Expressway region self-consistent energy extreme weather emergency control method

By collecting and analyzing multi-source operational data from highway areas, the system enables continuous power supply analysis and tiered triggering control under extreme weather conditions. This solves the problems of delayed power supply switching and discontinuous emergency control, ensuring the stable operation of the highway area power supply system under extreme weather conditions.

CN123073743APending Publication Date: 2026-11-10CHINA ACAD OF TRANSPORTATION SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611207826.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-11
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

The power supply system in the highway area is slow to switch power or has discontinuous emergency control under extreme weather conditions, making it difficult to meet the timeliness requirements for rapid power restoration of critical facilities. Moreover, the existing emergency control scheme cannot adapt to the narrow strip distribution and dynamic load changes.

Method used

Collect multi-source operation data for time alignment processing, analyze power supply continuity, execute hierarchical trigger control, switch to off-grid emergency power supply operation mode when grid power supply is interrupted, hierarchically dispatch regional energy, energy storage and backup power supply resources, and dynamically adjust the power supply dispatch process.

Benefits of technology

It improves the timeliness of power supply switching and the continuity of emergency control, meets the rapid power restoration needs of critical facilities, prioritizes core loads, adapts to the special constraints of chain topology, and avoids dispatch failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123073743A_ABST
    Figure CN123073743A_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of highway road energy, and more particularly to a highway road area self-consistent energy extreme weather emergency control method, comprising the following steps: collecting meteorological, power grid, distributed energy, energy storage and load data and performing time alignment, carrying out energy supply continuity analysis and power grid energy supply interruption risk determination, executing hierarchical triggering control according to the risk level, realizing pre-control operation and power grid disconnection control; in the off-grid emergency energy supply mode, the road area load is classified, the priority of energy, energy storage and standby power supply is scheduled in combination with energy supply constraints, and dynamic optimization is implemented based on rolling update data to ensure energy supply continuity and operation safety under extreme conditions. In the present application, through time alignment of multi-source operation data and energy supply continuity analysis, the power grid energy supply interruption risk determination and hierarchical triggering control are realized, the off-grid emergency energy supply mode is switched when the power is off, and the problems of energy supply switching lag and control discontinuity under extreme weather are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of highway roadway energy technology, and in particular to a method for emergency control of self-sufficient energy in highway roadways during extreme weather. Background Technology

[0002] With the development of intelligent highway infrastructure and diversified energy structures, integrated energy systems are gradually being built within highway areas, combining distributed new energy power generation units, energy storage devices, and backup power supply equipment to ensure the stable operation of toll stations, monitoring systems, tunnel lighting, communication equipment, and roadside service facilities. Under normal operating conditions, such roadside energy systems are typically connected to the external power grid, meeting daily energy needs through grid power supply and coordination with local energy sources. In terms of operation and maintenance, the existing model heavily relies on manual inspections and fault diagnosis. Due to the dispersed locations of highway stations and long travel distances, the fault location and emergency repair recovery cycle is long, making it difficult to meet the timeliness requirements for rapid power restoration of critical facilities, especially under extreme weather conditions.

[0003] Unlike general microgrids such as industrial park microgrids and building microgrids, which are distributed in a point-like or ring-like pattern, highway roadside energy systems exhibit a typical narrow, elongated strip-like distribution. Their photovoltaic power generation units, energy storage devices, and loads are dispersed along the highway, forming a chain-like topology through nodes such as service areas and toll stations. In this chain-like topology, the power supply distance between nodes along the route is long, and power transmission is significantly limited by line capacity. An interruption in the power supply of any node can affect the power supply reliability of adjacent nodes through the chain structure. Furthermore, the load composition and importance vary spatially across different sections of the highway, and the distribution of meteorological conditions and power grid status along the route is also uneven. In addition, severe weather conditions such as blizzards, freezing rain, and severe convection often occur in strip-like segments along the highway, with significant differences in the types and intensities of meteorological disasters faced by different sections. This results in a non-uniform distribution of energy supply risks at various nodes along the route. These characteristics make it impossible to directly transplant general microgrid emergency control schemes to highway scenarios. There is an urgent need to design specialized extreme weather emergency control methods for chain topologies. At the same time, the traffic flow along the highway exhibits significant tidal fluctuations, causing drastic spatiotemporal dynamic changes in charging load and facility energy demand, further exacerbating the difficulty of matching energy supply and demand.

[0004] Traditional highway roadside energy supply control mostly adopts post-event response or single-state judgment methods. Due to the lack of continuous analysis and hierarchical triggering mechanisms based on multi-source operation data, problems such as delayed energy supply switching or discontinuous emergency control connection are caused in extreme weather conditions. Summary of the Invention

[0005] To overcome the above shortcomings, this invention provides a self-consistent energy emergency control method for highways under extreme weather conditions. It aims to improve the traditional highway energy supply control, which mostly adopts post-event response or single-state judgment methods, and is prone to problems such as delayed energy supply switching or discontinuous emergency control connection under extreme weather conditions.

[0006] This invention provides the following technical solution: a method for emergency control of self-sufficient energy in highway areas during extreme weather. The self-sufficient energy in highway areas includes multiple energy nodes distributed along the highway, which form a chain topology through service areas or toll stations. The method includes the following steps: S1. Collect meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information related to highway road area energy supply, and perform time alignment processing on the collected information to form operation data; S2. Analyze the continuity of power supply within the preset analysis time range based on the operation data, determine whether there is a risk of power grid power supply interruption, and generate risk assessment results. S3. Execute graded trigger control based on risk assessment results. When there is a risk of grid power supply interruption, execute pre-control operation. When grid power supply interruption is confirmed, execute energy interaction disconnection operation with the grid. S4. After performing the energy interaction disconnection operation with the power grid, switch to the off-grid emergency power supply operation mode. In the off-grid emergency power supply operation mode, classify the load of the road area, generate the classification results of the load of the road area, and coordinate and schedule the energy, energy storage and backup power supply resources of the road area. S5. In the off-grid emergency power supply operation mode, the output of energy, energy storage and backup power supply resources in the road area is scheduled based on the hierarchical results of the road area load as the power supply scheduling constraint. S6. In the off-grid emergency power supply operation mode, the power supply scheduling process is dynamically adjusted based on the updated operation data.

[0007] By adopting the above technical solution, operational data is generated by collecting meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information and performing time alignment processing. Based on the operational data, the continuity of power supply within a preset analysis time range is analyzed and the risk of power grid power supply interruption is judged. Then, based on the risk judgment result, graded trigger control is executed, and when a power grid power supply interruption is confirmed, the system switches to an off-grid emergency power supply operation mode. This improves the problem that traditional highway road area power supply control mostly adopts a post-event response or single-state judgment method. Due to the lack of continuous analysis and graded trigger mechanism based on multi-source operational data, the power supply switching is delayed or the emergency control connection is not continuous under extreme weather conditions.

[0008] Furthermore, in S1, the step of performing time alignment processing on the collected information to form operational data includes: The collected meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information of each energy node are associated with corresponding time identifiers. Determine the target time granularity for running data generation; For all types of information with sampling intervals smaller than the target time granularity, time aggregation processing is performed according to the target time granularity; For various types of information with sampling time intervals greater than the target time granularity or obtained based on event triggering, time mapping processing is performed according to the time identifier; Correct or remove any information with missing or abnormal time stamps; And generate runtime data based on various information after time alignment processing.

[0009] Furthermore, in S2, the step of analyzing the power supply continuity within a preset analysis time range based on operational data includes: Determine the start and end times of the preset analysis time range; The data includes meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information for each energy node in the operation data, corresponding to the analysis time range. The various types of information of each energy node are arranged in chronological order to form an operational status sequence divided by time period or time point; The continuity of power supply at each energy node is detected at each time period or point in time, including whether various information indicates potential signs of power supply interruption; The continuous monitoring results for each time period or point in time are summarized to form the energy supply continuity analysis results.

[0010] Furthermore, in S2, the step of determining whether there is a risk of grid power supply interruption includes: The continuity detection results for each time period or point in time in the power supply continuity analysis results are iterated through. Determine whether the risk of power grid power supply interruption exists in each time period or time point according to the preset power grid power supply interruption judgment rules; The results of the assessments at different time periods or points in time are summarized to form the overall power grid power supply interruption risk assessment results. Output the overall power grid power supply interruption risk assessment results.

[0011] Furthermore, in S3, the step of executing tiered trigger control based on the risk assessment result includes: Obtain the risk assessment result; According to the preset risk level classification rules, the risk assessment results are divided into several risk levels; Determine the control operation sequence corresponding to each risk level according to the risk level order; The control operations corresponding to each level are triggered sequentially. The control operations are passed to each energy node level by level along the chain topology, including performing pre-control operations when there is a risk of grid power supply interruption, and performing energy interaction disconnection operations with the grid when grid power supply interruption is confirmed. Record the control operations that have been triggered and their corresponding risk levels.

[0012] Furthermore, in S4, the step of classifying the road area load and generating the classification results of the road area load under the off-grid emergency power supply operation mode includes: Obtain the road area load energy demand information of each energy node under the off-grid emergency power supply operation mode; Based on the predefined load classification criteria, the loads are divided into core guarantee loads, important support loads, and general service loads; The output of the classification results corresponding to each load level forms the classification results of the road area load.

[0013] Furthermore, in S5, the step of scheduling the output of road area energy, energy storage, and backup energy resources based on the hierarchical results of road area load as energy supply scheduling constraints includes: Obtain the classification results of road area load under off-grid emergency power supply operation mode; Based on the classification results of road area load, power supply scheduling constraints are established, including power transmission constraints based on the chain topology. The available power output of roadside energy, energy storage, and backup energy resources is statistically analyzed. According to the energy supply dispatch constraints, the output power of road area energy, energy storage and backup energy resources will be allocated to various loads; Output power allocation scheme for energy, energy storage and backup energy resources in the road area.

[0014] Furthermore, in S6, the step of dynamically adjusting the energy supply scheduling process based on the updated operating data includes: S61. Continuously acquire the road area energy operation status information, energy storage status information, backup energy supply resource operation status information and road area load energy demand information of each energy node to form updated operation data; S62. Update the energy supply scheduling constraints based on the updated operating data, including load classification results and available power of various energy supply resources; S63. Based on the updated constraints, reallocate the power output of road area energy, energy storage and backup energy resources; S64. Output a new power supply scheduling scheme, and repeat steps S61 to S63 in the next cycle.

[0015] The present invention has the following beneficial effects: 1. In this invention, operational data is generated by collecting meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information and performing time alignment processing. Based on the operational data, the continuity of energy supply within a preset analysis time range is analyzed and the risk of power grid power supply interruption is judged. Then, based on the risk judgment result, graded trigger control is executed, and when a power grid power supply interruption is confirmed, the system switches to an off-grid emergency power supply operation mode. This improves the problem that traditional highway road area energy supply control mostly adopts a post-event response or single-state judgment method. Due to the lack of continuous analysis and graded trigger mechanism based on multi-source operational data, the energy supply switching is delayed or the emergency control connection is discontinuous under extreme weather conditions.

[0016] 2. In this invention, by classifying the road area load under the off-grid emergency power supply operation mode and generating the classification result of the road area load, and then using the classification result of the road area load as the power supply scheduling constraint, the output of road area energy, energy storage and backup power supply resources is scheduled. This improves the problem that traditional off-grid power supply scheduling mostly adopts a unified load allocation method, which does not distinguish the importance of different loads, resulting in the inability to reflect the priority order of power supply for critical loads and general loads under resource constraints.

[0017] 3. In this invention, by continuously acquiring updated operating data in the off-grid emergency power supply operation mode and updating the power supply scheduling constraints based on the updated operating data, the power output of road area energy, energy storage and backup power supply resources is redistributed and the scheduling process is executed cyclically. This improves the problem that traditional emergency power supply scheduling mostly adopts fixed scheduling schemes, which do not dynamically adjust in combination with real-time operating status changes, resulting in deviation between power supply scheduling and actual operating status.

[0018] 4. In this invention, by applying the control method to a distributed energy system along a highway with a chain topology consisting of service areas or toll stations, the special constraints such as communication time differences, power transmission capacity limitations, and load spatial distribution differences among nodes along the chain topology are fully considered. This enables the step-by-step transmission of control operations along the chain topology and the coordinated power supply guarantee of all nodes along the entire line. This effectively distinguishes it from the centralized emergency control scheme of general microgrids and avoids the scheduling failure problem caused by ignoring the special constraints of the chain topology when simply transplanting general microgrid technology to the highway scenario. Attached Figure Description

[0019] Figure 1 This is a flowchart illustrating the emergency control method for self-consistent energy in highway areas during extreme weather proposed in this invention. Figure 2 A schematic diagram of a self-consistent energy chain topology for a highway network provided by the present invention; Figure 3 A schematic diagram of the power supply continuity analysis and power grid power supply interruption risk assessment process based on operational data provided by this invention; Figure 4 This invention provides a schematic diagram of the risk-level triggering control and off-grid emergency power supply operation mode switching process. Figure 5 This is a schematic diagram of the road area load classification and energy resource coordination and scheduling process under the off-grid emergency power supply operation mode provided by the present invention. Figure 6 This is a schematic diagram of the module architecture of the highway self-consistent energy extreme weather emergency control system provided by the present invention. Detailed Implementation

[0020] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0021] Example 1: In the first embodiment of the present invention, the present invention provides a method for emergency control of self-consistent energy in highway areas during extreme weather. Self-consistent energy in highway areas includes multiple energy nodes distributed along the highway, which form a chain-like topology through service areas or toll stations, such as... Figure 2 As shown, each energy node includes at least a distributed generation unit, an energy storage unit, and a load unit. Power transmission between nodes is achieved through power supply lines. In a chain topology, the power scheduling of any node must satisfy the power transmission constraints along the line, that is, the power exchange between adjacent nodes is limited by line capacity and voltage drop limitations, such as... Figure 1 As shown, the process includes the following steps: S1, collecting meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information related to highway road area energy supply, and performing time alignment processing on the collected information to form operation data; Furthermore, in S1, the steps of time-aligning the collected information to form runtime data include: The collected meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information of each energy node are associated with corresponding time identifiers. Determine the target time granularity for running data generation; For all types of information with sampling intervals smaller than the target time granularity, time aggregation processing is performed according to the target time granularity; For various types of information with sampling time intervals greater than the target time granularity or obtained based on event triggering, time mapping processing is performed according to the time identifier; Correct or remove any information with missing or abnormal time stamps; And generate runtime data based on various information after time alignment processing.

[0022] Specifically, the system first collects meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information. All types of information originate from the real-time sampling data stream or event log data stream of the corresponding monitoring system. Each data point includes a data value and a collection timestamp. Let the first data point be... The data representation of class information on the original time series is as follows ;in For sampling time identification, This represents the numerical value of the physical quantity or state quantity corresponding to the category. The timestamp is automatically generated by the data acquisition system during data generation. After obtaining all the raw data, a unified target time granularity is determined. The target time granularity is preset according to the time resolution required for scheduling control, and is used to generate a unified time axis. ;in The index is a natural number; for sampling time intervals less than... Continuous data, categorized by time interval Perform time aggregation processing, and the aggregation result is represented as follows: ;in To determine the number of sampling points falling within this time interval, an equally spaced data sequence corresponding to the target time granularity is obtained; for sampling time intervals greater than [a certain value], [the remaining data is not specified]. Or, based on data obtained from event triggers, the original timestamp is determined according to the time identifier. Mapped to the nearest unified timeline node The mapping rules satisfy The corresponding data is then assigned to that time node to form aligned data. For data with missing time markers or abnormal jumps, anomalies are identified through time series integrity verification. When the difference between adjacent time points does not meet the preset continuity condition, a correction value is generated for continuous data using linear interpolation. ;in and Valid time identifiers are used at both ends of the abnormal interval; data that cannot be corrected is removed. After completing the above time aggregation, time mapping, and abnormality correction, the data of each category are placed on a unified time axis. The above are combined to form a structured set of operational data. ;in This represents the total number of information categories. The generated operational data maintains consistency across the time dimension and can be directly used as input data for subsequent power supply continuity analysis steps. It is used to calculate the trend of power supply capacity changes, grid power supply stability indicators, and load matching degree within a preset analysis time range, thereby providing a unified data foundation for subsequent risk assessment and graded triggering control. The preset analysis time range is determined using a rolling time window method, with a window length of T. w After each scheduling cycle T c The data is updated once forward to ensure the timeliness and continuity of the risk analysis. Since the energy nodes along the highway are distributed in a chain, the communication distance between different nodes and the data acquisition center varies, resulting in inconsistent arrival times of data from each node. This step achieves synchronous alignment of the operating data of each node along the highway through unified time axis mapping, providing a consistent time benchmark for subsequent cross-node collaborative energy supply continuity analysis.

[0023] like Figure 3 As shown, S2, based on the operating data, analyze the continuity of power supply within the preset analysis time range, determine whether there is a risk of power grid power supply interruption, and generate risk assessment results; Furthermore, in S2, the steps for analyzing the continuity of power supply within a preset analysis time range based on operational data include: Determine the start and end times of the preset analysis time range; The data includes meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information for each energy node within the operational data, corresponding to the analysis time range. Arrange various types of information from each energy node in chronological order to form an operational status sequence divided by time period or time point; Detect the continuity of power supply at each energy node in each time period or point in time, including whether various information shows signs of potential power supply interruption; The continuous monitoring results for each time period or point in time are summarized to form the energy supply continuity analysis results.

[0024] Specifically, the first step is to determine the start time of the preset analysis time range. and the end time The start and end times are set to form the analysis interval based on the current running time and risk prediction requirements. Subsequently, from the runtime data set generated in the steps Extract the satisfying A subset of the data is used as input for analysis, where at any given time point... Above, the power supplied by the power grid is denoted as The output power of the energy in the road area is denoted as The energy storage discharge power is denoted as The output power of the backup energy supply resources is denoted as The power demand of the road area is denoted as The power data mentioned above are all derived from the corresponding category of state variables or measured values ​​in the aforementioned operating data; in the time dimension, according to The increasing order forms the operating state sequence, and at each time node, the matching relationship between available power and load demand is calculated, defining the total available power as... And construct an energy margin index ,when When a power supply shortage is detected at a given time point, a power grid anomaly criterion sequence is formed by combining the power grid operation status information with the power outage indicator or voltage anomaly indicator. ;in Extract and convert the corresponding state fields from the power grid operation status information into numerical state variables; construct a power grid power supply interruption risk judgment function at each time node. Its judgment rules include: when When a power grid outage is indicated, it is directly determined that there is a risk of power grid supply interruption at that time point, and so on. =1; when This indicates abnormal power grid operation and insufficient power supply margin. When the value is less than 0, it is judged as a high-level power grid supply interruption risk, and... =1; when the power grid is operating normally but When the value is less than 0, it is identified as a potential risk of insufficient energy supply and a warning sign is recorded. =1; in other cases, let =1; =0, thus obtaining the time series risk identifier set. Under the chain topology, the energy supply continuity analysis needs to cover all energy nodes along the route. Different nodes may face different meteorological conditions and power grid status. In particular, severe weather such as blizzards, freezing rain, and strong convection often appear in strip-shaped segments along the highway. The types and intensities of meteorological disasters in different sections vary significantly, resulting in a non-uniform distribution of energy supply risks at each node along the route. Therefore, this step independently calculates and determines the power supply margin index and grid anomaly criteria for each node, and summarizes the risk determination results of each node to form an overall risk determination result for the entire line. This achieves comprehensive perception and collaborative determination of power supply risks for each node in a chain topology. For example, some sections may experience strong winds or heavy rain while other sections may have relatively stable weather, or some nodes may have normal grid power supply while adjacent nodes may experience voltage drops. Therefore, this step independently calculates and determines the power supply margin index and grid anomaly criteria for each node, and summarizes the risk determination results of each node to form an overall risk determination result for the entire line. This achieves comprehensive perception and collaborative determination of power supply risks for each node in a chain topology. The above risk determination rules remain consistent in this embodiment. Subsequent grid power supply interruption risk determination steps do not redefine new determination logic but directly call this risk determination function. This serves as a unified judgment standard, ensuring the consistency of the internal logic of the instruction manual; risk indicators for all time points within the analysis period are summarized to form an interval risk index. ,when When the value is greater than zero, it is determined that there is a risk of power grid power supply interruption within the preset analysis time range, and risk judgment result data is generated. The risk judgment result includes the interval risk identifier and the sequence of risk occurrence time and location. The generated risk judgment result serves as the input for the next step of hierarchical trigger control, which is used to determine whether to perform pre-control operation or disconnect energy interaction with the power grid, thereby realizing the data connection and process connection between power supply continuity analysis and trigger control logic.

[0025] Furthermore, in S2, the steps for determining whether there is a risk of grid power supply interruption include: Iterate through the continuity detection results for each time period or point in time in the power supply continuity analysis results; Determine whether there is a risk of power grid power supply interruption in each time period or time point according to the preset power grid power supply interruption judgment rules; The results of the assessments at different time periods or points in time are summarized to form the overall power grid power supply interruption risk assessment results. Output the overall power grid power supply interruption risk assessment results.

[0026] Specifically, the input data for determining whether there is a risk of power grid interruption is the time-series risk baseline data obtained from the power supply continuity analysis step. This data includes the power supply margin index at each time point within the analysis time range. and power grid operation status identification quantity ;in The difference between the total available power and the power demand of the road area reflects the degree of matching between energy supply capacity and load demand. It is derived from power outage signals, voltage anomaly signals, or frequency anomaly signals in the power grid operation status information, and is used to indicate whether the power grid operation status is abnormal; in the time dimension, it traverses each time node in a unified time axis order, and constructs a power grid power supply interruption determination function for each time node. When the predefined decision rules are met, let Otherwise Predefined judgment rules and risk judgment functions constructed during the energy supply continuity analysis phase. Consistency includes: when the power grid is in operation When a power outage is indicated, it is directly judged as a risk of grid power supply interruption; when the grid operation is abnormal and the power supply margin is insufficient... A value less than 0 indicates a high-level risk of power grid interruption; when the power grid is operating normally but the power supply margin is insufficient... When the value is less than 0, it is considered a potential energy shortage risk. The continuous analysis results are then converted into a time-series risk assessment indicator set using the aforementioned rules. After traversing all time points, the risk assessment indicators are summarized to construct an interval risk statistic. ;in and To preset the start and end times of the analysis time range, when When the overall power grid power supply interruption risk assessment result is generated, the state of risk exists. When the overall power grid power supply interruption risk assessment result is generated and the state is deemed risk-free, records are kept that meet the requirements. The time node sequence serves as the data for the time and location of risk occurrence; the output of the overall power grid power supply interruption risk judgment result includes the risk status identifier and the corresponding time node information. This result serves as the input basis for subsequent hierarchical triggering control steps, used to determine whether to perform pre-control operation or disconnect energy interaction with the power grid, thereby realizing the transformation from continuous analysis results to triggering control logic, ensuring that subsequent control steps are executed based on the unified judgment result.

[0027] like Figure 4 As shown, S3 executes graded trigger control based on the risk assessment result, performs pre-control operation when there is a risk of grid power supply interruption, and performs energy interaction disconnection operation with the grid when it is confirmed that a grid power supply interruption has occurred. Furthermore, in S3, the steps for implementing tiered trigger control based on the risk assessment results include: Obtain the risk assessment results; Based on the preset risk level classification rules, the risk assessment results are divided into several risk levels; Determine the control operation sequence corresponding to each risk level according to the risk level order; The control operations corresponding to each level are triggered sequentially. The control operations are passed to each energy node level by level along the chain topology, including performing pre-control operations when there is a risk of grid power supply interruption, and performing energy interaction disconnection operations with the grid when grid power supply interruption is confirmed. Record the control operations that have been triggered and their corresponding risk levels.

[0028] Specifically, the input data for the tiered trigger control is the overall power grid power supply interruption risk assessment result generated in the steps, which includes interval risk statistics. and the time sequence of risk occurrence ;in Risk assessment function within the analysis time range The cumulative value is obtained. The judgment rules are derived from the results of power supply continuity analysis and power grid operation status information; firstly, the risk judgment results are read and risk level judgment indicators are constructed. Risk states are mapped to different levels according to predefined risk level classification rules. These rules are determined based on interval risk statistics and power grid status confirmation information. Furthermore, if the power grid operation status does not show any actual power outage indicators, it is defined as a warning level and recorded as such. When a power outage confirmation flag is present in the power grid operation status information, it is defined as a power outage level and recorded as [missing information]. Risk level variables The risk level is directly calculated using the above-mentioned judgment rules; after obtaining the risk level, the corresponding control operation sequence is determined according to the risk level order, and a control operation set is constructed. ,when The time control operation set includes pre-control operations, when The time-controlled operation set includes energy interaction disconnection operations with the power grid. In the highway chain topology, energy nodes are linearly distributed along the highway, and the instructions for hierarchical triggering control need to be transmitted to each node level by level along the chain topology. When a node triggers a control operation, the operation instruction is transmitted sequentially to adjacent nodes through the chain communication network, realizing coordinated pre-control or disconnection operations of all nodes along the entire line. Unlike the centralized instruction issuance method of general microgrids, the hierarchical transmission method in this step fully considers the engineering reality of long communication distances and dispersed nodes along the highway, ensuring reliable transmission and orderly execution of control instructions between nodes. Subsequently, triggering control is performed according to changes in risk level. When the current risk level changes from low to high, the corresponding level of control operation is executed sequentially, and the executed control operations and their corresponding risk levels are recorded. ;in The trigger time is derived from the current system time. The output results include the current risk level identifier, the sequence of triggered control operations, and the trigger time record. This output result serves as the basis for subsequent operation mode switching steps. When the risk level is the warning level, it provides control input for the pre-control stage. When the risk level is the power outage level, it serves as the trigger condition for executing the disconnection operation with the grid energy interaction and entering the off-grid emergency energy supply operation mode, thereby realizing the logical connection between the risk assessment result and the execution of control behavior.

[0029] S4. After performing the energy interaction disconnection operation with the power grid, switch to the off-grid emergency power supply operation mode. In the off-grid emergency power supply operation mode, classify the load of the road area, generate the classification results of the load of the road area, and coordinate and schedule the energy, energy storage and backup power supply resources of the road area. Furthermore, in S4, the steps for classifying road area loads and generating the classification results under the off-grid emergency power supply operation mode include: Obtain information on road load energy demand of each energy node under off-grid emergency power supply operation mode; Based on the predefined load classification criteria, the loads are divided into core guarantee loads, important support loads, and general service loads; The output of the classification results corresponding to each load level forms the classification results of the road area load.

[0030] Specifically, after performing the energy interaction disconnection operation with the power grid and entering the off-grid emergency power supply operation mode, the first step is to obtain the road area load energy demand information under this operation mode. The road area load energy demand information comes from the load power data at the corresponding time node in the operation data set generated in the steps. Let's assume that at the time node... Upper The real-time power demand of each load is ;in This indicates the load number. The load set consists of the toll collection system, monitoring system, tunnel lighting system, communication system, and other energy-consuming units. This power demand data is collected by on-site metering devices and processed after time alignment. After obtaining all load demand data, each load is classified according to a predefined load classification standard. The load classification standard is preset based on the functional attributes of the load in traffic safety assurance, operation management support, and service function maintenance, and forms a load level mapping function. ;in Indicates core protection load, Indicates important support loads, This represents general service loads. Core support loads include toll booths and monitoring equipment; important support loads include emergency lighting in service areas; and general service loads include commercial facilities. The load level mapping function takes load identification information and functional attribute information as input. The functional attribute information comes from system configuration data or a load type database. Load levels are comprehensively classified based on load importance, continuous operation requirements, and power outage tolerance. After determining the load level, a load set is formed according to the load level. ;in And calculate the total power demand of each load level at the current time point. This yields road area load classification data, including load number, corresponding level identifier, and total power demand for each level. This classification result serves as a constraint input for subsequent coordination and scheduling steps. It is used to prioritize the energy demand of loads classified as core protection loads when energy supply capacity is limited, and to allocate power to important support loads and general service loads in sequence within the allowable range of energy supply capacity, thereby realizing graded energy supply control under the off-grid emergency energy supply operation mode. Under the chain topology of highways, there are spatial differences in the load composition and importance of different sections. At the same time, the traffic flow of highways exhibits significant tidal fluctuation characteristics, resulting in dramatic dynamic changes in charging load and energy demand of service areas along the route over time. Therefore, the classification results in this step need to be dynamically updated in conjunction with real-time energy consumption data to reflect the actual changes in the importance of the load at different times, providing an accurate constraint basis for subsequent scheduling. The priority of ensuring lighting and ventilation loads in tunnel sections, toll plaza loads and monitoring loads in toll plaza areas, and emergency lighting and commercial loads in service sections may differ due to the different functions of the sections. Therefore, the classification process in this step needs to classify the loads within each energy node independently to form a load classification result covering all nodes along the entire line, providing a segmented and node-specific constraint basis for subsequent power scheduling under the chain topology.

[0031] like Figure 5 As shown in Figure S5, under the off-grid emergency power supply operation mode, the output of energy, energy storage and backup power supply resources in the road area is scheduled based on the hierarchical results of the road area load as the power supply scheduling constraint. Furthermore, in S5, the steps for scheduling the output of energy, energy storage, and backup energy resources in the road area, based on the hierarchical results of the road area load as energy supply scheduling constraints, include: Obtain the classification results of road area load under off-grid emergency power supply operation mode; Based on the classification results of road load, energy supply scheduling constraints are established, including power transmission constraints based on the chain topology. The available power output of roadside energy, energy storage, and backup energy resources is statistically analyzed. According to the energy supply dispatch constraints, the output power of road area energy, energy storage and backup energy resources will be allocated to various loads; Output power allocation scheme for energy, energy storage and backup energy resources in the road area.

[0032] Specifically, in the off-grid emergency power supply operation mode, this invention executes power allocation and scheduling through a multi-objective collaborative optimization algorithm. First, it obtains the road area load classification result data generated in the previous steps, which includes sets of various load levels. and corresponding time nodes Total power demand of the level ;in , Derived from the real-time power demand of loads of the same level The summation result is used to establish power supply scheduling constraints, including power balance constraints and priority power supply constraints. The power balance constraints are expressed at time nodes. Above, the actual output power of the energy supply resources satisfies the equation balance constraint: At the same time, it satisfies the resource-side inequality constraints: Let the available output power of the road energy unit be... The discharge power of the energy storage unit under the current state of charge is The available power of backup energy resources is The aforementioned available power data was collected by the distributed power monitoring device, the energy storage management system, and the backup power control module, and obtained after status verification. Therefore, the total available power supply is... And satisfy the condition that the sum of the allocated load power is not greater than Priority power supply constraints are manifested in the allocation of power according to tiers when power supply capacity is limited. In addition to the power balance constraints and resource output constraints mentioned above, due to the chain-like topology of the highway energy system, with energy nodes linearly distributed along the highway, power transmission from one node to an adjacent node is limited by line capacity and voltage drop along the line. Therefore, power dispatch constraints also include power transmission constraints based on the chain-like topology: for any pair of adjacent nodes (i,j), the power exchange between nodes... Must meet ;in The maximum transmission capacity of the power supply lines between nodes is defined; simultaneously, the voltage amplitude at each node along the line must be maintained within the allowable range. These power transmission constraints distinguish the power dispatch problem in a chain topology from that in a general microgrid. In a general microgrid, power transmission is usually not limited by line capacity or is subject to weaker constraints, while in a highway chain topology, the capacity limitations and voltage drops of long-distance power transmission are hard constraints that must be considered. This step incorporates the power transmission constraints into the power dispatch constraints to ensure that the dispatch results are physically achievable in a chain topology. The specific allocation process can be implemented using a sequential allocation method, first targeting the core-level guaranteed load set. Power allocation, defined as follows: After allocation, update the remaining available power to Subsequently, the set of important supporting loads was analyzed. Power distribution Update the remaining available power to Finally, for the general service load set Power distribution This results in the actual power supply allocation for each load level. When the total available power supply is less than the total power demand of the core guaranteed loads, the power supply within the core guaranteed loads is reduced according to a preset minimum operating power ratio to ensure the minimum operating requirements of critical equipment. Within each load level, the power demand of each individual load can be adjusted based on its real-time demand. The allocation is subdivided proportionally and tiered. Inner The power allocated to each load is The proportionality coefficient is determined by the ratio of the total demand power to the actual allocated power at that level. After power allocation to the load side is completed, the output responsibility ratio is determined based on the operating characteristics of each energy supply resource. For example, priority is given to utilizing the output of roadside new energy units. When their output is insufficient, it is supplemented by energy storage units. When the energy storage power reaches the limit, the standby energy supply resources are activated, forming a system where each energy supply unit operates at specific time points. The actual output power command value, to ensure the physical feasibility of the scheduling result, at the time node The actual output power of each energy source satisfies the power balance constraint: ;in, This refers to the actual output power of the roadside energy unit. This represents the actual output power of the energy storage unit. The actual output power of the backup energy supply resources. For each load level at the time node The sum of the actual allocated power, and at the same time, the output power of each energy supply resource satisfies the operating constraints:

[0033]

[0034]

[0035] in , , These represent the maximum allowable output power of the corresponding energy supply resources under the current operating conditions. From the current state of charge The final output will include the power allocated to each load level. Power distribution to each individual unit The system also includes power allocation scheme data for the actual output power of each energy resource. This scheme serves as the execution command input to the energy management and control module of the dispatch and control system, generating corresponding power adjustment signals to achieve coordinated control of roadside energy, energy storage, and backup energy resources. The energy storage units maintain an energy balance between adjacent dispatch cycles. ;in For the rated capacity of energy storage, The scheduling cycle is used to ensure that the energy storage output scheduling complies with the energy conservation constraint and to provide basic data for subsequent operation data updates and dynamic adjustments.

[0036] S6. In the off-grid emergency power supply operation mode, the power supply scheduling process is dynamically adjusted based on the updated operation data; Furthermore, in S6, the steps for dynamically adjusting the power supply scheduling process based on the updated operational data include: S61. Continuously acquire the road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information of each energy node to form updated operation data. S62. Update the power supply scheduling constraints based on the updated operating data, including load classification results and available power of various power supply resources; S63. Based on the updated constraints, reallocate the power output of road area energy, energy storage and backup energy resources; S64. Output a new power supply scheduling scheme, and repeat steps S61 to S63 in the next cycle.

[0037] Specifically, in the off-grid emergency power supply operation mode, a periodic rolling scheduling mechanism is constructed based on a multi-objective collaborative optimization algorithm to achieve dynamic adjustment of the power supply scheduling process. Specifically, during the scheduling period T... c The inner loop executes the data acquisition, constraint update, and power reallocation processes, with a scheduling period T. cThe settings are based on system response speed, control accuracy requirements, and energy storage dynamic characteristics. The time period can be fixed or adaptively adjusted according to risk level or load fluctuations. In step S61, the system continuously acquires road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information. Let T be the time corresponding to the nth scheduling cycle. n The actual power generation capacity of the distributed energy unit is P E (T n This data is calculated by the energy monitoring device based on the current irradiance, wind speed, or equipment output status. The state of charge (SOC) of the energy storage unit is... n Its allowable discharge power is P. S (T n ), P S (T n Based on energy storage capacity and current SOC (T) n The available power of the backup energy supply is P, calculated based on the allowable discharge rate and other parameters. B (T n The real-time power demand of each load is determined by the backup power control module based on feedback from the equipment's operating status. The data is collected by the front-end metering device, and the above data constitutes the updated operating data set. In step S62, the energy supply scheduling constraints are updated based on the above updated data. First, the total demand power of each level is recalculated according to the real-time demand power of each load. It then determines whether the load function attributes have changed based on the current operating status to update the level mapping results, and subsequently recalculates the total available power supply. The total available power supply meets the requirements. ;in This represents the total power available for allocation in the current cycle. This value is derived from the summation of the real-time available power of various energy resources, while also being limited by energy storage operation constraints. The discharge power shall not exceed the maximum discharge power allowed by the current state of charge; in step S63, the power demand shall be based on the updated load level. and total available power Re-execute the priority allocation process, first allocating power to the load set with the core protection level. The remaining power is then allocated to subsequent levels in sequence to obtain the actual power supply of each level in the current cycle. Then, calculate the actual power supply of each individual load according to the proportional allocation principle. The system determines the output power to be undertaken by the energy unit, energy storage unit, and backup energy resources based on the operating status of each energy resource, ensuring that the sum of the output power of each resource equals the allocated power of the corresponding load level. In step S64, a new energy dispatching scheme containing the allocated power of each load and the output power of each energy resource is output. This scheme is sent as a control command to the energy management system execution module to adjust the operating status of the power conversion device and switching equipment. Simultaneously, the execution results of this cycle and real-time operating data are stored for use in the next cycle. The data is updated and constraints are corrected again. Historical operating data is used to update risk assessment threshold parameters, load level mapping relationships, and energy margin prediction model parameters, thereby achieving continuous optimization of energy dispatching strategies. This forms a closed-loop dynamic dispatching mechanism based on updated operating data, enabling continuous correction and optimization of the energy dispatching process under off-grid emergency energy supply operation mode. Through data acquisition, risk assessment, risk level triggering, off-grid load grading, energy resource power allocation, and rolling dynamic optimization processes, a complete closed-loop control system is constructed to achieve continuous energy supply guarantee and adaptive operation of the integrated energy system in the road area under grid anomalies or power outages. The operation adjustment and redistribution process satisfies the power balance constraints, resource output constraints, and energy storage constraints defined in step S5. Under the chain topology, the changes in the operating status of each energy node may have temporal differences. For example, a node may experience a sudden drop in photovoltaic output due to local weather changes, while the output of adjacent nodes remains normal. Or, a section may experience a sudden increase in charging load due to peak traffic, while the load of other sections remains stable. The dynamic adjustment mechanism in this step monitors the changes in the operating status of each node and independently updates the scheduling constraints of each node, thereby achieving coordinated optimization and dynamic adaptation of power supply scheduling for all nodes along the entire line, and avoiding chain power supply interruptions caused by changes in the status of a single node.

[0038] Example 2: In the second embodiment of the present invention, the present invention provides a highway roadway self-consistent energy emergency control system for extreme weather, such as... Figure 6 As shown, it includes the following modules: The information acquisition module is used to collect meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information related to highway road area energy supply, and performs time alignment processing on the collected information to form operation data; The risk analysis module is used to analyze the continuity of power supply within a preset analysis time range based on operational data, determine whether there is a risk of power grid interruption, and generate risk assessment results. The trigger control module is used to perform hierarchical trigger control based on the risk assessment results. When there is a risk of grid power supply interruption, it performs pre-control operation and performs energy interaction disconnection operation with the grid when grid power supply interruption is confirmed. The off-grid dispatch module is used to switch to the off-grid emergency power supply operation mode after performing the energy interaction disconnection operation with the power grid. In the off-grid emergency power supply operation mode, the load of the road area is classified, the classification result of the load of the road area is generated, and the energy, energy storage and backup power supply resources of the road area are coordinated and dispatched. The output scheduling module is used to schedule the output of road area energy, energy storage and backup energy resources based on the hierarchical results of road area load as energy scheduling constraints in the off-grid emergency power supply operation mode. The dynamic adjustment module is used to dynamically adjust the power supply scheduling process based on updated operating data in the off-grid emergency power supply operation mode.

[0039] During a super typhoon that made landfall on a mountainous section of a coastal highway, continuous heavy rainfall and strong winds caused multiple fluctuations in the upstream power grid, posing a risk of tower collapse and line breakage. Some sections experienced short-term voltage drops. This section contains a group of long tunnels, centralized toll stations, and multiple video surveillance and communication base stations. If the external power grid were to completely fail, the loss of power to tunnel lighting, ventilation, and monitoring systems would severely impact driving safety. The existing power supply mainly relies on the external power grid and simple backup diesel generators, lacking the ability to coordinate and control new energy sources, energy storage, and loads, making it difficult to predict risks in a timely manner and implement tiered protection, resulting in delayed emergency response. To solve these problems, the self-consistent energy emergency control system for extreme weather in highway areas, as provided in this invention, is adopted. Its structure is as follows: Figure 2 As shown. The specific implementation process of this system is as follows: First, after the typhoon warning is issued, the information acquisition module continuously collects wind speed and rainfall intensity data from meteorological monitoring stations, voltage and frequency status data from the power grid, output status data from roadside photovoltaic arrays and wind turbines, state of charge data from energy storage batteries, operating status data from standby generator sets, and real-time power consumption data from various loads. It then performs time alignment processing through a unified timestamp mechanism to form a complete set of operational data, thereby achieving synchronous fusion of multi-source information, providing a consistent data foundation for subsequent analysis, and improving the accuracy of judgment. Subsequently, the risk analysis module assesses the continuity of power grid supply within a preset analysis time range based on the operational data. When it detects that the voltage fluctuation amplitude of the power grid continues to increase and judges that there is a possibility of power outage in combination with the meteorological trend forecast results, it generates a risk judgment result, enabling the system to identify potential risks in advance before the power grid fails completely, thus improving the prediction capability. The trigger control module executes hierarchical trigger control based on the risk assessment results. When an interruption risk is determined, the energy storage system is started in advance to enter a high availability state and the standby unit is pre-started for hot standby, thereby shortening the subsequent switching time. When the grid power is detected to be zero or the protection device confirms that the grid has lost power, the energy interaction with the grid is immediately disconnected, so that the road area energy system is switched to an isolated grid operation state, avoiding the risk of backfeeding and ensuring operational safety. After entering the off-grid emergency power supply operation mode, the off-grid dispatch module classifies each load according to its importance in traffic safety assurance. Toll stations and monitoring equipment are classified as core protection loads, emergency lighting in service areas, tunnel lighting and ventilation systems are classified as important support loads, and commercial facilities are classified as general service loads. The module generates load classification results and coordinates the dispatch of various resources in conjunction with the current output of new energy sources and energy storage capacity. This ensures that core safety loads receive power first, guaranteeing the continuity of tunnel and critical node operation, thereby achieving optimal allocation of energy resources under limited conditions. The output scheduling module uses the load classification results as constraints to allocate and control the output power of photovoltaic, wind power, energy storage and standby generator units. It prioritizes the use of available new energy sources, supplements power by the energy storage system when new energy sources are insufficient, and puts standby generator units into operation when necessary. It forms a specific power allocation scheme and issues control commands to make the energy supply structure more reasonable, reduce fuel consumption and improve the overall self-consistency of the system. During the typhoon, the dynamic adjustment module continuously updates operational data according to a preset scheduling cycle. When it detects that a decrease in wind speed leads to a reduction in wind power output or that some loads experience changes in power demand due to traffic control, it updates the scheduling constraints in real time and recalculates the power allocation scheme. In the next cycle, it automatically executes the new scheduling strategy, thus forming a closed-loop rolling optimization mechanism. This enables the system to adaptively adjust to changes in the environment and load, ensuring continuous power supply and safe operation of critical highway facilities under extreme weather conditions. It also demonstrates the system's comprehensive control capabilities in risk prediction, rapid switching, tiered protection, and dynamic optimization. During the dynamic adjustment process, the system tracks the banded evolution trend of meteorological conditions at each node in real time and the load fluctuations caused by traffic flow tides, ensuring that the scheduling strategy is continuously optimized according to changes in the environment and energy demand.

[0040] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for emergency control of self-sufficient energy in highway areas during extreme weather, wherein the self-sufficient energy in the highway area includes multiple energy nodes distributed along the highway, and the multiple energy nodes form a chain topology through service areas or toll stations, characterized in that... Includes the following steps: S1. Collect meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy resource operation status information, and road area load energy demand information related to highway road area energy supply, and perform time alignment processing on the collected information to form operation data; S2. Analyze the continuity of power supply within the preset analysis time range based on the operation data, determine whether there is a risk of power grid power supply interruption, and generate risk assessment results; S3. Execute graded trigger control based on risk assessment results. When there is a risk of grid power supply interruption, execute pre-control operation. When grid power supply interruption is confirmed, execute energy interaction disconnection operation with the grid. S4. After performing the energy interaction disconnection operation with the power grid, switch to the off-grid emergency power supply operation mode. In the off-grid emergency power supply operation mode, classify the load of the road area, generate the classification results of the load of the road area, and coordinate and schedule the energy, energy storage and backup power supply resources of the road area. S5. In the off-grid emergency power supply operation mode, the output of energy, energy storage and backup power supply resources in the road area is scheduled based on the hierarchical results of the road area load as the power supply scheduling constraint. S6. In the off-grid emergency power supply operation mode, the power supply scheduling process is dynamically adjusted based on the updated operation data.

2. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S1, the step of performing time alignment processing on the collected information to form runtime data includes: The collected meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information of each energy node are associated with corresponding time identifiers. Determine the target time granularity for running data generation; For all types of information with sampling intervals smaller than the target time granularity, time aggregation processing is performed according to the target time granularity; For various types of information with sampling time intervals greater than the target time granularity or obtained based on event triggering, time mapping processing is performed according to the time identifier; Correct or remove any information with missing or abnormal time stamps; And generate runtime data based on various information after time alignment processing.

3. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S2, the step of analyzing the power supply continuity within a preset analysis time range based on operational data includes: Determine the start and end times of the preset analysis time range; The data includes meteorological information, power grid operation status information, road area energy operation status information, energy storage status information, backup energy supply resource operation status information, and road area load energy demand information for each energy node in the operation data, corresponding to the analysis time range. The various types of information of each energy node are arranged in chronological order to form an operational status sequence divided by time period or time point; The continuity of power supply at each energy node is detected at each time period or point in time, including whether various information indicates potential signs of power supply interruption; The continuous monitoring results for each time period or point in time are summarized to form the energy supply continuity analysis results.

4. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S2, the step of determining whether there is a risk of power grid interruption includes: The continuity detection results for each time period or point in time in the power supply continuity analysis results are iterated through. Determine whether the risk of power grid power supply interruption exists in each time period or time point according to the preset power grid power supply interruption judgment rules; The results of the assessments at different time periods or points in time are summarized to form the overall power grid power supply interruption risk assessment results. Output the overall power grid power supply interruption risk assessment results.

5. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S3, the step of executing graded trigger control based on the risk assessment result includes: Obtain the risk assessment result; According to the preset risk level classification rules, the risk assessment results are divided into several risk levels; Determine the control operation sequence corresponding to each risk level according to the risk level order; The control operations corresponding to each level are triggered sequentially. The control operations are passed to each energy node level by level along the chain topology, including performing pre-control operations when there is a risk of grid power supply interruption, and performing energy interaction disconnection operations with the grid when grid power supply interruption is confirmed. Record the control operations that have been triggered and their corresponding risk levels.

6. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S4, the step of classifying the road area load and generating the classification results of the road area load under the off-grid emergency power supply operation mode includes: Obtain the road area load energy demand information of each energy node under the off-grid emergency power supply operation mode; Based on the predefined load classification criteria, the loads are divided into core guarantee loads, important support loads, and general service loads; The output of the classification results corresponding to each load level forms the classification results of the road area load.

7. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S5, the step of scheduling the output of road area energy, energy storage, and backup energy resources, based on the hierarchical results of road area load as energy supply scheduling constraints, includes: Obtain the classification results of road area load under off-grid emergency power supply operation mode; Based on the classification results of road area load, power supply scheduling constraints are established, including power transmission constraints based on the chain topology. The available power output of roadside energy, energy storage, and backup energy resources is statistically analyzed. According to the energy supply dispatch constraints, the output power of road area energy, energy storage and backup energy resources will be allocated to various loads; Output power allocation scheme for energy, energy storage and backup energy resources in the road area.

8. The method for emergency control of self-sufficient energy in highway areas during extreme weather, as described in claim 1, is characterized in that... In S6, the step of dynamically adjusting the power supply scheduling process based on the updated operating data includes: S61. Continuously acquire the road area energy operation status information, energy storage status information, backup energy supply resource operation status information and road area load energy demand information of each energy node to form updated operation data; S62. Update the energy supply scheduling constraints based on the updated operating data, including load classification results and available power of various energy supply resources; S63. Based on the updated constraints, reallocate the power output of road area energy, energy storage and backup energy resources; S64. Output a new power supply scheduling scheme, and repeat steps S61 to S63 in the next cycle.