Installation devices and methods for electrical penetrations in nuclear power plants

By combining the lifting mechanism and the continuous guide support assembly, the shortage of hoisting tools in the installation of electrical penetrations in nuclear power plants has been solved, enabling stable and precise installation in confined spaces, reducing the risk of mechanical damage, and improving installation efficiency.

CN122607935BActive Publication Date: 2026-11-17CHINA NUCLEAR IND FIFTH CONSTR CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202611115979.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-07-27
Publication Date
2026-11-17
Estimated Expiration
2046-07-27

AI Technical Summary

Technical Problem

The existing method of installing electrical penetrations in nuclear power plants relies on hoisting tools, which makes it difficult to set up hoisting points in confined spaces, results in insufficient stability, and makes the cylinder prone to tilting or shifting during the pushing process, and the welded parts are easily damaged.

Method used

The system employs a lifting mechanism and a continuous guide support assembly, including a slide rail and an independent pulley support assembly. By switching between support and clearance positions, the electrical penetration component can be stably lifted and guided, preventing it from being suspended or tilted. When in the support position, the pulley support assembly provides stable support, and when in the clearance position, it clears the outer peripheral protrusion, ensuring the smooth installation of the electrical penetration component.

Benefits of technology

This method enables efficient and stable installation of electrical penetrations without relying on lifting points, reducing the risk of mechanical damage, improving installation accuracy and efficiency, and simplifying construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122607935B_ABST
    Figure CN122607935B_ABST
Patent Text Reader

Abstract

A device and method for installing electrical penetrations in nuclear power plants are provided, including a lifting mechanism and a continuous guide support assembly. The lifting mechanism drives the continuous guide support assembly to move up and down. The continuous guide support assembly includes a slide rail and multiple pulley support assemblies spaced apart along the extension direction of the slide rail. Each pulley support assembly is independently arranged and can switch between a support position and a clearance position. In the support position, the pulley support assembly supports the electrical penetration assembly. In the clearance position, the pulley support assembly releases its support from the axial section of the electrical penetration assembly corresponding to the pulley support assembly, allowing the outer peripheral protrusion to pass through the support position where the pulley support assembly is located. This device enables efficient and safe installation of electrical penetrations without using a hoisting structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of nuclear industry installation technology, specifically to an installation device and method for electrical penetrations in nuclear power plants. Background Technology

[0002] Electrical penetrations are specialized devices used in nuclear power plants to allow cables to pass through the containment structure. They are installed on the inner containment layer of the reactor building, distributed at floors ±0.00m, +3.60m, +7.50m, +13.50m, and +16.50m. The specific installation height on each floor ranges from 0.8m to 2m. The welded flanges of the electrical penetrations are located inside the reactor building. These devices provide electrical connections through the reactor containment structure. As part of the containment, electrical penetrations form a third barrier against radioactive material leakage, ensuring the integrity of the containment.

[0003] The reactor building has a dense network of pipes and limited space, and the electrical penetrations are located in a circular corridor area, restricting equipment transportation routes. Existing methods for installing electrical penetrations mostly rely on hoisting, requiring the use of hoisting tools to lift or adjust the position of the electrical penetrations.

[0004] For example, Chinese patent CN110853776B discloses an electrical penetration component assembly and an installation method for electrical penetration components in nuclear power plants. It describes two installation methods: penetration from the inside of the containment structure and penetration from the outside of the shielding wall. A trolley and a slider are used as temporary supports for the penetration component. However, regardless of the installation method, a hand-operated hoist is required to adjust the position of the electrical penetration component. Alternatively, there is a method that directly uses lifting equipment for installation. Lifting slings are placed over the non-welded flange end of the electrical penetration component and the bolt holes of the lifting eye. By adjusting the size of the lifting slings and using a hand-operated hoist, the cylinder is lifted horizontally. After the lifting equipment has transported the cylinder to the predetermined height, construction workers manually push the cylinder into the civil engineering steel sleeve to complete the installation.

[0005] However, the inventors discovered that the hoisting method during installation had many inconveniences. Hoisting relied on hoisting points, but the internal space of the steel platform inside the reactor building was small, making it difficult to set up hoisting points on site. Welding any hoisting points was not allowed on the inner wall of the containment vessel, so the hoisting operation was severely restricted by the site conditions. During hoisting and installation, the cylinder was in a suspended or semi-constrained state, which resulted in insufficient stability and increased the risk of mechanical damage to the cylinder. The final stage of electrical penetration installation relied on manual pushing. The cylinder lacked stable guidance and support during the process of being pushed into the civil engineering steel sleeve, which made it easy for it to tilt or deviate, thereby causing damage to the bevel of the welded parts. Summary of the Invention

[0006] One object of the present invention is to provide an electrical penetration installation device for nuclear power plants, which enables efficient and safe installation of electrical penetrations without the use of a hoisting structure.

[0007] An electrical penetration installation device for nuclear power plants, used to install electrical penetration assemblies, is provided to achieve the above objectives. The electrical penetration assembly includes an outer peripheral protrusion. The installation device includes: a lifting mechanism; and a continuous guide support assembly disposed on the lifting mechanism. The lifting mechanism drives the continuous guide support assembly to lift and lower, thereby adjusting the height position of the electrical penetration assembly. The continuous guide support assembly includes a slide rail and a plurality of pulley support assemblies spaced apart along the extension direction of the slide rail. Each pulley support assembly is disposed on the slide rail and supports the electrical penetration assembly, allowing the electrical penetration assembly to move along the extension direction of the slide rail. Each pulley support assembly is independently disposed and can switch between a support position and a clearance position. In the support position, the pulley support assembly supports the electrical penetration assembly. In the clearance position, the pulley support assembly releases support on the axial section of the electrical penetration assembly corresponding to the pulley support assembly, allowing the outer peripheral protrusion to pass through the support position where the pulley support assembly is located.

[0008] In one or more embodiments, each of the pulley support assemblies includes a pair of opposing support members and a plurality of rolling members disposed on the support members, the support members being arc-shaped.

[0009] In one or more embodiments, the slide rail is provided with a groove, and the bottom of the support member is provided with a slider accommodated in the groove. The slider is configured to rotate within the groove to drive the support member to rotate.

[0010] In one or more embodiments, a pair of the support members has a pair of opposing end faces, the end faces being arc-shaped to allow the end faces to not interfere with each other when the support members rotate.

[0011] In one or more embodiments, the slide rail is provided with a limiting hole, and each of the support members is provided with a limiting pin that cooperates with the limiting hole.

[0012] In one or more embodiments, the lifting mechanism includes a lifting platform and a scissor-type support frame disposed below the lifting platform.

[0013] In one or more embodiments, the device further includes an anti-tipping component detachably connected to the lifting mechanism.

[0014] In one or more embodiments, the anti-tipping assembly includes a support rod that is detachably connected to the lifting mechanism, and the bottom of the support rod is provided with an adjustable support foot.

[0015] In one or more embodiments, the device further includes a plurality of handrails, each of which is detachably connected to the lifting mechanism.

[0016] In one or more embodiments, the device further includes a caster wheel located at the bottom of the lifting mechanism and a braking structure for braking the caster wheel.

[0017] In one or more embodiments, the electrical penetration assembly includes a sleeve and an electrical penetration element located within the sleeve.

[0018] In one or more embodiments, when one of the pulley support components is in the avoidance position, at least one of the pulley support components located on the front and / or rear side of the pulley support component is in the support position.

[0019] In one or more embodiments, each of the pulley support assemblies is configured to be position-adjustable along the extension direction of the slide rail and to be locked relative to the slide rail.

[0020] In one or more embodiments, the lifting mechanism includes a plurality of lifting units spaced apart along the extension direction of the slide rail, each of the lifting units being capable of lifting independently to adjust the tilt angle of the electrical penetration assembly.

[0021] Another object of the present invention is to provide a method for installing electrical penetration components in a nuclear power plant, using the aforementioned installation device for electrical penetration components in a nuclear power plant. The installation method includes: placing the electrical penetration component on multiple pulley support components of a continuous guide support assembly; driving the continuous guide support assembly to rise and fall via a lifting mechanism to align the electrical penetration component with the part to be penetrated; pushing the electrical penetration component along the extension direction of the slide rail of the continuous guide support assembly, causing the electrical penetration component to move on the multiple pulley support components; and moving the outer peripheral protrusion to one of the slide rails. When the pulley support assembly is in the support position, the pulley support assembly is switched from the support position to the avoidance position to release the support of the pulley support assembly on the axial section of the electrical penetration assembly corresponding to the pulley support assembly, thereby allowing the outer peripheral protrusion to continue moving; after the outer peripheral protrusion passes the support position where the pulley support assembly is located, the pulley support assembly is reset from the avoidance position to the support position to support the electrical penetration assembly again; the electrical penetration assembly is continued to be pushed along the extension direction of the slide rail until the electrical penetration assembly reaches the predetermined installation position.

[0022] In one or more embodiments, switching the pulley support assembly from the supported position to the avoidance position includes the following steps: rotating a pair of support members of the pulley support assembly relative to the slide rail so that the support members avoid the movement path of the outer peripheral protrusion.

[0023] In one or more embodiments, the lifting mechanism is adjusted by adjusting the height of multiple lifting units at different positions along the extension direction of the slide rail, thereby adjusting the tilt angle of the electrical penetration assembly.

[0024] The aforementioned device uses multiple pulley support components to provide continuous multi-point support and timely guidance for the electrical penetration component during installation. This prevents the electrical penetration component from becoming suspended, sagging, tilting, or shifting during pushing or hoisting, improving the alignment accuracy between the electrical penetration component and the component to be penetrated. Furthermore, each pulley support component is set to be independent and can switch between support and avoidance positions. When the outer protrusion passes a pulley support component, that component can partially avoid it, while other pulley support components continue to support the electrical penetration component. This maintains overall support stability while allowing the electrical penetration component to advance continuously, enabling complete installation of the electrical penetration component without relying on on-site lifting points. Attached Figure Description

[0025] The above and other features, properties and advantages of the present invention will become more apparent from the following description taken in conjunction with the accompanying drawings and embodiments, wherein: Figure 1 This is a schematic diagram of the containment structure and electrical penetrations; Figure 2 This is a cross-sectional schematic diagram of an electrical penetration component installed inside a civil engineering steel sleeve; Figure 3 This is a schematic diagram of the first embodiment of the electrical penetration installation device for nuclear power plants; Figure 4 This is a schematic diagram of the first embodiment of the electrical penetration installation device for nuclear power plants and the electrical penetration assembly; Figure 5 This is a left view of the first embodiment of the electrical penetration installation device for nuclear power plants; Figure 6 This is a front view of the first embodiment of the electrical penetration installation device for nuclear power plants; Figure 7 This is a schematic diagram of a pair of support components; Figure 8 This is a schematic diagram of a second embodiment of an electrical penetration installation device for nuclear power plants; Figure 9 This is a schematic diagram of the chute and the wheel; Figure 10This is a top view of a second embodiment of an electrical penetration installation device for nuclear power plants. Detailed Implementation

[0026] The present invention will be further described below with reference to specific embodiments and accompanying drawings. More details are set forth in the following description in order to provide a full understanding of the present invention. However, the present invention can obviously be implemented in many other ways different from those described herein. Those skilled in the art can make similar extensions and derivations based on actual application situations without departing from the spirit of the present invention. Therefore, the scope of protection of the present invention should not be limited by the content of this specific embodiment.

[0027] It should be noted that these and other accompanying drawings are merely examples and are not drawn to scale, and should not be construed as limiting the scope of protection of the present invention.

[0028] The Hualong One is a megawatt-class pressurized water reactor nuclear power unit independently developed and designed in my country. Compared with the second-generation M310 pressurized water reactor unit, the electrical installation technology design requirements and technical standards of the Hualong One are higher.

[0029] Currently, all containment structures adopt a double-layer containment structure, such as Figure 1 and Figure 2 As shown, the electrical penetration 2 needs to penetrate the double-layer containment 1, and the wiring harness then enters the containment interior through the electrical penetration 2.

[0030] As mentioned earlier, the installation of electrical penetrations in previous projects has always been done by hoisting, which presents many inconveniences. Even when using trolleys and sliders to support the electrical penetrations, they only serve to switch support points at different stages. Based on the existing structure and considering the installation characteristics of electrical penetrations, this application proposes a device for installing electrical penetrations in nuclear power plants. This device provides continuous, stable, and low-friction support and guidance throughout the entire installation process using a continuous guide support assembly. Furthermore, it uses a lifting mechanism to control the position of the electrical penetrations, enabling stable and safe installation of the electrical penetrations without relying on steel platform hoisting points.

[0031] like Figure 2 and Figure 4 As shown, at least a portion of the outer periphery of the electrical penetration member 2 is fitted with a sleeve 3. After the electrical penetration member 2 extends into the sleeve 3, it forms an electrical penetration assembly 4. The electrical penetration assembly 4 passes through the containment 1 from outside the containment 1, specifically through the civil engineering steel sleeve 6 inside the containment 1, and finally a portion enters the containment 1.

[0032] In one specific embodiment, the total length of the civil engineering steel sleeve 6 is approximately 1.5 meters, and the total length of the electrical penetration equipment is approximately 3.5 meters.

[0033] Continue to refer to Figure 4As shown, the outer periphery of the electrical penetration assembly 4 is generally provided with an outer peripheral protrusion 5. The outer peripheral protrusion 5 includes, but is not limited to, end flanges, welding rings, reinforcing rings, connecting rings, and other structures that protrude radially outward from the outer peripheral surface of the main body. The outer peripheral protrusion 5 is the reason why it is difficult to feed the roller in the conventional solution, because the outer peripheral protrusion 5 significantly increases the outer diameter of the electrical penetration assembly 4. During the continuous pushing of the electrical penetration assembly 4, support components such as sliders and trolleys will block the outer peripheral protrusion 5, making it impossible for the electrical penetration assembly 4 to be continuously pushed into the containment.

[0034] Based on this Figure 3 and Figure 4 The invention illustrates an electrical penetration installation apparatus 100 for a nuclear power plant, comprising a lifting mechanism 10 and a continuous guide support assembly 20 mounted on the lifting mechanism 10. The lifting mechanism 10 drives the continuous guide support assembly 20 to lift as a whole, thereby adjusting the height of the electrical penetration assembly 4 so that the electrical penetration assembly 4 can be aligned with the portion of the containment structure to be penetrated.

[0035] In one specific embodiment, the lifting mechanism 10 includes a lifting platform 11 and a scissor-type support frame 12 disposed below the lifting platform 11. The height of the lifting platform 11 can be adjusted by operating the scissor-type support frame 12 to extend and retract, such as by stepping on the adjustment component 13. Through this lifting mechanism 10, the height and orientation of the electrical penetration component 4 can be adjusted without relying on factory hoisting points or manual hoists. For example, during the transportation of the electrical penetration component 4, the height can be adjusted to avoid collisions with already installed objects in the factory; furthermore, during installation, the electrical penetration component 4 can be adjusted to the required installation height. This allows the device to complete the transportation and installation of the electrical penetration component without relying on a steel platform or temporary lifting lugs as hoisting points, thereby reducing the difficulty of setting up on-site hoisting points and minimizing the risk of the electrical penetration component swinging, tilting, or colliding during hoisting or semi-suspended states.

[0036] Preferably, the lifting mechanism 10 may also be provided with multiple lifting units 110 spaced apart along the extension direction of the slide rail, such as... Figure 5 As shown, each lifting unit can be raised and lowered independently to adjust the tilt angle of the electrical penetration assembly 4, thereby adjusting the axial posture of the electrical penetration assembly 4. This structure is suitable for installation scenarios where there are height deviations, axial deviations, or uneven foundations on site, requiring local adjustments to the electrical penetration assembly.

[0037] The continuous guide support assembly 20 includes a slide rail 21 and a plurality of pulley support assemblies 22 spaced apart along the extension direction of the slide rail 21.

[0038] The slide rail 21 extends along the installation direction of the electrical penetration assembly 4, and multiple pulley support assemblies 22 are sequentially arranged on the slide rail 21 to jointly support the electrical penetration assembly 4 and allow the electrical penetration assembly 4 to move along the extension direction of the slide rail 21. Therefore, the electrical penetration assembly can receive multi-point, continuous support and guidance during installation, avoiding situations where the electrical penetration assembly tilts, shifts, or experiences excessive localized stress due to relying solely on localized support or manual pushing.

[0039] Each pulley support assembly 22 is set independently of each other, and each pulley support assembly 22 can switch between a support position and a clearance position.

[0040] In the supported position, the pulley support assembly 22 supports the electrical penetration assembly 4.

[0041] In the avoidance position, the pulley support assembly 22 releases its support on the axial section of the electrical penetration assembly 4 corresponding to the pulley support assembly 22, so as to allow the outer peripheral protrusion 5 to pass through the support position where the pulley support assembly 22 is located.

[0042] Each pulley support component 22 is independent of each other. When one of the pulley support components 22 switches to the avoidance position, the other pulley support components 22 can still remain in the support position, so that the electrical penetration component 4 remains stable as a whole when the outer peripheral protrusion 5 passes through the local support position.

[0043] This structure solves the problem of the outer peripheral protrusion 5 obstructing the installation of the electrical penetration component 4. When supporting the electrical penetration component 4, the pulley support component 22 provides stable support for the electrical penetration component 4, ensuring not only the stability of the electrical penetration component 4, but also the accuracy of its current position and attitude. When the pulley support component 22 switches to the avoidance position, the outer peripheral protrusion 5 is pushed forward. After passing through this section, the pulley support component 22 resets, continuing to provide local support for the electrical penetration component 4.

[0044] Specifically, each pulley support assembly 22 may include a pair of oppositely arranged support members 221 and a plurality of rolling members 222 disposed on the support members 221. The pair of support members 221 are respectively located on both radial sides of the electrical penetration assembly 4, and are used to jointly support the outer peripheral surface of the electrical penetration assembly 4.

[0045] In some embodiments, the rolling member 222 is a low-center-of-gravity caster, enabling the electrical penetration assembly 4 to maintain a low center of gravity and slide smoothly horizontally on the support member 221.

[0046] The support member 221 may be arc-shaped to fit the outer peripheral surface of the electrical penetration assembly 4. The support area of ​​the support member 221 is larger than the diameter of the electrical penetration assembly 4.

[0047] Multiple rolling members 222 are spaced apart along the arcuate direction of the support member 221 and are able to roll into contact with the outer peripheral surface of the electrical penetration assembly 4. Through the cooperation of the arcuate support member 221 and the multiple rolling members 222, on the one hand, the support envelope of the electrical penetration assembly 4 can be increased, improving the support stability; on the other hand, sliding friction can be converted into rolling friction, reducing pushing resistance and minimizing damage to the outer surface, coating, or weld bevel of the electrical penetration assembly 4.

[0048] In the first adjustment mode of the pulley support assembly 22, a groove 211 is provided on the slide rail 21, and a slider 223 is provided at the bottom of the support member 221 and accommodated in the groove 211. Figure 6 As shown, the slider 223 can rotate around its own axis S within the groove 211, thereby causing the support member 221 to rotate relative to the slide rail 21 around the axis S, for example, by 0 degrees or 60 degrees, to avoid the outer peripheral protrusion 5. The two ends of the arc-shaped support member should be a certain lateral distance from the electrical penetration assembly 4, or the width of the arc-shaped support member should be as narrow as possible, so that the ends of the rotated arc-shaped support member do not interfere with the surface of the electrical penetration assembly 4.

[0049] When the pulley support assembly 22 is in the supported position, a pair of support members 221 are arranged facing each other and support the electrical penetration assembly 4. When the outer peripheral protrusion 5 moves to the position of the pulley support assembly 22, the support members 221 can be rotated to a clearance position, allowing the pair of support members 221 to clear the movement path of the outer peripheral protrusion 5. After the outer peripheral protrusion 5 has passed, the support members 221 are rotated back to the supported position to restore support for the electrical penetration assembly 4.

[0050] To prevent mutual interference between the pair of support members 221 during rotational avoidance, the pair of support members 221 may have a pair of oppositely arranged end faces 221a and 221b, and the end faces 221a and 221b may be set as arc-shaped end faces, such as... Figure 7 As shown. The arc-shaped end face can provide clearance space when the support 221 rotates, thereby ensuring that the support 221 can smoothly switch between the support position and the clearance position without interference.

[0051] Magnetic structures can also be provided on end faces 221a and 221b to ensure the overall stability of the support component 221 during docking.

[0052] Furthermore, the slide rail 21 is provided with a limiting hole 212, and the support member 221 is provided with a limiting pin 224 that mates with the limiting hole 212. When the support member 221 is in the supported position, the limiting pin 224 is inserted into the limiting hole 212 to restrict the rotation or movement of the support member 221, so that the support member 221 is stably held in the supported position. When it is necessary to avoid the outer peripheral protrusion 5, the limiting pin 224 is pulled out or released, allowing the support member 221 to move. The limiting pin 224 can improve the positioning reliability of the support member 221 in the supported state.

[0053] In the second adjustment method of the pulley support assembly 22, the support member 221 is directly fixed to the limiting hole 212 provided on the slide rail 21 by the limiting pin 224, such as Figure 8 and Figure 9 As shown, this fixing structure differs from the above embodiment. The support member 221 is equipped with a wheel 225 located inside the slide groove 211. When the support member 221 is in the supported position, the limiting pin 224 is inserted into the limiting hole 212 and the extension mounting part 227 of the support member 221 to restrict the rotation or movement of the support member 221, so that the support member 221 is stably held in the supported position. When it is necessary to avoid the outer peripheral protrusion 5, the limiting pin 224 is pulled out or released, so that the support member 221 is disengaged from the slide groove 211 in the direction C, and the pulley support assembly 22 is quickly disassembled to achieve partial avoidance of the outer peripheral protrusion 5. After the outer peripheral protrusion 5 has passed, the pulley support assembly 22 is reinstalled.

[0054] In other embodiments, each pulley support assembly 22 is configured to be position-adjustable along the extension direction of the slide rail 21 and to be locked relative to the slide rail to change the support point of the electrical penetration assembly 4 as needed.

[0055] Back Figure 3 As shown, the installation device 100 may further include an anti-tipping assembly 30. The anti-tipping assembly 30 is detachably connected to the lifting mechanism 10 and / or the continuous guide support assembly 20, and is used to improve the stability of the installation device 100 during the support and pushing of the electrical penetration assembly 4. The anti-tipping assembly 30 may include a support rod 31, which is detachably connected to the lifting mechanism 10. The bottom of the support rod 31 is provided with an adjustable support foot 32. The adjustable support foot 32 is used for fine-tuning the height according to the flatness of the ground, preventing the device from tilting on uneven ground.

[0056] By adjusting the extension length of the adjustable support foot 32, the support rod 31 can be stably supported on the construction ground, thereby forming a multi-point support structure and reducing the risk of the installation device 100 overturning when supporting the heavy-duty electrical penetration assembly 4 at a high position.

[0057] The mounting device 100 may also include multiple handrails 33. Each handrail 33 is detachably connected to the lifting mechanism 10, such as by fixing the handrail to the bottom mounting plate 14 of the lifting mechanism 10. The handrails 33 facilitate the movement and adjustment of the mounting device 100 by construction personnel, providing multiple points of force application, and can also serve as temporary auxiliary stabilizing structures, improving the convenience of transporting and positioning the device in confined construction spaces.

[0058] In addition, the device also includes casters 40 located at the bottom of the lifting mechanism and a braking structure for braking the casters, which allows the device to move freely in a compact and complex construction space.

[0059] With the above structure, the installation device 100 can perform lifting and adjusting, continuous support, rolling and pushing, and partial avoidance of the electrical penetration assembly 4 without relying on the plant's lifting points. In particular, when the outer peripheral protrusion 5 of the electrical penetration assembly 4 passes through a certain pulley support assembly 22, the pulley support assembly 22 can temporarily switch to an avoidance position, while the other pulley support assemblies 22 continue to support the electrical penetration assembly 4, thus balancing the smooth passage of the outer peripheral protrusion 5 with the overall stable support of the electrical penetration assembly 4. As a result, the risk of tilting, displacement, collision, and bevel damage to the electrical penetration assembly 4 during installation can be reduced, improving the safety and efficiency of electrical penetration installation operations in nuclear power plants.

[0060] The electrical penetration component is supported by the pulley support assembly throughout the installation process, avoiding mechanical damage such as cylinder tilting and weld bevel damage caused by manual pushing and hoisting.

[0061] The following is a detailed introduction to the usage of the electrical penetration installation device for the nuclear power plant and the installation method of the electrical penetration.

[0062] First, the electrical penetration assembly is placed on multiple pulley support assemblies of the continuous guide support assembly. Specifically, the lifting mechanism 10 is adjusted to its lowest height, the handrail 33 is removed, and the electrical penetration assembly 4 is placed on each pulley support assembly 22.

[0063] The handrail 33 is then reinstalled, moving the device and electrical penetration assembly to their installation position. The handrail 33 is pushed to maintain a low center of gravity as the device moves within the factory until the electrical penetration assembly 4 is transported to its designated installation position. During transport, if there is a risk of collision between the device and existing objects within the factory, the height of the device is adjusted using the lifting mechanism 10 to avoid obstacles within the factory.

[0064] After reaching the designated installation position, an anti-tipping component can be added to the device to enhance its stability. Install the support rod 31 from the anti-tipping component 30, connecting it to the lifting mechanism 10. Adjust the height of the support rod 31 using the adjustable support feet 32 ​​according to the ground level. Operate the braking structure at the bottom of the device to lock the casters in their current position.

[0065] Adjust the orientation of the electrical penetration assembly 4 on the support 221, and drive the continuous guide support assembly to rise and fall through the lifting mechanism 10 so that the electrical penetration assembly 4 is aligned with the axis of the hole to be installed on the containment 1.

[0066] Specifically, the electrical penetration assembly is installed into the civil engineering steel sleeve 6 on the containment vessel 1, referring to... Figure 2 As shown. The electrical penetration assembly 4 is pushed along the pulley support assembly toward the civil engineering steel sleeve 6, that is, in direction D, so that the electrical penetration assembly 4 moves horizontally along the extension direction of the slide rail 21.

[0067] When the outer peripheral protrusion 5 of the electrical penetration assembly 4 moves to the support position of one of the pulley support assemblies and interferes with the pulley support assembly 22, the electrical penetration assembly 4 cannot continue to move forward. This causes the pulley support assembly 22 to switch from a support position to a clearance position, such as by rotating the support member 221 relative to the slide rail 21 to allow the support member 221 to clear the movement path of the outer peripheral protrusion 5. This releases the support of the pulley support assembly 22 on the axial section of the electrical penetration assembly 4 corresponding to the pulley support assembly, thereby allowing the outer peripheral protrusion to continue moving towards the containment side in direction D. After the outer peripheral protrusion 5 passes the support position of the pulley support assembly, the pulley support assembly returns from the clearance position to the support position to re-support the electrical penetration assembly 4.

[0068] Continue pushing the electrical penetration assembly along the extension direction of the slide rail. Repeat the above operation for each outer peripheral protrusion until the electrical penetration assembly reaches the predetermined installation position and is completely inserted into the civil engineering steel sleeve.

[0069] In some embodiments, the height of the continuous guide support assembly at different positions along the slide rail extension direction can be adjusted by adjusting multiple lifting units of the lifting mechanism, thereby adjusting the tilt angle of the electrical penetration assembly and changing its posture to make it more flexibly adaptable to installation under different working conditions.

[0070] Finally, disassemble the support rod 31 and handrail 33 in the anti-tipping assembly 30, operate the lifting mechanism 10 to slowly lower the device, release the locking state of the brake structure on the caster wheel, move the device away from the installation position, and complete the installation.

[0071] The above-mentioned device and method eliminate the need to rely on steel platform lifting points during the transportation and installation of the electrical penetration assembly. Each pulley support assembly can be released from its limit one by one, allowing the protruding parts on the electrical penetration assembly to smoothly pass over the pulley support assembly. This achieves continuous pushing and continuous support, ensuring that the electrical penetration assembly is always in a continuously supported state, avoiding suspension or instability, and preventing swinging or damage caused by suspension. This simplifies construction operations and improves the installation efficiency of electrical penetration components.

[0072] This application uses specific terms to describe embodiments of the application. Terms such as "an embodiment," "one embodiment," and / or "some embodiments" refer to a particular feature, structure, or characteristic associated with at least one embodiment of the application. Therefore, it should be emphasized and noted that references to "an embodiment," "one embodiment," or "an alternative embodiment" in different locations throughout this specification do not necessarily refer to the same embodiment. Furthermore, certain features, structures, or characteristics in one or more embodiments of the application can be appropriately combined.

[0073] While the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the invention. Any variations and modifications can be made by those skilled in the art without departing from the spirit and scope of the invention. Therefore, any modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of the present invention, without departing from the scope of the invention, fall within the protection scope defined by the claims of the present invention.

Claims

1. A nuclear power plant electrical penetration installation device for installing electrical penetration components, characterized in that, The electrical penetration assembly includes an outer peripheral protrusion, and the mounting device includes: Lifting mechanism; A continuous guide support assembly is disposed on the lifting mechanism. The lifting mechanism is used to drive the continuous guide support assembly to rise and fall, so as to adjust the height position of the electrical penetration assembly. The continuous guide support assembly includes a slide rail and a plurality of pulley support assemblies spaced apart along the extension direction of the slide rail. Each pulley support assembly is disposed on the slide rail and is used to support the electrical penetration assembly and allow the electrical penetration assembly to move along the extension direction of the slide rail. Each of the pulley support assemblies is independently arranged, and each of the pulley support assemblies can switch between a support position and a clearance position. In the support position, the pulley support assembly supports the electrical penetration assembly. In the clearance position, the pulley support assembly releases its support on the axial section of the electrical penetration assembly corresponding to the pulley support assembly, so as to allow the outer peripheral protrusion to pass through the support position where the pulley support assembly is located. Each of the pulley support assemblies includes a pair of opposing support members and a plurality of rolling members disposed on the support members, wherein the support members are arc-shaped; The slide rail is provided with a slide groove, and the bottom of the support member is provided with a slider that is accommodated in the slide groove. The slider is configured to rotate within the slide groove to drive the support member to rotate.

2. The apparatus as claimed in claim 1, characterized in that, Each pair of support members has a pair of opposing end faces, which are arc-shaped to allow the end faces to not interfere with each other when the support members rotate.

3. The apparatus as described in claim 1, characterized in that, The slide rail is provided with a limiting hole, and each of the supporting members is provided with a limiting pin that cooperates with the limiting hole.

4. The apparatus as claimed in claim 1, characterized in that, The lifting mechanism includes a lifting platform and a scissor-type support frame disposed below the lifting platform.

5. The apparatus as claimed in claim 1, characterized in that, The device also includes an anti-tipping component, which is detachably connected to the lifting mechanism.

6. The apparatus as claimed in claim 5, characterized in that, The anti-tipping component includes a support rod, which is detachably connected to the lifting mechanism, and the bottom of the support rod is provided with an adjustable support foot.

7. The apparatus as claimed in claim 1, characterized in that, The device also includes multiple handrails, each of which is detachably connected to the lifting mechanism.

8. The apparatus as claimed in claim 1, characterized in that, The device also includes casters located at the bottom of the lifting mechanism and a braking structure for braking the casters.

9. The apparatus as claimed in claim 1, characterized in that, The electrical penetration assembly includes a sleeve and an electrical penetration element located within the sleeve.

10. The apparatus as claimed in claim 1, characterized in that, When one of the pulley support components is in the avoidance position, at least one of the pulley support components located in front of or behind the pulley support component is in the support position.

11. The apparatus as claimed in claim 1, characterized in that, Each of the pulley support assemblies is configured to be adjustable in position along the extension direction of the slide rail and to be locked relative to the slide rail.

12. A method for installing electrical penetrations in a nuclear power plant, characterized in that, The installation is performed using the nuclear power plant electrical penetration installation device as described in any one of claims 1 to 11, wherein the installation method includes: The electrical penetration assembly is placed on multiple pulley support assemblies of the continuous guide support assembly; The continuous guide support assembly is raised and lowered by a lifting mechanism to align the electrical penetration assembly with the part to be penetrated. The electrical penetration assembly is pushed along the slide rail extension direction of the continuous guide support assembly, so that the electrical penetration assembly moves on the plurality of pulley support assemblies; When the outer peripheral protrusion moves to the support position of one of the pulley support assemblies, the pulley support assembly is switched from the support position to the avoidance position to release the support of the pulley support assembly on the axial section of the electrical penetration assembly corresponding to the pulley support assembly, thereby allowing the outer peripheral protrusion to continue to move; After the outer peripheral protrusion passes the support position where the pulley support assembly is located, the pulley support assembly is reset from the avoidance position to the support position to support the electrical penetration assembly again; Continue pushing the electrical penetration assembly along the extension direction of the slide rail until the electrical penetration assembly reaches the predetermined installation position.

13. The method for installing electrical penetrations in a nuclear power plant as described in claim 12, characterized in that, Switching the pulley support assembly from the supporting position to the avoidance position includes the following steps: rotating a pair of support members of the pulley support assembly relative to the slide rail so that the support members avoid the movement path of the outer peripheral protrusion.

Citation Information

Patent Citations

  • Nuclear power plant electrical penetration components and installation methods

    CN110853776B

  • Lifting tool

    CN115385262A

  • Welding device and welding method for communication base station supporting assembly

    CN122077316A