Multi-mode charging and discharging control method and system for megawatt-level mobile energy storage

By constructing a thermal-electric coupling capability envelope calculation module and a pre-evaluation mapping table, the problem of overly optimistic capability assessment during multi-mode switching in megawatt-level mobile energy storage emergency repair vehicles was solved, realizing autonomous preheating and automatic switching of 5C blade batteries, thus improving operational efficiency and ease of operation.

CN122660183BActive Publication Date: 2026-11-17JIANGSU XISHENG GROUP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202610748668.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2026-05-28
Publication Date
2026-11-17
Estimated Expiration
2046-05-28

AI Technical Summary

Technical Problem

Existing technologies in megawatt-level mobile energy storage emergency repair vehicles lack systematic modeling and quantification of thermal-electric coupling characteristics during multi-mode switching, leading to inaccurate capacity assessments and an inability to accurately predict whether the thermal state during charging and discharging processes meets power requirements, resulting in low operational efficiency.

Method used

By constructing a thermal-electric coupling capability envelope calculation module, the battery pack temperature, state of charge, and operating power of the thermal management device are calculated in real time. A full-mode pre-evaluation mapping table is generated to perform differentiated switching decisions and targeted thermal preprocessing, thereby realizing the collaborative priority power dynamic allocation of the thermal management device.

Benefits of technology

Accurately assess system capabilities to enable the 5C blade battery to autonomously preheat and automatically switch in low-temperature scenarios, improve the automation and ease of operation of multi-mode switching processes, and ensure accurate perception of available capabilities in high-speed charging scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN122660183B_ABST
    Figure CN122660183B_ABST
Patent Text Reader

Abstract

This invention provides a multi-mode charging and discharging control method and system for megawatt-level mobile energy storage, relating to the field of large-capacity energy storage system control technology. The method first collects battery temperature, state of charge, and thermal management operating power to calculate the thermal-electric coupling capability envelope; it then traverses the system's operating modes to complete a pre-assessment and generate a mapping table; based on switching commands, it looks up the table to obtain power and energy margins, performs mode switching judgment and directional thermal preprocessing, and outputs a switching permission after meeting the criteria; finally, it coordinates with thermal management to dynamically allocate operating power. This invention combines the high-voltage topology of mobile energy storage to construct a three-dimensional coupling envelope, incorporating loss correction capability assessment to avoid assessment bias in high-power scenarios; it relies on a directional preheating strategy to achieve autonomous switching of high-power output under low-temperature conditions, eliminating manual intervention; and it establishes a hierarchical power scheduling mechanism, with power voltage drop and energy status updated in linkage, significantly improving the energy storage system's replenishment response speed and operational control accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of control technology for large-capacity energy storage systems, and particularly to a multi-mode charging and discharging control method and system for megawatt-level mobile energy storage. Background Technology

[0002] As a core piece of equipment in the power emergency response system, energy storage emergency repair vehicles must be capable of continuously supplying power to critical loads under extreme conditions of no mains power or damaged mains power. They must also be able to rapidly replenish high-power energy at 10kV substation nodes to ensure the continuous execution of repair tasks. In recent years, high-power-density energy storage emergency repair vehicle platforms, represented by 2.4MW mobile megawatt-level power units, have gradually become the industry's development direction.

[0003] The 2.4MW mobile megawatt-level energy storage emergency repair vehicle needs to integrate a large-capacity battery pack, high-voltage conversion device, DC fast charging interface, low-voltage AC power supply system, and thermal management device within a limited onboard space, forming a highly compact vehicle integrated architecture. All subsystems share the same battery pack and DC intermediate bus, and different power supply modes correspond to different power path topology combinations. The coexistence of multiple modes places extremely high demands on the coordination and management capabilities of the control system.

[0004] Unlike traditional energy storage systems that indirectly access power through a power frequency transformer before rectification and charging, the energy storage emergency repair vehicle platform, characterized by a direct-connected high-voltage topology, can directly introduce 10kV grid power into the battery pack's DC bus via a direct-connected high-voltage conversion unit, achieving rapid charging of 10kV and 2.4MW. While the direct-connected topology eliminates the bulky power frequency transformer, significantly reducing the vehicle's load, it also significantly increases the difficulty of managing the charging power flow: a 2.4MW charging power means a charging and discharging current of several thousand amperes, placing far more stringent requirements on impact suppression, thermal state management, and capacity boundary assessment during dynamic power path switching than conventional energy storage systems.

[0005] The 5C blade battery is the core component of this platform. Compared to traditional 1C to 2C battery systems, the 5C blade battery can be fully charged in approximately 12 minutes, giving the energy storage emergency repair vehicle the ability to replenish power rapidly. However, under 5C high-rate charge and discharge conditions, the battery pack's temperature rise rate can reach 6 to 8 times that under normal conditions, causing significant fluctuations in the real-time operating power of the thermal management device, directly eroding the system's available power. Simultaneously, high-rate charge and discharge place stringent requirements on the current carrying capacity and heat dissipation of the charge and discharge harnesses, and the power loss caused by harness impedance cannot be ignored. Existing control schemes lack systematic modeling and quantification of these strong thermo-electric coupling characteristics, leading to severely inaccurate capability assessments during multi-mode switching.

[0006] After completing a high-power output task, energy storage emergency repair vehicles need to restore their power through rapid recharging as quickly as possible to support the next task. Current technology lacks a pre-assessment mechanism for mode switching decisions during the recharging process. Operators cannot know in advance whether the current thermal state meets the power requirements of the target charging mode, and can only passively wait for the system to reject their request before taking action, resulting in low operational efficiency.

[0007] In view of this, there is an urgent need for a megawatt-level mobile energy storage multi-mode charging and discharging control method and system to at least address the above-mentioned shortcomings. Summary of the Invention

[0008] One of the objectives of this invention is to provide a multi-mode charging and discharging control method and system for megawatt-level mobile energy storage, so as to solve the problems mentioned in the background art.

[0009] The megawatt-level mobile energy storage multi-mode charging and discharging control method provided in this embodiment of the invention includes: Step 1: Calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device; Step 2: Based on the current thermal-electric coupling capability envelope, perform comparative calculations on all configured operating modes of the system in a loop to obtain a full-mode pre-evaluation mapping table; Step 3: Receive the operating mode switching instruction, query the full-mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met. Step 4: Perform dynamic allocation of thermal management collaborative priority power based on the switching permission signal.

[0010] Preferably, step 1: Based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device, calculate the thermal-electric coupling capability envelope at the current moment, including: Based on the pre-calibrated temperature-power derating mapping relationship, the upper limit of the hot output power is calculated from the current battery pack temperature and denoted as the power envelope component. Based on the nominal total capacity of the battery pack, the actual usable capacity is obtained by deducting the guaranteed reserve capacity, the power conversion loss of the entire link, and the cumulative power consumption of the real-time operating power of the thermal management device within the preset reference operating time. This is recorded as the capacity envelope component. The real-time operating power of the thermal management device is included in the deduction calculation as an internal load of the system. Based on the current average temperature of the battery pack, a pre-calibrated temperature-capacity correspondence table is consulted to obtain the temperature-capacity correction coefficient, which is denoted as the correction envelope component. The correction envelope component is updated synchronously with each update of the energy envelope component. The power envelope component, the charge envelope component, and the correction envelope component together constitute the thermal-electric coupling capability envelope at the current moment.

[0011] Preferably, step 2: Based on the current thermal-electric coupling capability envelope, perform cyclical comparison calculations on all configured operating modes of the system to obtain a full-mode pre-evaluation mapping table, including: The operating mode that performs the comparison calculation is used as the evaluation mode. The power feasible margin of the evaluation mode is obtained by subtracting the preset minimum power requirement of the evaluation mode from the power envelope component. The power feasibility margin of the evaluation mode is obtained by multiplying the power envelope component by the corrected envelope component and then subtracting the preset minimum power requirement of the evaluation mode. The power feasibility margin and energy feasibility margin of each operating mode are continuously written into the full-mode pre-evaluation mapping table. The full-mode pre-evaluation mapping table is indexed by the operating mode identifier and uses the power feasibility margin and energy feasibility margin as fields. It is refreshed synchronously each time the thermal-electric coupling capability envelope is updated.

[0012] Preferably, in step 3: Receive the operating mode switching instruction, query the full-mode pre-evaluation mapping table using the target operating mode identifier as an index, read the power feasibility margin and energy feasibility margin of the target operating mode, and execute differentiated switching decisions and targeted thermal preprocessing according to the following three mutually exclusive conditions: When the power feasible margin is not less than 0 and the energy feasible margin is not less than 0, a switching permission signal and a target operating mode identifier are generated, and power path reconstruction is performed. When the feasible power margin is not less than 0 but the feasible power margin is less than 0, the estimated remaining time required for the feasible power margin to turn to not less than 0 is estimated based on the current operating power of the thermal management device and the thermal capacity of the battery pack. The estimated remaining time is continuously output to the human-machine interface. At the same time, a directional thermal preprocessing sequence with the preset minimum power requirement of the target operating mode as the calibration target is started. During the thermal preprocessing process, the feasible power margin of the target operating mode in the full-mode pre-evaluation mapping table is continuously polled. Once the feasible power margin turns to not less than 0, a switching permission signal and a target operating mode identifier are immediately generated, and power path reconstruction is performed without the need for the operator to issue another command. When the available power margin is less than 0, the switch is refused, the power shortage is output to the operator, and the alternative operating mode identifier with the largest available power margin is selected from the full-mode pre-evaluation mapping table based on the available power margin from largest to smallest and output to the human-machine interface.

[0013] Preferably, step 4: dynamically allocate thermal management collaborative priority power based on the switching permission signal, including: Under the constraint of not exceeding the power envelope component, the thermal management device is regarded as the lowest priority power consumption unit and participates in the priority queue power allocation together with each active external output path. When the power demand of the high priority external output path increases and the total power tends to saturate, the allocated power of the thermal management device is reduced to the minimum value required to maintain the current temperature range, and then the allocated power of each external output path is reduced in order of priority from low to high. Each time the thermal management device allocates power, it sends an update trigger signal to step 1, carrying the current allocated power value of the thermal management device. Step 1 then recalculates the electrical envelope component based on the current allocated power value and updates the thermal-electric coupling capability envelope. The updated thermal-electric coupling capability envelope in step 1 triggers step 2 to refresh the full-mode pre-evaluation mapping table, forming a closed loop of thermal management power scheduling and capability envelope update.

[0014] Preferably, after sending the handover permission signal in step 3, an orderly transition handover step is further included before performing power path reconstruction: Compare the differences in the working status of the equipment in the current operating mode with the target operating mode for each node to obtain the set of nodes that need to be withdrawn and the set of nodes that need to be put into operation. Disconnect each node in the set of nodes that need to be removed in an orderly manner according to the order of electrical distance between each node and the battery pack from farthest to closest, and wait for each node to return a disconnection confirmation; After receiving confirmation of complete disconnection, each path to be connected in the set of nodes to be connected is pre-charged through a current limiting loop. The difference between the voltage at both ends of each path and the DC intermediate bus voltage is continuously monitored. Once the difference between the voltage at both ends of each path and the DC intermediate bus voltage is less than the preset tolerance value, the current limiting constraint is removed and the path is fully connected. After each node returns to normal operation confirmation, a power path reconstruction completion signal is output, and dynamic power allocation is performed.

[0015] Preferably, the directional thermal preprocessing sequence, with the minimum power requirement preset for the target operating mode as the calibration target, is initiated, including the following steps: Using the preset minimum power requirement of the target operating mode as input, query the pre-calibrated temperature-power derating mapping relationship, and reversely determine the minimum battery pack temperature corresponding to the power envelope component reaching the preset minimum power requirement of the target operating mode, which is denoted as the thermal pretreatment target temperature. Using the difference between the target temperature of thermal pretreatment and the current battery pack temperature as input, and combining the equivalent thermal capacity pre-calibrated according to the battery pack model and the adjustable power limit determined by the rated power of the thermal management device and the current operating state, the estimated time required for the battery pack temperature to change from the current value to the target temperature of thermal pretreatment is estimated and recorded as the estimated time of thermal pretreatment. The estimated time of thermal pretreatment is continuously output to the human-machine interface. The direction of heating or cooling adjustment is determined based on the difference between the target temperature of thermal pretreatment and the current battery pack temperature. Thermal pretreatment is started with the upper limit of the adjustable power of the thermal management device, and the real-time temperature of the battery pack is continuously collected and recorded as the temperature during the thermal pretreatment process. Using the temperature of the heat pretreatment process as input, continuously query the temperature-power derating mapping relationship, calculate the current power envelope component, trigger the full-mode pre-evaluation mapping table refresh, and obtain the power feasible margin after the target operating mode is updated. Using the updated power feasibility margin as the judgment input, when the power feasibility margin turns to not less than 0, the thermal preprocessing performed at the adjustable power upper limit is stopped, the thermal management device is restored to the normal operating power required to maintain the target temperature range, and a switching permission signal and target operating mode identifier are generated.

[0016] Preferably, in step 4, the priority queues from high to low are the high voltage conversion output path, the DC fast charging output path, and the low voltage AC output path; When the total power is sufficient, power is allocated to each path according to the preset initial allocation ratio of each path in the system parameter table; When the total power approaches saturation, after the power distribution voltage of the thermal management device is reduced to the minimum value required to maintain the current temperature range, the power distribution voltage of each path is reduced in the order of low-voltage AC output path, DC fast charging output path, and high-voltage conversion output path. The actual power distribution voltage of each path is not lower than the corresponding minimum maintenance power value preset in the system parameter table. If the system power still approaches saturation after the power distribution voltage of the high-voltage conversion output path is reduced to the minimum maintenance power value, a power saturation alarm signal is sent, and step 3 is triggered to re-evaluate the feasibility of the current operating mode according to the full-mode pre-evaluation mapping table.

[0017] Preferably, the operating modes configured for the system include low-voltage uninterruptible power supply mode; When executing the low-voltage uninterruptible power supply mode, continuously monitor the voltage amplitude deviation, frequency deviation, and phase jump of the external mains power. When any parameter of voltage amplitude deviation, frequency deviation or phase jump variable is detected to exceed the corresponding preset abnormal threshold, a three-step linkage switching action is executed in sequence: disconnecting the mains side switch, closing the energy storage side switch, and activating the bidirectional DC-AC converter to enter the independent inverter mode; the total time from detecting any parameter exceeding the corresponding preset abnormal threshold to the load side restoring stable power supply does not exceed the preset switching time limit. During operation in low-voltage uninterruptible power supply mode, the power feasibility margin calculation for low-voltage uninterruptible power supply mode replaces the reference power component in the preset minimum power requirement with the current real-time load power, thereby realizing dynamic correction of the power feasibility margin.

[0018] The megawatt-level mobile energy storage multi-mode charging and discharging control system provided in this embodiment of the invention includes: The coupling capability envelope calculation module is used to calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device. The comparison calculation module is used to perform comparison calculations on all the operating modes configured by the system in a loop based on the current thermal-electric coupling capability envelope, and obtain a full-mode pre-evaluation mapping table; The switching decision module is used to receive the operating mode switching instruction, query the full mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met. The power dynamic allocation module is used to dynamically allocate thermal management collaborative priority power based on the switching permission signal.

[0019] The beneficial effects of this invention are as follows: This invention addresses the direct-mounted high-voltage topology characteristics of a 2.4MW mobile megawatt-level energy storage emergency repair vehicle platform, constructing a three-dimensional thermal-electric coupling capability envelope composed of a power envelope component, a charge envelope component, and a corrected envelope component. Under high-rate charge-discharge conditions of 5C blade batteries, the real-time operating power of the thermal management device accounts for a significant proportion of the system's rated power, and the transformation losses caused by the charging and discharging harness impedance are also substantial. This invention incorporates both of these internal losses into the dynamic deduction calculation of the charge envelope, effectively solving the problem of overly optimistic capability assessment in megawatt-level high-power-density scenarios in existing technologies.

[0020] This invention creatively designs a directional thermal pretreatment sequence with the minimum power requirement preset in the target operating mode as the calibration target. By reverse querying the temperature-power derating mapping relationship, the target temperature for thermal pretreatment is accurately determined. This enables the 5C blade battery to autonomously preheat from insufficient thermal state to meeting the 2.4MW high-power output condition in low-temperature scenarios, and automatically triggers switching after the condition is met. This eliminates the intermediate step of waiting for judgment and secondary command by the operator after preheating, and improves the automation level and operation convenience of the multi-mode switching process.

[0021] This invention establishes a dynamic power allocation mechanism with priority for thermal management, incorporating the thermal management device into the lowest priority power consumption unit and coordinating its scheduling with the high-voltage conversion output path, DC fast charging output path, and low-voltage AC output path under the direct-connected high-voltage topology framework. In ultra-fast recharge scenarios requiring rapid charging at 10kV and 2.4MW, the power voltage drop of the thermal management device and the closed-loop refresh of the power envelope achieve strong coupling and linkage, ensuring the system maintains accurate awareness of available capacity throughout the entire recharge cycle.

[0022] Other features and advantages of the invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention. The objects and other advantages of the invention may be realized and obtained by means of the structures particularly pointed out in this application.

[0023] The technical solution of the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0024] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used in conjunction with embodiments of the invention to explain the invention and do not constitute a limitation thereof. In the drawings: Figure 1 This is a schematic diagram of a megawatt-level mobile energy storage multi-mode charge and discharge control method in an embodiment of the present invention; Figure 2 This is a schematic diagram of a megawatt-level mobile energy storage multi-mode charging and discharging control system in an embodiment of the present invention. Detailed Implementation

[0025] The preferred embodiments of the present invention will be described below with reference to the accompanying drawings. It should be understood that the preferred embodiments described herein are for illustration and explanation only and are not intended to limit the present invention.

[0026] The megawatt-level mobile energy storage multi-mode charging and discharging control method provided in this embodiment of the invention is implemented based on a 2.4MW mobile megawatt-level energy storage emergency repair vehicle platform.

[0027] In this embodiment, the rated total output power of the energy storage emergency repair vehicle platform is 2.4MW, and the rated energy storage capacity is no less than 480kWh. The battery pack adopts a 5C blade battery system. The significant advantage of the 5C blade battery compared to the traditional lithium iron phosphate system is that it supports continuous charging and discharging at a 5C rate, and can be fully charged in about 12 minutes, providing a physical basis for the platform to achieve rapid charging capability at 10kV and 2.4MW. The 5C blade battery module is connected in parallel to the battery busbar through charging and discharging harnesses, and then connected to each power conversion device through a high-voltage DC intermediate bus. The cross-sectional area and material of the charging and discharging harnesses have been specially optimized to meet the current carrying requirements of thousands of amperes under 5C high-rate conditions.

[0028] The platform adopts a direct-connected high-voltage topology. Direct connection means that the battery pack's DC bus can be directly connected to the 10kV grid node via a direct-connected high-voltage conversion unit, eliminating the bulky power frequency transformer found in traditional solutions. The direct-connected high-voltage conversion unit directly converts the 10kV AC to DC intermediate bus voltage, achieving rapid charging capability at 10kV and 2.4MW. While the direct-connected high-voltage topology reduces the overall vehicle weight and increases system power density, it also significantly increases the difficulty of voltage coordination and topology reconfiguration between power paths during multi-mode switching. This is the key engineering challenge that the control method of this invention needs to address.

[0029] The system is configured with the following four types of power paths, corresponding to different operating modes: High-voltage conversion output path: Output electrical energy to 10kV grid nodes or high-voltage electrical equipment through direct-connected high-voltage conversion units, with a rated power of 2.4MW, corresponding to high-power output operation mode; DC fast charging output path: Output DC power to external electric vehicles or other energy storage devices through a high-power DC charging interface (compatible with national standard high-power charging protocol), with a rated power of not less than 480kW; Low-voltage AC output path: 220V / 380V AC power is supplied to the field power frequency load through a bidirectional DC-AC converter, with a rated power of not less than 100kW, including low-voltage uninterruptible power supply mode; Rapid energy replenishment path: The 5C blade battery pack is rapidly charged from the 10kV grid node at a power of 2.4MW through a direct-connected high-voltage conversion unit, achieving rapid energy replenishment.

[0030] The four paths mentioned above are connected to the DC intermediate bus via their respective solid-state switches or mechanical contactors. The thermal management device consists of a liquid-cooled circulating pump, compressor, fan, and corresponding valve group. Under the 5C blade battery's 5C rate charge and discharge conditions, the rated operating power of the thermal management device can reach 12kW to 40kW, accounting for 0.5% to 1.7% of the total rated power of the system, but it cannot be ignored in the full-cycle energy accounting.

[0031] Before leaving the factory, the system pre-calibration system completes the following key calibration tasks: Based on the thermal characteristics of the 5C blade battery, the maximum continuous charge and discharge power is calibrated point by point in 5℃ increments within the temperature range of -20℃ to 60℃, and a temperature-power derating mapping table is established; full charge and discharge cycles are completed at each temperature point, and a temperature-capacity correspondence table is established; using the charge and discharge harness impedance parameters as input, the characteristics of the change in power conversion loss of the entire link with the operating power are calibrated and written into the system parameter table; the equivalent thermal capacity of the 5C blade battery pack is calibrated and written into the system parameter table as a pre-calibration parameter; the net effective thermal power of the thermal management device at various ambient temperatures is calibrated, an ambient temperature-net effective thermal power mapping MAP is established, and written into the system parameter table.

[0032] This invention provides a multi-mode charging and discharging control method for megawatt-level mobile energy storage, such as... Figure 1 As shown, it includes: Step 1: Calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device.

[0033] The thermal-electric coupling capability envelope is a comprehensive quantitative representation of the current actual usable capability of the mobile energy storage system in this invention. It is composed of three components: power envelope component, energy envelope component, and correction envelope component.

[0034] The controller reads the temperature data of the entire battery pack in real time with a sampling period of no less than 100ms, taking the lowest temperature of the entire pack as the basis for calculation, conservatively estimating to prevent overlooking excessively low temperatures of individual modules. Using this temperature value as an index, it queries a pre-calibrated temperature-power derating mapping table, and uses linear interpolation to obtain the upper limit of the hot-state output power under the current thermal condition, denoted as the power envelope component. The physical meaning of the power envelope component is: under the current thermal condition, the maximum total power that the battery pack can continuously supply to all external output paths and internal loads. For example, during winter operation of an energy storage emergency repair vehicle, if the lowest temperature of the 5C blade battery pack is 10℃, the derating table calibrates the corresponding power as 75% of the rated power, and the system rated power is 1000kW, then the current power envelope component is 750kW.

[0035] Starting with the product of the nominal total capacity of the 5C blade battery pack and the current state of charge output by the BMS, the following three items are subtracted sequentially to obtain the actual usable capacity, which is denoted as the capacity envelope component: The first item is to deduct the minimum reserve capacity. The minimum reserve capacity corresponds to the lower limit of over-discharge protection of the 5C blade battery system, which is set to 10% of the nominal total capacity in this embodiment. The reasonable configuration range of the minimum reserve capacity ratio is 5% to 30%, and the specific value is determined by the cycle life requirements of the battery pack model and written into the system parameter table.

[0036] The second item is to deduct the equivalent electrical energy of the power conversion loss across the entire link. In this embodiment, the power conversion loss across the entire link includes two parts: the conversion loss of the direct-connected high-voltage conversion unit and the impedance loss of the charging and discharging harness. The impedance loss of the charging and discharging harness is particularly significant under the 5C high-rate operating condition.

[0037] The conversion loss of a direct-connected high-voltage converter unit is characterized by the multidimensional loss method (MAP), where MAP is represented by the DC-side output power. (Unit: kW) and current average battery pack temperature (Unit: °C) is the efficiency of the dual-input, output-to-end conversion. The MAP is calibrated point-by-point before leaving the factory at a combination of operating points across the full power range (0 to 2400kW, step size 240kW) and the full temperature range (-20℃ to 60℃, step size 10℃). Intermediate operating points are obtained using bilinear interpolation. The equivalent electrical charge of the conversion loss is calculated using the following formula: ; in This is the preset reference runtime.

[0038] The impedance loss of the charging and discharging harness is characterized using a temperature-compensated impedance model. Harness DC impedance. The data is obtained from the factory low-frequency calibration and written into the system parameter table; during actual operation, the current harness temperature is used. (Data collected by the thermistor on the wire harness surface) and current amplitude (Data acquired in real time by a Hall sensor) is used as input. The equivalent operating impedance is calculated using the following analytical formula: ; in Temperature coefficient of resistance of conductor material (for standard copper conductors) ); The reference temperature for calibration is 20℃. The combined correction coefficient for skin effect and proximity effect is used as... To obtain the index, a pre-calibrated current-skin coefficient MAP was used. This MAP was calibrated using finite element simulation within the DC to 5kHz range according to the actual wire harness diameter and arrangement, under a rated current of 5C. The correction range is typically between 1.05 and 1.18; the equivalent charge of the harness loss is calculated using the following formula: ; in Take the effective root mean square value within the preset reference runtime.

[0039] The total equivalent power loss of the entire power conversion process is: ; Will It is subtracted from the charge envelope component. The introduction of a two-parameter MAP and a temperature-compensated impedance model ensures that the calculation accuracy of the charge envelope component is better than that of the nominal available charge in the 2.4MW high power density scenario. This effectively avoids overly optimistic envelope bias caused by underestimating losses.

[0040] The third step involves deducting the cumulative power consumption of the thermal management device. The controller reads the real-time operating power of the thermal management device and uses a preset reference operating time (set to 1 hour in this embodiment, but adjustable according to task planning) as a reference window. The product of the real-time operating power of the thermal management device and the reference operating time is deducted from the available power as the cumulative power consumption of the thermal management device. The real-time operating power of the thermal management device is included in the deduction calculation as an internal load of the system. Under the high-rate charge and discharge conditions of the 5C blade battery, this power is significantly higher than that under the low-rate conditions. Dynamic deduction calculation is crucial for the accuracy of capability assessment.

[0041] Using the current average temperature of the battery pack (the arithmetic mean of all sampling points) as an index, a pre-calibrated temperature-capacity correspondence table is consulted. Linear interpolation is then used to obtain the temperature-capacity correction coefficient, denoted as the correction envelope component. The capacity reduction effect of the 5C blade battery under low-temperature conditions is more significant than that of conventional systems. For example, at 0°C, the correction envelope component can be as low as 0.82, indicating that the actual release capacity of the battery pack is only 82% of the nominal value. The physical meaning of the correction envelope component is the reduction ratio of the actual release capacity of the battery pack at the current temperature relative to the nominal capacity. Therefore, in step 2, it is multiplied by the capacity envelope component rather than added to obtain the actual usable capacity after temperature correction. The correction envelope component is updated synchronously with each update of the capacity envelope component.

[0042] The power envelope component, the electric charge envelope component, and the modified envelope component are combined to form the thermal-electric coupling capability envelope, which is then output to step 2.

[0043] Step 4 sends an update trigger signal to Step 1 after each power allocation by the thermal management device with a voltage drop, carrying the current allocated power value of the thermal management device after the voltage drop. After receiving the signal, Step 1 recalculates the cumulative power consumption of the thermal management device with the new allocated power, updates the power envelope component, refreshes the thermal-electric coupling capability envelope, and notifies Step 2 to synchronously refresh the full-mode pre-evaluation mapping table, forming a closed loop of thermal management power scheduling and capability envelope update.

[0044] Step 2: Based on the current thermal-electric coupling capability envelope, perform comparative calculations on all configured operating modes of the system in a loop to obtain a full-mode pre-evaluation mapping table.

[0045] The full-mode pre-evaluation mapping table is the core data structure of this invention for realizing multi-mode early perception and dynamic evaluation. Step 2 is activated immediately after each update of the thermal-electric coupling capability envelope in Step 1. It performs a complete sequential traversal comparison calculation on all operating modes registered in the system parameter table. After updating all entries, it sends a mapping table refresh completion notification to Step 3 to ensure that the mapping table always reflects the latest capability status of the system.

[0046] For the current operating mode participating in the comparison calculation (referred to as the evaluation mode), its two margin indicators are calculated as follows: With power envelope component Subtract the minimum power requirement preset in the system parameter table for the evaluation mode. To obtain a feasible power margin : ; This indicates that the current thermal state meets the minimum power requirements of this evaluation mode, and the power dimension is feasible; This indicates that the current thermal state power capability is insufficient, and thermal pretreatment is needed to increase the battery pack temperature to improve the power envelope component. Taking the 2.4MW high-power output mode as an example, if the preset minimum power requirement of this mode is 1200kW, and the current power envelope component is 750kW, then the power feasible margin is -450kW. This mode enters a power insufficient state, and a targeted thermal pretreatment sequence must be started to switch it.

[0047] With electrical envelope component With modified envelope components The product of these values, minus the minimum power requirement preset in the system parameter table for the evaluation mode. To obtain a feasible power margin : Multiplying the charge envelope component by the corrected envelope component yields the effective charge that the system can actually provide to the evaluation mode at the current temperature. This indicates that the battery is fully charged; This indicates a power shortage that cannot be compensated for by thermal pretreatment, and the system will refuse to switch to this mode.

[0048] After completing the comparison calculations for all operating modes, the power feasibility margin and energy feasibility margin for each operating mode are continuously written into the full-mode pre-evaluation mapping table. The mapping table uses the operating mode identifier as the primary key index and the power feasibility margin and energy feasibility margin as searchable fields. It is stored in memory as a hash table structure. After each envelope refresh, an in-place overwrite update is performed without reallocating memory, ensuring the real-time performance of the refresh operation.

[0049] Step 3: Receive the operating mode switching instruction, query the full-mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met.

[0050] Step 3, upon receiving the operating mode switching instruction, queries the full-mode pre-evaluation mapping table using the target operating mode identifier as an index. It then reads the current power feasibility margin and energy feasibility margin for the target operating mode and sequentially judges and executes the corresponding decisions based on the following three mutually exclusive conditions. The mutual exclusivity of the three branches is guaranteed by judging the energy condition as the first priority and the power condition as the second priority, ensuring that when the energy is insufficient, the third branch is entered directly, and an invalid thermal preprocessing sequence is not initiated for energy shortage problems that cannot be resolved by thermal preprocessing.

[0051] When the power feasible margin and the energy feasible margin of the target operating mode are not less than 0, it is determined that the target operating mode meets the current system capability in both the power and energy dimensions. A switching permission signal and a target operating mode identifier are generated, and the orderly transition switching step is entered to perform power path reconstruction.

[0052] The implementation method of the orderly transition switching step is as follows: The differences in equipment operating status between the current operating mode and the target operating mode are compared node by node to generate a set of nodes to be withdrawn and a set of nodes to be put into operation. In this embodiment, the "electrical distance between a node and the battery pack" is measured by the number of controllable switching devices connected in series between the node and the positive terminal of the battery pack. Nodes with a larger number of these devices have a greater electrical distance and are disconnected first; if the number is the same, they are disconnected in descending order of parasitic impedance. Each node in the set of nodes to be withdrawn is disconnected in an orderly manner according to the order of electrical distance from farthest to closest, waiting for each node to return a disconnection confirmation. The timeout period does not exceed 200ms; if no confirmation is received within the timeout period, the switching is aborted and a node fault alarm is output. After receiving all disconnection confirmations, each path to be put into operation in the set of nodes to be put into operation is pre-charged through a current-limiting circuit. The difference between the voltage at both ends of each path and the DC intermediate bus voltage is continuously monitored. Each path is judged independently: when the voltage difference of a certain path is less than a preset tolerance value (1% of the rated voltage of the DC intermediate bus in this embodiment), the current-limiting constraint on that path is immediately removed and it is fully connected without waiting for other paths to meet the standard. Each path is independently configured with a pre-charge timeout duration (set to 500ms in this embodiment). Paths that fail to converge after the timeout are marked as having a pre-charge timeout fault and a fault alarm is output. The remaining converged paths are connected normally. After all normal path nodes return confirmation of normal operation, a power path reconstruction completion signal is output, triggering step 4 to perform dynamic power allocation.

[0053] When the feasible power margin for the target operating mode is not less than 0 but the feasible power margin is less than 0, the power condition for the target operating mode is deemed met, but the current thermal state of the battery pack is insufficient to support the minimum power requirement of the target mode. This situation is most common before the energy storage emergency repair vehicle starts its 2.4MW high-power output task during the low-temperature season.

[0054] Step 3 performs the following actions: Based on the current operating power of the thermal management device and the pre-calibrated equivalent thermal capacity of the battery pack, combined with the net effective thermal power of the thermal management device at the current ambient temperature, it estimates the estimated remaining time required for the power feasibility margin to turn positive. This time is continuously updated and output to the human-machine interface in the form of a dynamic countdown, eliminating operator uncertainty with quantified waiting time. Simultaneously, a directional thermal preprocessing sequence is initiated, with the preset minimum power requirement of the target operating mode as the calibration target. Detailed implementation of the directional thermal preprocessing sequence is described in detail below. During the execution of the thermal preprocessing sequence, Step 3 is triggered by each map table refresh in Step 2, continuously polling the power feasibility margin of the target operating mode. Once the power feasibility margin turns to not less than 0, the thermal preprocessing sequence is immediately stopped, a switching permission signal and a target operating mode identifier are generated, triggering an orderly transition switching step without requiring further operator commands.

[0055] When the feasible power margin of the target operating mode is less than 0, the system refuses to switch and outputs the specific value of the power shortage (unit: kWh) to the operator, suggesting that the operator prioritize fast charging via the 10kV, 2.4MW rapid charging path. Simultaneously, step 3 uses the feasible power margin of each operating mode in the full-mode pre-assessment mapping table as the sorting key, filtering alternative solutions from largest to smallest: if there is an alternative operating mode with a feasible power margin not less than 0, the alternative mode with the largest feasible power margin is output to the HMI; if the feasible power margin of all operating modes is less than 0, the system outputs a "Full-mode power insufficient" alarm to the HMI, suggesting that the operator immediately stop external power supply and arrange rapid charging, maintaining the current operating mode until the operator actively orders a shutdown.

[0056] The target temperature for thermal pretreatment is not a fixed value preset offline, but is determined in real time by reverse lookup based on the actual power requirements of the target operating mode. The complete execution flow of the directional thermal pretreatment sequence includes the following sub-steps: Sub-step a: Using the preset minimum power requirement of the target operating mode as input, traverse the temperature-power derating mapping table in reverse, comparing the power envelope components corresponding to each temperature node one by one, and find the minimum temperature node that ensures the power envelope component is not lower than the preset minimum power requirement of the target operating mode for the first time. The corresponding temperature is then accurately determined through linear interpolation between adjacent nodes and denoted as the thermal pretreatment target temperature. For example, in the 2.4MW high-power output mode, if the preset minimum power requirement is 1200kW, a reverse search in the derating table might reveal a thermal pretreatment target temperature of 5℃. This means the battery pack must be heated to at least 5℃ for the power envelope component to meet the startup conditions of this mode.

[0057] Sub-step b: Using the difference between the target temperature for thermal pretreatment and the current battery pack temperature as input, and combining the equivalent thermal capacity pre-calibrated according to the battery pack model and the adjustable power limit determined by the rated power of the thermal management device and the current operating state, estimate the estimated time required for the battery pack temperature to change from the current value to the target temperature for thermal pretreatment, denoted as the estimated thermal pretreatment time: ; in For the pre-calibrated equivalent thermal capacity of the battery pack, The target temperature for heat pretreatment. The current battery pack temperature. This represents the net effective thermal power of the thermal management device at the current ambient temperature (obtained from the ambient temperature - net effective thermal power MAP, taking into account both the output power of the thermal management device and the influence of heat exchange between the system and the environment). Limited by... and The ratio, Typically lasting in the tens of minutes, the controller displays a countdown to the operator while simultaneously activating the following state keep-alive mechanism: During the thermal pretreatment period, the controller continuously monitors the voltage amplitude deviation on the 10kV grid side as an independent high-priority task. Frequency deviation and phase jump variables Once any parameter is detected to exceed the preset monitoring threshold ( , , The thermal pretreatment sequence was immediately terminated, the thermal management device was restored to normal operating power, and an alarm "Preheating Interruption - Power Grid Anomaly" was issued to the operator. The system returned to the steady-state operating state before the thermal pretreatment was started, and the achieved battery pack temperature value was retained. As the starting condition for the next preheating; If a sudden load is detected during thermal pretreatment (path current surge exceeds the start-up current threshold) The controller determines in real time whether the current power envelope component meets the following requirements: ; in, This refers to the power envelope component currently output in step 1; This represents the actual operating power of the thermal management device during the current heat pretreatment stage. The measured power of the sudden load access path; If the conditions are met, preheating is maintained and load power is distributed synchronously; if not, the preheating power of the thermal management device is reduced to the minimum value required to maintain the temperature. Prioritize handling sudden loads and recalculate the remaining preheating time using the following formula: ; in, This represents the net effective thermal power of the thermal management device on the battery pack after voltage drop.

[0058] The recalculation results are then synchronously updated on the human-machine interface. The controller sets a hardware watchdog timeout for the thermal pretreatment state machine, with the timeout duration set to [value missing]. If the temperature during the heat pretreatment process does not reach the target temperature within this time frame, the watchdog timer will trigger the controller to update the heat pretreatment task context (including the target operating mode identifier, ...). Cumulative preheating time and current status The entire data is written to the non-volatile storage area, and a "warm-up timeout" alarm is output to the operator. After the operator confirms, they can choose to continue warming up or stop.

[0059] Sub-step c: Based on the direction of the difference between the target temperature of the thermal pretreatment and the current battery pack temperature: if the target temperature is higher than the current temperature, it is determined to be a heating scenario (a typical situation under low-temperature conditions in winter for energy storage emergency repair vehicles), and the heating circuit is activated; if the target temperature is lower than the current temperature, it is determined to be a cooling scenario, and the cooling circuit is activated. The thermal pretreatment is started with the current adjustable power limit of the thermal management device, and the real-time temperature of the 5C blade battery pack is continuously collected and recorded as the temperature during the thermal pretreatment process.

[0060] Sub-step d: Using the temperature during the thermal pretreatment process as an index, continuously query the temperature-power derating mapping table, calculate the current power envelope component, trigger a full-mode pre-evaluation mapping table refresh, and obtain the power feasibility margin after the target operating mode update. This sub-step constitutes the inner driving loop in the thermal pretreatment process, and the loop frequency is consistent with the envelope refresh frequency of step 1.

[0061] Sub-step e: Step 3 continuously monitors the sign change of the power feasible margin after the target operating mode update. Once the power feasible margin turns to not less than 0, immediately stop the thermal preprocessing at the current adjustable power upper limit, restore the thermal management device to the normal operating power required to maintain the target temperature range (i.e., the minimum maintenance operating power determined by the thermal management subsystem based on the ambient temperature - minimum maintenance power MAP), generate a switching permission signal and target operating mode identifier, trigger the orderly transition switching steps, and perform power path reconstruction without requiring the operator to issue another command.

[0062] Step 4: Perform dynamic allocation of thermal management collaborative priority power based on the switching permission signal.

[0063] Step 4 enters steady-state power allocation mode after receiving the power path reconstruction completion signal. The core design of Step 4 is to treat the thermal management device and each external output path as common consumers of total power, and uniformly include them in a priority queue with the power envelope component as the upper limit constraint, and determine the guarantee order of each party when the power tends to saturate based on the priority.

[0064] In this embodiment, the priority queue, from highest to lowest, is as follows: high-voltage conversion output path (2.4MW high-power output, highest priority), DC fast charging output path (second highest priority), low-voltage AC output path (medium priority), and thermal management device (lowest priority). The physical basis for designing the thermal management device as the lowest priority is that a short-term, moderate voltage drop in thermal management power will not cause the 5C blade battery pack temperature to immediately exceed the limit, because the battery pack has an equivalent thermal capacity as a thermal inertia buffer. However, if the external power supply path is prioritized for voltage drop at this time, it will directly affect the power supply quality of the load.

[0065] Power allocation under sufficient power conditions: The controller adds the power demand of each active external output path to the current operating power demand of the thermal management device in real time to obtain the current total demand. When the total demand does not exceed the preset saturation trigger ratio of the power envelope component (set to 95% in this embodiment, which can be configured through the system parameter table, with a reasonable range of 90% to 100%), it is determined to be a sufficient power state, and power is allocated to each path according to the preset initial allocation ratio of each path in the system parameter table. The purpose of setting the saturation trigger ratio below 100% is to initiate the voltage drop response in advance when the total demand approaches the upper limit, ensuring that the system does not exceed the upper limit of the power envelope component before the power voltage drop of the thermal management device is completed, which is especially necessary in high power density scenarios of 2.4MW.

[0066] Power allocation under saturation conditions: When the total demand exceeds the power envelope component multiplied by the saturation trigger ratio, it is determined that the total power is approaching saturation, and the controller executes power voltage drop in the following order: The first step is to reduce the power allocated by the thermal management device to the minimum operating power required to maintain the current temperature range of the 5C blade battery pack. This minimum operating power is obtained in real time by the thermal management subsystem based on the ambient temperature - minimum sustaining power MAP, ensuring that the battery pack temperature does not exceed the lower limit of the target range.

[0067] The second step is to reduce the power distribution of each path in the order of low-voltage AC output path, DC fast charging output path, and high-voltage conversion output path if the total demand still exceeds the upper limit after the voltage reduction thermal management device is installed. The actual power distribution of each path shall not be lower than the corresponding minimum maintenance power value preset in the system parameter table, so as to ensure that each path can still maintain basic power supply function after the voltage reduction.

[0068] Third step: If the power distributed through the high-voltage converter output path has been reduced to the minimum sustaining power value preset in the system parameter table. (That is, the minimum power limit that the high-voltage converter output path can still maintain basic function after voltage drop, written into the system parameter table according to the minimum modulation ratio of the high-voltage converter unit) After that, the sum of the allocated power of all active paths and thermal management devices still exceeds the power envelope component, that is: ; in This is a collection of all currently active paths and thermal management devices. For the first The current power allocation for each unit This is the power envelope component output in real time from step 1 (i.e., the maximum total power that the system can continuously supply to all paths under the current thermal state). Step 4: Send a power saturation alarm signal to the human-machine interface and the upper-level scheduling system. Simultaneously, write the "mode reassessment request" flag to the controller's internal shared memory area and start a safety timer with the timing window set to the saturation tolerance duration. (Default value 200ms, configurable range 100ms to 500ms). The upper limit is subject to the overcurrent protection action time of the DC intermediate bus. Constraints, i.e. ;in The response time of the DC intermediate bus overcurrent protection device from detecting overcurrent to completing the circuit breaker tripping action is recorded in the system parameter table after being measured and calibrated by the system integration test.

[0069] Step 3 involves periodically checking this flag bit as a high-priority task. If the current operating mode has a power feasibility margin... (That is, the power feasibility margin field value calculated and continuously written to the full-mode pre-evaluation mapping table in step 2, and read using the current operating mode identifier as the index) has turned into a negative value. Step 3 immediately uses the full-mode pre-evaluation mapping table as the data source to filter those that meet the power feasibility margin constraint. And the alternative operating mode with the largest feasible power margin: ; in For the first The power feasible margin for each operating mode (defined in step 2, i.e., the power envelope component minus the preset minimum power requirement for that mode). For the first The power feasible margin for each operating mode (defined in step 2, i.e., the power envelope component multiplied by the corrected envelope component minus the preset minimum power requirement for that mode); the selection is based on maximizing the power feasible margin as the optimization objective, and on ensuring that the power feasible margin is not less than 0 as the feasibility constraint, so as to ensure that the selected alternative mode has the maximum switching margin in the power dimension.

[0070] Identify alternative solutions Corresponding power feasibility margin (Right now The power feasibility margin field value in the mapping table (reflecting the system power margin after switching) and the current saturation duration are synchronously output to the alarm area of ​​the human-machine interface; at the same time, the controller enters the dual-track parallel execution mode: Operator active confirmation track: If the operator confirms the switching command via the human-machine interface before the safety timer expires, the safety timer is immediately cleared, triggering an orderly transition switching procedure, and switching to... ; Automatic forced track switching: If the safety timer reaches its set time... If the operator does not respond, the controller automatically performs a forced switch. The system triggers an orderly transition switching procedure for the target; when a forced switch is triggered, the controller pushes a high-level alarm "Automatic Forced Switch - Saturation Timeout" to the human-machine interface, and records the forced switch event (trigger time, original operating mode, ... , The duration of saturation is fully written to an overwriteable event log area for later traceability. The dual-track parallel mechanism ensures that even in extreme operating conditions where operators cannot respond in a timely manner, the system can still function. The system autonomously completes closed-loop protection actions within the time window, ensuring that the continuous overload time of the DC intermediate bus is strictly less than [a specified value]. This eliminates the risk of busbar breakdown caused by delays in manual response.

[0071] like (Power saturation is caused by a brief peak). Clear the flag and safety timer, and continue operating in the current mode.

[0072] Closed-loop feedback of thermal management voltage drop and capacity envelope: After each voltage drop in the power allocation of the thermal management device, step 4 immediately sends an update trigger signal to step 1, carrying the current allocated power value of the thermal management device after the voltage drop. Step 1 recalculates the cumulative power consumption of the thermal management device based on this value, updates the power envelope component, refreshes the thermal-electric coupling capacity envelope, and triggers step 2 to refresh the full-mode pre-evaluation mapping table, forming a complete closed loop. Under the high-rate operation of the 5C blade battery, the power of the thermal management device changes significantly. The power margin released after the voltage drop in the allocated power of the thermal management device is reflected in the full-mode pre-evaluation mapping table in a timely manner through closed-loop refresh, enabling step 3 to perceive the dynamic increase in the feasible power margin of some modes, effectively improving the power margin utilization rate of the system.

[0073] In this embodiment, the system is configured with a low-voltage uninterruptible power supply (UPS) mode. During the operation of the energy storage repair vehicle, the low-voltage UPS mode is responsible for supplying power to the on-site repair equipment, communication equipment, and emergency lighting. It is one of the power supply modes with the highest reliability requirements among the integrated functions of the vehicle.

[0074] When executing the low-voltage uninterruptible power supply mode, the system continuously monitors the voltage amplitude deviation (preset abnormal threshold ±15%), frequency deviation (preset abnormal threshold ±2Hz), and phase jump (preset abnormal threshold ±30°) of the external mains power through a dedicated detection circuit at a sampling frequency of not less than 10kHz.

[0075] When any of the above parameters exceeds the corresponding preset abnormal threshold, the system directly drives the underlying driver via a hardware interrupt, bypassing the RTOS task scheduling layer, and sequentially executes a three-step linkage switching action: First, disconnect the solid-state circuit breaker on the mains side to cut off the power supply path from the mains to the load, with a response time of no more than 5ms; Second, close the energy storage side switch to connect the output path of the energy storage system to the load side, with a response time of no more than 3ms; Third, activate the bidirectional DC-AC converter to enter independent inverter mode, using the battery pack DC voltage as input to output stable AC power to the load, with an inverter activation setup time of no more than 5ms. During UPS mode operation, the bidirectional DC-AC converter always maintains a "hot standby" state with DC side pre-charging, ensuring that the inverter output can quickly establish a stable waveform after receiving the activation command. The total time for the three actions to be executed sequentially does not exceed 13.1ms, meeting the preset switching time upper limit requirement and providing sufficient timing margin.

[0076] During operation in low-voltage uninterruptible power supply mode, the on-site repair load power dynamically changes with the actual working conditions. If the feasible power margin is still estimated using the static reference power component, it will lead to an overestimation of the consumption rate under light load and an underestimation of the consumption rate under heavy load. Therefore, the system uses a three-phase power metering module (sampling frequency not less than 10kHz, update cycle not exceeding 100ms) installed at the low-voltage AC output path outlet to collect the current load power in real time. This real-time load power is used to replace the reference power component in the preset minimum power demand, dynamically correcting the feasible power margin for low-voltage uninterruptible power supply mode. ; in, This is the result of dynamic correction for the feasible margin of power capacity. This refers to the electrical envelope component; To correct the envelope components; The current load power is collected in real time by the three-phase power metering module; This is a preset reference runtime. This dynamic correction ensures that the power availability margin for low-voltage uninterruptible power supply mode in the mapping table always reflects the remaining continuous power supply capacity under the current actual load consumption rate.

[0077] This invention addresses the direct-mounted high-voltage topology characteristics of a 2.4MW mobile megawatt-level energy storage emergency repair vehicle platform, constructing a three-dimensional thermal-electric coupling capability envelope composed of a power envelope component, a charge envelope component, and a corrected envelope component. Under high-rate charge-discharge conditions of the 5C blade battery, the real-time operating power of the thermal management device accounts for a significant proportion of the system's rated power, and the transformation losses caused by the charging / discharging harness impedance are also substantial. This invention incorporates both of these internal losses into the dynamic deduction calculation of the charge envelope, effectively solving the problem of overly optimistic capability assessment in megawatt-level high-power-density scenarios in existing technologies. A directional thermal preprocessing sequence, with the minimum power requirement preset for the target operating mode as the calibration target, accurately determines the target thermal preprocessing temperature by reverse querying the temperature-power derating mapping relationship. This enables the 5C blade battery to autonomously preheat from insufficient thermal state to meeting the 2.4MW high-power output conditions in low-temperature scenarios, and automatically triggers switching after the conditions are met. This eliminates the intermediate steps of waiting for judgment and issuing secondary commands after preheating, improving the automation level and operational convenience of the multi-mode switching process. A dynamic power allocation mechanism prioritizing thermal management was established, incorporating the thermal management device into the lowest-priority power consumption unit and coordinating its scheduling with the high-voltage conversion output path, DC fast charging output path, and low-voltage AC output path under the direct-connected high-voltage topology framework. In the ultra-fast energy replenishment scenario of 10kV and 2.4MW achieving rapid full charging, the power voltage drop of the thermal management device and the closed-loop refresh of the power envelope are strongly coupled and linked, enabling the system to maintain accurate perception of available capacity throughout the entire energy replenishment cycle.

[0078] This invention provides a megawatt-level mobile energy storage multi-mode charging and discharging control system, such as... Figure 2 As shown, it includes: The coupling capability envelope calculation module 1 is used to calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge and real-time operating power of the thermal management device. The comparison calculation module 2 is used to perform comparison calculations on all the operating modes configured by the system in a loop according to the thermal-electric coupling capability envelope at the current moment, and obtain a full-mode pre-evaluation mapping table; The switching decision module 3 is used to receive the operating mode switching instruction, query the full mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met. The power dynamic allocation module 4 is used to perform thermal management collaborative priority power dynamic allocation based on the switching permission signal.

[0079] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, this invention also intends to include these modifications and variations.

Claims

1. A multi-mode charging and discharging control method for megawatt-level mobile energy storage, applied to mobile energy storage systems with multiple operating modes, each operating mode corresponding to different power path combinations, characterized in that... include: Step 1: Calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device; Step 2: Based on the current thermal-electric coupling capability envelope, perform comparative calculations on all configured operating modes of the system in a loop to obtain a full-mode pre-evaluation mapping table; Step 3: Receive the operating mode switching instruction, query the full-mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met. Step 4: Perform dynamic allocation of thermal management collaborative priority power based on the switching permission signal; In step 3: Receive the operating mode switching command, query the full-mode pre-evaluation mapping table using the target operating mode identifier as an index, read the power feasibility margin and energy feasibility margin of the target operating mode, and execute differentiated switching decisions and targeted thermal preprocessing according to the following three mutually exclusive conditions: When the power feasible margin is not less than 0 and the energy feasible margin is not less than 0, a switching permission signal and a target operating mode identifier are generated, and power path reconstruction is performed. When the feasible power margin is not less than 0 but the feasible power margin is less than 0, the estimated remaining time required for the feasible power margin to turn to not less than 0 is estimated based on the current operating power of the thermal management device and the thermal capacity of the battery pack. The estimated remaining time is continuously output to the human-machine interface. At the same time, a directional thermal preprocessing sequence with the preset minimum power requirement of the target operating mode as the calibration target is started. During the thermal preprocessing process, the feasible power margin of the target operating mode in the full-mode pre-evaluation mapping table is continuously polled. Once the feasible power margin turns to not less than 0, a switching permission signal and a target operating mode identifier are immediately generated, and power path reconstruction is performed without the need for the operator to issue another command. When the available power margin is less than 0, the switch is refused, the power shortage is output to the operator, and the alternative operating mode identifier with the largest available power margin is selected from the full-mode pre-evaluation mapping table based on the available power margin from largest to smallest and output to the human-machine interface.

2. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 1, characterized in that, Step 1: Based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device, calculate the thermal-electric coupling capability envelope at the current moment, including: Based on the pre-calibrated temperature-power derating mapping relationship, the upper limit of the hot output power is calculated from the current battery pack temperature and denoted as the power envelope component. Based on the nominal total capacity of the battery pack, the actual usable capacity is obtained by deducting the guaranteed reserve capacity, the power conversion loss of the entire link, and the cumulative power consumption of the real-time operating power of the thermal management device within the preset reference operating time. This is recorded as the capacity envelope component. The real-time operating power of the thermal management device is included in the deduction calculation as an internal load of the system. Based on the current average temperature of the battery pack, a pre-calibrated temperature-capacity correspondence table is consulted to obtain the temperature-capacity correction coefficient, which is denoted as the correction envelope component. The correction envelope component is updated synchronously with each update of the energy envelope component. The power envelope component, the charge envelope component, and the correction envelope component together constitute the thermal-electric coupling capability envelope at the current moment.

3. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 1, characterized in that, Step 2: Based on the current thermal-electric coupling capability envelope, perform cyclical comparison calculations on all configured operating modes of the system to obtain a full-mode pre-evaluation mapping table, including: The operating mode that performs the comparison calculation is used as the evaluation mode. The power feasible margin of the evaluation mode is obtained by subtracting the preset minimum power requirement of the evaluation mode from the power envelope component. The power feasibility margin of the evaluation mode is obtained by multiplying the power envelope component by the corrected envelope component and then subtracting the preset minimum power requirement of the evaluation mode. The power feasibility margin and energy feasibility margin of each operating mode are continuously written into the full-mode pre-evaluation mapping table. The full-mode pre-evaluation mapping table is indexed by the operating mode identifier and uses the power feasibility margin and energy feasibility margin as fields. It is refreshed synchronously each time the thermal-electric coupling capability envelope is updated.

4. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 1, characterized in that, Step 4: Dynamically allocate thermal management collaborative priority power based on the switching permission signal, including: Under the constraint of not exceeding the power envelope component, the thermal management device is regarded as the lowest priority power consumption unit and participates in the priority queue power allocation together with each active external output path. When the power demand of the high priority external output path increases and the total power tends to saturate, the allocated power of the thermal management device is reduced to the minimum value required to maintain the current temperature range, and then the allocated power of each external output path is reduced in order of priority from low to high. Each time the thermal management device allocates power, it sends an update trigger signal to step 1, carrying the current allocated power value of the thermal management device. Step 1 then recalculates the electrical envelope component based on the current allocated power value and updates the thermal-electric coupling capability envelope. The updated thermal-electric coupling capability envelope in step 1 triggers step 2 to refresh the full-mode pre-evaluation mapping table, forming a closed loop of thermal management power scheduling and capability envelope update.

5. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 1, characterized in that, After sending the handover permission signal in step 3, an orderly transition handover step is also included before power path reconstruction is performed: Compare the differences in the working status of the equipment in the current operating mode with the target operating mode for each node to obtain the set of nodes that need to be withdrawn and the set of nodes that need to be put into operation. Disconnect each node in the set of nodes that need to be removed in an orderly manner according to the order of electrical distance between each node and the battery pack from farthest to closest, and wait for each node to return a disconnection confirmation; After receiving confirmation of complete disconnection, each path to be connected in the set of nodes to be connected is pre-charged through a current limiting loop. The difference between the voltage at both ends of each path and the DC intermediate bus voltage is continuously monitored. Once the difference between the voltage at both ends of each path and the DC intermediate bus voltage is less than the preset tolerance value, the current limiting constraint is removed and the path is fully connected. After each node returns to normal operation confirmation, a power path reconstruction completion signal is output, and dynamic power allocation is performed.

6. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 1, characterized in that, Initiate a directional thermal preprocessing sequence with the target operating mode's preset minimum power requirement as the calibration target, including the following steps: Using the preset minimum power requirement of the target operating mode as input, query the pre-calibrated temperature-power derating mapping relationship, and reversely determine the minimum battery pack temperature corresponding to the power envelope component reaching the preset minimum power requirement of the target operating mode, which is denoted as the thermal pretreatment target temperature. Using the difference between the target temperature of thermal pretreatment and the current battery pack temperature as input, and combining the equivalent thermal capacity pre-calibrated according to the battery pack model and the adjustable power limit determined by the rated power of the thermal management device and the current operating state, the estimated time required for the battery pack temperature to change from the current value to the target temperature of thermal pretreatment is estimated and recorded as the estimated time of thermal pretreatment. The estimated time of thermal pretreatment is continuously output to the human-machine interface. The direction of heating or cooling adjustment is determined based on the difference between the target temperature of thermal pretreatment and the current battery pack temperature. Thermal pretreatment is started with the upper limit of the adjustable power of the thermal management device, and the real-time temperature of the battery pack is continuously collected and recorded as the temperature during the thermal pretreatment process. Using the temperature of the heat pretreatment process as input, continuously query the temperature-power derating mapping relationship, calculate the current power envelope component, trigger the full-mode pre-evaluation mapping table refresh, and obtain the power feasible margin after the target operating mode is updated. Using the updated power feasibility margin as the judgment input, when the power feasibility margin turns to not less than 0, the thermal preprocessing performed at the adjustable power upper limit is stopped, the thermal management device is restored to the normal operating power required to maintain the target temperature range, and a switching permission signal and target operating mode identifier are generated.

7. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 4, characterized in that, In step 4, the priority queues from high to low are: high voltage conversion output path, DC fast charging output path, and low voltage AC output path. When the total power is sufficient, power is allocated to each path according to the preset initial allocation ratio of each path in the system parameter table; When the total power approaches saturation, after the power distribution voltage of the thermal management device is reduced to the minimum value required to maintain the current temperature range, the power distribution voltage of each path is reduced in the order of low-voltage AC output path, DC fast charging output path, and high-voltage conversion output path. The actual power distribution voltage of each path is not lower than the corresponding minimum maintenance power value preset in the system parameter table. If the system power still approaches saturation after the power distribution voltage of the high-voltage conversion output path is reduced to the minimum maintenance power value, a power saturation alarm signal is sent, and step 3 is triggered to re-evaluate the feasibility of the current operating mode according to the full-mode pre-evaluation mapping table.

8. The megawatt-level mobile energy storage multi-mode charging and discharging control method as described in claim 4, characterized in that, The system is configured with operating modes including low-voltage uninterruptible power supply mode; When executing the low-voltage uninterruptible power supply mode, continuously monitor the voltage amplitude deviation, frequency deviation, and phase jump of the external mains power. When any parameter of voltage amplitude deviation, frequency deviation or phase jump variable is detected to exceed the corresponding preset abnormal threshold, a three-step linkage switching action is executed in sequence: disconnecting the mains side switch, closing the energy storage side switch, and activating the bidirectional DC-AC converter to enter the independent inverter mode; the total time from detecting any parameter exceeding the corresponding preset abnormal threshold to the load side restoring stable power supply does not exceed the preset switching time limit. During operation in low-voltage uninterruptible power supply mode, the power feasibility margin calculation for low-voltage uninterruptible power supply mode replaces the reference power component in the preset minimum power requirement with the current real-time load power, thereby realizing dynamic correction of the power feasibility margin.

9. A megawatt-level mobile energy storage multi-mode charging and discharging control system, characterized in that, include: The coupling capability envelope calculation module is used to calculate the thermal-electric coupling capability envelope at the current moment based on the collected battery pack temperature, state of charge, and real-time operating power of the thermal management device. The comparison calculation module is used to perform comparison calculations on all the operating modes configured by the system in a loop based on the current thermal-electric coupling capability envelope, and obtain a full-mode pre-evaluation mapping table; The switching decision module is used to receive the operating mode switching instruction, query the full mode pre-evaluation mapping table with the target operating mode identifier as the index, read the power feasibility margin and energy feasibility margin of the target operating mode, perform differentiated switching decisions and directional thermal preprocessing, and generate a switching permission signal when the switching conditions are met. The power dynamic allocation module is used to dynamically allocate thermal management collaborative priority power based on the switching permission signal; When the switching decision module is executed, it makes decisions based on the following three mutually exclusive conditions: When the power feasible margin is not less than 0 and the energy feasible margin is not less than 0, a switching permission signal and a target operating mode identifier are generated, and power path reconstruction is performed. When the feasible power margin is not less than 0 but the feasible power margin is less than 0, based on the current operating power of the thermal management device and the thermal capacity of the battery pack, the estimated remaining time required for the feasible power margin to turn into not less than 0 is estimated, and the estimated remaining time is continuously output to the human-machine interface. At the same time, a directional thermal preprocessing sequence with the preset minimum power requirement of the target operating mode as the calibration target is started. During the thermal pretreatment process, the power feasible margin of the target operating mode in the full-mode pre-evaluation mapping table is continuously polled. Once the power feasible margin turns to not less than 0, a switching permission signal and target operating mode identifier are immediately generated, and power path reconstruction is performed without the need for the operator to issue another command. When the available power margin is less than 0, the switch is refused, the power shortage is output to the operator, and the alternative operating mode identifier with the largest available power margin is selected from the full-mode pre-evaluation mapping table based on the available power margin from largest to smallest and output to the human-machine interface.

Citation Information

Patent Citations

  • Mobile energy storage vehicle system for increasing charging and power supply radius in complex environment and control method

    CN115085320A

  • Mobile energy storage vehicle energy management method based on intelligent algorithm

    CN120262410A