A method for safety monitoring and interlocking control of bridge erecting machines
By establishing a mechanical position benchmark for the bridge erecting machine and performing cross-verification of multi-source data, the actual operating conditions are identified, solving the problem of inaccurate safety interlock judgment in existing technologies and achieving higher safety and stability.
Patent Information
- Application Number
- CN202611122121.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-28
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2046-07-28
AI Technical Summary
The existing bridge erecting machine safety monitoring system lacks a unified mechanical benchmark for judging data such as outrigger reaction force, crane position, and lifting point load, which leads to inaccurate judgment of safety interlocks and poses a risk of the whole machine overturning and beam falling.
Establish mechanical position benchmarks between the support points of the bridge erecting machine's outriggers, the running position of the overhead crane, the position of the hoisting point, and the center of gravity of the entire machine. Identify the current actual working conditions through cross-verification of multi-source data, and perform graded interlocking control before outputting action commands.
It improves the reliability of safety assessment of bridge erecting machines, reduces the risk of machine overturning and beam falling, and enhances the traceability of operation records and the stability of status assessment.
Smart Images

Figure CN122653082B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of safety monitoring technology for lifting machinery, specifically a method for interlocking control of safety monitoring of bridge erecting machines. Background Technology
[0002] A bridge erecting machine is a large-scale special lifting equipment used to erect precast bridge beams onto bridge piers or abutments. During operations such as crossing spans, feeding beams, lifting, lateral movement, and lowering beams, the overall support state of the machine, the position of the gantry crane, and the load application point of the beams are constantly changing, which can easily lead to safety risks such as cantilever stress, off-center load transfer, and reduced overturning margin. For example, the invention patent with authorization announcement number CN112650115B discloses an active safety monitoring system for a bridge erecting machine, which collects stress values of parts such as longitudinal guide beams and outriggers through a stress detection unit and compares the measured stress values with preset warning values to realize alarms, shutdowns, or reverse operation. Another example is the invention patent with authorization announcement number CN116991108B, which discloses a smart management method, system, device, and storage medium for a bridge erecting machine. It collects monitoring data and environmental parameters according to the operation stage and adjusts the operation speed when the operation stability does not meet preset conditions.
[0003] While the aforementioned existing technologies can collect, display, alarm, or adjust the speed of bridge erecting machines, their safety assessments typically rely primarily on manually selected operating modes, manually input operating stages, or preset thresholds. Data such as outrigger reaction force, main beam inclination angle, lifting point load, and gantry crane position lack cross-verification to match actual working conditions, failing to unify the actual load-bearing state of each outrigger, beam load position, and overall machine center of gravity changes under the same mechanical benchmark for interlocking judgments. Therefore, if the outrigger pins are not reliably in place, some outriggers have not yet formed effective support, or the gantry crane is not in a stable position, and the operator switches the operating mode prematurely and issues longitudinal movement, lifting, or beam lowering commands, individual monitoring parameters may not have reached the alarm threshold, leading to dangerous situations. The operation may still be allowed to proceed; however, if an alarm or shutdown is triggered only after the tilt angle, stress, or load exceeds the static threshold, the center of gravity of the entire machine may already be close to the critical range of overturning. Braking inertia and eccentric moment will further weaken the shutdown effect, thereby increasing the risk of the entire machine overturning or the beam falling. Therefore, it is necessary to propose a safety monitoring and interlocking control method for bridge erecting machines. This method integrates the distribution of leg reaction forces, lifting point loads, gantry crane position, and main beam posture in real time, automatically identifies the actual working conditions of the bridge erecting machine, calculates the anti-overturning safety margin, and completes graded release interlocking before the action is executed. This solves the technical problems of inconsistency between the interlocking judgment benchmark and the actual stress state and the lag in alarm handling in the existing technology, thereby achieving the technical effect of preventing dangerous actions in advance and improving the safety of bridge erecting operations. Summary of the Invention
[0004] To address the shortcomings of existing technologies, this invention provides a safety monitoring and interlocking control method for bridge erecting machines, which solves the problems mentioned in the background section.
[0005] To achieve the above objectives, the present invention provides the following technical solution:
[0006] A method for safety monitoring and interlocking control of a bridge erecting machine includes:
[0007] S1: Establish the mechanical positional benchmarks between the support points of the bridge erecting machine's outriggers, the crane's running position, the winch hoisting point position, and the overall center of gravity position;
[0008] S2: Synchronously acquire outrigger reaction force, outrigger locking status, cylinder stroke, main beam posture, crane position, lifting point load and lifting height, and receive commands for actions to be executed;
[0009] S3: Based on the aforementioned mechanical position benchmark, the vertical bearing relationship between the outrigger reaction force and the machine's self-weight, lifting point load, and additional load is verified. The moment relationship between the outrigger reaction force, the machine's self-weight, the beam load, and the lifting point load is verified. The attitude relationship is verified based on the cylinder stroke and the measured main beam attitude. The data collected by the pressure detection elements arranged in parallel on the same outrigger, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points are compared for consistency to obtain reliable state data.
[0010] S4: Based on the leg bearing status in the trusted status data, as well as the load change at the lifting point, the position of the overhead crane and the posture of the main beam, identify the current actual working condition of the bridge erecting machine, and verify the current actual working condition with the manually selected working mode and the allowed adjacent transition relationship to obtain the working condition verification status. The working condition verification status includes the working condition consistency status, the working condition conflict status, the transition status or the restricted action permission status.
[0011] S5: Before the action command to be executed is output to the actuator, the action command to be executed is classified and interlocked according to the working condition verification status, the current actual working condition, the outrigger locking status, the support status, the load application position and the anti-overturning safety margin, and the action command to be executed is determined to be allowed to be executed, executed at a limited speed or prohibited from being executed; in the case of working condition conflict, the relevant action command is determined to be prohibited from being executed or transferred to manual confirmation; in the case of restricted action permission, only the stop, descent, retraction or locking actions are allowed to be executed.
[0012] Furthermore, S1 includes:
[0013] Using the bearing plane of the bridge erecting machine as the horizontal reference plane, and the longitudinal centerline and transverse centerline of the whole machine as coordinate axes, a planar mechanical coordinate system is established to mark the center of each outrigger base, the travel range of the overhead crane, the linkage position of the hoisting point, and the coordinates of the unloaded center of gravity.
[0014] The load application point of the beam is calculated based on the weight of the beam, the load distribution relationship between the front and rear lifting points and the real-time position of the gantry crane, and the coordinates of the bearing point, the gantry crane travel, the lifting point offset, the coordinates of the unloaded center of gravity and the specifications of the beam are written into the mechanical position reference table.
[0015] After outrigger step change, support pad adjustment, counterweight change, main beam assembly section change, or beam segment specification change, update the mechanical position reference table, and determine the outrigger that is effectively locked, has normal cylinder stroke, and reaches the release recognition threshold as the effective support point, and generate the current effective support range.
[0016] Furthermore, S2 includes:
[0017] The outrigger reaction force, suspension point load, and main beam attitude are classified as mechanical data.
[0018] The cylinder stroke, crane position, and lifting height are classified as position data.
[0019] Wind speed, operating mode, and equipment operating status are categorized into slow-changing data.
[0020] Using the sampling period of mechanical data as the benchmark, position data and slowly changing data are aligned to form a state data frame, and data exceeding the preset time difference is marked as timeout data.
[0021] The reaction force of the outrigger lifting cylinder pressure is calculated and the jump-type screening is performed.
[0022] The outrigger locking status is confirmed by two consistent signals.
[0023] Zero-point correction is performed on the main beam attitude, and zero-point calculation is performed on the crane position and lifting height;
[0024] Write the action instructions to be executed into the status data frame.
[0025] Furthermore, using the sampling period of the mechanical data as the baseline beat, the positional data and slowly varying data are aligned to form a state data frame, and data exceeding a preset time difference is marked as timeout data, including:
[0026] Configure the sampling time, data source number, engineering unit, and validity identifier for the sampled data;
[0027] Read the latest mechanical data according to the reference beat, and select position data and slowly changing data whose time difference with the reference beat meets the preset requirements for time alignment;
[0028] Position-type data and slowly changing data whose time difference from the baseline beat exceeds a preset threshold are marked as timeout data;
[0029] Record the outrigger reaction force sequence, locking state sequence, cylinder stroke sequence, main beam attitude, crane position, lifting point load, lifting height, operation mode, pending action commands and time stamps in the same state data frame.
[0030] Furthermore, S3 includes:
[0031] The effective load-bearing outrigger reaction force is summed and compared with the machine's self-weight, lifting point load, and additional load to verify the vertical load-bearing residual.
[0032] Using the bearing boundary of the effective support range or the line connecting the outriggers as the reference axis, the moment residuals of the outrigger reaction force, the self-weight of the whole machine, the beam load and the lifting point load are checked.
[0033] The attitude of the main beam is calculated based on the stroke of the hydraulic cylinder, and the attitude deviation is checked with the actual measured attitude of the main beam.
[0034] The consistency of the data collected by the pressure detection elements arranged in parallel on the same leg, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points were compared.
[0035] According to the verification and consistency comparison results, the data credibility level, abnormal data identification and bearing status are marked. Low credibility data is eliminated or estimated and marked, and the missing status of key data is marked as mechanical state unconfirmable.
[0036] Furthermore, consistency comparisons include:
[0037] The data collected by the pressure detection elements arranged in parallel on the same leg, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points were compared by difference.
[0038] According to the allowable difference range of the corresponding detection object, the detection data that exceeds the allowable difference range is marked as off-balance candidate data or detection abnormal candidate data, and an abnormal data identifier is written.
[0039] Furthermore, S4 includes:
[0040] Preset the combination of working conditions corresponding to the whole machine passing through the hole, feeding the beam, lifting, lateral movement and alignment and beam placement;
[0041] The reliable status data is combined with the characteristics of each working condition for weighted matching, and the current actual working condition is determined by combining the changing trends of lifting point load, lifting height, crane position and main beam attitude within a preset time window.
[0042] Verify the current actual working conditions against the manually selected working mode and the allowed adjacent transition relationships;
[0043] When the verification is consistent, mark the working condition as consistent. When the verification is inconsistent, the working condition changes repeatedly, or the mechanical state cannot be confirmed, mark the working condition as conflicting, transitional, or restricted action permission, respectively.
[0044] Furthermore, the current actual operating conditions are compared with the manually selected operating modes and allowed adjacent transition relationships, including:
[0045] When the current actual working conditions are consistent with the manually selected working mode, or when they belong to a preset allowed adjacent transition relationship, it is marked as a consistent working condition state;
[0046] If the current actual working conditions are inconsistent with the manually selected working mode and do not belong to the preset allowed adjacent transition relationship, it is marked as a working condition conflict state, and the relevant action instructions are transferred to prohibit execution or manual confirmation;
[0047] When the mechanical state cannot be confirmed, maintain the previously confirmed working condition and set the action permission state to restricted.
[0048] Furthermore, S5 includes:
[0049] Verify the outrigger locking, effective support, lifting gear status, beam position, and support alignment conditions corresponding to the current actual working conditions.
[0050] The location of the overall center of gravity is determined based on the lifting point load, the crane position, and the effective support range. The stabilizing moment, overturning moment, and anti-overturning stability coefficient are calculated with the overturning boundary as the reference.
[0051] Based on the safety margin of the center of gravity position, the trend of the safety margin change, the action trend and the conflict state of the working conditions, the action command to be executed is determined as allowed to be executed, executed at a limited speed or prohibited from being executed;
[0052] In case of conflicting operating conditions, the relevant action instructions will be determined as prohibited from execution or transferred to manual confirmation; in case of restricted action permissions or missing key data, only stop, descent, rollback or lock actions will be generated and action release data will be recorded.
[0053] Furthermore, the overall center of gravity position is determined based on the lifting point load, crane position, and effective support range. The stabilizing moment, overturning moment, and anti-overturning stability coefficient are calculated using the overturning boundary as a reference, including:
[0054] The load application point of the beam segment is determined by weighting the loads at the front and rear lifting points and their position coordinates, and the load application point of the beam segment is combined with the unloaded center of gravity of the whole machine to form the horizontal projection of the comprehensive center of gravity.
[0055] The boundary closest to the horizontal projection of the comprehensive center of gravity within the effective support range is selected as the overturning boundary.
[0056] The stabilizing moment is calculated based on the reaction force of each effective supporting leg and the vertical distance from the corresponding supporting leg bearing point to the overturning boundary. The overturning moment is calculated based on the machine's self-weight, beam load, and lifting point load offset and the vertical distance from their points of action to the overturning boundary. The ratio of the stabilizing moment to the overturning moment is determined as the anti-overturning stability coefficient.
[0057] Compared with the prior art, the present invention provides a safety monitoring and interlocking control method for bridge erecting machines, which has the following beneficial effects:
[0058] 1. This invention establishes a mechanical position benchmark between the outrigger bearing point, the gantry crane's operating position, the hoisting point position, and the overall machine's center of gravity. It also incorporates outrigger reaction force, hoisting point load, gantry crane position, and main beam posture into the same mechanical judgment system. This eliminates the reliance on manually selected operating modes or single parameter thresholds for bridge erecting machine safety assessment. Furthermore, it verifies vertical bearing relationships, moment relationships, and posture relationships, and compares the consistency of pressure detection data corresponding to the same outrigger, strain detection data corresponding to the same main beam section, and load detection data corresponding to the front and rear hoisting points. This process identifies and addresses abnormal, low-reliability, and critical data. Identifying missing states improves the reliability of load-bearing status judgment. By identifying the current actual working conditions based on reliable status data and verifying them against manually selected working modes and permissible adjacent transition relationships, a working condition verification status is obtained. The working condition verification results directly participate in the graded release interlocking of action commands. By calculating the comprehensive center of gravity position and anti-overturning safety margin before the action command is output, and combining the working condition verification status to generate interlocking conclusions that allow execution, limit speed execution, or prohibit execution, the technical effects of preventing dangerous actions in advance, reducing the risk of whole machine overturning and beam falling are achieved, and improving the safety of beam erection operations are improved.
[0059] 2. This invention, by uniformly recording outrigger reaction force, lifting point load, main beam posture, cylinder stroke, gantry crane position, lifting height, operating mode, and pending action commands in a status data frame, and configuring sampling time, data source number, engineering unit, and validity identifier for the sampled data, enables multi-source status data during bridge erection machine operation to have a unified data format and clear data source. By classifying and marking timeout data, jump data, low-reliability data, and missing key data states, and recording information such as the current actual operating conditions, action command type, mechanical premise confirmation results, overturning stability coefficient, center of gravity position safety margin, safety margin change trend, interlocking conclusion, output action, and abnormal data identifier during interlock judgment, it can provide complete evidence for subsequent maintenance, parameter verification, and accident analysis. This reduces false alarms and shutdowns caused by short-term sensor fluctuations, communication delays, or incorrect manual mode selection, thereby achieving the technical effects of improving the stability of bridge erection machine status judgment, enhancing the traceability of operating records, and reducing the difficulty of on-site troubleshooting. Attached Figure Description
[0060] Figure 1 This is a schematic diagram of the safety monitoring and interlocking control method for a bridge erecting machine according to the present invention;
[0061] Figure 2 This is a schematic diagram showing the mechanical position reference and effective support range of the bridge erecting machine of the present invention;
[0062] Figure 3 This is a schematic diagram of multi-source state data synchronization and framing according to the present invention;
[0063] Figure 4 This is a schematic diagram illustrating the cross-verification of outrigger load-bearing and attitude data in this invention.
[0064] Figure 5 This is a schematic diagram illustrating the identification of actual working conditions and the verification of manual modes in this invention;
[0065] Figure 6 This is a schematic diagram of the anti-overturning safety margin and graded interlocking control of the present invention. Detailed Implementation
[0066] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0067] Example 1: Figure 1 - Figure 6 A safety monitoring and interlocking control method for bridge erecting machines is presented, including:
[0068] S1: Establish the mechanical positional benchmarks between the support points of the bridge erecting machine's outriggers, the crane's running position, the winch hoisting point position, and the overall center of gravity position;
[0069] S2: Synchronously acquire outrigger reaction force, outrigger locking status, cylinder stroke, main beam posture, crane position, lifting point load and lifting height, and receive commands for actions to be executed;
[0070] S3: Based on the aforementioned mechanical position benchmark, the vertical bearing relationship between the outrigger reaction force and the machine's self-weight, lifting point load, and additional load is verified. The moment relationship between the outrigger reaction force, the machine's self-weight, the beam load, and the lifting point load is verified. The attitude relationship is verified based on the cylinder stroke and the measured main beam attitude. The data collected by the pressure detection elements arranged in parallel on the same outrigger, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points are compared for consistency to obtain reliable state data.
[0071] S4: Based on the leg bearing status in the trusted status data, as well as the load change at the lifting point, the position of the overhead crane and the posture of the main beam, identify the current actual working condition of the bridge erecting machine, and verify the current actual working condition with the manually selected working mode and the allowed adjacent transition relationship to obtain the working condition verification status. The working condition verification status includes the working condition consistency status, the working condition conflict status, the transition status or the restricted action permission status.
[0072] S5: Before the action command to be executed is output to the actuator, the action command to be executed is classified and interlocked according to the working condition verification status, the current actual working condition, the outrigger locking status, the support status, the load application position and the anti-overturning safety margin, and the action command to be executed is determined to be allowed to be executed, executed at a limited speed or prohibited from being executed; in the case of working condition conflict, the relevant action command is determined to be prohibited from being executed or transferred to manual confirmation; in the case of restricted action permission, only the stop, descent, retraction or locking actions are allowed to be executed.
[0073] This method is applicable to the girder erection operation of a walking-type double-girder bridge erecting machine at highway or railway bridge construction sites. The operation process includes the whole machine passing through the span, girder feeding by the girder transport vehicle, crane lifting, lateral alignment, and girder placement. It involves components such as the front outrigger, middle outrigger, rear outrigger, outrigger lifting cylinder, outrigger locking pin, main girder, front and rear cranes, winch mechanism, lifting gear, girder transport vehicle, hydraulic pump station, walking drive mechanism, and operating console. The bridge erecting machine's status data should include at least the outrigger reaction force, outrigger locking status, cylinder stroke, main girder posture, crane position, lifting point load, and lifting height. The operating console's action commands should include at least the operation mode signal. The method collects information such as the action commands to be executed; it unifies the scattered state data into a mechanical positional relationship benchmark, obtains reliable state data through cross-validation of multi-source data, and identifies the current actual working condition of the bridge erecting machine based on the reliable state data; before the action commands to be executed are output to the hydraulic pump station, travel drive mechanism or hoisting mechanism, it performs graded release interlocking based on the current actual working condition, outrigger locking status, support status, load application position and anti-overturning safety margin, outputs control conclusions of allow execution, speed-limited execution or prohibition of execution, and generates a safety holding action adapted to the current actual working condition when execution is prohibited.
[0074] Specifically, such as Figure 2As shown: After the bridge erecting machine completes on-site installation, leveling, outrigger step change, counterweight adjustment, or beam specification replacement, a mechanical positional relationship benchmark is established between the outrigger bearing points, gantry crane operating position, winch hoisting point position, and the overall machine center of gravity position. This benchmark can also be checked before the first shift of each day. Using the bridge erecting machine's bearing plane as the horizontal reference plane, the longitudinal centerline of the entire machine as the first coordinate axis, and the transverse centerline of the entire machine as the second coordinate axis, the midpoint of the line connecting the centers of the rear outriggers or the midpoint of the line connecting the centers of the middle outriggers is selected as the origin, thus establishing the bridge erecting machine's planar mechanical coordinate system. The base centers of the front, middle, and rear outriggers are respectively marked as fixed bearing point coordinates. The runnable track sections of the front and rear trolleys along the main beam are marked as continuous position intervals. The positions of the front and rear hoisting points relative to the corresponding trolleys are marked as linked positions that change with the trolley positions. The horizontal projection of the unloaded center of gravity of the whole machine is marked as the unloaded center of gravity coordinates. When the beam is in the hoisting state, the load application point of the beam is converted into the plane mechanical coordinate system of the bridge erecting machine according to the weight of the beam, the load distribution relationship of the front and rear hoisting points, and the real-time position of the trolley, so as to obtain the application position of the beam load under the current working conditions.
[0075] The coordinates of the outrigger bearing points can be obtained using a total station, laser rangefinder, or construction layout data, with a preferred coordinate measurement error of no more than 20mm. This value is primarily determined based on the accuracy requirements of the total station layout, outrigger base installation error, support pad adjustment error, and the calculation of the effective support range boundary of the bridge erecting machine. This ensures the accuracy required for the outrigger bearing points to participate in subsequent torque judgment and support range generation. The gantry crane's running position can be obtained using the gantry crane's travel encoder, track scale, or limit calibration points, with a preferred position resolution of no more than 10mm. This value is primarily determined based on the positioning control accuracy of the gantry crane at low speeds, the commonly used resolution of the encoder, and the load effect at the lifting points. The point conversion requires precise control of the gantry crane position to reflect the impact of gantry crane position changes on the load application point of the beam segment. The hoisting point position is determined by the gantry crane center position, the lateral offset of the hoisting point, and the connection position of the lifting device. The coordinates of the unloaded center of gravity of the entire machine are determined by the factory technical parameters of the bridge erecting machine, the counterweight arrangement, and on-site weighing verification data. For double-guide beam bridge erecting machines, the distance between the front and rear hoisting points is determined based on the design position of the beam segment hoisting points, the spacing between the front and rear gantry cranes, and the lifting device structure, and is written into the mechanical positional relationship benchmark during the installation and commissioning of the bridge erecting machine or the switching of beam segment specifications. When the distance between the front and rear hoisting points, the hoisting point offset, or the center of gravity position of the beam segment changes, the conversion parameters of the load application point of the beam segment are updated synchronously.
[0076] The mechanical positional relationship benchmark is stored in the form of a benchmark table. The benchmark table includes at least the following fields: bearing point number, bearing point coordinates, outrigger type, corresponding cylinder number, locking pin number, upper limit of crane travel, lower limit of crane travel, lifting point offset, unloaded center of gravity coordinates, beam segment specifications, and update time. The benchmark table serves as the spatial basis for subsequent data verification, identification of actual working conditions, and judgment of action interlocks. Each time the outrigger steps change, support pads are adjusted, counterweight is changed, main beam assembly sections change, or beam segment specifications change, the affected coordinate items are recalibrated, and the updated benchmark table is used as the input for the next sampling and judgment. If the verification deviation exceeds 50mm, or if the measured position of the outrigger base is inconsistent with the position recorded in the reference table, the corresponding bearing point will be marked as pending verification. Before the verification is completed, high-risk actions such as longitudinal movement of the main beam, crane travel, lifting and lowering of the beam related to the bearing point will not be included in the subsequent release process. The 50mm verification threshold is mainly determined based on the 20mm coordinate measurement error, taking into account the outrigger base placement deviation, support pad compression deformation, on-site construction disturbance and repeated calibration error. This can avoid frequent verification triggered by small installation deviations and can identify obvious positional deviations that are sufficient to affect the calculation of the effective support range.
[0077] Simultaneously, rules for generating the effective support range are established. For outriggers whose locking state is confirmed, cylinder stroke is within the allowable range, and outrigger reaction force reaches or exceeds the release threshold, the center coordinates of their base are used as the effective support point, and the current effective support range is formed by the effective support point. For outriggers whose locking state is not confirmed, cylinder stroke is abnormal, or outrigger reaction force is below the release threshold, they are not used as effective support points in the generation of the effective support range. The release threshold can be selected as 10% to 20% of the theoretical load share of the outrigger under the corresponding working condition. This range is mainly based on the outrigger's movement from contact with the load-bearing surface to the formation of a stable bearing area. The characteristics of reaction force changes between loads, the cylinder pressure detection error, and the initial compression deformation of the support pad are used to determine whether the outrigger is in a state of detachment or basic contact, and are not used as sufficient load conditions before releasing high-risk actions. The effective support range is not based on all outriggers under the design state as a fixed boundary, but is dynamically determined based on the actual load state collected later, so as to reflect the change of the support range with the load state of the outrigger during the process of passing through the hole, feeding the beam, and lowering the beam. Therefore, the mechanical position relationship benchmark can provide a unified spatial basis for subsequent data verification, working condition identification, and action interlock judgment.
[0078] Specifically, such as Figure 3As shown: After the mechanical positional relationship benchmark is effectively established, the status data of the bridge erecting machine body and the operation commands of the control panel are acquired synchronously, and the data is continuously updated throughout the entire process of the bridge erecting machine being powered on and in standby, preparing for action, executing action, and stopping action; the outrigger reaction force is obtained by converting the pressure of the outrigger lifting cylinder, that is, collecting the working pressure of the outrigger lifting cylinder and multiplying the working pressure by the effective bearing area of the cylinder piston to obtain the vertical support force of the corresponding outrigger; the outrigger locking status is obtained by the pin positioning detection element, mechanical limit switch, or proximity switch; the cylinder stroke is obtained by the pull wire displacement sensor, magnetostrictive displacement sensor, or built-in stroke encoder; the main beam posture is obtained by the tilt angle detection elements arranged in the longitudinal and transverse directions of the main beam; the gantry crane position is obtained by the gantry crane travel encoder, track positioning ruler, or positioning switch; the lifting point load is obtained by the winch bearing pin, wire rope tension detection element, or hook load sensor; the lifting height is obtained by the winch encoder or height detection element; the action commands to be executed are issued by the control panel handle, button, touch screen, or construction controller;
[0079] To reduce interlocking judgment biases caused by inconsistent sampling times of different data types, the state data is divided into mechanical data, positional data, and slowly changing data according to their rate of change. Mechanical data includes outrigger reaction force, lifting point load, and main beam posture, with a sampling period selectable from 50ms to 100ms. Positional data includes cylinder stroke, crane position, and lifting height, with a sampling period selectable from 100ms to 200ms. Slowly changing data includes wind speed, operating mode, and equipment operating status, with a sampling period selectable from 500ms to 1s. These sampling periods are primarily determined based on the rate of mechanical change in high-risk processes of the bridge erecting machine, sensor response capabilities, and on-site controller processing capabilities. During the cantilever forward movement, beam load transfer, or braking impact, the risk of overturning typically develops rapidly within seconds. A sampling period of 50ms to 100ms for mechanical data can form a continuous data sequence within this time scale, reflecting the changing direction of outrigger reaction force, lifting point load, and main beam attitude. The changes in cylinder stroke, crane position, and lifting height are relatively slow, and a sampling period of 100ms to 200ms can meet the position tracking requirements during crane travel, winch lifting, and outrigger jacking. Wind speed, operating mode, and equipment operating status are data that change slowly, and a sampling period of 500ms to 1s can meet the interlocking judgment requirements and reduce the real-time processing load on the controller.
[0080] Each sampled data item is accompanied by the sampling time, data source number, engineering unit, and validity identifier. The sampling period of mechanical data is used as the baseline cycle. At the arrival of each baseline cycle, the latest acquired mechanical data is used as the current cycle data, and the most recent valid position data and slow-changing data are aligned to the current cycle to form a frame of state data. This state data includes at least the following fields: outrigger reaction force sequence, locking status sequence, cylinder stroke sequence, main beam attitude, crane position, lifting point load, lifting height, operating mode, pending action command, and time identifier. If the time difference between position data and the current baseline cycle exceeds 300ms, or the time difference between slow-changing data and the current baseline cycle exceeds 2s, the corresponding data is no longer padded with the most recent valid value but is marked as timeout data. 300ms corresponds to 1 to 2 sampling cycles for position data, and 2s corresponds to 2 to 4 sampling cycles for slow-changing data. This setting is mainly determined by combining the normal sampling interval, on-site communication delay, and controller refresh cycle, and can distinguish between normal data delay and data transmission interruption, preventing outdated data from entering subsequent verification and interlocking judgments.
[0081] Before being written into the status data, the outrigger reaction force data undergoes engineering quantity conversion and rationality screening. If the cylinder pressure is less than zero, exceeds the rated pressure limit, or there is a jump exceeding 15% of the rated range in adjacent sampling periods, and this jump does not match the changes in the lifting point load, the crane position, or the current direction of movement, the corresponding outrigger reaction force is marked as an abnormal candidate data. The 15% jump threshold is mainly determined by combining the pressure fluctuation range of the outrigger lifting cylinder, the normal transfer speed of the beam load, and the impact resistance of the pressure detection element. It is used to identify sudden changes that significantly exceed the normal load transfer process. This threshold is not used as an abnormal conclusion on its own. Only when the pressure sudden change cannot be corroborated by the lifting point load, the crane position, or the direction of movement will the corresponding outrigger reaction force be used as an abnormal candidate data, thereby avoiding misjudging the real load transfer as a sensing anomaly.
[0082] The outrigger locking status adopts a dual-signal consistent confirmation method. When positioning detection points are set at both ends of the pin, the locking is confirmed to be effective after both positioning detection points return a positioning signal. If either detection point fails to return a positioning signal, or if the positioning signal fluctuates within a continuous sampling period, the locking status is recorded as uncertain. The main beam attitude data undergoes zero-point correction before participating in subsequent verification. The zero-point correction value is taken from the no-load leveling state of the bridge erecting machine. The crane position and lifting height are calculated from the zero point determined during equipment installation and commissioning. The action command to be executed is not directly output to the hydraulic pump station, traveling drive mechanism, or hoisting mechanism after being received. Instead, it is written into the command field of the current status data and enters the subsequent cross-verification and hierarchical interlocking judgment along with the status data.
[0083] Specifically, such as Figure 4As shown: After the time-aligned state data is generated, cross-validation is performed on the correspondence between outrigger reaction force, lifting point load, cylinder stroke, main beam posture, and similar detection data based on the mechanical positional relationship benchmark to obtain reliable state data, abnormal data identification, and load-bearing status. Cross-validation utilizes the spatial positional relationship and force relationship between outrigger, main beam, crane, and hoisting point to mutually verify multi-source data at the same time, so that subsequent working condition identification and action interlock judgment are based on reliable data.
[0084] First, the vertical bearing relationship between the outrigger reaction force and the lifting point load is verified. The reaction forces of each outrigger that is locked and has the bearing capacity in the current state data are summed to obtain the resultant vertical support force. The total vertical load is obtained by summing the machine's self-weight, the current lifting point load, and the known additional load. The difference between the resultant vertical support force and the total vertical load is taken as the vertical bearing residual. When the bridge erecting machine is in a static load or low-speed operation state, the resultant vertical support force should maintain a corresponding relationship with the total vertical load, and the vertical bearing residual should be within the allowable range of the detection accuracy. The tolerance of the vertical bearing residual can be selected as ±3% to ±5% of the rated vertical load. The percentage range is ±3%, which is applicable to working conditions where the detection element has high precision, the number of outriggers is small, and the on-site calibration is sufficient. ±5% is applicable to working conditions where the number of outriggers is large, the hydraulic pipeline pressure fluctuates greatly, or the on-site vibration is strong. This range is mainly determined based on the cylinder pressure detection error, the cylinder piston effective bearing area conversion error, the lifting point load detection error, and the cumulative error of multiple outrigger data. When the vertical bearing residual exceeds the corresponding tolerance, the bridge erecting machine is not directly judged to be in a dangerous state. Instead, the outrigger reaction force and lifting point load involved in the verification are marked as data to be verified, and the source of the anomaly is determined by combining the torque relationship verification and the consistency verification of similar data.
[0085] Secondly, the moment relationship between the outrigger reaction force, the lifting point load, and the mechanical positional relationship benchmark is verified. Using the bearing boundary or outrigger connection line within the effective support range as the reference axis, the stabilizing moment formed by each outrigger reaction force on this reference axis is calculated, along with the overturning moment formed by the machine's self-weight, beam load, and lifting point load on this reference axis. The difference between the stabilizing moment and the overturning moment is taken as the moment relationship residual. The tolerance for the moment relationship residual can be selected as ±4% to ±6% of the rated overturning moment; this range is within the vertical bearing residual range. The tolerance is appropriately relaxed, mainly considering the impact of bearing point coordinate calibration error, lifting point position conversion error, and lever arm amplification error on moment calculation; if the reaction force of a certain leg causes the residual to deviate in the same abnormal direction in both vertical bearing relationship and moment relationship, while the reaction forces of other legs maintain a stable correspondence with the lifting point load, then the reaction force of that leg is marked as low confidence data; if the change in lifting point load is inconsistent with the hoisting height, crane position, and current direction of movement, then the lifting point load is marked as low confidence data.
[0086] Next, the attitude relationship between the cylinder stroke and the main beam posture is verified. Based on the coordinates of each leg bearing point in the mechanical positional relationship benchmark and the current cylinder stroke, the theoretical attitude change trends of the main beam in the longitudinal and transverse directions are calculated, and the theoretical attitude is compared with the main beam posture collected by the tilt angle detection element. If the difference between the theoretical attitude and the measured attitude does not exceed 0.05°, or the height difference converted to the end of the main beam does not exceed 2mm, the attitude relationship is considered to be consistent. 0.05° and 2mm are mainly determined based on the resolution of commonly used tilt angle detection elements, the accuracy of cylinder stroke detection, and the small attitude differences caused by the elastic deformation of the main beam. It can cover reasonable fluctuations during normal leveling and low-speed operation; for bridge erecting machines with different spans, the angle deviation can also be converted into the height difference at the end of the main beam for judgment, so as to avoid underestimating the end displacement error of the long-span main beam when simply using the angle value; when the attitude deviation exceeds the corresponding range, the source of the abnormality is judged in combination with the change of the outrigger reaction force; when the change of the cylinder stroke is obvious but the attitude of the main beam does not change accordingly, the abnormality of the tilt angle detection element or the local deformation of the main beam is marked as an abnormality candidate first; when the attitude of the main beam changes significantly but the cylinder stroke and the outrigger reaction force do not change accordingly, the tilt angle data drift or impact interference is marked as an abnormality candidate first.
[0087] Then, consistency verification is performed on similar test data; for pressure testing elements arranged in parallel on the same leg, strain testing elements symmetrically arranged on the same main beam section, and load testing elements set at the front and rear suspension points respectively, the differences of the same or symmetrical physical quantities are compared; for dual pressure testing elements, the difference can be selected to be no more than 5% of the larger reading, and this value is mainly determined based on the common measurement errors of pressure testing elements and the pressure pulsation range of the hydraulic cylinder; for symmetrical strain testing points on the same section, the difference can be selected to be no more than 5% to 10% of the normal stress difference of the section, and this range mainly considers the structural differences on both sides of the main beam. Reasonable differences caused by welding residual stress and lateral eccentric load; smaller values are taken when the structure has high symmetry and sufficient on-site calibration, and larger values are taken when the on-site eccentric load has a significant impact; for the loads of the front and rear lifting points, reasonable differences are allowed due to the different positions of the lifting points and the center of gravity of the beam during the lifting operation; when the difference exceeds 15% of the rated load of a single lifting point, it is marked as eccentric load or detected as abnormal; the 15% threshold is mainly determined based on the allowable fluctuation of load distribution during double lifting point lifting, the safety reserve of wire rope stress, and the beam attitude control requirements, and is used to identify eccentric load before it develops to the point of affecting the safety of the lifting equipment, wire rope, and beam attitude;
[0088] After completing the above cross-validation, key data are assigned a confidence level; confidence levels can be divided into high confidence, medium confidence, and low confidence; data that passes all relevant validations is marked as high confidence; data with one validation anomaly but which can be explained by other validation relationships is marked as medium confidence; data with multiple validations pointing to anomalies is marked as low confidence; credible state data should include at least the following fields: leg reaction force confidence level, lifting point load confidence level, main beam attitude confidence level, cylinder stroke confidence level, consistency identifier of similar test data, anomaly identifier, and load-bearing status; low confidence data does not directly participate in the identification of actual working conditions; if the physical quantity corresponding to low confidence data can be... If the data is estimated from other highly reliable data, the estimated value is used in subsequent judgments, and the original anomaly marker is retained. The estimation method can be to calculate the reaction force of the missing outrigger based on the vertical load balance and moment relationship, or to estimate the main beam attitude based on the cylinder stroke and load point coordinates. When too much key data is missing and a reliable load state cannot be formed, the current state is marked as an unconfirmable mechanical state. In this state, the actual working conditions are not updated, and high-risk actions such as main beam longitudinal movement, crane travel, lifting, and beam lowering are prohibited from execution or require manual confirmation. Thus, the reliable state data after cross-validation can serve as the data basis for identifying the actual working conditions and judging the action interlock.
[0089] Specifically, such as Figure 5 As shown: After obtaining reliable status data, abnormal data identification, and load-bearing status, the current actual working condition of the bridge erecting machine is identified based on the outrigger load-bearing status, lifting point load changes, gantry crane position, and main beam posture. The identification results are then compared with the manually selected working mode for consistency verification. The actual working condition identification uses the objective mechanical state after cross-validation as the main criterion, and the manually selected working mode as the consistency verification object.
[0090] To identify the actual operating conditions of the bridge erecting machine, a combination of operating condition characteristics corresponding to the whole machine passing through the span, feeding the beam, lifting, lateral alignment, and beam placement is established. The operating condition characteristics of the whole machine passing through the span are: the reaction force of some outriggers is lower than the lower limit of the effective load, the reaction force of the remaining outriggers increases, the load at the lifting point is close to no load, the gantry crane is located in a longitudinal section that is conducive to the balance of the whole machine, and the longitudinal attitude of the main beam changes slowly with the direction of travel. The lower limit of the effective load can be taken as 10% to 20% of the theoretical load share of the corresponding outrigger. If it is lower than this range, it is considered that the outrigger is in a state of detachment or basic contact. This range is mainly determined based on the reaction force change characteristics of the outrigger from the contact bearing surface to the formation of stable bearing, the hydraulic cylinder pressure detection error, and the initial compression deformation of the support pad. It is only used to identify whether the outrigger is detached. The following conditions are not considered sufficient load-bearing conditions before high-risk actions are permitted: The characteristics of beam feeding are that all outriggers are in a load-bearing state, the gantry crane and beam transport vehicle are in the docking position range, the load at the lifting point gradually increases from a low value, and the main beam's posture changes smoothly; the characteristics of lifting are that the load at the lifting point increases within a continuous sampling period, the lifting height increases, and the main beam stress or posture changes accordingly with the load transfer; the characteristics of lateral alignment are that the load at the lifting point remains within the range corresponding to the beam weight, the gantry crane position or the lateral position of the lifting point changes, and the main beam's lateral posture changes with the lateral movement of the load; the characteristics of beam placement are that the lifting height decreases, the load at the lifting point gradually decreases, and the outrigger reaction force and the main beam posture change as the beam load transfers to the pier supports.
[0091] When identifying the current working condition, reliable state data is compared item by item with each working condition feature combination. The outrigger bearing status is used to determine whether the effective support range is complete; the lifting point load change is used to determine whether the beam is in the process of lifting, suspending, or lowering; the gantry crane position is used to determine the position of the load application point relative to the main beam; and the main beam attitude is used to determine the direction of force change for the entire machine. Each working condition feature is assigned a discrimination weight. The outrigger bearing status and lifting point load change are primary features, each with a weight of 30%; the gantry crane position is a secondary feature with a weight of 25%; and the main beam attitude is an auxiliary feature with a weight of 15%. These weights can be... During the installation and commissioning phase of the bridge erecting machine, corrections are made based on sampled data from typical working conditions. However, the combined weight of the outrigger bearing condition and the load change at the lifting point is no less than 50%. This is because the two directly reflect the effective support range and the load transfer state of the beam, and are the main basis for distinguishing between the conditions of crossing the span, lifting, and lowering the beam. After matching various features, the matching value for each working condition is obtained. When the matching value is no less than 75% and at least 15% higher than the matching value of other working conditions, the working condition is identified as the current actual working condition. The 75% is used to ensure that most key features have been matched, and the 15% difference is used to avoid misidentification under the boundary conditions of adjacent working conditions, so that the working condition judgment has clear distinguishability.
[0092] When the matching values of two adjacent working conditions are close, the dynamic change trend within the most recent 1 second is introduced for auxiliary judgment. If the load at the lifting point rises continuously and the lifting height increases, it is preferentially identified as lifting. If the load at the lifting point falls continuously and the lifting height decreases, it is preferentially identified as lowering the beam. If the load at the lifting point is close to the weight of the beam and the lateral or longitudinal position of the gantry crane changes significantly, it is preferentially identified as lateral alignment. If the load at the lifting point is close to no load and the number of effective supporting legs decreases, it is preferentially identified as the whole machine passing through the hole. The most recent 1 second is used as the trend window, which is mainly determined by combining the sampling period of mechanical data from 50ms to 100ms. Under this sampling period, the 1 second window can provide about 10 to 20 frames of continuous data, which can filter out single sampling jitter and reflect the direction of action in a timely manner. When the main beam's attitude fluctuates for a short time due to field vibration or wind load, the attitude data can be averaged using 3 to 5 sampling points before participating in the trend judgment. 3 to 5 sampling points correspond to a short smoothing range of about 150ms to 500ms, which can suppress instantaneous impact without masking the trend of working condition transformation.
[0093] After identifying the actual working condition, the identification results are checked against the manually selected working mode. If the current actual working condition is consistent with the manually selected working mode, or if the two are in an acceptable adjacent transition relationship (e.g., entering lateral movement preparation after hoisting), a working condition consistency identifier is generated, and the action command to be executed is allowed to enter the subsequent graded release interlock. If the current actual working condition is inconsistent with the manually selected working mode (e.g., manually selecting the beam lowering mode but the reliable status data shows that the beam has not yet been hoisted, or manually selecting the through-hole mode but the front outrigger has not yet formed effective load), a working condition conflict identifier is generated. After the working condition conflict identifier is generated, the action command related to the conflict mode does not enter the release judgment, but directly enters the prohibition execution or manual confirmation process. When the cross-check result shows that the mechanical state is not confirmable, a new actual working condition is not forcibly identified. Instead, the previously confirmed working condition is maintained, and the action permission status is adjusted to the restricted state, allowing only actions that reduce risk to enter the subsequent graded release interlock, such as hoist descent, low-speed retraction, or stop locking.
[0094] To avoid frequent switching of operating conditions at the boundary of adjacent operating conditions, a working condition confirmation rollback rule is also set. When the actual operating condition repeatedly jumps between two adjacent operating conditions and the duration is less than 2 seconds, the confirmed operating condition is not changed immediately, but the previous stable operating condition is maintained and a transition indicator is added. The current actual operating condition is updated only when the matching value of the same new operating condition meets the confirmation condition for 2 consecutive seconds. The 2-second confirmation time corresponds to 20 to 40 frames of continuous data under a sampling period of 50ms to 100ms, which can avoid frequent switching of operating conditions caused by sensor jitter, short-term impact or micro-movement of the operating handle. The working condition recognition result includes at least the current actual operating condition, operating condition consistency indicator, operating condition conflict indicator, transition indicator and action permission status, and serves as the basis for the judgment of the hierarchical release interlock of the action command to be executed.
[0095] Specifically, such as Figure 6 As shown: After obtaining the working condition consistency identifier and receiving the action command to be executed, the action command to be executed is graded and interlocked according to the current actual working condition, action command type, outrigger locking status, effective support range, lifting point load, crane position, lifting height, main beam posture and mechanical position relationship benchmark; the interlock judgment is completed before the action command to be executed enters the hydraulic pump station, travel drive mechanism or hoisting mechanism, and the interlock conclusion includes allow execution, speed-limited execution and prohibition of execution;
[0096] Before implementing graded release interlocking, first confirm the mechanical prerequisites corresponding to the current actual operating conditions. For the machine's through-hole movement, the outrigger bearing the load under the current operating condition among the front, middle, or rear outriggers should meet the following conditions: locking pin in place, outrigger reaction force reaching the full load threshold, cylinder stroke within the allowable range, and the crane in a stable position range. The outrigger locking pin adopts a dual-point confirmation method. When placement detection points are set at both ends of the pin, the locking is deemed effective after both placement detection points return a placement signal. If either detection point fails to return a placement signal, or if the placement signal fluctuates within the continuous sampling period, the locking is deemed unreliable. The full load threshold can be selected as 80% of the theoretical load share of the outrigger under the corresponding operating condition. If it is lower than this value, it indicates that the corresponding outrigger has not yet borne the load that should be borne under the current operating condition. Longitudinal displacement of the main beam is not permitted; the 80% threshold is used for full load confirmation before action release, and its judgment standard is higher than the detachment identification threshold; this threshold is mainly determined by combining the requirements of the outrigger to bear the main design reaction force under the corresponding working conditions, hydraulic pressure fluctuation, support pad compression deformation, and sensor measurement error; when the outrigger reaction force reaches more than 80% of the theoretical load share, it indicates that the outrigger has entered a stable stress state and can participate in the subsequent anti-overturning safety margin judgment; for lifting actions, the winch braking state, lifting point load, lifting equipment state, and outrigger load state should be consistent; for beam lowering actions, the beam position, lifting height, and pier support alignment state should meet the lowering conditions; if any mechanical precondition is not met, the action command to be executed will not enter the anti-overturning safety margin judgment and will directly generate a prohibition conclusion;
[0097] After the mechanical preconditions are met, calculate the current load application location and overturning safety margin; based on the mechanical positional relationship benchmark, combine the unloaded center of gravity of the whole machine, the load application point of the beam segment, and the current lifting point load into the horizontal projection position of the comprehensive center of gravity; for lifting with front and rear double lifting points, when the current lifting point loads are F1 and F2 respectively, and the coordinates of the front and rear lifting point positions are P1 and P2 respectively, the load application point P of the beam segment can be determined as follows:
[0098]
[0099] The results are obtained; then the points of action of the machine's self-weight and the points of action of the beam load are combined into a comprehensive horizontal projection of the center of gravity according to the weight ratio; the effective support range is formed according to the base coordinates of the current effective support leg, the minimum distance from the comprehensive horizontal projection of the center of gravity to the boundary of the effective support range is calculated, and this minimum distance is used as the safety margin of the center of gravity position;
[0100] The overturning safety margin is represented by the overturning stability coefficient K. K is calculated using the boundary closest to the horizontal projection of the comprehensive center of gravity within the current effective support range as the overturning boundary. The stabilizing moment is obtained by multiplying the reaction force of each effective support leg by the vertical distance from the corresponding support leg bearing point to the overturning boundary and summing the results. The overturning moment is obtained by multiplying the equivalent action components corresponding to the machine's self-weight, beam load, lifting point load offset, and deceleration inertia by the vertical distance from their action points to the overturning boundary and summing the results. The ratio of the stabilizing moment to the overturning moment is used as the overturning stability coefficient K. The minimum distance from the horizontal projection of the comprehensive center of gravity to the boundary of the effective support range is used as an auxiliary verification quantity for K. When the judgment result corresponding to the safety margin of the center of gravity position is inconsistent with the judgment result corresponding to the overturning stability coefficient K, the more stringent judgment result is used for graded release interlocking.
[0101] When K is not less than 1.5, it is classified as a safe zone; when K is between 1.3 and 1.5, it is classified as a warning zone; and when K is less than 1.3, it is classified as a danger zone. Among them, 1.5 is the preferred safety threshold for high-risk conditions such as the whole machine passing through holes and the cantilever moving forward, and 1.3 is the bottom line threshold for normal low-speed conditions. The above values are mainly determined with reference to the design verification of the bridge erecting machine, the stability control requirements of the lifting machinery, and the safety reserves for high-risk conditions at the construction site. A stricter threshold is used for high-risk conditions, and a bottom line threshold is used for normal low-speed conditions, so that the interlock judgment during operation is consistent with the construction safety verification logic of the bridge erecting machine.
[0102] After obtaining the current overturning safety margin, the action trend of the action command to be executed is judged; based on the action type and the current actual working conditions, the direction of change of the load application position or effective support range after the action is executed is judged; when the action command is the longitudinal movement of the main beam, it is judged whether the longitudinal movement direction brings the overall center of gravity closer to the boundary of the effective support range; when the action command is the crane traveling, it is judged whether the load application point of the hoisting point moves to the dangerous side after the crane moves; when the action command is the hoisting hoist, it is judged whether the increase in the load of the hoisting point causes the overall center of gravity to shift towards the boundary of the effective support range; when the action command is the beam lowering, it is judged whether the release direction of the load of the hoisting point is conducive to the recovery of the overturning safety margin; at the same time, the current K is compared with the change of K in the last 1 second to obtain the trend of the safety margin change; when K continues to decrease and the decrease per unit time exceeds the warning change rate, it is judged that the safety margin is rapidly deteriorating;
[0103] The warning rate of change is determined during the installation and commissioning phase of the bridge erecting machine. Specifically, the rate of change of K over time is recorded under simulated working conditions such as unloaded travel, rated beam trial lifting, low-speed span crossing, and beam dropping. After eliminating isolated anomalies caused by communication interruption, sensor jumps, and mechanical impact, the maximum normal value of the rate of change of K in each commissioning condition is taken as the upper limit of the normal rate of change. Then, 1.5 times the upper limit of the normal rate of change is taken as the rapid deterioration trigger value. This setting is mainly determined by combining the safety margin change characteristics of bridge erecting machines with different tonnages, spans, and leg arrangements under normal operation. It can avoid misjudgment caused by using a fixed rate of change and can identify the increased risk caused by abnormal load transfer or rapid shift of the center of gravity.
[0104] Based on the mechanical preconditions, current safety margin range, safety margin change trend, and action trend, a graded release conclusion is generated. If all mechanical preconditions are met, the current K is within the safety range, and the action to be performed will not significantly bring the load application position close to the effective support range boundary, a permitted execution conclusion is generated, and the action command to be performed is output to the corresponding actuator according to the original settings. If the current K is in the warning range, or K is within the safety range but is continuously decreasing, or the action to be performed will move the load application position towards the danger side but has not yet crossed the danger threshold, a speed-limited execution conclusion is generated. During speed-limited execution, the traveling drive mechanism, crane traveling mechanism, or hydraulic system will be... The speed of the pump station is limited to 20% to 50% of the rated speed, preferably 40%. This speed range is mainly determined by considering the stability of the bridge erecting machine at low speed, the response characteristics of the hydraulic system, and the need for control of the center of gravity movement speed. It can reduce the load transfer speed and allow subsequent sampling cycles to continue tracking changes in the safety margin. 40% is the preferred value, which is a compromise value determined on the basis of ensuring that the action can still be executed continuously and avoiding frequent start-stop impacts of the hydraulic system and the traveling mechanism. When K is in the danger zone, or when it is predicted that the action will enter the danger zone after execution, or when there is a working condition conflict indicator, a conclusion prohibiting execution is generated, and the action command to be executed is not output to the execution mechanism.
[0105] When generating a prohibition conclusion, a safety holding action is generated based on the current actual working conditions. When the current actual working condition is that the entire machine passes through a hole, the main beam is prohibited from continuing to move longitudinally in the dangerous direction, and the traveling drive mechanism is controlled to gradually reduce speed according to the deceleration slope and then lock to avoid additional impact caused by instantaneous sudden stop. When the current actual working condition is that during hoisting, the winch is prohibited from continuing to rise, but the winch is allowed to descend or hold. When the current actual working condition is that during lateral alignment, the overhead crane is prohibited from moving in the direction that reduces the safety margin, but the overhead crane is allowed to retreat at low speed in the direction that restores the safety margin. When the current actual working condition is that the beam is lowered into place and the beam is partially supported by the pier support, the winch is allowed to descend at low speed to complete the load transfer, avoiding the beam from remaining in a semi-suspended state for a long time. When key data is missing and the anti-overturning safety margin cannot be calculated, the action command to be executed is treated as a high-risk action. Actions that increase the load, move the center of gravity, or reduce the effective support range are prohibited. Only stop, descent, retreat, or safety holding actions after manual confirmation are allowed.
[0106] Each interlock judgment generates a traceable action release record. The action release record includes at least the following fields: input status, current actual working conditions, action command type, mechanical prerequisite confirmation result, overturning stability coefficient K, center of gravity position safety margin, safety margin change trend, interlock conclusion, output action, and abnormal data identifier. This record is used for subsequent maintenance, accident analysis, and parameter correction, but does not participate in the real-time control closed loop. If the same detection element triggers prohibited or speed-limited execution within multiple consecutive action cycles, the detection element or related mechanism is marked as a key review object. After the outrigger adjustment, crane return, or beam placement is completed on-site, the re-collected status data is cross-checked to restore consistency, and the actual working conditions are consistent with the manually selected working mode again. The overturning safety margin is recalculated, and the corresponding action permission is restored. After the above processing, the action command to be executed completes the interlock judgment of working condition consistency, mechanical prerequisite, and overturning safety margin before output.
[0107] Example 2: Based on Example 1, the specific application process of a bridge erecting machine safety monitoring and interlocking control method is further explained:
[0108] The specific application process is to erect a precast beam on a bridge construction site using a walking double-girder bridge erecting machine. After the bridge erecting machine completes on-site installation, leveling, and outrigger placement, a mechanical positional relationship benchmark is first established between the front outrigger, middle outrigger, rear outrigger, front and rear overhead cranes, hoisting points, and the unloaded center of gravity of the entire machine. This mechanical positional relationship benchmark is used to determine whether each outrigger forms effective support under the current working conditions, the position of the beam load application point in the bridge erecting machine's planar mechanical coordinate system, and the positional relationship of the horizontal projection of the overall center of gravity of the machine relative to the effective support range.
[0109] Before the first shift, the bridge erecting machine is checked under no-load conditions. The front, middle, and rear outriggers are locked and confirmed in sequence, the overhead crane returns to the preset balance position, and the winch is ready to lift. The pressure of the lifting cylinders of each outrigger, the pin positioning signal, the cylinder stroke, the longitudinal attitude of the main beam, the lateral attitude of the main beam, the position of the front and rear overhead cranes, the lifting height of the winch, and the operating mode of the control panel are collected. If the measured position of the outrigger base is consistent with the coordinates of the bearing point in the mechanical position relationship benchmark, and the coordinate verification deviation does not exceed 50mm, then the bearing point continues to be used as a valid bearing point for subsequent judgment. The 50mm threshold is mainly determined by combining the coordinate measurement error, the outrigger base placement deviation, the compression deformation of the support pad, and the repeated calibration error at the construction site. It is used to identify obvious deviations that may affect the calculation of the effective support range.
[0110] When the operator selects the whole machine through-hole mode and issues the main beam longitudinal movement command, the command is not directly output to the travel drive mechanism. Instead, it is first written into the same frame of status data along with the current outrigger reaction force, outrigger locking status, main beam attitude, and crane position. Mechanical data is updated at a period of 50ms to 100ms, positional data at a period of 100ms to 200ms, and slowly changing data at a period of 500ms to 1s. The above periods are mainly determined by combining the mechanical change rate of the bridge erecting machine during the cantilever forward movement and load transfer process, the sensor response capability, and the processing capability of the field controller. This allows for the formation of a continuous data sequence during dangerous development processes on a scale of several seconds.
[0111] If only one side of the front outrigger pin is in place at this time, or if the front outrigger reaction force is less than 10% to 20% of the theoretical load share under the corresponding working condition, it is determined that the front outrigger has not yet formed a stable load. The 10% to 20% range is mainly used to identify whether the outrigger is in a state of detachment or basic contact. It is mainly determined based on the reaction force change characteristics of the outrigger from the contact bearing surface to the formation of a stable load, the cylinder pressure detection error, and the initial compression deformation of the support pad. Since the front outrigger has not formed an effective support, the current actual working condition is identified as a hole preparation state or a support unconfirmed state, rather than the manually selected whole machine hole state. At this time, a working condition conflict mark is generated, the main beam longitudinal movement command is not output to the travel drive mechanism, the travel drive mechanism remains locked, or only low-speed retraction, stopping, and other risk-reducing actions are allowed.
[0112] After the front outrigger is repositioned and the pins are confirmed to be in place at both points, the outrigger reaction force and cylinder stroke are collected again. When the outrigger reaction force reaches more than 80% of the theoretical load share under this working condition, it is determined that the front outrigger has entered a stable load-bearing state. The 80% threshold is used to confirm sufficient load before the action is released. It is higher than the release threshold and is mainly determined by combining the requirements of the main design reaction force that the outrigger should bear under the corresponding working condition, hydraulic pressure fluctuations, compression deformation of the support pad, and sensor measurement errors. Subsequently, the effective support range is re-formed based on the current effective support points, and the position of the horizontal projection of the comprehensive center of gravity relative to the boundary of the effective support range is calculated.
[0113] During the longitudinal movement of the main beam, if the horizontal projection of the overall center of gravity gradually approaches the effective support boundary in front, the support boundary closest to the horizontal projection of the overall center of gravity is taken as the overturning boundary. The stabilizing moment formed by the reaction force of each effective bearing leg on this overturning boundary is calculated, and the overturning moment corresponding to the self-weight of the whole machine, the load of the beam, the load offset of the lifting point, and the deceleration inertia of the movement is calculated. The ratio of the stabilizing moment to the overturning moment is taken as the anti-overturning stability coefficient K. If K is not less than 1.5, and the longitudinal movement direction of the main beam will not make the overall center of gravity significantly closer to the support boundary, the longitudinal movement command of the main beam is determined to be allowed to be executed. 1.5 is used as the preferred safety threshold for high-risk conditions such as the whole machine passing through the hole and the forward movement of the cantilever. It is mainly determined by referring to the design verification of the bridge erecting machine, the stability control requirements of the lifting machinery, and the safety reserve for high-risk conditions at the construction site.
[0114] After the bridge erecting machine completes the span crossing and enters the beam feeding process, the beam transport vehicle delivers the precast beam into the lifting range of the front and rear overhead cranes. At this time, the front, middle, and rear outriggers are all in an effective load-bearing state, the overhead cranes are located in the docking position range, the load at the lifting point gradually increases from a low value, and the main beam's posture changes smoothly. Based on this, the current actual working condition is identified as either beam feeding or lifting preparation. If the manually selected working mode is also beam feeding or lifting preparation, a working condition consistency identifier is generated, and the hoisting mechanism is allowed to enter the lifting interlock judgment.
[0115] At the start of lifting, the loads at the front and rear lifting points are denoted as F1 and F2 respectively, and the coordinates of the front and rear lifting points are denoted as P1 and P2 respectively. The load application point P of the beam is determined according to...
[0116]
[0117] Calculate the horizontal projection of the composite center of gravity by combining the load application point and the unloaded center of gravity of the bridge erecting machine according to the weight ratio; if the difference in load between the front and rear lifting points does not exceed 15% of the rated load of a single lifting point, and this difference can be explained by the position of the beam's center of gravity and the arrangement of the lifting points, then the lifting point load data is assigned a high or medium confidence level; the 15% threshold is mainly determined by combining the allowable fluctuation of load distribution during the double lifting process, the safety reserve of wire rope stress, and the beam attitude control requirements, and is used to identify the situation before the off-center load develops to the point of affecting the safety of the lifting equipment, wire rope, and beam attitude;
[0118] If the load at the front and rear lifting points continues to rise during the lifting process, the lifting height increases synchronously, and the main beam's posture shows a slight change consistent with the load transfer direction, then the current actual working condition is identified as a lifting state. If K is between 1.3 and 1.5 at this time, or if K is greater than 1.5 but has been continuously decreasing in the last second, then a speed limit execution conclusion is generated, limiting the hoisting speed or hydraulic pump station output speed to 20% to 50% of the rated speed, preferably 40%. The speed range of 20% to 50% is mainly determined based on the stability of the bridge erecting machine at low speed, the response characteristics of the hydraulic system, and the need for control of the center of gravity movement speed. 40% is the preferred value, which can reduce the load transfer speed and at the same time avoid frequent start-stop of the hydraulic system and traveling mechanism due to excessively low speed.
[0119] During the lateral alignment process, the beam is suspended, and the load at the lifting points remains within the range corresponding to the beam's weight. Changes in the lateral position of the gantry crane or the lifting points cause changes in the lateral attitude of the main beam. The working condition matching value is calculated based on the outrigger bearing status, the change in lifting point load, the gantry crane position, and the main beam attitude. The weights for outrigger bearing status and lifting point load change can be 30%, gantry crane position 25%, and main beam attitude 15%. These weights can be adjusted based on typical working condition sampling data during the bridge erecting machine installation and commissioning phase, but the combined weight of outrigger bearing status and lifting point load change should not be less than 50% to ensure that working condition identification is primarily constrained by the effective support range and the beam's load transfer state. If the lateral alignment working condition matching value is not less than 75% and is at least 15% higher than other working condition matching values, then the current actual working condition is confirmed as a lateral alignment state. 75% is used to ensure that most key features have been matched, and the 15% difference is used to avoid misidentification under adjacent working condition boundary states.
[0120] If the operator mistakenly switches the operation mode to beam lowering during the lateral movement, and the reliable status data shows that the lifting height has not decreased, the load at the lifting point has not decreased, and the beam has not yet reached the support alignment range, then the current actual working condition is inconsistent with the manually selected working mode, and a working condition conflict indicator is generated; the hoisting descent command related to beam lowering is not directly output to the hoisting mechanism, but enters the prohibition execution or manual confirmation process; if the current lateral movement direction of the overhead crane will cause the overall center of gravity to move further closer to the effective support range boundary, then the overhead crane is prohibited from continuing to move in the dangerous direction, and the overhead crane is only allowed to retreat slowly in the direction of restoring the safety margin;
[0121] When the beam segment completes the lateral alignment and enters the beam placement process, the lifting height and lifting point load changes are continuously monitored. If the lifting height gradually decreases, the lifting point load gradually decreases, and the beam segment load is gradually transferred from the lifting equipment to the pier support, and the direction of the outrigger reaction force and the main beam attitude change is consistent with the load release process, then the current actual working condition is identified as the beam placement state. If K is within the safe range, and the direction of the lifting point load release is conducive to the recovery of the anti-overturning safety margin, then the hoist descent command is allowed to be executed. If the beam segment is already partially supported by the pier support, but key data is temporarily missing, making it impossible to accurately calculate K, then actions that increase risk, such as lateral movement or lifting, are not executed. Instead, the hoist is allowed to descend at low speed to complete the load transfer, avoiding the beam segment remaining in a semi-suspended state for a long time.
[0122] Throughout the entire bridge erection process, each action command to be executed undergoes an interlocking judgment of working condition consistency, mechanical prerequisites, and anti-overturning safety margin before output. When execution is permitted, the action command is output to the corresponding actuator according to the original settings. When execution is limited to speed, the action command is output after speed constraints. When execution is prohibited, the action command is not output to the actuator, and a safety holding action is generated based on the current actual working conditions. The action release record includes at least the following fields: input status, current actual working conditions, action command type, mechanical prerequisite confirmation result, anti-overturning stability coefficient K, center of gravity position safety margin, safety margin change trend, interlocking conclusion, output action, and abnormal data identification. If the same detection element triggers prohibited or limited execution within multiple consecutive action cycles, the detection element or related mechanism is marked as a key review object. When the outrigger adjustment, crane return, or beam placement is completed on site, the re-collected status data is cross-checked to restore consistency, and the actual working conditions are consistent with the manually selected working mode again, the corresponding action permission is restored.
[0123] Through the above operation process, the bridge erecting machine is controlled not only according to the manually selected operation mode in the continuous processes of whole machine passing through the hole, feeding beams, lifting, lateral movement and positioning, and lowering beams into place, but also in combination with the actual load-bearing state, load application position, main beam posture and anti-overturning safety margin, and completes graded release interlocking before the action command enters the actuator.
[0124] It should be noted that this invention can be deployed on the device itself to realize embedded applications, or it can run on a PC or other terminal with a user interface, thereby meeting various hardware environments and usage requirements.
[0125] The above embodiments can be implemented in whole or in part by software, hardware, firmware, or any other combination. When implemented in software, the above embodiments can be implemented in whole or in part by a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the processes or functions of the embodiments of this application are implemented in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium or transmitted from one computer-readable storage medium to another. For example, the computer instructions can be transmitted wirelessly or wiredly from one website, computer, server, or data center to another website, computer, server, or data center. Wired methods include optical fiber, twisted pair, coaxial cable, etc. Wireless methods include infrared, microwave, etc. Available media include any available media that can be accessed by a computer or data storage devices such as servers and data centers that contain one or more sets of available media. Available media can be magnetic media (floppy disks, hard disks, magnetic tapes), optical media (DVDs), or semiconductor media. Semiconductor media can be solid-state drives.
[0126] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
[0127] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for safety monitoring and interlocking control of a bridge machine, characterized in that, include: S1: Establish the mechanical positional benchmarks between the support points of the bridge erecting machine's outriggers, the crane's running position, the winch hoisting point position, and the overall center of gravity position; S2: Synchronously acquire outrigger reaction force, outrigger locking status, cylinder stroke, main beam posture, crane position, lifting point load and lifting height, and receive commands for actions to be executed; S3: Based on the aforementioned mechanical position benchmark, the vertical bearing relationship between the outrigger reaction force and the machine's self-weight, lifting point load, and additional load is verified. The moment relationship between the outrigger reaction force, the machine's self-weight, the beam load, and the lifting point load is verified. The attitude relationship is verified based on the cylinder stroke and the measured main beam attitude. The data collected by the pressure detection elements arranged in parallel on the same outrigger, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points are compared for consistency to obtain reliable state data. S4: Based on the leg bearing status in the trusted status data, as well as the load change at the lifting point, the position of the overhead crane and the posture of the main beam, identify the current actual working condition of the bridge erecting machine, and verify the current actual working condition with the manually selected working mode and the allowed adjacent transition relationship to obtain the working condition verification status. The working condition verification status includes the working condition consistency status, the working condition conflict status, the transition status or the restricted action permission status. S5: Before the action command to be executed is output to the actuator, the action command to be executed is classified and interlocked according to the working condition verification status, the current actual working condition, the outrigger locking status, the support status, the load application position and the anti-overturning safety margin, and the action command to be executed is determined to be allowed to be executed, executed at a limited speed or prohibited from being executed; in the case of working condition conflict, the relevant action command is determined to be prohibited from being executed or transferred to manual confirmation; Under restricted action permission status, only the actions of stopping, descending, rewinding, or locking are allowed to be executed.
2. The bridge erecting machine safety monitoring and interlocking control method according to claim 1, characterized in that, S1 includes: Using the bearing plane of the bridge erecting machine as the horizontal reference plane, and the longitudinal centerline and transverse centerline of the whole machine as coordinate axes, a planar mechanical coordinate system is established to mark the center of each outrigger base, the travel range of the overhead crane, the linkage position of the hoisting point, and the coordinates of the unloaded center of gravity. The load application point of the beam is calculated based on the weight of the beam, the load distribution relationship between the front and rear lifting points and the real-time position of the gantry crane, and the coordinates of the bearing point, the gantry crane travel, the lifting point offset, the coordinates of the unloaded center of gravity and the specifications of the beam are written into the mechanical position reference table. After outrigger step change, support pad adjustment, counterweight change, main beam assembly section change, or beam segment specification change, update the mechanical position reference table, and determine the outrigger that is effectively locked, has normal cylinder stroke, and reaches the release recognition threshold as the effective support point, and generate the current effective support range.
3. The bridge erecting machine safety monitoring and interlocking control method according to claim 1, characterized in that, S2 includes: The outrigger reaction force, suspension point load, and main beam attitude are classified as mechanical data. The cylinder stroke, crane position, and lifting height are classified as position data. Wind speed, operating mode, and equipment operating status are categorized into slow-changing data. Using the sampling period of mechanical data as the benchmark, position data and slowly changing data are aligned to form a state data frame, and data exceeding the preset time difference is marked as timeout data. The reaction force of the outrigger lifting cylinder pressure is calculated and the jump-type screening is performed. The outrigger locking status is confirmed by two consistent signals. Zero-point correction is performed on the main beam attitude, and zero-point calculation is performed on the crane position and lifting height; Write the action instructions to be executed into the status data frame.
4. The bridge erecting machine safety monitoring and interlocking control method according to claim 3, characterized in that, Using the sampling period of mechanical data as the baseline beat, positional data and slowly varying data are aligned to form a state data frame, and data exceeding a preset time difference is marked as timeout data, including: Configure the sampling time, data source number, engineering unit, and validity identifier for the sampled data; Read the latest mechanical data according to the reference beat, and select position data and slowly changing data whose time difference with the reference beat meets the preset requirements for time alignment; Position-type data and slowly changing data whose time difference from the baseline beat exceeds a preset threshold are marked as timeout data; Record the outrigger reaction force sequence, locking state sequence, cylinder stroke sequence, main beam attitude, crane position, lifting point load, lifting height, operation mode, pending action commands and time stamps in the same state data frame.
5. The bridge erecting machine safety monitoring and interlocking control method according to claim 1, characterized in that, S3 includes: The effective load-bearing outrigger reaction force is summed and compared with the machine's self-weight, lifting point load, and additional load to verify the vertical load-bearing residual. Using the bearing boundary of the effective support range or the line connecting the outriggers as the reference axis, the moment residuals of the outrigger reaction force, the self-weight of the whole machine, the beam load and the lifting point load are checked. The attitude of the main beam is calculated based on the stroke of the hydraulic cylinder, and the attitude deviation is checked with the actual measured attitude of the main beam. The consistency of the data collected by the pressure detection elements arranged in parallel on the same leg, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points were compared. According to the verification and consistency comparison results, the data credibility level, abnormal data identification and bearing status are marked. Low credibility data is eliminated or estimated and marked, and the missing status of key data is marked as mechanical state unconfirmable.
6. The bridge erecting machine safety monitoring and interlocking control method according to claim 5, characterized in that, Consistency comparisons include: The data collected by the pressure detection elements arranged in parallel on the same leg, the data collected by the strain detection elements arranged symmetrically on the same main beam section, and the load detection data corresponding to the front and rear lifting points were compared by difference. According to the allowable difference range of the corresponding detection object, the detection data that exceeds the allowable difference range is marked as off-balance candidate data or detection abnormal candidate data, and an abnormal data identifier is written.
7. The bridge erecting machine safety monitoring and interlocking control method according to claim 1, characterized in that, S4 includes: Preset the combination of working conditions corresponding to the whole machine passing through the hole, feeding the beam, lifting, lateral movement and alignment and beam placement; The reliable status data is combined with the characteristics of each working condition for weighted matching, and the current actual working condition is determined by combining the changing trends of lifting point load, lifting height, crane position and main beam attitude within a preset time window. Verify the current actual working conditions against the manually selected working mode and the allowed adjacent transition relationships; When the verification is consistent, mark the working condition as consistent. When the verification is inconsistent, the working condition changes repeatedly, or the mechanical state cannot be confirmed, mark the working condition as conflicting, transitional, or restricted action permission, respectively.
8. The bridge erecting machine safety monitoring and interlocking control method according to claim 7, characterized in that, Verify the current actual operating conditions against the manually selected operating mode and the allowed adjacent transition relationships, including: When the current actual working conditions are consistent with the manually selected working mode, or when they belong to a preset allowed adjacent transition relationship, it is marked as a consistent working condition state; If the current actual working conditions are inconsistent with the manually selected working mode and do not belong to the preset allowed adjacent transition relationship, it is marked as a working condition conflict state, and the relevant action instructions are transferred to prohibit execution or manual confirmation; When the mechanical state cannot be confirmed, maintain the previously confirmed working condition and set the action permission state to restricted.
9. The bridge erecting machine safety monitoring and interlocking control method according to claim 1, characterized in that, S5 includes: Verify the outrigger locking, effective support, lifting gear status, beam position, and support alignment conditions corresponding to the current actual working conditions. The location of the overall center of gravity is determined based on the lifting point load, the crane position, and the effective support range. The stabilizing moment, overturning moment, and anti-overturning stability coefficient are calculated with the overturning boundary as the reference. Based on the safety margin of the center of gravity position, the trend of the safety margin change, the action trend and the conflict state of the working conditions, the action command to be executed is determined as allowed to be executed, executed at a limited speed or prohibited from being executed; In case of conflicting operating conditions, the relevant action instructions will be determined as prohibited from execution or transferred to manual confirmation; in case of restricted action permissions or missing key data, only stop, descent, rollback or lock actions will be generated and action release data will be recorded.
10. A method for safety monitoring and interlocking control of a bridge erecting machine according to claim 9, characterized in that, The overall center of gravity position is determined based on the lifting point load, crane position, and effective support range. The stabilizing moment, overturning moment, and anti-overturning stability coefficient are calculated using the overturning boundary as a reference, including: The load application point of the beam segment is determined by weighting the loads at the front and rear lifting points and their position coordinates, and the load application point of the beam segment is combined with the unloaded center of gravity of the whole machine to form the horizontal projection of the comprehensive center of gravity. The boundary closest to the horizontal projection of the comprehensive center of gravity within the effective support range is selected as the overturning boundary. The stabilizing moment is calculated based on the reaction force of each effective supporting leg and the vertical distance from the corresponding supporting leg bearing point to the overturning boundary. The overturning moment is calculated based on the machine's self-weight, beam load, and lifting point load offset and the vertical distance from their points of action to the overturning boundary. The ratio of the stabilizing moment to the overturning moment is determined as the anti-overturning stability coefficient.
Citation Information
Patent Citations
An active safety monitoring system for bridge erecting machines
CN112650115B
A method, system, device and storage medium for intelligent control of bridge erecting machines
CN116991108B
Task processing method and device, operation machine, equipment and medium
CN117875620A
Intelligent crane operation environment construction method based on digital twinborn technology
CN120805483A