Heavy steel structure truss high-altitude bulk construction method
By combining finite element software simulation and real-time monitoring with staggered stepped construction method, the construction difficulties of heavy steel trusses in narrow sites were solved, realizing efficient and safe construction of heavy steel trusses and improving construction accuracy and safety.
CN122286879APending Publication Date: 2026-06-26ANHUI SANJIAN ENG
View PDF 0 Cites 0 Cited by
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- ANHUI SANJIAN ENG
- Filing Date
- 2026-02-26
- Publication Date
- 2026-06-26
Smart Images

Figure CN122286879A_ABST
Abstract
This invention discloses a method for high-altitude assembly of heavy steel trusses, relating to the field of steel structure construction technology. The method includes the following steps: S1, Pre-construction preparation: Using finite element software to simulate the entire construction process, determining a reasonable construction sequence, theoretical values of component internal forces and deflection, generating a construction simulation analysis report, and conducting detailed design of the steel truss components, numbering them according to the hoisting sequence; S2, Ground segmental assembly: Dividing the overall truss into reasonable segments, erecting temporary support frames for component assembly; S3, Segmented high-altitude assembly construction, etc. This invention reduces the amount of high-altitude work by adopting "ground segmental assembly + segmented high-altitude assembly + staggered ladder construction," solving the construction limitations of traditional overall hoisting in confined spaces. Large-span steel beams achieve displacement deviations ≤5mm through "uneven span segmented sliding in mid-air," improving synchronous control accuracy and enhancing the level and quality of bridge sliding construction.