance. By using pre-set remote technology, the electricity consumption behavior of target power users corresponding to abnormal business expansion and connection applications can be monitored in real time and continuously. This avoids the need for manual on-site inspections of all business expansion and connection applications, significantly reducing the time and cost of manual on-site inspections. Therefore, automation reduces the need for manual inspection, further reducing the possibility of inspection errors and shortening inspection time, thus improving the efficiency and accuracy of compliance inspections for business expansion and connection applications.
[0135] Figure 3 A schematic diagram of the structure of the compliance testing device for business expansion and installation services provided in this application embodiment is shown below. Figure 3 As shown, the compliance testing device 300 for the business expansion application includes: an acquisition module 301, a determination module 302, a testing module 303, and a survey module 304;
[0136] The acquisition module 301 is used to acquire the business expansion application business submitted by the target power user to the power company; the business expansion application business represents the process by which the target power user applies to the power company for a new power connection or to expand the existing power supply.
[0137] The determination module 302 is used to determine the power service parameters stipulated in the business expansion application business, as well as the electricity metering data of the target power user; the power service parameters are used to indicate the basic electricity requirements put forward by the power company to the target power user; the electricity metering data is the data after the target power user completes the business expansion application business.
[0138] The detection module 303 is used to match power service parameters and / or electricity metering data with preset standards to conduct compliance detection on business expansion application business;
[0139] The determination module 302 is also used to determine abnormal business expansion and installation applications that have failed the compliance test;
[0140] The survey module 304 is used to conduct remote surveys of abnormal business expansion and installation applications based on preset remote technology, and to provide target rectification suggestions to the corresponding target power users based on the survey results.
[0141] In one possible design, module 302 is also used for:
[0142] Based on electricity metering data, determine whether the target electricity user is in a state of electricity use after completing the business expansion application process;
[0143] The business expansion application and electricity metering data of the target electricity users who are in a state of electricity consumption are respectively identified as the target business expansion application and the target electricity metering data; the electricity service parameters specified in the target business expansion application are identified as the target electricity service parameters.
[0144] The detection module 303 is also used to match the target power service parameters and / or target electricity metering data with preset standards to conduct compliance testing on the target business expansion application.
[0145] In one possible design, the target power service parameters include power capacity and voltage level;
[0146] The detection module 303 also includes: a setting module 305, which is used to set the current transformer installed at the target site location to a non-working state if the power consumption capacity is less than the first preset capacity; wherein, the target site location represents the geographical location corresponding to the business expansion application service applied for by the target power user;
[0147] The determination module 302 is also used to: if the voltage level is not equal to the preset voltage when the current transformer is in an inactive state, determine that the target business expansion application has failed the compliance test, and mark the target business expansion application with the first abnormal information.
[0148] In one possible design, the target power service parameters also include the overall ratio and the current transformer ratio;
[0149] The setting module 305 is also used to set the current transformer to an inactive state if the power consumption capacity is greater than or equal to the first preset capacity and less than the second preset capacity; wherein the second preset capacity is greater than the first preset capacity.
[0150] The determination module 302 is also used to determine that the target business expansion application has failed the compliance test if the comprehensive ratio is not equal to 1 and the current transformer ratio is not empty and not equal to 1 when the current transformer is in an inactive state, and to mark the target business expansion application with the second abnormal information.
[0151] Among them, the comprehensive ratio characterizes the total ratio when current transformers and voltage transformers are used in combination, and the current transformer ratio characterizes the ratio between the primary current and the secondary current of the current transformer.
[0152] In one possible design, the target electricity service parameters also include electricity consumption categories, and the target electricity metering data includes the total monthly electricity consumption; wherein, the electricity consumption categories include residential electricity consumption and non-residential electricity consumption;
[0153] Module 302 is also used for:
[0154] If the electricity consumption category is residential electricity and the total monthly electricity consumption is greater than or equal to the first preset electricity consumption, then determine the number of the first month corresponding to the total monthly electricity consumption that is greater than or equal to the first preset electricity consumption;
[0155] If the number in the first month is greater than the total number in the first preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the third abnormal information.
[0156] In one possible design, module 302 is also used for:
[0157] If the electricity consumption category is non-residential electricity consumption and the total monthly electricity consumption is greater than or equal to the second preset threshold, then determine the number of the second month corresponding to the total monthly electricity consumption that is greater than or equal to the second preset threshold.
[0158] If the number in the second month is greater than the total number in the second preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the fourth abnormal information.
[0159] In one possible design, module 302 is also used to determine the on-site location corresponding to abnormal business expansion and installation applications;
[0160] The survey module 304 is also used to conduct remote surveys of the on-site locations corresponding to abnormal business expansion and installation applications based on preset remote technology.
[0161] Module 302 is also used to determine the non-compliance reasons for abnormal business expansion and installation applications based on the survey results;
[0162] The survey module 304 also includes a rectification module, which is used to provide target rectification suggestions to the target power users corresponding to the abnormal business expansion application business based on non-compliance reasons.
[0163] The compliance testing device for business expansion and installation services provided in this application embodiment can be used to execute the compliance testing method for business expansion and installation services in any of the above embodiments. Its implementation principle and technical effect are similar, and will not be described again here.
[0164] It should be noted that the division of the various modules in the above device is merely a logical functional division. In actual implementation, they can be fully or partially integrated into a single physical entity, or they can be physically separated. Furthermore, these modules can be implemented entirely in software via processing element calls; they can be fully implemented in hardware; or some modules can be implemented by processing element calls to software, while others are implemented in hardware. Additionally, these modules can be fully or partially integrated together, or implemented independently. The processing element mentioned here can be an integrated circuit with signal processing capabilities. In the implementation process, each step of the above method or each of the above modules can be completed through the integrated logic circuits in the hardware of the processor element or through software instructions.
[0165] Figure 4 This is a schematic diagram of the structure of an electronic device provided in an embodiment of this application. Figure 4 As shown, the electronic device may include: transceiver 41, processor 42, and memory 43.
[0166] Processor 42 executes computer execution instructions stored in memory, causing processor 42 to perform the scheme in the above embodiments. Processor 42 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, or discrete hardware components.
[0167] The memory 43 is connected to the processor 42 via the system bus and completes communication between them. The memory 43 is used to store computer program instructions.
[0168] Transceiver 41 can be used to communicate and interact with other devices.
[0169] The system bus can be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The system bus can be divided into address bus, data bus, control bus, etc. For ease of representation, only one thick line is used in the diagram, but this does not indicate that there is only one bus or one type of bus. Transceivers are used to enable communication between database access devices and other computers (e.g., clients, read-write libraries, and read-only libraries). Memory may include random access memory (RAM) and may also include non-volatile memory.
[0170] The electronic device provided in this application embodiment can be used to execute the method provided in any of the above embodiments. Its implementation principle and technical effect are similar, and will not be described again here.
[0171] This application also provides a computer-readable storage medium storing computer instructions that, when executed on a computer, cause the computer to perform the methods provided in any of the above embodiments.
[0172] This application also provides a computer program product, which includes a computer program stored in a computer-readable storage medium. At least one processor can read the computer program from the computer-readable storage medium, and when the at least one processor executes the computer program, it can implement the method provided in any of the above embodiments.
[0173] In the several embodiments provided in this application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are merely illustrative; for instance, the division of modules is only a logical functional division, and in actual implementation, there may be other division methods. For example, multiple modules may be combined or integrated into another system, or some features may be ignored or not executed. Furthermore, the coupling or direct coupling or communication connection shown or discussed may be indirect coupling or communication connection through some interfaces, devices, or modules, and may be electrical, mechanical, or other forms.
[0174] The modules described as separate components may or may not be physically separate. The components shown as modules may or may not be physical units; that is, they may be located in one place or distributed across multiple network units. Some or all of the modules can be selected to implement the solution of this embodiment according to actual needs.
[0175] Furthermore, the functional modules in the various embodiments of this application can be integrated into one processing unit, or each module can exist physically separately, or two or more modules can be integrated into one unit. The unit composed of the above modules can be implemented in hardware or in the form of hardware plus software functional units.
[0176] The integrated modules described above, implemented as software functional modules, can be stored in a computer-readable storage medium. These software functional modules, stored in a storage medium, include several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) or processor to execute some steps of the methods of the various embodiments of this application.
[0177] It should be understood that the aforementioned processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), etc. A general-purpose processor can be a microprocessor or any conventional processor. The steps of the method disclosed in this invention can be directly manifested as execution by a hardware processor, or execution by a combination of hardware and software modules within the processor.
[0178] The memory may include high-speed RAM, and may also include non-volatile storage (NVM), such as at least one disk storage device, and may also be a USB flash drive, external hard drive, read-only memory, disk or optical disc, etc.
[0179] The bus can be an Industry Standard Architecture (ISA) bus, a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. Buses can be categorized as address buses, data buses, control buses, etc. For ease of illustration, the buses shown in the accompanying drawings are not limited to a single bus or a single type of bus.
[0180] The aforementioned storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, magnetic disk, or optical disk. The storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer.
[0181] An exemplary storage medium is coupled to a processor, enabling the processor to read information from and write information to the storage medium. Alternatively, the storage medium can be an integral part of the processor. The processor and storage medium can reside in an Application Specific Integrated Circuit (ASIC). Alternatively, the processor and storage medium can exist as discrete components in an electronic control unit or main control device.
[0182] Those skilled in the art will understand that all or part of the steps of the above-described method embodiments can be implemented by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When executed, the program performs the steps of the above-described method embodiments; and the aforementioned storage medium includes various media capable of storing program code, such as ROM, RAM, magnetic disks, or optical disks.
[0183] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A method for compliance testing of business expansion and installation services, characterized in that, include: The document describes the process by which a target power user applies to a power company for a new power connection or to expand its existing power supply. The power service parameters stipulated in the business expansion application are determined, as well as the electricity metering data of the target power user; the power service parameters are used to indicate the basic electricity requirements proposed by the power company to the target power user; the electricity metering data is the data after the target power user completes the business expansion application. The power service parameters and / or the electricity metering data are matched with preset standards to conduct compliance checks on the business expansion application. For abnormal business expansion applications that fail compliance testing, conduct remote surveys of the abnormal business expansion applications based on preset remote technology, and provide target rectification suggestions to the corresponding target power users based on the survey results.
2. The method according to claim 1, characterized in that, The step of matching the power service parameters and / or the electricity metering data with preset standards to perform compliance checks on the business expansion application includes: Based on the electricity metering data, it is determined whether the target electricity user is in a state of electricity use after completing the business expansion application. The business expansion application and electricity metering data of the target power user who is in a state of electricity consumption are respectively determined as the target business expansion application and the target electricity metering data; the power service parameters specified in the target business expansion application are determined as the target power service parameters. The target power service parameters and / or the target electricity metering data are matched with preset standards to conduct compliance checks on the target business expansion application.
3. The method according to claim 2, characterized in that, The target power service parameters include power capacity and voltage level; The step of matching the target power service parameters and / or the target electricity metering data with preset standards to conduct compliance checks on the target business expansion application includes: If the power consumption capacity is less than the first preset capacity, the current transformer installed at the target site location will be set to an inactive state; wherein, the target site location represents the geographical location corresponding to the business expansion application service applied for by the target power user. If the voltage level is not equal to the preset voltage when the current transformer is not in operation, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the first abnormal information.
4. The method according to claim 3, characterized in that, The target power service parameters also include the overall multiplier and the current transformer multiplier, and the method further includes: If the power consumption is greater than or equal to the first preset capacity and less than the second preset capacity, the current transformer will still be set to an inactive state; wherein the second preset capacity is greater than the first preset capacity. If the overall ratio is not equal to 1 and the current transformer ratio is not empty and not equal to 1 when the current transformer is not in operation, then it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the second abnormal information. The comprehensive ratio represents the total ratio when the current transformer and voltage transformer are used in combination, and the current transformer ratio represents the ratio between the primary current and the secondary current of the current transformer.
5. The method according to claim 2, characterized in that, The target electricity service parameters also include electricity consumption categories, and the target electricity metering data includes total monthly electricity consumption; wherein, the electricity consumption categories include residential electricity consumption and non-residential electricity consumption; The step of matching the target power service parameters and / or the target electricity metering data with preset standards to conduct compliance checks on the target business expansion application includes: If the electricity consumption category is residential electricity consumption and the total monthly electricity consumption is greater than or equal to the first preset electricity consumption, then determine the number of the first month corresponding to the total monthly electricity consumption that is greater than or equal to the first preset electricity consumption; If the number in the first month is greater than the total number in the first preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with third abnormal information.
6. The method according to claim 5, characterized in that, The method further includes: If the electricity consumption category is non-residential electricity consumption and the total monthly electricity consumption is greater than or equal to the second preset threshold, then determine the number of the second month corresponding to the total monthly electricity consumption that is greater than or equal to the second preset threshold; If the number in the second month is greater than the total number in the second preset month, it is determined that the target business expansion application has failed the compliance test, and the target business expansion application is marked with the fourth abnormal information.
7. The method according to any one of claims 1 to 6, characterized in that, The method of remotely surveying the abnormal business expansion application based on preset remote technology, and providing target rectification suggestions to the corresponding target power users based on the survey results, includes: Determine the on-site location corresponding to the abnormal business expansion and installation application; Based on preset remote technology, the on-site location corresponding to the abnormal business expansion application is remotely surveyed, and the non-compliance reason of the abnormal business expansion application is determined according to the survey results; Based on the aforementioned reasons for non-compliance, targeted rectification suggestions are provided to the target power users corresponding to the abnormal business expansion and installation applications.
8. A compliance testing device for business expansion and installation services, characterized in that, include: The acquisition module is used to acquire business expansion application requests submitted by target power users to the power company. The business expansion application service represents the process by which a target power user applies to a power company for a new power connection or to expand the existing power supply. The determination module is used to determine the power service parameters stipulated in the business expansion application, as well as the electricity metering data of the target power user; the power service parameters are used to indicate the basic electricity requirements proposed by the power company to the target power user; the electricity metering data is the data after the target power user completes the business expansion application. The detection module is used to match the power service parameters and / or the electricity metering data with preset standards to perform compliance detection on the business expansion application. The determining module is also used to determine abnormal business expansion and installation applications that have failed the compliance test; The survey module is used to conduct remote surveys of the abnormal business expansion application services based on preset remote technology, and provide target rectification suggestions to the corresponding target power users based on the survey results.
9. An electronic device, characterized in that, include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executed instructions; The processor executes the computer execution instructions stored in the memory to implement the compliance detection method for business expansion and installation services as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that, The computer-readable storage medium stores computer-executable instructions, which, when executed by a processor, are used to implement the compliance detection method for business expansion and installation services as described in any one of claims 1 to 7.