Workflow construction method, electronic device, and storage medium

By extracting key data from user request data and matching intents in an artificial intelligence system, and constructing work intents and node data, the problems of low efficiency and inflexibility in workflow construction are solved, and efficient and flexible workflow management is achieved.

CN123032007APending Publication Date: 2026-11-03FU TAI HUA IND SHENZHEN +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510535532.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-04-25
Publication Date
2026-11-03

AI Technical Summary

Technical Problem

Existing artificial intelligence technologies are unable to effectively and automatically build and adjust workflows, resulting in low efficiency and inflexibility in workflow building, which affects user experience.

Method used

By extracting key data from user request data, using feature vectors to match preset intents, constructing working intents and drawing workflows, including word segmentation, encoding, determining entity categories, matching intents, constructing node data, and drawing workflows.

Benefits of technology

It improves the efficiency and flexibility of workflow drawing, making the workflow clearer and more controllable, and enabling rapid response to changes in user needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123032007A_ABST
    Figure CN123032007A_ABST
Patent Text Reader

Abstract

The application belongs to the technical field of artificial intelligence, and provides a workflow construction method, an electronic device and a storage medium. The method extracts key data in request data of a user; matches an intention in the key data with a preset intention to obtain a work intention corresponding to the request data; constructs process data according to node data corresponding to the work intention; and draws a work flow corresponding to the request data based on the process data. The above method can improve the construction efficiency of the work flow.
Need to check novelty before this filing date? Find Prior Art