A bus power supply and electronic wiring machine room resource dynamic scheduling system
Patent Information
- Application Number
- CN202611194372.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-07
- Publication Date
- 2026-11-03
AI Technical Summary
[0004]针对现有技术存在的问题,本发明提供了一种总线供电与电子配线的机房资源动态调度系统,具备部署灵活、运维自动化、资源一体化调度、链路精细化可视的优点,解决了现有技术中传统机房人工布线工作量大、网络操作易引发业务故障、电网两套系统独立管控、机房物理拓扑难以实时掌握的问题
简化部署,提升灵活性:轨道式动态供电系统使得设备电源连接实现了“即插即用”,运维人员无需处理繁琐的独立电源线,只需将设备挂接到轨道上的任意空闲智能接入模块即可,设备位置调整变得极其便捷,解决了现有技术中布线繁琐、灵活性差的问题。
Smart Images

Figure CN123030457A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of data center infrastructure operation and maintenance technology, and in particular relates to a dynamic scheduling system for data center resources with bus power supply and electronic wiring. Background Technology
[0002] Modern data center server rooms house a large number of servers, network, and storage devices. The deployment, power-on, and network configuration of these devices are core aspects of operations and maintenance, currently managed using traditional rack power distribution units (PDUs) and manual network patch cords. In data center infrastructure, power supply and network connectivity are two independent subsystems highly reliant on manual operation. For power, fixed-installation PDUs are typically used, with each device connected to a specific socket on the PDU via an independent power cord. For networking, patch panels and numerous patch cords are used, with operations personnel manually plugging and unplugging to change connections.
[0003] To improve management efficiency, the industry has introduced intelligent PDUs (power distribution units) that can remotely control the on / off state of individual power outlets and basic data center infrastructure management (DCIM) software. However, intelligent PDUs only solve the problem of remote power control and do not simplify the complexity of physical cabling; network patch cord management still relies entirely on manual labor. Existing technologies have many shortcomings: Physical cabling is cumbersome and lacks flexibility: every time equipment is installed or its location is adjusted, manual laying, plugging and unplugging, and bundling of power cables and network patch cords are required. The process is cumbersome, time-consuming and labor-intensive, and it can easily lead to cable accumulation and mess, affecting heat dissipation and maintenance. Changes are inefficient and prone to errors: Changes to network connections require maintenance personnel to enter the data center and manually search for and plug and unplug patch cords in dense patch panels. This operation is extremely inefficient and prone to human error, leading to service interruptions. Inflexible resource scheduling and lack of coordination: The power system and network system are isolated, making it impossible to achieve "plug and play" equipment and unified dynamic scheduling of resources. For example, it is impossible to coordinate the power supply and network switching operations of equipment through a single command, resulting in low automation. Insufficient status visibility: Traditional PDUs and patch panels cannot provide detailed physical connection topology, making it difficult for administrators to quickly and accurately grasp real-time information such as "which device is plugged into which power port" and "network connection relationships between devices". Summary of the Invention
[0004] To address the problems existing in the prior art, this invention provides a dynamic scheduling system for data center resources using bus power supply and electronic wiring. It has the advantages of flexible deployment, automated operation and maintenance, integrated resource scheduling, and fine-grained visibility of links. It solves the problems of large workload for manual cabling in traditional data centers, easy business failures caused by network operations, independent management of two power grid systems, and difficulty in real-time monitoring of the data center's physical topology.
[0005] This invention is implemented as follows: a dynamic scheduling system for data center resources using bus power supply and electronic cabling, comprising a central control layer, a rack execution layer, and an equipment layer. The central control layer deploys a DCIM unified scheduling platform for pre-allocating data center equipment resources, issuing power supply and network collaborative scheduling commands, collecting full rack operation data, and generating a visualized physical topology. The rack execution layer includes a rack intelligent manager, a track bus power supply system, and a network subsystem. The track bus power supply system includes a vertical conductive track and several slidable intelligent access modules. The network subsystem includes at least one electronic cabling panel, with each network cable port of the electronic cabling panel integrating a semiconductor electronic switch array at the rear end. The switch array is driven by a port controller, and the electronic cabling panel communicates with the rack intelligent manager via Ethernet. The equipment layer comprises data center IT equipment, with power cords plugged into intelligent access module output sockets and network cables plugged into physical ports of the electronic cabling panel. The IT equipment includes servers, storage, and network devices.
[0006] As a preferred embodiment of the present invention, the cabinet intelligent manager is a cabinet-level embedded unit that has bidirectional communication connections to the DCIM unified scheduling platform, the track bus power supply system, and the network subsystem. It is used to forward collaborative scheduling instructions, locally cache the cabinet operating status, and report to the upper layer.
[0007] With this setting, the rack intelligent manager takes on the local agent function for all intelligent hardware in the rack, uniformly summarizes power supply and wiring status data and relays uplink and downlink commands, so as to realize data communication between the hardware in the rack and the upper-level management platform.
[0008] As a preferred embodiment of the present invention, the DCIM unified scheduling platform executes a one-click collaborative deployment process: pre-allocates idle intelligent access modules and electronic wiring ports in the cabinet, sends instructions to the cabinet intelligent manager, and simultaneously completes remote power-on of the intelligent access modules and automatic connection of the electronic wiring panel port links, thereby realizing integrated dynamic scheduling of power and network resources.
[0009] With this setting, a single command can be issued on the DCIM unified scheduling platform to simultaneously enable power supply to the equipment and configure the business network links, breaking down the barriers between the traditional separate operation of the power and network systems and improving the automation level of data center equipment going online.
[0010] In a preferred embodiment of the present invention, the conductive track is fixedly installed on the cabinet column, the conductive track is encapsulated with an insulated high-voltage conductor, the conductive track is vertically installed on the left and right columns of the cabinet, and a sliding buckle slot is provided on the outside of the track. The intelligent access module can slide and lock into the power supply port at any height along the track, so that no power cable needs to be re-laid when the equipment is moved or added to the rack.
[0011] With this setup, the smart access module can be freely adjusted to follow the installation height of IT equipment, eliminating the need for separate wiring and bundling of independent power cables and removing the problem of messy cable accumulation in the cabinet.
[0012] As a preferred embodiment of the present invention, the intelligent access module is provided with a sliding conductive connector on the back to draw power along the conductive track, and has a built-in MCU, power consumption acquisition sensor, remote on / off relay, and cabinet bus communication unit. All intelligent access modules are connected to the cabinet intelligent manager through a shared communication bus.
[0013] With this setup, each smart access module can be independently controlled and can independently collect voltage, current and power consumption data, which are then uniformly transmitted back to the rack smart manager via a shared bus, enabling each power supply port in the rack to be independently controllable and monitorable.
[0014] As a preferred embodiment of the present invention, the DCIM unified scheduling platform collects the voltage, current, power consumption, and on / off status of each intelligent access module in real time, and simultaneously collects the connection relationships of all ports on the electronic wiring panel. It automatically generates a cabinet physical connection topology diagram accurate to a single power socket and a single network port, and automatically triggers maintenance alarms when the power consumption threshold is exceeded or when the port link is offline.
[0015] This setup allows administrators to intuitively grasp the complete physical connections of the data center, provide real-time alerts for anomalies such as equipment overload and network cable disconnection, quickly locate faults, and provide complete data support for future data center expansion and energy efficiency optimization.
[0016] As a preferred embodiment of the present invention, the shared communication bus adopts an RS-485 bus or a CAN bus.
[0017] With this setup, both industrial buses are characterized by stability, reliability, simple wiring, and multi-node parallel communication, making them suitable for the networking and communication needs of multiple intelligent access modules within a cabinet.
[0018] Compared with the prior art, the beneficial effects of the present invention are as follows: Simplified deployment and enhanced flexibility: The track-mounted dynamic power supply system enables "plug-and-play" power connection for equipment. Maintenance personnel do not need to deal with cumbersome independent power cables. They can simply connect the equipment to any available smart access module on the track. Adjusting the equipment position becomes extremely convenient, solving the problems of cumbersome wiring and poor flexibility in existing technologies.
[0019] Achieving network automation and eliminating human error: Through the electronic cabling system, changes to network connections are transformed from physical operations that require manual plugging and unplugging in the server room to logical operations that can be completed with a click on the software interface. This not only reduces operation time from minutes / hours to seconds, but also completely avoids misoperations that may be caused by manual plugging and unplugging, significantly improving operation and maintenance efficiency and reliability.
[0020] Achieving integrated resource scheduling and improving the level of operation and maintenance automation: The unified resource scheduling and management platform has abstracted and integrated the originally isolated power and network resources at the management level. Through the process orchestration of the DCIM unified scheduling platform, it has realized the collaborative automation of equipment power-on and network networking, solved the problem of rigid resource scheduling, and taken a key step towards the vision of "data center as code".
[0021] Provides refined visibility for intelligent management: Since all intelligent access modules and electronic wiring panels are addressable and communicable intelligent units, the DCIM unified scheduling platform can generate physical connection maps and status views in real time, accurate to each power socket and network port, and provide unprecedented data support for capacity planning, energy efficiency analysis and fault location. Attached Figure Description
[0022] Figure 1 This is a schematic diagram of the system process framework provided in an embodiment of the present invention. Detailed Implementation
[0023] To further understand the invention's content, features, and effects, the following embodiments are provided, and detailed descriptions are given in conjunction with the accompanying drawings.
[0024] The structure of the present invention will now be described in detail with reference to the accompanying drawings.
[0025] refer to Figure 1As shown in the figure, an embodiment of the present invention provides a dynamic scheduling system for data center resources using bus power supply and electronic cabling, comprising a central control layer, a rack execution layer, and an equipment layer. The central control layer deploys a DCIM unified scheduling platform for pre-allocating data center equipment resources, issuing power supply and network collaborative scheduling commands, collecting full rack operation data, and generating a visualized physical topology. The rack execution layer includes a rack intelligent manager, a track bus power supply system, and a network subsystem. The track bus power supply system includes a vertical conductive track and several slidable intelligent access modules. The network subsystem includes at least one electronic cabling panel, with each network cable port of the electronic cabling panel integrating a semiconductor electronic switch array at the rear end. The switch array is driven by a port controller, and the electronic cabling panel communicates with the rack intelligent manager via Ethernet. The equipment layer consists of data center IT equipment, with power cords plugged into intelligent access module output sockets and network cables plugged into physical ports of the electronic cabling panel. The IT equipment includes servers, storage, and network devices.
[0026] Specifically, the cabinet intelligent manager is a cabinet-level embedded unit with bidirectional communication connections to the DCIM unified scheduling platform, the track bus power supply system, and the network subsystem. It is used to forward collaborative scheduling instructions, locally cache the cabinet operating status, and report to the upper layer.
[0027] Using the above solution, the cabinet intelligent manager assumes the local agent function for all intelligent hardware in the cabinet, uniformly summarizes power supply and wiring status data, and relays uplink and downlink commands to achieve data communication between the hardware in the cabinet and the upper-level management platform.
[0028] Specifically, the DCIM unified scheduling platform executes a one-click collaborative deployment process: pre-allocates idle intelligent access modules and electronic wiring ports in the cabinet, sends instructions to the cabinet intelligent manager, and simultaneously completes remote power-on of the intelligent access modules and automatic connection of the electronic wiring panel port links, thereby realizing integrated dynamic scheduling of power and network resources.
[0029] By adopting the above solution, the power supply to the equipment and the configuration of the business network link can be completed simultaneously by issuing a single instruction on the DCIM unified scheduling platform. This breaks down the barriers between the traditional separate operation of the power and network systems and improves the automation level of the data center equipment.
[0030] Specifically, the conductive rail is fixedly installed on the cabinet column, and the conductive rail is encapsulated with an insulated high-voltage conductor. The conductive rail is vertically installed on the left and right columns of the cabinet, and a sliding buckle slot is provided on the outside of the rail. The intelligent access module can slide and lock into the power supply port at any height along the rail, so that no new power cables need to be laid when the equipment is moved or added to the rack.
[0031] Using the above solution, the intelligent access module can be freely adjusted to follow the installation height of IT equipment, eliminating the need for separate wiring and binding of independent power cables and removing the problem of messy cable accumulation in the cabinet.
[0032] Specifically, the intelligent access module is equipped with a sliding conductive connector on the back to draw power along the conductive track, and has a built-in MCU, power consumption acquisition sensor, remote on / off relay, and cabinet bus communication unit. All intelligent access modules are connected to the cabinet intelligent manager through a shared communication bus.
[0033] Using the above solution, each intelligent access module can be independently controlled and independently collect voltage, current and power consumption data, which are then uniformly transmitted back to the rack intelligent manager via a shared bus, enabling each power supply port in the rack to be independently controllable and monitorable.
[0034] Specifically, the DCIM unified scheduling platform collects the voltage, current, power consumption, and on / off status of each intelligent access module in real time, and simultaneously collects the connection relationships of all ports on the electronic wiring panel. It automatically generates a cabinet physical connection topology map accurate to a single power socket and a single network port, and automatically triggers operation and maintenance alarms when the power consumption threshold is exceeded or the port link goes offline.
[0035] By adopting the above solution, managers can intuitively grasp the complete physical connection relationship of the data center, and receive real-time warnings for anomalies such as equipment overload and network cable offline, enabling rapid fault location. At the same time, it provides complete data support for the future expansion and energy efficiency optimization of the data center.
[0036] Specifically, the shared communication bus adopts an RS-485 bus or a CAN bus.
[0037] Using the above solutions, both industrial buses are characterized by stability and reliability, simple wiring, and multi-node parallel communication, making them suitable for the networking and communication needs of multiple intelligent access modules in a cabinet.
[0038] Working principle of the invention: During use, equipment registration and planning: Maintenance personnel plan resources for new equipment on the DCIM unified scheduling platform. The DCIM unified scheduling platform automatically or manually assigns an available smart access module port and an electronic wiring panel port. Physical connection: Maintenance personnel move the equipment to the designated rack location, connect its power cord to the designated smart access module, and connect its network cable to the designated electronic patch panel port. This process requires no additional wiring. One-click power-on and networking: After the maintenance personnel confirm on the interface of the DCIM unified dispatch platform, the platform sends a "power-on" command to the designated intelligent access module through the cabinet intelligent manager, and at the same time sends a command to the electronic wiring panel to connect the port connected to the device to the aggregation port of the target network (such as service VLAN or management VLAN). Status monitoring and recycling: The DCIM unified scheduling platform displays the power consumption of each smart access module and the connection status of each electronic wiring panel port in real time. When the equipment is offline, the platform can perform a "resource recycling" operation with one click: remotely cut off the power and reset the network port connection, release power supply and network resources for reuse, and realize the integrated automated dynamic scheduling of power and network resources throughout the process.
[0039] This invention employs a rail bus power supply, allowing the intelligent access module to freely slide and draw power, eliminating the need for extensive power cable laying and making cabling simpler and more flexible. Utilizing the semiconductor switches on the electronic wiring panel, network links can be remotely switched without manual plugging and unplugging of jumpers, eliminating human error. The intelligent cabinet manager links the power supply and wiring subsystems, and the DCIM platform synchronously completes device power-on and network networking with a single click, achieving integrated power and network scheduling and improving the automation level of the data center. The system collects power consumption and port connection data in real time, generating a refined physical topology. Equipment overload and port offline issues are promptly alerted, facilitating fault location and data center capacity and energy efficiency planning.
[0040] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0041] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A dynamic scheduling system for computer room resources with bus power supply and electronic wiring, characterized in that, Includes the central control layer, the cabinet execution layer, and the equipment layer; The central control layer deploys a DCIM unified scheduling platform, which is used for pre-allocation of data center equipment resources, issuing power supply and network collaborative scheduling instructions, collecting full rack operation data and generating a visual physical topology. The rack execution layer includes a rack intelligent manager, a track bus power supply system, and a network subsystem; the track bus power supply system includes a vertical conductive track and several sliding intelligent access modules; the network subsystem includes at least one electronic wiring panel, each network cable port of the electronic wiring panel integrates a semiconductor electronic switch array at the rear end, the switch array is driven by a port controller, and the electronic wiring panel is connected to the rack intelligent manager via Ethernet communication. The equipment layer consists of IT equipment in the computer room. The power cord of the IT equipment is plugged into the output socket of the intelligent access module, and the network cable is plugged into the physical port of the electronic wiring panel.
2. The data center resource dynamic scheduling system for bus power supply and electronic wiring as described in claim 1, characterized in that, The cabinet intelligent manager is a cabinet-level embedded unit with bidirectional communication connections to the DCIM unified scheduling platform, the track bus power supply system, and the network subsystem. It is used to forward collaborative scheduling instructions, locally cache the cabinet's operating status, and report to the upper layer.
3. The data center resource dynamic scheduling system for bus power supply and electronic wiring as described in claim 1, characterized in that, The DCIM unified scheduling platform executes a one-click collaborative deployment process: pre-allocates idle intelligent access modules and electronic wiring ports in the cabinet, sends instructions to the cabinet intelligent manager, and simultaneously completes remote power-on of the intelligent access modules and automatic connection of electronic wiring panel port links, realizing integrated dynamic scheduling of power and network resources.
4. The data center resource dynamic scheduling system for bus power supply and electronic wiring as described in claim 1, characterized in that, The conductive track is fixedly installed on the cabinet column, and the conductive track is encapsulated with an insulated high-voltage conductor.
5. A dynamic scheduling system for computer room resources with bus power supply and electronic wiring as described in claim 1, characterized in that, The intelligent access module is equipped with a sliding conductive connector on the back to draw power along the conductive track, and has a built-in MCU, power consumption acquisition sensor, remote on / off relay, and cabinet bus communication unit. All intelligent access modules are connected to the cabinet intelligent manager through a shared communication bus.
6. The data center resource dynamic scheduling system for bus power supply and electronic wiring as described in claim 1, characterized in that, The DCIM unified scheduling platform collects the voltage, current, power consumption, and on / off status of each intelligent access module in real time, and simultaneously collects the connection relationships of all ports on the electronic wiring panel. It automatically generates a cabinet physical connection topology map accurate to a single power socket and a single network port, and automatically triggers operation and maintenance alarms when the power consumption threshold is exceeded or when a port link goes offline.
7. A dynamic scheduling system for computer room resources with bus power supply and electronic wiring as described in claim 5, characterized in that, The shared communication bus adopts RS-485 bus or CAN bus.