Drill pipe precision counting and full life cycle management system and method
By using dual RFID reader timing identification technology and a full lifecycle management system, the problems of drill pipe counting errors and inefficient management have been solved, enabling accurate counting and full lifecycle traceability of drill pipes, thus improving construction safety and management efficiency.
Patent Information
- Application Number
- CN202611231173.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-14
- Publication Date
- 2026-11-10
AI Technical Summary
In existing technologies, the accuracy of drill pipe counting is insufficient, especially in complex downhole conditions where misjudgment is easy, resulting in large errors in borehole depth calculation. Drill pipe management is also lax, making it impossible to track the usage history and location of individual drill pipes, leading to difficulties in tracing loss and accidents.
By employing dual RFID reader time-series identification technology, combined with the unique ID of the drill pipe, the drilling, retraction, and punching reciprocating conditions are accurately distinguished, and a full life-cycle management system for the drill pipe is constructed to realize electronic file management for each drill pipe.
It improved counting accuracy, reduced drill pipe loss rate, enhanced construction safety and management sophistication, reduced accident investigation time, and improved operation and maintenance efficiency.
Smart Images

Figure CN123070144A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of automated drill pipe counting and consumable management technology in underground coal mine drilling sites, specifically involving a drill pipe accurate counting and full life cycle management system and method based on time sequence recognition. Background Technology
[0002] In underground gas extraction and water exploration drilling in coal mines, the accuracy of drill rod withdrawal counts is directly related to the calculation of drilling depth and construction quality. As a key consumable material, the circulation status and wear of drill rods directly affect construction costs and safety.
[0003] In existing technologies, drill pipe counting mainly relies on manual statistics or a single technical means. Manual statistics are prone to omissions and errors due to fatigue and negligence; single visual counting solutions have low recognition accuracy in low-light, high-dust, and drill pipe-obstructed scenarios downhole; single RFID reader solutions can only identify "drill pipe passing by" and cannot accurately determine the direction of drill pipe movement.
[0004] More critically, existing management software is mostly deployed in the wellhead control room and lacks the ability to manage individual drill pipes in a refined manner. In typical operating conditions such as perforation, the drill pipe undergoes high-frequency reciprocating motion between the stern and the gripper. Existing counting systems are prone to misinterpreting this reciprocating motion as drilling in or out, leading to severe counting inaccuracies. Furthermore, existing systems cannot track the entry time, number of uses, wear condition, and current position of individual drill pipes, resulting in frequent drill pipe losses and exceeding service life. In the event of accidents such as piston rod breakage, accurate tracing and liability determination are difficult.
[0005] In drilling operations for underground gas extraction and water exploration in coal mines, the accuracy of drill rod counting directly affects borehole depth calculation and construction quality. Furthermore, as a critical consumable material, the condition, wear and tear, and management of drill rods also impact construction efficiency and cost control. Existing technologies have the following shortcomings: Large counting deviations in non-continuous working conditions: Traditional counting solutions (such as single RFID readers and AI video counting) can only identify continuous drilling / retracting processes. When encountering punching conditions (the drill rod reciprocates at high frequency between the tail and the holder), the reciprocating motion will be misjudged as drilling or retracting, resulting in serious counting deviations.
[0006] Drill pipe management is inefficient: existing systems focus more on "quantity" than "individuals," failing to distinguish the usage history, wear and tear, and current location of each drill pipe. This often leads to problems such as lost drill pipes, drill pipes exceeding their service life, and inability to trace the source after an accident.
[0007] The logic for determining the working condition is too simple: existing dual-sensor solutions mostly use the "presence or absence of signal" to determine the condition, without combining the unique ID of the drill pipe with the timing logic. They cannot distinguish between "new drill pipe entering" and "the same drill pipe going back and forth", and they are also unable to cope with the harsh environment of high dust and low light downhole. Summary of the Invention
[0008] To address the aforementioned technical problems, this invention provides a drill pipe precision counting and full lifecycle management system and method based on time-series identification: Dual RFID reader timing identification: By using the timing triggering logic of dual RFID readers at the drill rig tail and the clamp, combined with the unique ID identification of the drill rod, the three working conditions of "drilling in, drilling out, and punching reciprocating" can be accurately distinguished, thus solving the counting deviation problem in the non-continuous in-and-out process. Full lifecycle management of drill pipes: Based on the unique RFID tag of each drill pipe, an electronic file is built for each drill pipe, realizing full-process traceability and health management from entry into the well, construction to exit from the well / disposal, filling the management gap of existing technologies.
[0009] To address the aforementioned issues, this invention provides a drill pipe precision counting and full lifecycle management system based on time-series recognition, comprising a perception layer, a transmission layer, and a local application layer; The sensing layer includes drill pipe embedded RFID tags and dual RFID readers. The embedded RFID tags are embedded inside each drill pipe and store a unique ID. The dual RFID readers include a first reader and a second reader. The transmission layer includes a mining ring network access unit, which is responsible for data reception, acquisition, fusion verification and transmission. The application layer includes a local application layer and a ground application layer. The local application layer includes an edge drilling host, which deploys localized management software to realize real-time counting display, working condition monitoring and local interaction. The ground application layer includes ground server management software to realize full mine drilling task management, counting display, working condition monitoring, drill rod life cycle management and remote interaction.
[0010] To ensure that the card reader can accurately identify relevant information, the first RFID card reader is installed at the drill rod exit of the drill rig tail with the antenna facing the drill rod's movement trajectory, and the second RFID card reader is installed inside the drill rig's clamp to ensure that the drill rod can be identified when it is clamped or released.
[0011] This invention provides a method for accurate drill pipe counting and full lifecycle management, used in the aforementioned accurate drill pipe counting and full lifecycle management system, comprising the following steps: S1 Equipment and System Basic Configuration: Complete the configuration of equipment, system, and software, bind tags, and issue drilling tasks; S2 Data Acquisition, Preprocessing and Local Control: Acquire drill pipe related data and auxiliary data, preprocess the data, and manage it collaboratively at the local application layer; S3 drilling record data interaction: Data interaction is realized in both the uplink and downlink; S4 Drill Pipe Lifecycle Management: Trace the complete history of drill pipe's idle, commissioning, scrapping, and abnormality through its unique ID; To ensure the accuracy and effectiveness of subsequent data collection, step S1 specifically includes the following steps: S11 Equipment Deployment and Debugging: Complete the installation of dual RFID readers; S12 Tag Binding and System Configuration: Enter the specific sequence range of the threshold RFID tag into the system database; initialize the configuration of timing thresholds: drilling interval threshold t1=0.3s, drilling withdrawal interval threshold t2=0.3s, same tag data filtering threshold ΔT=1s, and bind the card reader to the corresponding drilling host; S13 software initialization configuration: drilling design and planning; initialization of the drill pipe lifecycle management module, setting lifespan threshold and drilling duration threshold; S14 Drilling Task Issuance: The ground client issues a drilling task work order to the downhole drilling host.
[0012] To accurately distinguish between the three working conditions of "drilling in, drilling out, and punching reciprocating", and to solve the counting deviation problem in non-continuous infeeding and outfeeding processes, step S2 specifically includes the following steps: S21 Multi-source Data Acquisition: Drill pipe related: The camera captures the video stream; the first and second card readers simultaneously scan the RFID tags on the drill pipe and upload the ID and timestamp; Auxiliary data: Sensors collect drilling site environment and equipment operating parameters; S22 Data Preprocessing: Data aggregation: The drilling monitoring host receives video streams, RFID data, and sensor data; Dual RFID verification: Timing-ID logic determination: The edge computing node determines the operating condition based on the triggering order and interval of the first and second card readers; Punching condition identification: If the drill rod shows alternating triggering of the second card reader → first card reader → second card reader → first card reader, it is determined to be punching reciprocating; Duplicate filtering: If the same ID is read repeatedly by the first card reader within ΔT, the system will automatically filter it and not record it; S23 Local Application Layer Collaborative Management and Control: Drilling machine core control: Operators switch modes via touchscreen: Homepage mode: Displays real-time counts, drilling depth, equipment status, and an overview of the position of each drill rod; Video modes: preview, switch, and focus the camera feed; Drilling mode: Monitor the construction process, manually correct the count, and view sensor data; Intercom mode: Two-way voice communication with the ground control center; Local data storage and interaction: Real-time storage of count data, operation logs, video clips, and drill pipe lifecycle data.
[0013] To achieve full-process traceability and health management from well entry and construction to well exit / decommissioning, step S3 specifically includes the following steps: S31 uplink: The drilling host reports counting data, drill rod position and status, sensor readings, and alarm information in real time. Receive control commands from the ground; S32 downlink: The drilling host can connect to multiple camera video streams to achieve local display and forwarding; The field equipment acts as the monitoring master station, using UDP communication to poll and collect RFID sensor data, and polling other sensor data via the bus.
[0014] In summary, compared with the prior art, the present invention has the following technical advantages and beneficial effects: (1) Counting accuracy is significantly improved By using dual RFID timing logic to accurately distinguish between punching reciprocating motion and actual drilling advance and retreat, the counting accuracy rate under non-continuous working conditions is ≥99.5%, and the drilling depth calculation error is ≤0.3%, which solves the stubborn problem of counting deviation in this scenario of traditional technology. (2) High degree of management refinement It has achieved full life-cycle management of "one drill rod, one file", reducing the drill rod loss rate to 0, reducing the risk of exceeding the service life by 90%, and allowing managers to query the material information of any drill rod at any time, providing accurate data for consumable cost accounting; (3) Enhanced safety early warning capabilities Automatic warnings for "suspected damage" drill pipes based on cumulative wear data can guide preventative maintenance, effectively reducing the probability of safety accidents such as broken pipes and stuck drills, and improving construction safety. (4) Improved operation and maintenance efficiency Localized downhole operations reduced communication between the surface and underground operations, shortening data synchronization time by over 90%. Following an accident, complete single-pole traceability data improved investigation efficiency by 80%. Attached Figure Description
[0015] Figure 1This is a schematic diagram of the drill pipe precision counting and full life cycle management system of the present invention; Figure 2 This is a flowchart illustrating the drill pipe precision counting and full lifecycle management method of the present invention; Figure 3 This is a flowchart of the logic for determining the drilling advance and retreat of the dual RFID reader of the present invention. Detailed Implementation
[0016] The preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby providing a clearer and more explicit definition of the scope of protection of the present invention.
[0017] like Figure 1 The diagram illustrates a drill pipe precision counting and full lifecycle management system based on time-series recognition, comprising a perception layer, a transmission layer, and a local application layer.
[0018] Specifically, the perception layer includes Embedded RFID tags in drill pipes: These tags are embedded inside each drill pipe and sealed to store a unique ID, which is associated with basic information such as drill pipe specifications and production date. Dual RFID readers: including a first reader (R1) and a second reader (R2). The first reader (R1) is installed on the drill rod side of the drill rig tail with the antenna facing the drill rod side. The second reader (R2) is installed inside the drill rig holder with the antenna facing the drill rod side, ensuring that the drill rod can be identified when it moves in and out.
[0019] Specifically, the transmission layer includes a mining ring network access unit, which is responsible for data reception, acquisition, fusion verification, and transmission.
[0020] Specifically, the application layer includes Local application layer: includes an intrinsically safe downhole drilling host, directly connected to the field RFID reader, equipped with a touch screen deployed on the drilling site control panel, and localized management software to achieve real-time counting display, working condition monitoring and local interaction; Ground application layer: Includes ground server management software to realize full mine drilling task management, counting display, working condition monitoring, drill rod life cycle management and remote interaction.
[0021] Combination Figure 2 , Figure 3 The method for accurate drill pipe counting and full lifecycle management, shown below, is used in the aforementioned accurate drill pipe counting and full lifecycle management system and includes the following steps: S1 Equipment and System Basic Configuration S11 Equipment Deployment and Debugging: Complete the installation of dual RFID readers to ensure coverage of the drill pipe movement trajectory, and debug the communication link.
[0022] S12 Tag Binding and System Configuration: Enter the specific sequence range of threshold RFID tags into the system database to prevent abnormal tags from mixing in and causing counting chaos. Initialize the configuration of timing thresholds: drilling interval threshold t1=0.3s, drilling withdrawal interval threshold t2=0.3s, same tag data filtering threshold ΔT=1s. Bind the card reader to the corresponding drilling host.
[0023] S13 software initialization configuration: drilling design and planning; initialization of the drill pipe lifecycle management module, setting lifespan threshold and drilling time threshold.
[0024] S14 Drilling Task Issuance: The ground client issues a drilling task work order to the downhole drilling host.
[0025] S2 Data Acquisition, Preprocessing and Local Control S21 Multi-source Data Acquisition: Drill pipe related: The camera captures the video stream; R1 and R2 simultaneously scan the drill pipe RFID tag and upload the ID and timestamp.
[0026] Auxiliary data: Sensors collect drilling site environment and equipment operating parameters.
[0027] S22 Data Preprocessing: Data aggregation: The drilling monitoring host receives video streams, RFID data, and sensor data.
[0028] Dual RFID verification: Timing-ID logic determination: Edge computing nodes determine the operating conditions based on the triggering order and interval of R1 and R2.
[0029] For example, for a drill pipe with ID RFID-20260001, R1 is triggered at 08:32:40 and R2 is triggered at 08:32:40.6 (Δt=0.6s∈[t1,t2]), which is determined to be drilling.
[0030] Punching condition identification: If the drill rod subsequently experiences alternating triggering of R2→R1→R2→R1 at 08:35:22, it is determined to be punching reciprocating.
[0031] Duplicate filtering: If the same ID is read repeatedly by R1 within ΔT, the system will automatically filter it and not record it.
[0032] S23 Local Application Layer Collaborative Management and Control: Drilling machine core control: Operators switch modes via touchscreen: Homepage mode: Displays real-time counts, drilling depth, equipment status, and an overview of the position of each drill rod.
[0033] Video mode: preview, switch, and focus the camera view.
[0034] Drilling mode: Monitor the construction process, manually correct the count, and view sensor data.
[0035] Intercom mode: Two-way voice communication with the ground dispatch center.
[0036] Local data storage and interaction: Real-time storage of count data, operation logs, video clips, and drill pipe lifecycle data.
[0037] S3 Drilling Record Data Interaction S31 Uplink (Drilling Host → Ground): Real-time reporting of counting data, drill rod position and status, sensor readings, and alarm information.
[0038] Receive control commands (mission adjustments, parameter settings) from the ground.
[0039] S32 downlink (drilling host → field equipment): It can access video streams from multiple cameras to achieve local display and forwarding.
[0040] As the monitoring master station, it uses UDP communication to poll and collect RFID sensor data, and polls other sensor data via the bus.
[0041] S4 Drill Pipe Lifecycle Management S41 Full Lifecycle Traceability: Through the unique ID of the drill pipe, its complete history of idleness, use, scrapping, and abnormality can be traced. For example, in the event of a stuck drill accident, the ID, specifications, cumulative drilling meters, number of punching attempts, and last working condition of the drill pipe involved can be retrieved immediately to assist in accident analysis. The system can also configure normal wear, stuck and discarded statuses for the corresponding markers.
[0042] To facilitate understanding of the technical solution of this invention, the following describes in detail, in conjunction with a specific downhole construction scenario, a drill pipe precision counting and full life cycle management system and method based on time sequence recognition as described in this application.
[0043] Scene setting: In the 1203 return airway of a coal mine, there is a directional drilling rig numbered "ZJ-05" (hereinafter referred to as rig 05). The ground dispatch center plans to construct the "1203-05" gas drainage borehole within the operating range of this drilling rig. The system described in this application is deployed on site, and the intrinsically safe drilling host in the mine has been physically bound to rig 05, serving as its dedicated control center.
[0044] Step 1: Batch warehousing of drill pipes and binding them to drilling rig assets Assuming a new batch of 100 high-strength drill pipes is received into the ground material warehouse, the system will automatically assign RFID serial numbers ranging from RFID-2026-001 to RFID-2026-100.
[0045] Warehouse entry and filing: The warehouse manager uses the ground server management software to enter the specifications (1.5 meters / piece), material, production date and rated life (set to 10,000 meters) of this batch of drill pipes into the database, and marks the status as "idle in warehouse".
[0046] Rig Binding: Based on the daily maintenance needs and expected workload of rig No. 05, the ground dispatch center retrieves 20 drill rods (ID: RFID-2026-001 to RFID-2026-020) from the inventory and binds them to rig No. 05 through the "asset distribution" operation via software.
[0047] Asset Ownership: The system automatically updates the status of these 20 drill pipes to "Ready for Use" (i.e., the assets belong to Drill Rig 05 and are physically stored on the material rack next to the rig). At this time, if the card reader of other drill rigs (such as ZJ-06) scans these IDs, the system will prompt "Asset Ownership Conflict" to prevent drill pipes from being mixed or lost between different drill rigs.
[0048] On-site verification: After receiving the 20 drill pipes at drilling rig No. 05, the downhole workers can confirm their receipt of the drill pipes using the R1 / R2 card reader on the rig. The system verifies whether the IDs of the 20 drill pipes are within the preset sequence range and confirms their ownership as "ZJ-05" to prevent incorrect material receipt.
[0049] Step Two: Construction Preparation and System Initialization The downhole operator selects the "1203-05" drilling task on the intrinsically safe drilling host touch screen of drilling rig No. 05. The system loads the work order and automatically initializes the parameters: drilling advance count = 0, drilling retreat count = 0, drilling depth = 0.
[0050] The system loads preset time-series thresholds: drilling interval threshold t1=0.3s, drilling withdrawal interval threshold t2=0.3s, and same-label data filtering threshold ΔT=1s.
[0051] Note: The system interface displays "Current inventory of drilling rig #05: 20 drill rods" at this time, not "Task inventory". This is because drill rods are fixed assets of the drilling rig. After drilling the current hole, if there is no damage, they will continue to belong to the drilling rig for subsequent tasks.
[0052] Step 3: Normal Drilling Progress Count and Asset Consumption The operation began, and the operator took the first drill rod (ID: RFID-2026-001) from the material rack of drill rig No. 05.
[0053] 08:30:10.100: The first card reader R1 scanned the drill pipe ID: RFID-2026-001 and uploaded the timestamp.
[0054] 08:30:10.350: The second card reader R2 scanned the same ID and uploaded the timestamp.
[0055] Edge computing determination: The system calculates the time interval Δt = 0.25s. Since R1 triggers before R2, and 0s < 0.25s ≤ t1, the system determines it as "drilling".
[0056] System response: The "Drilling Count" on the drilling host touchscreen is updated to 1. The system retrieves the drill pipe specifications and updates the "Drilling Depth" to 1.5 meters. At the same time, the system updates the lifecycle status of the drill pipe to "In Use Downhole" and records its current borehole as "1203-05".
[0057] Asset ledger update: The system backend records that the drill pipe has consumed 1.5 meters of its lifespan, and the cumulative footage has changed from 0 meters to 1.5 meters. The touchscreen displays "Remaining inventory for drilling rig No. 05: 19 drill pipes".
[0058] Error prevention mechanism: If an operator mistakenly takes an asset that is not part of the drilling rig (such as an abandoned drill rod picked up casually), the system will immediately trigger an audible and visual alarm (pop-up window + buzzer) and suspend the counting, requiring manual verification.
[0059] Subsequently, the operators connected the 2nd to the 10th drill rods in succession. Based on the above dual RFID timing logic, the system accumulated the drilling count to 10, and the drilling depth was updated to 15 meters.
[0060] Step 4: Punching Condition Identification and Interference Resistance When drilling reaches 15 meters, punching operation is required, and the drilling rig drives the drill rod to perform high-speed reciprocating motion.
[0061] 08:45:22.100: R2 triggered (ID: RFID-2026-010).
[0062] 08:45:22.300: R1 triggered (ID: RFID-2026-010).
[0063] 08:45:22.600: R2 is triggered again (ID: RFID-2026-010).
[0064] 08:45:22.800: R1 is triggered again (ID: RFID-2026-010).
[0065] Edge computing determination: The system identifies a rapid alternating trigger sequence of R2→R1→R2→R1. Based on preset logic, it determines that the current operating condition is "punching reciprocating".
[0066] System Response: The system automatically locks the counting logic, pausing the drilling / retracting count to prevent the drill rod from being counted repeatedly during punching. A "Punching Mode" prompt appears on the touchscreen. After punching is completed, the sequence returns to normal, and the counting logic automatically unlocks.
[0067] Step 5: Drill Retraction Count Drilling is complete; begin retracting the drill.
[0068] 09:10:05.200: R2 scanned the drill pipe ID: RFID-2026-010 and uploaded the timestamp.
[0069] 09:10:05.450: R1 scanned the same ID and uploaded the timestamp.
[0070] Edge computing determination: The system calculates the time interval Δt = 0.25s. Since R2 triggers before R1, and 0s < 0.25s ≤ t2, the system determines it as "retracting from the drill".
[0071] System response: "Drill Retrieval Count" updated to 1, "Drilling Depth" deducted by 1.5 meters. The system updated the drill rod status to "On-Demand" (i.e., returned to the material rack of drill rig 05, awaiting the next drilling task), instead of directly returning it to the warehouse.
[0072] Step Six: Closed-Loop System for the Entire Lifecycle and Early Warning of Disposal After the construction is completed, the system automatically generates a construction log for borehole "1203-05".
[0073] History update: The status of drill pipe RFID-2026-001 to 010 remains "on standby", continues to belong to drill rig No. 05, and waits to perform the next task (such as drilling holes No. 1203-06).
[0074] Lifespan warning: The system scans the cumulative footage of all drill pipes under drilling rig No. 05. Assuming that drill pipe RFID-2026-001 had a cumulative footage of 9985 meters before this operation, adding this 15 meters, the cumulative footage reaches 10000 meters, reaching the preset lifespan threshold.
[0075] System Response: The ground server management software automatically marks the drill pipe as "reached its service life limit, recommended for scrapping". When drilling rig No. 05 attempts to use the drill pipe again (R1 / R2 scans the ID), the drilling host will pop up a window and continuously sound an alarm, indicating "This drill pipe is scrapped, do not enter the hole", warning the operators to replace it with a new drill pipe and prevent downhole accidents caused by drill pipe fatigue fracture.
[0076] Asset Return to Warehouse: When Drill Rig No. 05 needs maintenance or is moved out of Lane 1203, the warehouse manager initiates the "Asset Return to Warehouse" operation through the system. The system verifies the status of the drill rods under the name of the drilling rig. After confirming that there are no errors, the status of the drill rods is updated from "In-service" to "Idle in Warehouse" or "Pending Repair / Scrap," completing the closed loop of asset transfer.
[0077] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape, principle and application direction of this application should be covered within the scope of protection of this application.
Claims
1. A drill pipe precision counting and full lifecycle management system based on time-series recognition, characterized in that, It includes the perception layer, the transport layer, and the local application layer; The sensing layer includes drill pipe embedded RFID tags and dual RFID readers. The embedded RFID tags are embedded inside each drill pipe and store a unique ID. The dual RFID readers include a first reader and a second reader. The transmission layer includes a mining ring network access unit, which is responsible for data reception, acquisition, fusion verification and transmission; The application layer includes a local application layer and a ground application layer. The local application layer includes an edge drilling host, which deploys localized management software to realize real-time counting display, working condition monitoring and local interaction. The ground application layer includes ground server management software to realize full mine drilling task management, counting display, working condition monitoring, drill rod life cycle management and remote interaction.
2. The drill pipe precision counting and full life cycle management system according to claim 1, characterized in that, The first RFID reader is installed at the drill rod exit of the drill rig tail, with the antenna facing the drill rod's movement trajectory. The second RFID reader is installed inside the drill rig's clamp to ensure that the drill rod can be identified when it is clamped or released.
3. A method for precise counting and full lifecycle management of drill pipes, used in the precise counting and full lifecycle management system for drill pipes as described in claim 1 or 2, characterized in that, Includes the following steps: S1 Equipment and System Basic Configuration: Complete the configuration of equipment, system, and software, bind tags, and issue drilling tasks; S2 Data Acquisition, Preprocessing and Local Control: Acquire drill pipe related data and auxiliary data, preprocess the data, and manage it collaboratively at the local application layer; S3 drilling record data interaction: Data interaction is realized in both the uplink and downlink; S4 Drill Pipe Lifecycle Management: Trace the complete history of drill pipe's idle, commissioning, scrapping, and abnormality through its unique ID.
4. The method for accurate counting and full life-cycle management of drill pipes according to claim 3, characterized in that, Step S1 specifically includes the following steps: S11 Equipment Deployment and Debugging: Complete the installation of dual RFID readers; S12 Tag Binding and System Configuration: Enter the specific sequence range of the threshold RFID tag into the system database; initialize the timing threshold configuration; bind the card reader to the corresponding drilling host; S13 software initialization configuration: drilling design and planning; initialization of the drill pipe lifecycle management module, setting lifespan threshold and drilling duration threshold; S14 Drilling Task Issuance: The ground client issues a drilling task work order to the downhole drilling host.
5. The method for accurate drill pipe counting and full lifecycle management according to claim 4, characterized in that, Step S2 specifically includes the following steps: S21 Multi-source data acquisition: Drill pipe related: The camera captures the video stream; the first and second card readers simultaneously scan the RFID tags on the drill pipe and upload the ID and timestamp; Auxiliary data: Sensors collect drilling site environment and equipment operating parameters; S22 Data Preprocessing: Data aggregation: The drilling monitoring host receives video streams, RFID data, and sensor data; Dual RFID verification: Timing-ID logic determination: The edge computing node determines the operating condition based on the triggering order and interval of the first and second card readers; Punching condition identification: If the drill rod shows alternating triggering of the second card reader → first card reader → second card reader → first card reader, it is determined to be punching reciprocating; Duplicate filtering: If the same ID is read repeatedly by the first card reader within ΔT, the system will automatically filter it and not record it; S23 Local Application Layer Collaborative Management and Control: Drilling machine core control: Operators switch modes via touchscreen: Homepage mode: Displays real-time counts, drilling depth, equipment status, and an overview of the position of each drill rod; Video modes: preview, switch, and focus the camera feed; Drilling mode: Monitor the construction process, manually correct the count, and view sensor data; Intercom mode: Two-way voice communication with the ground control center; Local data storage and interaction: Real-time storage of count data, operation logs, video clips, and drill pipe lifecycle data.
6. The method for accurate counting and full life-cycle management of drill pipes according to claim 5, characterized in that, Step S3 specifically includes the following steps: S31 uplink: The drilling host reports counting data, drill rod position and status, sensor readings, and alarm information in real time. Receive control commands from the ground; S32 downlink: The drilling host can connect to multiple camera video streams to achieve local display and forwarding; The field equipment acts as the monitoring master station, using UDP communication to poll and collect RFID sensor data, and polling other sensor data via the bus.
