Deep water slope bare rock trestle steel pipe pile construction platform and its use method
By combining a mobile forward platform and an AGV (Automated Guided Vehicle) truck, the problem of disjointed construction procedures in traditional Bailey cantilever construction was solved, enabling efficient, stable, and safe construction of steel pipe piles for deep-water slope bare rock trestle bridges.
CN122147872APending Publication Date: 2026-06-05CCCC SECOND HARBOR ENGINEERING CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CCCC SECOND HARBOR ENGINEERING CO LTD
- Filing Date
- 2026-03-16
- Publication Date
- 2026-06-05
Smart Images

Figure CN122147872A_ABST
Abstract
The application provides a deep water slope bare rock trestle steel pipe pile construction platform and a use method thereof. The deep water slope bare rock trestle steel pipe pile construction platform comprises a forward moving platform arranged on a constructed trestle. A counterweight device is arranged at the rear end of the forward moving platform. An AGV load vehicle is arranged below the forward moving platform. A plurality of lifting assemblies are arranged on the AGV load vehicle. The lifting assemblies abut against the lower end of the forward moving platform. The AGV load vehicle drives the forward moving platform to move forward. A load frame is arranged at the upper end of the AGV load vehicle. Concave areas are arranged at the two ends of the load frame. The lifting assemblies are arranged in the concave areas. The problems of low piling efficiency and repeated disassembly and assembly of traditional bailey cantilever construction are solved.