Battery swapping system and method based on EMS and robot
By collaborating with the EMS system and robots, intelligent analysis of battery health status and automated replacement are achieved, solving the problems of high risk and low efficiency of manual operation in the installation and replacement of energy storage batteries, and realizing safe and efficient battery replacement.
Patent Information
- Application Number
- CN202610624698.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-05-08
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-05-08
AI Technical Summary
The installation and replacement of energy storage batteries are subject to high safety risks, low efficiency, and inaccurate maintenance due to reliance on manual operation, especially in complex environments where efficient automated operation is difficult to achieve.
A battery replacement system based on EMS and robots is adopted. The EMS system assigns identification codes to battery devices, manages all installation data, analyzes the battery health status using a preset algorithm model, estimates the replacement time, and uses a third-party robot to perform the battery replacement operation, ensuring that the battery is automatically replaced after the safety conditions are met.
It enables automated battery replacement driven by data intelligence, improving safety and efficiency, reducing the risks of manual operation, and adapting to various environmental conditions.
Smart Images

Figure CN122232591B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of intelligent assembly technology applications, and in particular to a battery replacement system and method based on EMS and robots. Background Technology
[0002] In energy storage power station systems, battery installation is the most time-consuming and complex stage. First, factory installation is challenging due to the weight and complexity of the batteries, posing significant safety risks to operators. While factories typically use automated assembly machines, which greatly simplify the installation process, these machines often cannot be moved. Second, as a critical component of energy storage power stations, batteries are subject to replacement due to malfunctions. Furthermore, batteries have a limited cycle life, gradually reaching the end of their lifespan and requiring periodic replacement. Additionally, energy storage power stations are often located in diverse natural environments, making it difficult to access areas using large equipment such as cranes and forklifts.
[0003] Currently, there is no effective solution to the problems of high safety risks, low efficiency, and inaccurate maintenance caused by reliance on manual operation during the installation and replacement of energy storage batteries. Summary of the Invention
[0004] The purpose of this invention is to address the shortcomings of existing technologies by providing a battery replacement system and method based on EMS and robots, in order to solve the technical problems of high safety risks, low efficiency, and inaccurate maintenance caused by reliance on manual operation during the installation and replacement of energy storage batteries.
[0005] To achieve the above objectives, the technical solution adopted by the present invention is as follows: This invention provides a battery replacement system based on EMS and a robot, comprising: an EMS system, an after-sales service center, and a third-party robot. The EMS system is used to assign identification codes to battery devices and manage all installation data for battery assembly; it analyzes the battery health status based on a preset algorithm model, estimates battery replacement time, and synchronously pushes the analysis results, simulation process, and original operating conditions and data to the after-sales service center; the after-sales service center is used to determine battery replacement needs based on the analysis results, generate task instructions based on the battery replacement needs, and send the task instructions to the third-party robot through the EMS system, wherein the task instructions include: battery installation or replacement tasks; the third-party robot is used to receive the task instructions sent by the EMS system, obtain all installation data from the EMS system, synchronously obtain the current operating condition data of the target device, and after confirming that the core components are fault-free through system self-check, it sends a ready signal back to the EMS system; after confirming that the surrounding environment meets the replacement conditions, it begins to perform the battery replacement operation.
[0006] Optionally, the full installation data includes the coordinates of the equipment installation reference location, battery compartment dimensions, battery interface specifications, installation process requirements, and compatible battery models and parameters. The EMS system is also used to collect the energy storage system's operating data, equipment history archives, historical maintenance records, and environmental condition data. The EMS system is also used to manage the full installation data by indexing each device with an identification code. Among these, the operating data includes system-level operating data and equipment-level operating data, the equipment history archives include the system BOM list, installation data, and full technical archives, the historical maintenance records include the most recent full charge-discharge calibration data, and the environmental condition data includes the temperature and humidity data of the deployment site.
[0007] Furthermore, optionally, the preset algorithm models include: an accelerated degradation model for high temperature and high humidity conditions, in which the weighting coefficient is increased when the average monthly temperature of the deployment site is greater than the temperature threshold and the humidity is greater than the humidity threshold; and a cycle life reduction model for frequent deep charge and discharge conditions, in which the number of cycles is calculated by a preset multiple when the proportion of times the SOC is less than the first threshold in a single month is greater than the second threshold.
[0008] Optionally, a battery installation or replacement task includes: task type, target device identifier, and battery model to be installed or replaced.
[0009] Optionally, third-party robots are also used to communicate with the EMS system in real time via API interfaces.
[0010] Optionally, the target device's current operating status data includes: whether the battery compartment is powered off, the residual voltage, the current SOC, and whether the system is in shutdown maintenance mode.
[0011] Optionally, the system self-check includes verifying the operating status of the battery gripping mechanism, the walking drive module, the positioning and navigation module, and the power system.
[0012] Optionally, third-party robots are also used to confirm the surrounding environmental conditions, including whether it is raining, whether the air humidity is too high, and whether anyone is working in the energy storage environment.
[0013] Optionally, third-party robots can be adapted to the loading requirements of box trucks and can be directly connected to local energy storage power stations for power replenishment.
[0014] This invention provides a battery replacement method based on EMS and robots, applied to a battery replacement system based on EMS and robots, comprising: assigning identification codes to battery devices and managing full installation data of battery assembly; analyzing battery health status based on a preset algorithm model, estimating battery replacement time, and synchronously pushing the analysis results, deduction process, and original operating conditions and operation data to the after-sales service center; receiving task instructions sent by the after-sales service center based on the analysis results, deduction process, and original operating conditions and operation data; sending the task instructions to a third-party robot, so that the third-party robot can obtain full installation data from the EMS system according to the task instructions, and synchronously obtain the current operating condition data of the target device, and after confirming that the core components are fault-free through system self-check, feeding back a ready signal to the EMS system; and starting the battery replacement operation after confirming that the surrounding environment meets the replacement conditions.
[0015] This invention employs the above technical solution, assigning identification codes to battery devices and managing all installation data of battery assembly; analyzing battery health status based on a preset algorithm model, estimating battery replacement time, and simultaneously pushing the analysis results, deduction process, and original operating conditions and data to the after-sales service center; receiving task instructions from the after-sales service center based on the analysis results, deduction process, and original operating conditions and data; sending the task instructions to a third-party robot, enabling the third-party robot to obtain all installation data from the EMS system according to the task instructions, and simultaneously obtain the current operating condition data of the target device, and after confirming that the core components are fault-free through system self-check, feeding back a ready signal to the EMS system; and after confirming that the surrounding environment meets the replacement conditions, starting the battery replacement operation. Compared with existing technologies, it has the following technical effects: achieving data-driven intelligent, automatic, safe, and efficient technical effects. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of a battery replacement system based on EMS and a robot according to an embodiment of the present invention; Figure 2 This is a schematic flowchart of a battery replacement method based on EMS and a robot according to an embodiment of the present invention. Detailed Implementation
[0017] To make the objectives, technical solutions, and advantages of this application clearer, the application is described and illustrated below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application. All other embodiments obtained by those skilled in the art based on the embodiments provided in this application without inventive effort are within the scope of protection of this application.
[0018] Obviously, the accompanying drawings described below are merely some examples or embodiments of this application. Those skilled in the art can apply this application to other similar scenarios based on these drawings without any inventive effort. Furthermore, it is understood that although the efforts made in this development process may be complex and lengthy, for those skilled in the art related to the content disclosed in this application, any changes to design, manufacturing, or production based on the technical content disclosed in this application are merely conventional technical means and should not be construed as insufficient disclosure of the content of this application.
[0019] In this application, the reference to "embodiment" means that a specific feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment that is mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described in this application may be combined with other embodiments without conflict.
[0020] Unless otherwise defined, the technical or scientific terms used in this application shall have the ordinary meaning understood by one of ordinary skill in the art to which this application pertains. The terms “a,” “an,” “an,” “the,” and similar words used in this application do not indicate quantity limitation and may indicate singular or plural. The terms “comprising,” “including,” “having,” and any variations thereof used in this application are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that includes a series of steps or units (elements) is not limited to the listed steps or units, but may also include steps or units not listed, or may include other steps or units inherent to these processes, methods, products, or apparatus. The terms “connected,” “linked,” “coupled,” and similar words used in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The terms “multiple” / “several” used in this application refer to two or more. “And / or” describes the relationship between related objects, indicating that three relationships may exist; for example, “A and / or B” can indicate: A alone, A and B simultaneously, or B alone. The character " / " generally indicates that the preceding and following objects are in an "or" relationship. The terms "first," "second," and "third" used in this application are merely to distinguish similar objects and do not represent a specific ordering of the objects.
[0021] An illustrative embodiment of the present invention, such as Figure 1 As shown, Figure 1This is a schematic diagram of a battery replacement system based on EMS and a robot according to an embodiment of the present invention. The battery replacement system based on EMS and a robot provided in this application includes: The system comprises an EMS system 10, an after-sales service center 12, and a third-party robot 14. The EMS system 10 assigns identification codes to battery devices and manages all installation data for battery assembly. It analyzes battery health status based on a preset algorithm model, estimates battery replacement time, and simultaneously pushes the analysis results, simulation process, and original operating conditions and data to the after-sales service center 12. The after-sales service center 12 determines battery replacement needs based on the analysis results, generates task instructions based on these needs, and sends the task instructions to the third-party robot 14 through the EMS system 10. These task instructions include battery installation or replacement tasks. The third-party robot 14 receives the task instructions from the EMS system 10, obtains all installation data from the EMS system 10, and simultaneously acquires the current operating condition data of the target device. After self-checking and confirming that the core components are fault-free, it sends a ready signal back to the EMS system 10. Once the surrounding environment meets the replacement conditions, it begins the battery replacement operation.
[0022] Optionally, the full installation data includes the coordinates of the equipment installation reference location, battery compartment size parameters, battery docking interface specifications, installation process requirements, and compatible battery models and parameters; the EMS system 10 is also used to collect the energy storage system's operating data, equipment historical archives, historical maintenance records, and environmental condition data; the EMS system 10 is also used to manage the full installation data by indexing it with an identification code, storing it in one file per device; among which, the operating data includes system-level operating data and equipment-level operating data, the equipment historical archives include the system BOM list, installation data, and full technical archives, the historical maintenance records include the most recent full charge-discharge calibration data, and the environmental condition data includes the temperature and humidity data of the deployment site.
[0023] Furthermore, optionally, the preset algorithm models include: an accelerated degradation model for high temperature and high humidity conditions, in which the weighting coefficient is increased when the average monthly temperature of the deployment site is greater than the temperature threshold and the humidity is greater than the humidity threshold; and a cycle life reduction model for frequent deep charge and discharge conditions, in which the number of cycles is calculated by a preset multiple when the proportion of times the SOC is less than the first threshold in a single month is greater than the second threshold.
[0024] Optionally, a battery installation or replacement task includes: task type, target device identifier, and battery model to be installed or replaced.
[0025] Optionally, a third-party robot 14 is also used to communicate with the EMS system 10 in real time via an API interface.
[0026] Optionally, the target device's current operating status data includes: whether the battery compartment is powered off, the residual voltage, the current SOC, and whether the system is in shutdown maintenance mode.
[0027] Optionally, the system self-check includes verifying the operating status of the battery gripping mechanism, the walking drive module, the positioning and navigation module, and the power system.
[0028] Optionally, the third-party robot 14 is also used to confirm the surrounding environment replacement conditions, including whether it is raining, whether the air humidity is too high, and whether anyone is working in the energy storage environment.
[0029] Optionally, the overall size of the third-party robot 14 can be adapted to the loading requirements of box trucks, and it can be directly connected to local energy storage power stations for power replenishment.
[0030] Specifically, in the battery replacement system based on EMS and robots provided in this application embodiment, the EMS system 10 undertakes the management function of all battery assembly installation data, assigns a unique identification code (SN code / UUID) (i.e., the identification code in this application embodiment) to each battery device as the core index for full life cycle data archiving and querying, realizes precise management of "one device, one storage", and ensures that the data is not duplicated or omitted.
[0031] The battery replacement system based on EMS and robots provided in this application embodiment can collect system-level (current, voltage, power, etc.) and device-level (current, voltage, power, etc.) operating data of the energy storage system; based on the identification code, it can quickly retrieve the local system BOM list, installation information and other full technical files of the corresponding device.
[0032] In daily management, the EMS system 10 can automatically retrieve core operational data such as battery cycle count, voltage, SOC, and SOH, and synchronously match them with the system BOM, battery type, historical maintenance records, and environmental condition data such as temperature and humidity at the equipment deployment site. For battery degradation characteristics under different operating conditions (e.g., high temperature and high humidity environments accelerate battery aging, and frequent deep charge / discharge cycles shorten cycle life), the system analyzes the battery health status through a preset algorithm model and accurately predicts battery replacement time. The analysis results, the deduction process, and the original operating conditions and data are then synchronously pushed to the after-sales service center. Based on the latest service manual, and considering the degree of impact of operating conditions and the battery degradation trend, the service center determines whether battery replacement is necessary and the specific replacement time.
[0033] In a preferred embodiment, data acquisition is defined as follows: Operational data, equipment history records, historical maintenance records, and environmental data, among which, Environment: High temperature and high humidity conditions: When the average monthly temperature of the deployment site is >35℃ and the humidity is >75%, the accelerated decay model is automatically matched and the weight coefficient is increased by 1.2~1.5 (that is, in the embodiments of this application, when the average monthly temperature of the deployment site is greater than the temperature threshold and the humidity is greater than the humidity threshold, the weight coefficient is increased).
[0034] Operation: Frequent deep charge and discharge conditions: When the percentage of times the SOC < 20% is greater than 30% in a single month, the cycle life reduction model is matched, and the number of cycles is calculated at 1.3 times the equivalent (that is, in the cycle life reduction model for frequent deep charge and discharge conditions in this application embodiment, when the percentage of times the SOC is less than the first threshold in a single month is greater than the second threshold, the number of cycles is calculated at a preset multiple).
[0035] Equipment history: For this type of battery, the manufacturer recommends that the battery be replaced after 10,000 full charge and discharge cycles, or when the SOH value is lower than the standard value. Historical maintenance record: During the most recent full charge / discharge calibration, the minimum voltage met the requirements.
[0036] Based on the above information, EMS system 10 generates a "Battery System Health Report" according to the model, which includes raw data, analysis data, and conclusions.
[0037] The report was sent to the after-sales service center 12.
[0038] The after-sales service center verifies and confirms the reports: The after-sales service center called the homeowner to report the issue. After thorough communication with the homeowner, they obtained the homeowner's formal authorization and confirmed the replacement plan and date.
[0039] The system sends a message back to EMS system 10 to initiate the battery replacement process.
[0040] In this embodiment, a third-party robot 14 is used. This robot is equipped with an integrated data interaction module, an environmental perception module, and a task execution module. The third-party robot 14 communicates with the EMS system 10 in real time via an API interface to complete data retrieval, status verification, task execution, and result feedback. The on-site sensor network consists of temperature and humidity sensors, infrared ranging sensors, voltage detection sensors, etc., and collects real-time environmental data and current equipment status data of the work area, providing an accurate data source for the verification process.
[0041] In this embodiment of the application, during the task triggering process: the after-sales service center 12 issues a battery installation / replacement task through the EMS system 10, specifying the task type (new equipment installation / old battery replacement), the target equipment SN code, the model of the battery to be installed / replaced, and other core information. The task instruction is simultaneously pushed to the dedicated robot control system.
[0042] In the data retrieval process of this application embodiment: the dedicated robot automatically calls up all the installation data of the target device in the EMS system 10 through a preset interface, specifically including: the coordinates of the device installation reference position, the battery compartment size parameters, the battery docking interface specifications, the installation process requirements (such as tightening torque, wiring sequence), and the compatible battery model and parameters; at the same time, a real-time data link is established with the EMS system 10 to synchronously obtain the current operating status data of the target device (such as whether the battery compartment is powered off, the residual voltage, the current SOC, and whether the system is in shutdown maintenance mode).
[0043] In the robot self-test process of this application embodiment: after receiving the task instruction and basic data, the dedicated robot (i.e., the third-party robot 14 in this application embodiment) starts its own system self-test, checks the operating status of core components such as battery gripping mechanism, walking drive module, positioning and navigation module, and power system, and after confirming that there are no faults, it sends "ready" feedback to EMS system 10 and enters the verification stage.
[0044] In the environmental verification process of this application embodiment, the robot (i.e., the third-party robot 14 in this application embodiment) verifies whether the surrounding environment meets the replacement conditions, such as whether it is raining, whether the air humidity is too high, whether people are working in the energy storage environment, etc.
[0045] After all conditions have been confirmed, contact the owner (or user) and the after-sales service center again to confirm whether the authorization is clear and whether the plan can be finally implemented.
[0046] After all of the above is completed.
[0047] Third-party robot 14 began replacing the battery.
[0048] In this embodiment, the third-party robot 14 is designed with full consideration of scenario flexibility. Its overall size is adapted to the loading requirements of box trucks under 2 tons, which facilitates cross-site transportation and rapid deployment.
[0049] Third-party robot 14 can be directly connected to the local energy storage power station for power replenishment.
[0050] In conjunction with the above, in a preferred embodiment, the battery replacement system based on EMS and a robot provided in this application performs the battery replacement process as follows: It should be noted that the battery replacement system based on EMS and a robot provided in this application consists of four stages during the battery replacement process: the first stage is data preparation and health assessment; the second stage is remote decision-making and task generation; the third stage is robot on-site preparation and verification; and the fourth stage is automatic execution and closed-loop management. Phase 1: Data preparation and health assessment (conducted routinely) Step 1 involves data collection. Each battery device is assigned a unique identification code (SN code / UUID) through the EMS system 10, and this code serves as the core index to manage all installation information of the device (such as installation coordinates, battery compartment dimensions, interface specifications, etc.).
[0051] Step 2 involves data collection, specifically the continuous collection and correlation of four types of data through the EMS system: Operating data: battery current, voltage, power, SOC (state of charge), SOH (state of health), and cycle count.
[0052] Equipment history records: Bill of Materials (BOM) and technical documents.
[0053] Historical maintenance records: such as the most recent calibration data.
[0054] Environmental conditions data: temperature and humidity at the deployment site.
[0055] Step 3 involves intelligent analysis and prediction. The fused data is analyzed using preset algorithm models built into the EMS system 10 (such as the high temperature and high humidity accelerated degradation model and the deep charge and discharge damage model) to accurately predict the battery replacement time and generate a "Battery System Health Report" containing the original data, analysis process and conclusions.
[0056] Step 4: Push the report. Specifically, the battery system health report is pushed to the after-sales service center 12 through the EMS system 10.
[0057] Phase Two: Remote Decision-Making and Task Generation Step 1 involves manual verification and confirmation. The report is verified by engineers from the after-sales service center 12, and the latest service manual is consulted to determine whether a replacement is necessary.
[0058] Step 2 involves communicating with and authorizing the client. This includes contacting the homeowner through the after-sales service center (12), providing feedback and communicating with them to obtain their formal authorization regarding the replacement plan, date, etc.
[0059] Step 3: Generate task instructions. After authorization, the after-sales service center 12 issues a battery replacement task through the EMS system 10. The instructions include: task type (replacement), target device SN code, and battery model to be replaced.
[0060] Phase 3: On-site robot preparation and verification Step 1 involves receiving tasks and data. The third-party robot 14 receives task instructions from the EMS system 10 via the API interface and automatically retrieves all installation data (coordinates, dimensions, etc.) of the target device. At the same time, a real-time link is established to obtain the current operating status data of the target device (such as whether it has been powered off, residual voltage, etc.).
[0061] Step 2: Perform a robot self-check. This involves initiating a self-check program via a third-party robot 14 to verify the status of core components such as the battery gripping mechanism, walking drive, navigation and positioning, and power system. Once confirmed to be normal, report "Ready" to the EMS system 10.
[0062] Step 3: Conduct environmental and safety verification. The third-party robot 14 uses its own sensors (temperature, humidity, infrared, etc.) and EMS data to verify that the on-site environment (whether it is raining, whether the humidity is too high) and working conditions (whether there are people in the working area) meet the conditions for safe replacement.
[0063] Step 4: Final authorization confirmation. Before the work begins, conduct a final confirmation with the owner and service center to ensure that all authorizations and plans are correct.
[0064] Phase 4: Automated Execution and Closed Loop Step 1: Perform the replacement operation. Once all conditions are met, the third-party robot 14 will autonomously perform the battery removal, handling, installation and other replacement operations.
[0065] Step 2: After the work is completed, the result status can be transmitted back to the EMS system 10 via a third-party robot 14 to update the equipment file and maintenance record, forming a closed loop of data throughout the entire life cycle.
[0066] This invention employs the above technical solution, using an EMS system to assign identification codes to battery devices and manage all installation data for battery assembly. Based on a preset algorithm model, it analyzes the battery health status, estimates battery replacement time, and synchronously pushes the analysis results, deduction process, and original operating conditions and data to the after-sales service center. The after-sales service center determines battery replacement needs based on the analysis results, generates task instructions based on these needs, and sends these instructions to a third-party robot via the EMS system. The task instructions include battery installation or replacement tasks. The third-party robot receives the task instructions from the EMS system, retrieves all installation data from the EMS system, synchronously acquires the current operating condition data of the target device, and performs a system self-check. After confirming that the core components are fault-free, it sends a ready signal back to the EMS system. Once the surrounding environment meets the replacement conditions, it begins the battery replacement operation. Compared with existing technologies, this invention achieves the following technical effects: data-driven intelligence, automatic, safe, and efficient operation.
[0067] An illustrative embodiment of the present invention, such as Figure 2 As shown, Figure 2 This is a schematic flowchart of a battery replacement method based on EMS and a robot according to an embodiment of the present invention, applied to... Figure 1 The battery replacement system based on EMS and a robot shown in this application embodiment includes a battery replacement method based on EMS and a robot, comprising: Step S202: Assign identification codes to battery devices and manage all installation data of battery assembly; Step S204: Analyze the battery health status based on the preset algorithm model, estimate the battery replacement time, and push the analysis results, deduction process, original operating conditions and operation data to the after-sales service center simultaneously. Step S206: Receive task instructions sent by the after-sales service center based on the analysis results, simulation process, and original working conditions and operation data; Step S208: The task instruction is sent to the third-party robot so that the third-party robot can obtain all the installation data from the EMS system according to the task instruction, and simultaneously obtain the current working status data of the target equipment. After confirming that the core components are fault-free through system self-check, it sends a ready signal back to the EMS system. After confirming that the surrounding environment meets the replacement conditions, the battery replacement operation is started.
[0068] Specifically, in conjunction with steps S202 to S208, the battery replacement method based on EMS and a robot provided in this application embodiment can be applied to... Figure 1 The EMS system is shown in the battery swapping system based on EMS and robots.
[0069] This invention employs the above technical solution, assigning identification codes to battery devices and managing all installation data of battery assembly; analyzing battery health status based on a preset algorithm model, estimating battery replacement time, and simultaneously pushing the analysis results, deduction process, and original operating conditions and data to the after-sales service center; receiving task instructions from the after-sales service center based on the analysis results, deduction process, and original operating conditions and data; sending the task instructions to a third-party robot, enabling the third-party robot to obtain all installation data from the EMS system according to the task instructions, and simultaneously obtain the current operating condition data of the target device, and after confirming that the core components are fault-free through system self-check, feeding back a ready signal to the EMS system; and after confirming that the surrounding environment meets the replacement conditions, starting the battery replacement operation. Compared with existing technologies, it has the following technical effects: achieving data-driven intelligent, automatic, safe, and efficient technical effects.
[0070] The above description is merely a preferred embodiment of the present invention and does not limit the implementation and protection scope of the present invention. Those skilled in the art should realize that any equivalent substitutions and obvious changes made based on the description and illustrations of the present invention should be included within the protection scope of the present invention.
Claims
1. A battery swapping system based on EMS and a robot, characterized in that, include: EMS system, after-sales service center, and third-party robots, among which... The EMS system is used to assign identification codes to battery devices and manage all installation data of battery assembly; it analyzes the battery health status based on a preset algorithm model, estimates the battery replacement time, and pushes the analysis results, deduction process, and original operating conditions and operation data to the after-sales service center simultaneously. The after-sales service center is used to determine battery replacement needs based on the analysis results, generate task instructions based on the battery replacement needs, and send the task instructions to the third-party robot through the EMS system. The task instructions include: battery installation or replacement tasks. The third-party robot is used to receive the task instructions sent by the EMS system, obtain the full installation data from the EMS system, and simultaneously obtain the current operating status data of the target equipment. After confirming that the core components are fault-free through system self-check, it sends a ready signal back to the EMS system. After confirming that the surrounding environment meets the replacement conditions, it begins to perform the battery replacement operation. The complete installation data includes equipment installation reference coordinates, battery compartment size parameters, battery interface specifications, installation process requirements, and compatible battery models and parameters. The EMS system is also used to collect the energy storage system's operating data, equipment historical archives, historical maintenance records, and environmental condition data. The EMS system is also used to manage the complete installation data using the identification code as an index for one-to-one storage. The operating data includes system-level operating data and equipment-level operating data. The equipment historical archives include the system BOM list, installation data, and complete technical archives. The historical maintenance records include the most recent full-charge-discharge calibration data. The environmental condition data includes the temperature and humidity data of the deployment site. The preset algorithm model includes: an accelerated degradation model for high temperature and high humidity conditions, in which the weighting coefficient is increased when the monthly average temperature of the deployment site is greater than the temperature threshold and the humidity is greater than the humidity threshold; and a cycle life reduction model for frequent deep charge and discharge conditions, in which the number of cycles is calculated by a preset multiple when the proportion of times the SOC is less than the first threshold in a single month is greater than the second threshold.
2. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The battery installation or replacement task includes: task type, the identification code of the target device, and the model of the battery to be installed or replaced.
3. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The third-party robot is also used to communicate with the EMS system in real time via an API interface.
4. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The target device's current operating status data includes: whether the battery compartment is powered off, residual voltage, current SOC, and whether the system is in shutdown maintenance mode.
5. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The system self-test includes checking the operating status of the battery gripping mechanism, the walking drive module, the positioning and navigation module, and the power system.
6. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The third-party robot is also used to confirm the surrounding environment replacement conditions, which include: whether it is raining, whether the air humidity is too high, and whether anyone is working in the energy storage environment.
7. The battery replacement system based on EMS and a robot according to claim 1, characterized in that, The overall size of the third-party robot is adapted to the loading requirements of box trucks, and it can be directly connected to local energy storage power stations for power replenishment.
8. A battery replacement method based on EMS and a robot, characterized in that, Battery swapping systems for EMS and robot-based applications include: Assign identification codes to battery devices and manage all installation data for battery assemblies; Based on a preset algorithm model, the battery health status is analyzed, the battery replacement time is estimated, and the analysis results, the deduction process, and the original operating conditions and operation data are simultaneously pushed to the after-sales service center. Receive task instructions sent by the after-sales service center based on the analysis results, the deduction process, the original working conditions, and the operating data; The task instruction is sent to a third-party robot, which then retrieves the full installation data from the EMS system based on the task instruction, and simultaneously obtains the current operating status data of the target device. After confirming that the core components are fault-free through system self-check, the robot sends a ready signal back to the EMS system. Once the surrounding environment is confirmed to meet the replacement conditions, the battery replacement operation begins. The complete installation data includes equipment installation reference location coordinates, battery compartment size parameters, battery docking interface specifications, installation process requirements, compatible battery models and parameters; it also collects the energy storage system's operating data, equipment historical archives, historical maintenance records, and environmental condition data; the complete installation data is managed on a one-to-one basis using the identification code as an index; wherein, the operating data includes system-level operating data and equipment-level operating data, the equipment historical archives include the system BOM list, installation data, and complete technical archives, the historical maintenance records include the most recent full charge-discharge calibration data, and the environmental condition data includes the temperature and humidity data of the deployment site; The preset algorithm model includes: an accelerated degradation model for high temperature and high humidity conditions, in which the weighting coefficient is increased when the monthly average temperature of the deployment site is greater than the temperature threshold and the humidity is greater than the humidity threshold; and a cycle life reduction model for frequent deep charge and discharge conditions, in which the number of cycles is calculated by a preset multiple when the proportion of times the SOC is less than the first threshold in a single month is greater than the second threshold.
Citation Information
Patent Citations
Full life cycle management method and system of power battery, medium and equipment
CN118410975A
Intelligent management system for electrochemical energy storage application
CN119231716A
Energy storage system battery full life cycle state sensing and value transfer method and system
CN121525336A
Energy storage rapid replacement and energy complementation cooperative system suitable for multiple stations of transformer substation
CN121689480A