Gis analysis method and system for automatic optimization of axis of pumped storage power station dam
By automatically generating dam axis schemes with the shortest dam length through a GIS analysis system, the problem of dam site selection that relies on experience in traditional methods has been solved, thus improving the scientific and economic efficiency of project investment.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- STATE GRID XINYUAN
- Filing Date
- 2026-04-27
- Publication Date
- 2026-07-17
AI Technical Summary
Traditional methods for dam site selection and dam axis determination rely on engineers' experience, are highly subjective, and are difficult to conduct large-scale systematic comparisons. Furthermore, existing tools fail to use the dam axis length as an optimization target, resulting in high project investment risks.
By constructing a system that automatically extracts terrain features, intelligently lays out potential dam sites, and automatically generates multi-axis schemes, and using a GIS analysis system with the 'shortest dam length' as the sole quantitative optimization objective, the system achieves fully automated decision-making and generates the most economical dam axis scheme.
This significantly improves the scientific rigor and efficiency of dam site selection, reduces initial investment risks, and ensures the economic viability and rationality of the plan.