A shield tunneling through a mine method tunnel section auxiliary device
By using steel arches and pre-settlement devices in shield tunneling, the load on the shield body is distributed, and the tunnel structure is monitored and reinforced. This solves the problem of tunnel wall instability in mining tunnel sections and enables the shield body to pass safely and be permanently reinforced.
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHINA RAILWAY 18TH BUREAU GRP CO LTD
- Filing Date
- 2026-04-22
- Publication Date
- 2026-07-10
AI Technical Summary
In shield tunneling, the tunnel wall structure of the mining method tunnel section is not stable enough, which leads to instability and damage of the shield body when it passes through. Existing technology lacks effective auxiliary devices to improve safety.
The system employs steel arch frames and pre-settlement devices, including reinforcing pipes, plugs, and displacement sensors. Through support devices and channel steel guidance, the system disperses the shield load, monitors and reinforces the tunnel structure, prevents instability, and forms permanent reinforcement.
It improves the safety and stability of the shield tunneling through the mining tunnel section, avoids tunnel structure instability, ensures the shield body passes smoothly and leaves permanent reinforcement.