Data processing method and device, equipment, storage medium and product

By acquiring and analyzing the interaction and feedback data between public welfare projects and media content platforms, multi-dimensional scoring results were determined, which solved the problem of inaccurate evaluation of public welfare projects and improved the efficiency of project management and resource allocation.

CN122347346APending Publication Date: 2026-07-07BEIJING ZITIAO NETWORK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
BEIJING ZITIAO NETWORK TECH CO LTD
Filing Date
2025-01-07
Publication Date
2026-07-07

AI Technical Summary

Technical Problem

In existing technologies, the quality assessment of public welfare projects is too simplistic, and the scoring results are inaccurate, leading to low accuracy and efficiency in resource allocation.

Method used

By acquiring interaction and feedback data from multiple data sources associated with the target project and the media content platform, the scoring results for multiple preset scoring dimensions are determined, and the scoring results, including multi-dimensional scoring including interaction and feedback data, are displayed in the project management platform.

Benefits of technology

It enables precise quantification of the quality of public welfare projects, and improves the efficiency of project management and resource allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122347346A_ABST
    Figure CN122347346A_ABST
Patent Text Reader

Abstract

The present disclosure provides a data processing method, device, equipment, storage medium and product, and relates to the technical field of computers. The method comprises: obtaining target data of a target project from multiple data sources; wherein the target data is used to score the project quality of the target project; the target project is associated with preset media content published in a media content platform; the target data at least comprises interaction data of the preset media content in the media content platform and / or feedback data of the target project in the media content platform; determining a scoring result of multiple preset scoring dimensions of the target project according to the target data; and sending the scoring result to a project management platform of the target project to instruct the project management platform to display the scoring result in a preset page. By adopting the above technical solution, the project quality of the target project can be quantified more accurately, thereby facilitating the improvement of the project management efficiency and resource allocation efficiency of the project management platform.
Need to check novelty before this filing date? Find Prior Art