A quick installation device and method for a blast furnace refractory masonry equipment
By using a cross-shaped main load-bearing frame combined with an inner and outer rhomboid stabilizing structure for rapid installation during blast furnace construction, the overall assembly and hoisting of refractory lining equipment outside the furnace was achieved, ensuring precise positioning. This solved the problems of low efficiency, high safety risks, and poor versatility in traditional construction, thereby improving construction efficiency and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- SHANGHAI ERSHIYE CONSTR CO LTD
- Filing Date
- 2026-02-25
- Publication Date
- 2026-06-19
AI Technical Summary
The existing blast furnace construction process suffers from low equipment installation efficiency, high safety risks, complex construction organization, and poor versatility, making it difficult to achieve simultaneous installation of the furnace shell and preparation of equipment inside the furnace.
A rapid installation device for blast furnace refractory lining equipment is adopted. The device consists of a cross-shaped main load-bearing frame composed of two vertically intersecting steel beams, four support plates, and four stiffening plates, combined with an inner and outer rhomboid stabilizing structure. It is used for overall assembly and hoisting into place outside the furnace, avoiding high-altitude assembly.
It enables rapid and precise installation of refractory lining equipment, reduces safety risks, simplifies construction organization, improves construction efficiency, and has good versatility and economy.