A Simulation Modeling and Verification Method for Low-Frequency Power Oscillation under Grid-Connected Operating Conditions of Hydropower Units

By establishing a closed-loop coupled model of the governor, nonlinear electro-hydraulic servo system, elastic water hammer water intake system, turbine, synchronous generator and excitation system under the grid-connected condition of hydropower units, the problem of inaccurate simulation of low-frequency active power oscillation at the moment of grid connection of hydropower units in the existing technology is solved, and the accurate description and verification of the low-frequency oscillation initiation, peak and valley phase and amplitude attenuation law are realized.

CN123069643APending Publication Date: 2026-11-10CHINA YANGTZE POWER
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202611136927.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-29
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing simulation models of low-frequency active power oscillations at the moment of grid connection of hydropower units fail to fully describe the continuous feedback process between electromagnetic torque, unit speed, governor output, guide vane opening, head, flow rate and mechanical torque, and lack systematic verification of the oscillation initiation, peak and valley times, oscillation frequency and amplitude decay laws.

Method used

A closed-loop coupled model of the governor, nonlinear electro-hydraulic servo system, elastic water hammer water inlet system, turbine, synchronous generator and excitation system is established. Multi-dimensional verification is carried out using field measured grid-connected power data. The model includes a detailed description of the governor model, nonlinear electro-hydraulic servo system model, elastic water hammer water inlet system model, turbine comprehensive characteristic curve interpolation model, synchronous generator model and excitation system model.

Benefits of technology

The model achieves complete simulation of low-frequency power oscillations in hydropower units connected to the grid, improving the simulation accuracy of oscillation initiation process, power change slope and peak-valley amplitude. Furthermore, the model's engineering applicability and reliability are enhanced through multi-dimensional verification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123069643A_ABST
    Figure CN123069643A_ABST
Patent Text Reader

Abstract

This invention discloses a method for simulating and verifying low-frequency power oscillations in grid-connected hydropower units. The method acquires unit modeling parameters and on-site grid-connected measured data, and establishes models for the governor, a nonlinear electro-hydraulic servo system with dead zones and saturation elements, an elastic water hammer water intake system, a turbine based on comprehensive characteristic curve interpolation, a synchronous generator, an excitation system, and an equivalent power grid. A closed-loop coupled model of hydraulic, mechanical, electrical, and power grid signals is constructed according to the transmission relationships of head, flow rate, mechanical torque, speed, excitation, and power signals. The low-frequency oscillation waveform of active power is obtained through grid-connected operating condition simulation, and the results are compared and verified with the on-site measured waveform in terms of oscillation initiation, peak-valley time, oscillation frequency, and amplitude attenuation characteristics. This invention can improve the accuracy and reliability of grid-connected power low-frequency oscillation simulation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of water conservancy and hydropower engineering simulation and power system control technology, specifically to a method for simulation modeling and verification of low-frequency power oscillations in grid-connected hydropower units. Background Technology

[0002] Hydropower units are crucial power sources in power systems, responsible for peak shaving, frequency regulation, and emergency backup. A hydropower unit consists of multiple interacting subsystems, including a water intake system, turbine, speed control system, synchronous generator, excitation system, and external power grid. During grid connection, the generator transitions from its pre-connection no-load or low-load operating state to a state where it exchanges active power with the grid. The electromagnetic torque change generated at the moment of connection causes continuous adjustments to the unit's speed, guide vane opening, turbine flow rate, mechanical torque, and excitation state. Simultaneously, the inertia of water flow in the intake pipe and water hammer pressure waves also participate in this dynamic process. Therefore, the active power oscillation after grid connection is essentially a complex transient process formed by the coupling of hydraulic, mechanical, electrical, and control components.

[0003] Existing dynamic simulation methods for hydropower units typically focus on a specific part of the hydraulic or power system. Some methods employ rigid water hammer models, linearized turbine models, or simplified generator models. While these methods can reflect the basic trends of dynamic changes in the unit, they may not be able to fully reflect the dynamic characteristics of the actual unit, such as sudden power surges at grid connection, peak-valley phase of oscillations, oscillation frequency, and oscillation amplitude attenuation.

[0004] Patent CN116305684B provides a Simulink simulation method for active power oscillations in a turbine unit induced by tailrace pressure pulsation. It discloses a closed-loop simulation model consisting of a turbine governor, a nonlinear turbine under elastic water hammer, a synchronous generator, an excitation control system, and an infinite power grid. This scheme simulates the impact of different pressure pulsation amplitudes on the unit's speed, mechanical power, and generator active power by injecting sinusoidal tailrace pressure pulsation signals into the turbine head. This achieves a hydro-mechanical coupling analysis of the process of tailrace pressure pulsation transferring to generator active power.

[0005] However, the above scheme mainly targets the continuous periodic pressure pulsations caused by factors such as the draft tube vortex during the stable operation of the unit. The external disturbance is pre-set as a sinusoidal signal with a certain frequency and amplitude, and the study focuses on the transmission law of this pressure pulsation in the turbine, generator, and control system. This scheme does not address the free-decaying power oscillation triggered by the sudden change in electromagnetic torque at the moment of grid connection, nor does it specifically describe the continuous feedback process between electromagnetic torque, unit speed, governor output, guide vane opening, head, flow rate, and mechanical torque after grid connection.

[0006] Furthermore, the electro-hydraulic servo system in CN116305684B uses a classic first-order inertial element, which is insufficient to fully reflect the nonlinear characteristics of actual electro-hydraulic actuators, such as dead zone, saturation, and output limiting. Its turbine mainly uses a parametric nonlinear model based on the IEEE working group model, resulting in a relatively simplified description of the actual comprehensive characteristic relationships between unit speed, guide vane opening, unit flow rate, and unit torque. The synchronous generator uses a practical third-order linearized model, and the excitation part mainly uses conventional PID control, which does not fully reflect the interaction between the damping winding, the power system stabilizer, and electromechanical transients. The embodiments of this scheme mainly compare the simulation response under different preset pressure pulsation amplitudes, without further utilizing on-site grid-connected measured active power data to comprehensively verify the oscillation initiation, peak-valley times, oscillation frequency, and amplitude decay patterns.

[0007] Patent CN102663241A provides a method for simulating and calculating the transient power of a hydraulic turbine under elastic water hammer conditions. It discloses a method for dynamically converting the hydraulic system, expressed as a transfer function under elastic water hammer conditions, into differential equations in relative value form, and combining this with the motion equations of the main servo motor to calculate the transient flow rate, head, power, and torque of the turbine. This method facilitates the connection of the hydraulic system model with governor, excitation controller, generator, and power grid models, providing a foundation for calculating the transient power of a hydraulic turbine under elastic water hammer conditions.

[0008] However, CN102663241A primarily addresses the problem that the elastic water hammer transfer function is difficult to directly convert into a nonlinear differential equation. Its implementation equates the complex water intake system to a single-machine, single-pipe system and assumes a linear relationship between the main servo displacement and the guide vane opening. This method calculates transient power using rated operating parameters and the turbine gain constant, and explicitly does not rely on the turbine's comprehensive characteristic curve. Therefore, there is still room for further detailed description of the nonlinear flow and torque characteristics of large turbines under non-rated head, non-rated speed, and different guide vane openings.

[0009] In summary, although existing technologies address the calculation of transient power of turbines under elastic water hammer conditions and the simulation of hydro-turbine-electric coupling between turbines, generators, speed control systems, and excitation systems, they still have the following shortcomings: Existing technologies mainly focus on guide vane step, periodic pressure pulsation in the tailrace, or general hydraulic transients, lacking a complete modeling method specifically for low-frequency active power oscillations during the instantaneous grid connection of hydropower units.

[0010] Existing hydro-turbine coupling models typically simplify the electro-hydraulic servo mechanism, the comprehensive characteristics of the turbine, or the electromagnetic transients of the synchronous generator to varying degrees, making it difficult to accurately describe the initial response, oscillation frequency, peak-valley phase, and damping attenuation of grid-connected oscillations simultaneously.

[0011] Existing models of elastic water hammer transient power mostly use rated parameters or equivalent single-unit single-pipe forms, failing to fully utilize the actual turbine comprehensive characteristic curves to calculate unit flow and unit torque under different instantaneous operating conditions.

[0012] Existing technologies typically use calculation results from a single subsystem, simulation curves under preset disturbances, or comparisons between different mathematical models for verification. However, there is a lack of methods to verify the complete hydraulic-mechanical-electrical-grid coupling model against the measured power waveforms in the field.

[0013] Existing model validation generally focuses on oscillation amplitude or response trend, lacking a systematic evaluation of key dynamic characteristics such as oscillation initiation direction and initial slope, first peak and first trough time, low-frequency oscillation frequency, and amplitude decay rate.

[0014] Therefore, it is necessary to provide a simulation modeling and verification method for low-frequency power oscillations in grid-connected hydropower units. This method involves closed-loop coupling of the governor, an electro-hydraulic servo system with nonlinear constraints, an elastic water hammer water intake system, a turbine based on actual comprehensive characteristic curves, a synchronous generator, an excitation system, and an equivalent power grid. The model is then validated from multiple dimensions using field-measured grid-connected power data, thereby improving the accuracy and engineering applicability of the grid-connected low-frequency power oscillation simulation. Summary of the Invention To address the problem that existing dynamic simulation methods for hydropower units suffer from the disconnect between the hydraulic system, electro-hydraulic servo system, turbine, generator, and excitation system, making it difficult to accurately reproduce the initiation process, peak-valley phase, oscillation frequency, and amplitude attenuation of low-frequency oscillations of active power at the moment of grid connection, this invention provides a method for simulating, modeling, and verifying low-frequency oscillations of power in hydropower units under grid-connected operating conditions. The method includes the following steps: Step S1: Obtain unit modeling parameters and on-site grid connection measurement data Acquire the equipment parameters, operating parameters, and on-site grid connection test data of the hydropower unit to be simulated. The equipment parameters and operating parameters include: governor control parameters, time constant, dead zone range, output upper and lower limits and guide vane closing law of the electro-hydraulic servo system, water intake system pipeline parameters, water hammer phase length and pipeline characteristic parameters, turbine runner diameter, rated speed, rated flow, rated power and comprehensive characteristic curve data, synchronous generator rated capacity, rated voltage, inertial parameters, synchronous reactance, transient reactance, ultra-transient reactance and corresponding time constant, excitation regulator and power system stabilizer control parameters, and equivalent grid rated voltage, rated frequency, short-circuit capacity and equivalent impedance parameters.

[0015] The on-site grid connection test data includes the grid connection time and the active power time sequence data within a preset time range after grid connection.

[0016] Preferably, the field measured data is time-aligned, outlier removed, and normalized to ensure that the field measured data and the simulation output data have a consistent time reference and physical quantity reference.

[0017] Step S2: Establish the speed governor model and the nonlinear electro-hydraulic servo system model. Step S21: Establish the speed governor model Based on the actual speed control method of the hydropower unit, a governor model is established, and its expression is: ; In the formula, For controller parameters; The differential time constant; Represents the permanent slip coefficient; Output signal to the controller This is a frequency deviation signal. This is the guide vane deviation signal.

[0018] Preferably, the speed governor adopts a parallel PID control structure, and the permanent slip coefficient, proportional gain, integral gain and derivative time constant are set according to the actual operating mode of the unit.

[0019] Step S22: Establish a nonlinear electro-hydraulic servo system model The guide vane control command output from the governor model is input into the nonlinear electro-hydraulic servo system model.

[0020] The nonlinear electro-hydraulic servo system model includes: Electro-hydraulic conversion and relay dynamic links, dead zone nonlinear links, saturation nonlinear links, guide vane opening limit links, and guide vane opening or closing rate limit links.

[0021] The dead-zone nonlinear element is described as follows: ; In the formula, a dead zone size u Input for dead zone circuit, w Output for dead-zone stages.

[0022] The saturated nonlinear element is described as follows: ; In the formula, u and y These are the input and output of the saturation circuit, respectively. y max and y min These are the output limit amplitudes for the saturation circuit.

[0023] The nonlinear electro-hydraulic servo system model calculates the actual guide vane opening based on the guide vane control command and outputs the actual guide vane opening to the turbine model.

[0024] By setting dead zones, saturation, and amplitude limiting elements, the mechanical backlash, hydraulic response hysteresis, relay output capacity limitation, and guide vane movement range limitation in electro-hydraulic actuators are simulated.

[0025] Step S3: Establish a model of the elastic water hammer water intake system Based on the length, cross-sectional dimensions, water flow inertia, pressure wave propagation velocity, and elastic parameters of the hydropower station's water intake pipeline, a water intake system model based on the elastic water hammer theory is established, with the following expression: ; In the formula, Water and water interact and grow together; These are pipeline characteristic parameters.

[0026] The elastic water hammer water intake system model calculates the dynamic changes in water head in the water intake system based on the changes in turbine flow rate, and inputs the calculated water head signal into the turbine model in real time.

[0027] Preferably, the water intake system uses an elastic water hammer transfer function containing hyperbolic function terms to describe the dynamic relationship between head and flow rate, and the transfer function includes at least water hammer phase length and pipe characteristic parameters.

[0028] Compared to the rigid water hammer model that only considers the overall inertia of the water column, the elastic water hammer water diversion system model further considers the propagation and reflection process of pressure waves in the pipeline to describe the dynamic phase relationship between head and flow rate under grid disturbance.

[0029] Step S4: Establish a turbine model based on comprehensive characteristic curve interpolation Step S41: Construct a comprehensive characteristic data array for the water turbine. Based on the turbine model test data or the actual comprehensive characteristic curve, the comprehensive characteristic curve of the turbine is discretized to form a characteristic data array containing the following parameters: guide vane opening, unit speed, unit flow rate, and unit torque.

[0030] Step S42: Determine the current operating point of the turbine. The turbine model receives the actual guide vane opening output in step S2, the unit speed fed back by the synchronous generator, and the dynamic head output in step S3.

[0031] The current unit speed is calculated based on the current guide vane opening, unit speed, and head, and discrete characteristic points adjacent to the current operating state are determined in the comprehensive characteristic data array.

[0032] Step S43: Perform interpolation calculations for turbine characteristic parameters. For cases where the current operating state is not located at a discrete node of the comprehensive characteristic curve, at least three discrete characteristic points adjacent to the current operating state are selected. The three-point quadratic Lagrange interpolation method is used to calculate the unit flow rate and unit torque under the current operating condition. The expressions are as follows: ; In the formula, Input variables for interpolation, To output the interpolation result, Given the unit rotational speed or guide vane opening, Given a known unit flow rate or unit torque, k Center point.

[0033] Calculate the actual flow rate and mechanical torque of the turbine based on the interpolated unit flow rate, unit torque, and current head.

[0034] The actual flow rate of the turbine is fed back to the elastic water hammer water intake system model, and the mechanical torque of the turbine is output to the synchronous generator model.

[0035] Step S5: Establish the synchronous generator model, excitation system model, and equivalent power grid model. Step S51: Establish a synchronous generator model A synchronous generator model is established based on the Park transformation, and the electrical part of the synchronous generator is transformed to the dq coordinate system.

[0036] The synchronous generator model includes: Stator d-axis and q-axis voltage equations: ; ; Stator and rotor flux linkage equations; ; ; In the formula, These are the terminal voltages of the generator's d and q axes, respectively; These are the currents of the generator stator d-axis and q-axis, respectively; The resistance of the generator stator winding; denoted as magnetic flux linkages along the d and q axes, respectively; The angular velocity of the rotor; Synchronous reactances for the d and q axes; The mutual inductance between the d- and q-axis stator and rotor windings; This refers to the current in the excitation winding. This refers to the d-axis damping winding current. These are the currents of the first and second damping windings along the q-axis, respectively.

[0037] Mechanical equation: ; In the formula, The mechanical inertia time constant of the generator; This represents the relative value of the unit's speed deviation. This represents the relative deviation of the prime mover torque. This represents the relative value of the generator load torque deviation. This is the generator load self-adjustment coefficient; This is the self-regulating coefficient of the water turbine.

[0038] The synchronous generator model receives the turbine mechanical torque output in step S4 and the electromagnetic torque fed back from the equivalent power grid, and calculates the rotor angular velocity, power angle, stator voltage, stator current, active power and reactive power.

[0039] The calculated rotor angular velocity or speed deviation signal is fed back to the governor model in step S2 and the turbine model in step S4.

[0040] Step S52: Establish the excitation system model Establish an excitation system model that includes an excitation regulator and a power system stabilizer.

[0041] The excitation regulator receives the generator terminal voltage, current and voltage command signal, and calculates the basic excitation control signal based on measurement compensation, differential adjustment, comprehensive amplification and rotor feedback.

[0042] The transfer function of the excitation regulator is as follows: ; In the formula, This indicates the output voltage after adjustment; Indicates the generator terminal voltage; Indicates stator current; and Indicates the differential resistor and reactance; Indicates the voltage proportionality coefficient; Indicates the measurement time constant; and This represents the overall amplification factor and time constant; and This represents the amplification factor and the time constant.

[0043] The transfer function of the power system stabilizer is as follows: ; In the formula, Indicates the gain coefficient; Indicates the time constant of the measurement process; Indicates the time constant of the DC blocking element; and The time constant represents the lead-lag relationship; This indicates the number of lead and lag elements, typically consisting of 1 to 3 connected elements, each with a different time constant.

[0044] The power system stabilizer receives the unit speed deviation, active power deviation, or preset oscillation state quantity, and generates an auxiliary stabilization signal through DC blocking, gain, and lead / lag compensation links.

[0045] The auxiliary stabilization signal is superimposed on the input or control terminal of the excitation regulator to obtain the excitation voltage, and the excitation voltage is input to the excitation winding of the synchronous generator.

[0046] Step S53: Establish an equivalent power grid model An equivalent power grid model is established based on the rated voltage, frequency, short-circuit capacity, and equivalent impedance of the actual power grid.

[0047] The equivalent grid uses the Three-Phase Source module from the SPS library. Swing nodes provide constant voltage and phase references in the simulation, maintaining stability of the endpoint voltages and system frequency.

[0048] The equivalent grid model is configured as a voltage and phase reference node to provide a stable voltage amplitude and frequency reference for the synchronous generator, and to calculate electromagnetic power and electromagnetic torque based on the voltage difference and equivalent impedance relationship between the synchronous generator and the equivalent grid.

[0049] Step S6: Establish a closed-loop coupled model of the entire hydraulic-mechanical-electrical-power grid system. The subsystems established in steps S2 to S5 are connected according to the physical quantities and control signal transmission relationships to form a closed-loop model of the hydropower unit speed regulation-excitation system, specifically including: Step S61: Coupling of the speed governor and the electro-hydraulic servo system The speed controller receives feedback signals from the unit's frequency deviation, active power, and guide vane opening, and outputs guide vane control commands.

[0050] The guide vane control command is processed by the nonlinear electro-hydraulic servo system to handle inertia, dead zone, saturation, and amplitude limiting, resulting in the actual guide vane opening.

[0051] Step S62: Coupling the electro-hydraulic servo system with the turbine The actual guide vane opening is input into the turbine model, and the turbine flow rate and mechanical torque are calculated by combining the unit speed and dynamic head.

[0052] Step S63: Coupling of the turbine and the water diversion system The turbine flow rate is input into the elastic water hammer water intake system model to calculate the head change; then the head change is fed back to the turbine model to form a head-flow closed loop.

[0053] Step S64: Coupling of the turbine and synchronous generator The mechanical torque of the water turbine is used as the power torque input of the synchronous generator.

[0054] The synchronous generator calculates the unit speed and power angle based on the difference between mechanical torque and electromagnetic torque, and feeds the unit speed back to the governor and turbine model.

[0055] Step S65: Coupling the excitation system with the synchronous generator The excitation system receives terminal voltage, current, active power, or speed deviation signals from the synchronous generator, calculates the excitation voltage and stability control signals, and inputs them into the excitation winding of the synchronous generator.

[0056] Step S66: Coupling the synchronous generator with the equivalent power grid The stator terminals of the synchronous generator are connected to the equivalent power grid. Based on the generator terminal voltage, power angle, and equivalent power grid impedance, the computer group outputs the active power, reactive power, and electromagnetic torque.

[0057] This results in a closed-loop coupled model of the entire system, including hydraulic, mechanical, electrical, control, and power grid components.

[0058] Step S7: Set up grid-connected operating conditions and perform power low-frequency oscillation simulation. Based on the on-site unit's operating status before grid connection, the initial conditions of the simulation model are set. The initial conditions include: initial unit speed, initial guide vane opening, initial head and flow rate, generator terminal voltage, excitation voltage, grid voltage and frequency, active power or mechanical power status before grid connection, and ensuring that the synchronous generator model and the equivalent grid model enter the grid-connected operating state at the preset grid connection time, and then solving the closed-loop model of the entire system.

[0059] Record the following dynamic quantities within a preset time range before and after grid connection: unit speed, guide vane opening, head and flow rate, turbine mechanical torque, generator electromagnetic torque, generator active power, generator reactive power, excitation voltage, and power system stabilizer output. Extract the low-frequency oscillation simulation waveform of the active power after grid connection from these dynamic quantities.

[0060] Step S8: Verify the simulation model using on-site measured data. The active power simulation waveform obtained in step S7 is time-aligned with the on-site grid-connected active power measured waveform obtained in step S1, and the comparison and verification are performed from the following aspects.

[0061] Step S81: Verification of Oscillation Initiation Characteristics By comparing the power change direction and initial slope of the simulated waveform and the measured waveform near the grid connection time, it can be determined whether the model can correctly reproduce the power change process at the moment of grid connection.

[0062] Step S82: Peak-Valley Time Verification Extract the first peak moment, the first trough moment, and subsequent peak and trough moments from the simulated waveform and the measured waveform respectively, and compare the time deviation between the corresponding peak and trough moments.

[0063] Step S83: Verification of oscillation frequency The oscillation period and oscillation frequency of the simulated waveform and the measured waveform are calculated based on adjacent peaks, adjacent troughs or frequency domain analysis results, and the frequency deviations of the two are compared.

[0064] Step S84: Verification of Amplitude Attenuation Characteristics Extract the oscillation envelopes of the simulated and measured waveforms, and compare their oscillation amplitude decay rate, decay period number, or damping characteristics.

[0065] Step S85: Model Validity Determination When the deviations between the simulated waveform and the measured waveform in terms of oscillation initiation characteristics, peak-valley time, oscillation frequency, and amplitude attenuation characteristics are all within the preset allowable range, the coupling model of the hydropower unit speed regulation-excitation system is deemed to be effective.

[0066] When at least one deviation exceeds the preset allowable range, the corresponding subsystem parameters are adjusted, and steps S7 to S8 are repeated until the model validity determination conditions are met.

[0067] Compared with the prior art, the beneficial effects of the present invention include: (1) According to the transmission relationship between actual physical quantities and control signals, the present invention connects the governor, nonlinear electro-hydraulic servo system, elastic water hammer water intake system, turbine, synchronous generator, excitation system and equivalent power grid to form a closed-loop coupling model, so that the electromagnetic torque change at the moment of grid connection can be continuously transmitted and fed back between hydraulic, mechanical, electrical and control links through state quantities such as unit speed, guide vane opening, head, flow rate and mechanical torque, thereby completely describing the formation and attenuation process of low frequency power oscillation of hydropower unit grid connection.

[0068] (2) The present invention considers dead zone, saturation and limiting characteristics in the electro-hydraulic servo system, and uses three-point quadratic Lagrange interpolation to calculate the unit flow and unit torque under the current non-node operating conditions based on the actual comprehensive characteristic curve of the turbine. This can more realistically describe the nonlinear action of the guide vane actuator and the changes in flow and torque of the turbine under different speeds, guide vane openings and heads, which is beneficial to improving the simulation accuracy of the grid connection oscillation initiation process, power change slope and peak-valley amplitude.

[0069] (3) This invention couples the elastic water hammer water intake system, the nonlinear model of the turbine, the electromechanical transient model of the synchronous generator and the excitation system including the power system stabilizer. It can comprehensively reflect the combined effects of pressure wave propagation, head-flow phase change and excitation damping on active power oscillation, so that the simulation model can simultaneously describe the frequency, peak-valley phase and amplitude attenuation law of grid-connected power oscillation.

[0070] (4) This invention uses on-site grid-connected active power measurement data to verify the whole system coupling model, and compares the simulated waveform with the measured waveform from multiple dimensions such as the oscillation start direction and initial slope, the time of the first peak and the first trough, the oscillation frequency and amplitude attenuation characteristics, avoiding judging the effectiveness of the model based solely on a single peak or overall trend, thus improving the completeness, reliability and engineering applicability of the model verification results. Attached Figure Description

[0071] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0072] Figure 1 This is a flowchart of a method for simulating and verifying low-frequency power oscillations in grid-connected hydropower units according to the present invention; Figure 2 This is a schematic diagram of a nonlinear electro-hydraulic servo system model provided in an embodiment of the present invention; Figure 3 This is a schematic diagram of the unit torque surface provided in an embodiment of the present invention; Figure 4 This is a schematic diagram of a unit flow rate surface provided in an embodiment of the present invention; Figure 5 This is a schematic diagram of a power system stabilizer model provided in an embodiment of the present invention; Figure 6 This is a schematic diagram of low-frequency power oscillation verification under grid-connected operating conditions provided in an embodiment of the present invention. Detailed Implementation

[0073] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention. Furthermore, the technical features involved in the various embodiments of this invention described below can be combined with each other as long as they do not conflict with each other.

[0074] Example 1 A method for simulation modeling and verification of low-frequency power oscillations in grid-connected hydropower units, the method comprising the following steps: Step S1: Obtain unit modeling parameters and on-site grid connection measurement data Acquire the equipment parameters, operating parameters, and on-site grid connection test data of the hydropower unit to be simulated. The equipment parameters and operating parameters include: governor control parameters, time constant, dead zone range, output upper and lower limits and guide vane closing law of the electro-hydraulic servo system, water intake system pipeline parameters, water hammer phase length and pipeline characteristic parameters, turbine runner diameter, rated speed, rated flow, rated power and comprehensive characteristic curve data, synchronous generator rated capacity, rated voltage, inertial parameters, synchronous reactance, transient reactance, ultra-transient reactance and corresponding time constant, excitation regulator and power system stabilizer control parameters, and equivalent grid rated voltage, rated frequency, short-circuit capacity and equivalent impedance parameters.

[0075] The on-site grid connection test data includes the grid connection time and the active power time sequence data within a preset time range after grid connection.

[0076] Preferably, the field measured data is time-aligned, outlier removed, and normalized to ensure that the field measured data and the simulation output data have a consistent time reference and physical quantity reference.

[0077] Step S2: Establish the speed governor model and the nonlinear electro-hydraulic servo system model. Step S21: Establish the speed governor model Based on the actual speed control method of the hydropower unit, a governor model is established, and its expression is: ; In the formula, For controller parameters; The differential time constant; Represents the permanent slip coefficient; Output signal to the controller This is a frequency deviation signal. This is the guide vane deviation signal.

[0078] Preferably, the speed governor adopts a parallel PID control structure, and the permanent slip coefficient, proportional gain, integral gain and derivative time constant are set according to the actual operating mode of the unit.

[0079] Step S22: Establish a nonlinear electro-hydraulic servo system model The guide vane control command output from the governor model is input into the nonlinear electro-hydraulic servo system model.

[0080] The nonlinear electro-hydraulic servo system model includes: Electro-hydraulic conversion and relay dynamic links, dead zone nonlinear links, saturation nonlinear links, guide vane opening limit links, and guide vane opening or closing rate limit links.

[0081] The dead-zone nonlinear element is described as follows: ; In the formula, a dead zone size u Input for dead zone circuit, w Output for dead-zone stages.

[0082] The saturated nonlinear element is described as follows: ; In the formula, u and y These are the input and output of the saturation circuit, respectively. y max and y min These are the output limit amplitudes for the saturation circuit.

[0083] The nonlinear electro-hydraulic servo system model calculates the actual guide vane opening based on the guide vane control command and outputs the actual guide vane opening to the turbine model.

[0084] By setting dead zones, saturation, and amplitude limiting elements, the mechanical backlash, hydraulic response hysteresis, relay output capacity limitation, and guide vane movement range limitation in electro-hydraulic actuators are simulated.

[0085] Step S3: Establish a model of the elastic water hammer water intake system Based on the length, cross-sectional dimensions, water flow inertia, pressure wave propagation velocity, and elastic parameters of the hydropower station's water intake pipeline, a water intake system model based on the elastic water hammer theory is established, with the following expression: ; In the formula, Water and water interact and grow together; These are pipeline characteristic parameters.

[0086] The elastic water hammer water intake system model calculates the dynamic changes in water head in the water intake system based on the changes in turbine flow rate, and inputs the calculated water head signal into the turbine model in real time.

[0087] Preferably, the water intake system uses an elastic water hammer transfer function containing hyperbolic function terms to describe the dynamic relationship between head and flow rate, and the transfer function includes at least water hammer phase length and pipe characteristic parameters.

[0088] Compared to the rigid water hammer model that only considers the overall inertia of the water column, the elastic water hammer water diversion system model further considers the propagation and reflection process of pressure waves in the pipeline to describe the dynamic phase relationship between head and flow rate under grid disturbance.

[0089] Step S4: Establish a turbine model based on comprehensive characteristic curve interpolation Step S41: Construct a comprehensive characteristic data array for the water turbine. Based on the turbine model test data or the actual comprehensive characteristic curve, the comprehensive characteristic curve of the turbine is discretized to form a characteristic data array containing the following parameters: guide vane opening, unit speed, unit flow rate, and unit torque.

[0090] Step S42: Determine the current operating point of the turbine. The turbine model receives the actual guide vane opening output in step S2, the unit speed fed back by the synchronous generator, and the dynamic head output in step S3.

[0091] The current unit speed is calculated based on the current guide vane opening, unit speed, and head, and discrete characteristic points adjacent to the current operating state are determined in the comprehensive characteristic data array.

[0092] Step S43: Perform interpolation calculations for turbine characteristic parameters. For cases where the current operating state is not located at a discrete node of the comprehensive characteristic curve, at least three discrete characteristic points adjacent to the current operating state are selected. The three-point quadratic Lagrange interpolation method is used to calculate the unit flow rate and unit torque under the current operating condition. The expressions are as follows: ; In the formula, Input variables for interpolation, To output the interpolation result, Given the unit rotational speed or guide vane opening, Given a known unit flow rate or unit torque, k Center point.

[0093] Calculate the actual flow rate and mechanical torque of the turbine based on the interpolated unit flow rate, unit torque, and current head.

[0094] The actual flow rate of the turbine is fed back to the elastic water hammer water intake system model, and the mechanical torque of the turbine is output to the synchronous generator model.

[0095] Step S5: Establish the synchronous generator model, excitation system model, and equivalent power grid model. Step S51: Establish a synchronous generator model A synchronous generator model is established based on the Park transformation, and the electrical part of the synchronous generator is transformed to the dq coordinate system.

[0096] The synchronous generator model includes: Stator d-axis and q-axis voltage equations: ; ; Stator and rotor flux linkage equations; ; ; In the formula, These are the terminal voltages of the generator's d and q axes, respectively; These are the currents of the generator stator d-axis and q-axis, respectively; The resistance of the generator stator winding; denoted as magnetic flux linkages along the d and q axes, respectively; The angular velocity of the rotor; Synchronous reactances for the d and q axes; The mutual inductance between the d- and q-axis stator and rotor windings; This refers to the current in the excitation winding. This refers to the d-axis damping winding current. These are the currents of the first and second damping windings along the q-axis, respectively.

[0097] Mechanical equation: ; In the formula, The mechanical inertia time constant of the generator; This represents the relative value of the unit's speed deviation. This represents the relative deviation of the prime mover torque. This represents the relative value of the generator load torque deviation. This is the generator load self-adjustment coefficient; This is the self-regulating coefficient of the water turbine.

[0098] The synchronous generator model receives the turbine mechanical torque output in step S4 and the electromagnetic torque fed back from the equivalent power grid, and calculates the rotor angular velocity, power angle, stator voltage, stator current, active power and reactive power.

[0099] The calculated rotor angular velocity or speed deviation signal is fed back to the governor model in step S2 and the turbine model in step S4.

[0100] Step S52: Establish the excitation system model Establish an excitation system model that includes an excitation regulator and a power system stabilizer.

[0101] The excitation regulator receives the generator terminal voltage, current and voltage command signal, and calculates the basic excitation control signal based on measurement compensation, differential adjustment, comprehensive amplification and rotor feedback.

[0102] The transfer function of the excitation regulator is as follows: ; In the formula, This indicates the output voltage after adjustment; Indicates the generator terminal voltage; Indicates stator current; and Indicates the differential resistor and reactance; Indicates the voltage proportionality coefficient; Indicates the measurement time constant; and This represents the overall amplification factor and time constant; and This represents the amplification factor and the time constant.

[0103] The transfer function of the power system stabilizer is as follows: ; In the formula, Indicates the gain coefficient; Indicates the time constant of the measurement process; Indicates the time constant of the DC blocking element; and The time constant represents the lead-lag relationship; This indicates the number of lead and lag elements, typically consisting of 1 to 3 connected elements, each with a different time constant.

[0104] The power system stabilizer receives the unit speed deviation, active power deviation, or preset oscillation state quantity, and generates an auxiliary stabilization signal through DC blocking, gain, and lead / lag compensation links.

[0105] The auxiliary stabilization signal is superimposed on the input or control terminal of the excitation regulator to obtain the excitation voltage, and the excitation voltage is input to the excitation winding of the synchronous generator.

[0106] Step S53: Establish an equivalent power grid model An equivalent power grid model is established based on the rated voltage, frequency, short-circuit capacity, and equivalent impedance of the actual power grid.

[0107] The equivalent grid uses the Three-Phase Source module from the SPS library. Swing nodes provide constant voltage and phase references in the simulation, maintaining stability of the endpoint voltages and system frequency.

[0108] The equivalent grid model is configured as a voltage and phase reference node to provide a stable voltage amplitude and frequency reference for the synchronous generator, and to calculate electromagnetic power and electromagnetic torque based on the voltage difference and equivalent impedance relationship between the synchronous generator and the equivalent grid.

[0109] Step S6: Establish a closed-loop coupled model of the entire hydraulic-mechanical-electrical-power grid system. The subsystems established in steps S2 to S5 are connected according to the physical quantities and control signal transmission relationships to form a closed-loop model of the hydropower unit speed regulation-excitation system, specifically including: Step S61: Coupling of the speed governor and the electro-hydraulic servo system The speed controller receives feedback signals from the unit's frequency deviation, active power, and guide vane opening, and outputs guide vane control commands.

[0110] The guide vane control command is processed by the nonlinear electro-hydraulic servo system to handle inertia, dead zone, saturation, and amplitude limiting, resulting in the actual guide vane opening.

[0111] Step S62: Coupling the electro-hydraulic servo system with the turbine The actual guide vane opening is input into the turbine model, and the turbine flow rate and mechanical torque are calculated by combining the unit speed and dynamic head.

[0112] Step S63: Coupling of the turbine and the water diversion system The turbine flow rate is input into the elastic water hammer water intake system model to calculate the head change; then the head change is fed back to the turbine model to form a head-flow closed loop.

[0113] Step S64: Coupling of the turbine and synchronous generator The mechanical torque of the water turbine is used as the power torque input of the synchronous generator.

[0114] The synchronous generator calculates the unit speed and power angle based on the difference between mechanical torque and electromagnetic torque, and feeds the unit speed back to the governor and turbine model.

[0115] Step S65: Coupling the excitation system with the synchronous generator The excitation system receives terminal voltage, current, active power, or speed deviation signals from the synchronous generator, calculates the excitation voltage and stability control signals, and inputs them into the excitation winding of the synchronous generator.

[0116] Step S66: Coupling the synchronous generator with the equivalent power grid The stator terminals of the synchronous generator are connected to the equivalent power grid. Based on the generator terminal voltage, power angle, and equivalent power grid impedance, the computer group outputs the active power, reactive power, and electromagnetic torque.

[0117] This results in a closed-loop coupled model of the entire system, including hydraulic, mechanical, electrical, control, and power grid components.

[0118] Step S7: Set up grid-connected operating conditions and perform power low-frequency oscillation simulation. Based on the on-site unit's operating status before grid connection, the initial conditions of the simulation model are set. The initial conditions include: initial unit speed, initial guide vane opening, initial head and flow rate, generator terminal voltage, excitation voltage, grid voltage and frequency, active power or mechanical power status before grid connection, and ensuring that the synchronous generator model and the equivalent grid model enter the grid-connected operating state at the preset grid connection time, and then solving the closed-loop model of the entire system.

[0119] Record the following dynamic quantities within a preset time range before and after grid connection: unit speed, guide vane opening, head and flow rate, turbine mechanical torque, generator electromagnetic torque, generator active power, generator reactive power, excitation voltage, and power system stabilizer output. Extract the low-frequency oscillation simulation waveform of the active power after grid connection from these dynamic quantities.

[0120] Step S8: Verify the simulation model using on-site measured data. The active power simulation waveform obtained in step S7 is time-aligned with the on-site grid-connected active power measured waveform obtained in step S1, and the comparison and verification are performed from the following aspects.

[0121] Step S81: Verification of Oscillation Initiation Characteristics By comparing the power change direction and initial slope of the simulated waveform and the measured waveform near the grid connection time, it can be determined whether the model can correctly reproduce the power change process at the moment of grid connection.

[0122] Step S82: Peak-Valley Time Verification Extract the first peak moment, the first trough moment, and subsequent peak and trough moments from the simulated waveform and the measured waveform respectively, and compare the time deviation between the corresponding peak and trough moments.

[0123] Step S83: Verification of oscillation frequency The oscillation period and oscillation frequency of the simulated waveform and the measured waveform are calculated based on adjacent peaks, adjacent troughs or frequency domain analysis results, and the frequency deviations of the two are compared.

[0124] Step S84: Verification of Amplitude Attenuation Characteristics Extract the oscillation envelopes of the simulated and measured waveforms, and compare their oscillation amplitude decay rate, decay period number, or damping characteristics.

[0125] Step S85: Model Validity Determination When the deviations between the simulated waveform and the measured waveform in terms of oscillation initiation characteristics, peak-valley time, oscillation frequency, and amplitude attenuation characteristics are all within the preset allowable range, the coupling model of the hydropower unit speed regulation-excitation system is deemed to be effective.

[0126] When at least one deviation exceeds the preset allowable range, the corresponding subsystem parameters are adjusted, and steps S7 to S8 are repeated until the model validity determination conditions are met.

[0127] Example 2 Based on the simulation modeling and verification method for low-frequency power oscillations under grid-connected operating conditions of hydropower units described in Example 1, this example takes a specific hydropower unit as the research object. According to the actual system composition and operating characteristics of the unit, a model of the speed control system, water intake system, turbine, synchronous generator, excitation system, and equivalent power grid is established, and a closed-loop coupled simulation model of hydraulic-mechanical-electrical-power grid is constructed. Based on this, simulation calculations and waveform comparison verification are carried out using on-site grid-connected operating data of the unit to verify the ability of the established model to describe the dynamic process of low-frequency active power oscillations under grid-connected operating conditions.

[0128] The hydropower unit speed governor adopts parallel PID mode with proportional gain. Integral gain Nonlinear servo system models such as Figure 2 As shown, The system employs a three-stage shut-off mechanism: the first stage shut-off time is 7.82 seconds; the second stage shut-off time is 51.5 seconds; and the third stage shut-off time is 80.92 seconds. The water diversion system parameters are set as follows: T w =2.11, T r =0.526; Turbine parameters are set as follows: runner diameter D 1=9.6m, rated speed n r =71.43 r / min, rated flow rate Q r =991.8m 3 / s, rated power P r =710MW, rated unit torque M 11r =1262.8, rated unit flow rate Q 11r =1167.3, rated unit speed n 11r =74.3776, unit torque, flow rate surface as shown Figure 3 , Figure 4 As shown in Table 1; the excitation system adopts PID+PSS control mode, and the parameters are shown in Table 2. The model block diagram is shown in Table 2. Figure 5 As shown in Table 3.

[0129] Table 1 Generator Parameters

[0130] Table 2 PSS Parameter Table

[0131] Table 3 Equivalent Power Grid Parameters

[0132] This application example is a simulation model of the entire speed regulation and excitation system of a hydroelectric generator based on the elastic water hammer model. By coupling the governor with the servo system; the water intake system with the turbine; the turbine with the generator; the excitation with the generator; and the generator with the equivalent power grid, a closed-loop simulation model of the entire system, including the four major components of hydraulics, mechanics, electrical system, and power grid, is formed to simulate the low-frequency power oscillation process under grid-connected conditions.

[0133] This application example, based on the constructed full-system model, ensures the reliability of the model in practical engineering applications by simulating low-frequency power oscillations under grid-connected unit conditions. Figure 6 As shown in the figures, (a), (b), and (c) represent different grid connection times. Furthermore, the simulation curves and measured curves are compared in terms of oscillation initiation characteristics, peak-to-valley time, oscillation frequency, and amplitude decay characteristics to verify the model's effectiveness. From these three figures, it can be seen that both the simulation and measured curves exhibit a sharp power surge at t=3s, with both rising upwards at the same slope; the first peak appears at t=3.3s, and the first trough appears at t=3.78s, with subsequent oscillation peak-to-valley times highly overlapping; the oscillation frequency of both is 1.02Hz; from t=3s to t=10s, the decay rate of the oscillation envelope is basically the same for both, decaying to a small fluctuation (less than 10MW) after about 5 to 6 cycles. In summary, the simulation curves maintain a high degree of consistency with the measured curves in the four key dimensions of oscillation initiation characteristics, peak-to-valley time, oscillation frequency, and decay rate. This proves that the simulation model of the hydropower unit's speed regulation excitation system based on the elastic water hammer model can accurately describe the dynamic characteristics of the unit under grid connection conditions, and the model is effective.

[0134] The embodiments described above are merely illustrative of implementation methods of the present invention, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of the present invention. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of the present invention, and these modifications and improvements all fall within the scope of protection of the present invention. Therefore, the scope of protection of this patent should be determined by the appended claims.

Claims

1. A method for simulation modeling and verification of low-frequency power oscillations under grid-connected operating conditions of hydropower units, characterized in that, include: S1. Obtain the modeling parameters of the governor, electro-hydraulic servo system, water intake system, turbine, synchronous generator, excitation system and equivalent power grid, and obtain the measured waveform of the active power of the unit connected to the grid; S2. Establish a parallel PID speed controller model and a nonlinear electro-hydraulic servo system model including dead zone, saturation and limiting elements, and output the guide vane opening degree; S3. Establish an elastic water hammer water intake system model that calculates dynamic head based on turbine flow rate changes; S4. Discretize the comprehensive characteristic curve of the turbine into a data array of guide vane opening, unit speed, unit flow rate and unit torque. Select three adjacent discrete points for the current non-node condition and perform second Lagrange interpolation to obtain the unit flow rate and unit torque, and calculate the actual flow rate and mechanical torque. S5. Establish a synchronous generator model, an excitation system model including an excitation regulator and a power system stabilizer, and an equivalent power grid model; S6. Couple the models so that the actual flow rate is input into the water diversion system, the dynamic head feedback turbine is input into the synchronous generator, the mechanical torque is input into the synchronous generator, the unit speed feedback governor and turbine are input into the synchronous generator, and the excitation voltage is input into the synchronous generator and the synchronous generator is connected to the equivalent power grid. S7. Perform grid-connected operating condition simulation to obtain the simulation waveform of low-frequency active power oscillation; S8. Compare the simulated waveform with the measured waveform in terms of oscillation initiation characteristics, first peak and first trough time, oscillation frequency and amplitude attenuation characteristics. When all errors are within the allowable range for unit operation, the model is deemed valid.

2. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S2, the speed governor model receives the unit frequency deviation signal and active power signal fed back from the synchronous generator, and outputs control commands after parallel PID control calculation. The expression of the speed governor model is: ; In the formula, For controller parameters; The differential time constant; Represents the permanent slip coefficient; Output signal to the controller This is a frequency deviation signal. This is the guide vane deviation signal.

3. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 2, characterized in that, The guide vane control command output from the governor model is input into the nonlinear electro-hydraulic servo system model, which includes: Electro-hydraulic conversion and relay dynamic links, dead zone nonlinear links, saturation nonlinear links, guide vane opening limit links, and guide vane opening or closing rate limit links.

4. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S3, the model of the elastic water hammer water intake system adopts the elastic water hammer transfer function, which characterizes the dynamic relationship between water head and flow rate. The expression is: ; In the formula, Water and water interact and grow together; These are pipeline characteristic parameters; H ( s ) represents the Laplace transform of the head deviation. Q ( s ) represents the Laplace transform of the flow deviation. s For the Laplace operator; L This is the equivalent length of the water diversion pipeline. c The propagation speed of water shock waves, Q r For rated flow rate, g It is the acceleration due to gravity. A The equivalent cross-sectional area of ​​the water diversion pipeline. H r Rated head; water hammer is constructive. T r Characterizing the time required for a pressure wave to travel round trip in a water diversion pipeline, pipeline characteristic parameters h w It characterizes the sensitivity of head changes caused by flow rate changes.

5. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S4, the three-point quadratic Lagrange interpolation method is used to calculate the unit flow rate and unit torque under the current operating conditions. The expression is: ; In the formula, Input variables for interpolation, To output the interpolation result, Given the unit rotational speed or guide vane opening, Given a known unit flow rate or unit torque, k Center point.

6. The method for simulation modeling and verification of low-frequency oscillation of power in grid-connected hydropower units according to claim 1, characterized in that, In step S5, the synchronous generator model is established based on the Park transformation, including the stator voltage equations, flux linkage equations, and rotor motion equations for the d-axis and q-axis. The synchronous generator model receives the mechanical torque and the electromagnetic torque fed back from the equivalent power grid, and calculates the rotor angular velocity, power angle, stator voltage, stator current, active power and reactive power.

7. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S5, the excitation regulator includes a measurement compensation adjustment stage, a comprehensive amplification control stage, and a rotor feedback stage, expressed as: ; In the formula, This indicates the output voltage after adjustment; Indicates the generator terminal voltage; Indicates stator current; and Indicates the differential resistor and reactance; Indicates the voltage proportionality coefficient; Indicates the measurement time constant; and This represents the overall amplification factor and time constant; and This represents the amplification factor and the time constant.

8. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S5, the power system stabilizer receives the unit speed deviation, active power deviation, or preset oscillation state quantity, and generates an auxiliary stabilization signal through DC blocking, gain, and lead / lag compensation links.

9. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, The equivalent grid model is configured as a voltage and phase reference node to provide a stable voltage amplitude and frequency reference for the synchronous generator, and to calculate electromagnetic power and electromagnetic torque based on the voltage difference and equivalent impedance relationship between the synchronous generator and the equivalent grid.

10. The method for simulation modeling and verification of low-frequency power oscillation under grid-connected operating conditions of hydropower units according to claim 1, characterized in that, In step S6, a closed-loop coupled model of the entire hydraulic-mechanical-electrical-power grid system is established; The turbine model obtains the unit flow rate and unit torque by interpolating the guide vane opening and unit speed, and calculates the mechanical torque by combining the dynamic head. The synchronous generator model calculates the unit speed and power angle based on mechanical torque and electromagnetic torque, and feeds the unit speed back to the governor model to form a speed closed loop. The excitation system model calculates the excitation voltage based on the voltage, current, and power signals at the synchronous generator terminals, forming an excitation closed loop.

Citation Information

Patent Citations

  • Analog calculation method for transient power of water turbine under elastic water attack

    CN102663241A

  • A Simulink simulation method for active power oscillation induced by tailrace pressure pulsation in the generator unit.

    CN116305684B