Preparation method of a planting hole planting rod, planting rod and its application

The planting stick with a three-layer coaxial composite structure solves the problems of insufficient support, poor water control, and lack of root guidance in slope ecological restoration. It realizes the gradual transformation of the structure into natural soil, improves the survival rate of vegetation and slope stability, and adapts to the ecological restoration needs of different slope types.

CN123100477APending Publication Date: 2026-11-17HENAN PROVINCIAL GEOLOGICAL BUREAU ECOLOGICAL ENVIRONMENT GEOLOGICAL SERVICE CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611285618.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-24
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing slope ecological restoration technologies suffer from insufficient support from planting structures, poor water regulation, lack of root guidance, and an inability to transform artificial structures into natural soil, resulting in low vegetation survival rates and poor stability.

Method used

The planting rod with a three-layer coaxial composite structure includes an outer supporting skeleton, an intermediate water storage and slow-release layer, and a central guiding planting structure. By controlling the raw material ratio and molding process, a multi-level pore size and microchannel network is formed to achieve the synergistic effect of structural support, water regulation and root guidance, and gradually transforms into natural soil during service.

Benefits of technology

It improves vegetation survival rate and slope stability, adapts to the full-cycle ecological restoration needs of different slope types, reduces ecological restoration costs, and achieves rapid vegetation establishment and long-term ecological restoration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123100477A_ABST
    Figure CN123100477A_ABST
Patent Text Reader

Abstract

This invention discloses a method for preparing a planting stick with planting holes, the planting stick itself, and its application in slope ecological restoration, belonging to the field of slope ecological restoration technology. The planting stick is a three-layer coaxial composite structure, including an outer load-bearing skeleton, a middle water-retaining and slow-release layer, and a central guiding planting structure. It is prepared through raw material compounding, layered construction, coaxial composite molding, and pre-setting of structural properties, achieving an evolutionary characteristic of gradually decreasing strength and gradually loosening structure. The outer skeleton provides initial support, the middle layer achieves water retention and slow-release of water and fertilizer, and the central hole directionally guides the roots deep into the slope. This invention solves the problems of insufficient support, poor water and fertilizer retention, lack of root guidance, and difficulty in natural degradation and integration in existing technologies. It has a synergistic effect of structural support, water regulation, and root guidance, adapting to the full-cycle restoration needs of steep and rocky slopes. It can significantly improve vegetation survival rate and slope stability, is ecologically friendly, has controllable processes, and possesses good engineering application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of slope ecological restoration technology, specifically involving a planting hole planting rod, its preparation method and application, which is particularly suitable for the ecological restoration of steep slopes and rock slopes. Background Technology

[0002] In the process of slope ecological restoration, steep slopes, rock slopes, and disturbed slopes generally suffer from problems such as soil loss, weak water and fertilizer retention capacity of the soil and rock, difficulty in vegetation establishment, and poor stability after survival, which seriously restrict the ecological restoration effect and long-term stability of slopes. Among the existing technologies, vegetation restoration methods such as hydroseeding, topsoil filling, and simple planting trough laying, as well as some single-function planting stick structures, all have obvious technical defects: in the early stage, there is a lack of stable structural support, and the slope soil and rock are easily eroded by rainwater and slipped or collapsed under gravity; the water storage and slow release capacity is insufficient, and it is impossible to continuously provide water supply for plant growth, resulting in poor root development and low survival rate; the growth direction of plant roots is not directional, making it difficult to penetrate into the slope to form an interlaced anchoring structure, and failing to achieve coordinated stability between vegetation and slope; some planting structures use non-degradable materials, which remain in the slope for a long time, destroying the compatibility with the natural ecological environment, and failing to achieve the transformation of artificial structures into natural soil. Existing planting stick structures mostly only have single support or water storage functions, failing to achieve the synergistic effect of structural support, water regulation, and root guidance. Furthermore, they lack a clear functional transformation mechanism that evolves gradually over time, making them unsuitable for the full-cycle needs of slope ecological restoration, from initial support to later natural integration. Therefore, developing a planting stick with pre-set structural performance, gradually transforming from artificial structure to natural soil during service, and achieving multi-functional synergy, along with its preparation method, has become the key to solving the aforementioned technical problems. Summary of the Invention

[0003] The purpose of this invention is to provide a planting stick with a planting hole, its preparation method and application, to solve the technical problems of insufficient planting structure support, poor water control effect, lack of root guidance and inability to achieve artificial to natural transformation in existing slope ecological restoration, and to achieve the synergistic effect of structural support, water control and root guidance, improve vegetation survival rate and meet the needs of the whole cycle of slope ecological restoration.

[0004] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: A method for preparing a planting hole planting rod includes the following steps: S1: Construction of the outer load-bearing skeleton: Mineral granular materials, cementitious materials, and structural control components are selected as raw materials and compounded. By controlling the particle size distribution of the raw materials, using layered fillers and layered static pressing molding processes, and pore formation methods, an outer load-bearing skeleton with a preset initial strength is prepared. The compaction degree is adjusted by controlling the thickness of the layered fillers, static pressure, holding time, and number of pressings. The thickness of each layer of filler is controlled to be 20-50 mm, the static pressure is controlled to be 5-15 MPa, the holding time is 30-120 s, and the number of pressings is 2-4. The compaction degree is calculated according to formula (I): Compaction degree (%) = (dry density after compaction / maximum dry density) × 100%. The compaction degree of the outer load-bearing skeleton is made to reach the preset value by adjusting the static pressure and the number of pressings. The pore formation methods include: controlling the primary pores by particle size distribution, forming secondary pores by adding soluble fillers or pore-forming agents, and controlling the total porosity by adjusting the compaction degree. S2: Construction of the intermediate water storage slow-release layer: Pore-forming components or reserved channel structures are introduced into the outer supporting skeleton to form a porous water storage layer with multi-level pore size distribution, and a network of interconnected microchannels is constructed throughout the porous water storage layer; the multi-level pore size structure is controlled in the following ways: macropores (>50μm) are formed by the dissolution of soluble fillers, and their pore size and quantity are controlled by the particle size (0.5~5mm) and dosage (10%~40%) of the soluble fillers; mesopores (2~50μm) are formed by the addition of pore-forming agents, and their pore size and quantity are controlled by the particle size (0.05~2mm) and dosage (3%~15%) of the pore-forming agents; micropores (<2μm) are formed by the structure of the cementitious material hydration products themselves, and are controlled by the water-cement ratio (0.3~0.6); the total porosity is controlled by formula (II): total porosity (%) = (1 - dry density after compaction / true density of material) × 100%; S3: Construction of a centrally guided planting structure: A through-hole is formed along the axial direction of the planting rod. The central planting hole is formed into a spatial configuration with root guiding function by means of mold forming or embedded structure. S4: Three-layer coaxial composite molding: The outer supporting skeleton prepared in step S1, the middle water storage and slow release layer prepared in step S2, and the center guiding planting structure prepared in step S3 are integrated into a molding process to obtain a planting rod with a three-layer coaxial composite structure. S5: Structural performance preset: In the above preparation process, by adjusting the material ratio of raw materials, the pore structure of the outer supporting skeleton and the middle water storage slow release layer, and the channel distribution of the microchannel network, the planting stick exhibits the evolutionary characteristics of gradually decreasing strength and gradually loosening structure during service.

[0005] Furthermore, the mineral particulate material is quartz sand, phosphogypsum, or granite crushed stone with a particle size of 5-10 mm; the cementing material is cement; and the structure regulating component is fly ash, slag powder, or straw fiber. The mass ratio of the cementing material, mineral particulate material, and structure regulating component is 1:(3.5-6):(0.2-0.5), and this mass ratio controls the initial strength and subsequent degradation rate of the planting stick.

[0006] Furthermore, the outer supporting skeleton is prepared using a graded particle size distribution method, which creates a dense zone and a loose zone in the radial direction, thereby forming a radial structural gradient. The graded particle size distribution specifically involves dividing the outer supporting skeleton into at least two levels from the outside to the inside, with different levels filled with mineral particles of different particle sizes. The outer dense zone uses a fine particle size distribution with a particle size range of 0.15–2 mm, of which the fine particle content is ≥60%. The inner loose zone uses a coarse particle size distribution with a particle size range of 2–10 mm, of which the coarse particle content is ≥70%. By filling the raw materials with different particle sizes in layers and controlling the compaction degree of each layer, the compaction degree of the outer dense zone is 5%–15% higher than that of the inner loose zone, forming a radial structural gradient with gradually increasing porosity from the outside to the inside.

[0007] Furthermore, the intermediate water-storing slow-release layer forms a multi-level pore structure by adding a pore-forming agent, a soluble filler, or a foaming component to the raw material. The soluble filler dissolves during the use of the planting stick, forming interconnected pores inside the intermediate water-storing slow-release layer. The pore-forming agent is bentonite, the soluble filler is a starch-based soluble filler, and the foaming component is foamed polypropylene particles.

[0008] Furthermore, the microchannel network is formed by pre-embedding fiber materials, setting sacrificial templates, or directional molding, and the microchannel network is directionally distributed along the axial or radial direction of the planting rod.

[0009] Furthermore, the guiding structure of the central implantation hole is a spiral structure, a conical structure, or a tapered structure, which is formed by molding or by setting an inner lining component.

[0010] Furthermore, the planting stick undergoes a structural support stage, a moisture regulation stage, and a structural degradation stage in sequence during use. The structural degradation stage is achieved by moisture penetrating into the interior of the planting stick and expanding the pore structure.

[0011] An implantation rod with planting holes is prepared by any of the above-described preparation methods. The implantation rod includes an outer supporting skeleton, an intermediate water-retaining and slow-release layer, and a central guiding planting structure. The three are coaxially arranged to form an integrated coaxial composite structure.

[0012] The application of a planting rod with a planting hole in slope ecological restoration involves inserting the planting rod into a pre-set hole in the slope; the outer load-bearing skeleton provides initial support and erosion resistance for the slope, the middle water-storing and slow-release layer provides water and nutrients for plant growth, and the central guiding planting structure guides plant roots to grow into the slope; the planting rod gradually degrades during use and eventually transforms into a structure suitable for plant growth.

[0013] The present invention has the following beneficial effects: This invention achieves synergistic effects of structural support, water regulation, and root guidance by constructing a three-layer coaxial composite planting rod with planting holes. Through pre-setting the structural performance during the preparation process, the planting rod gradually transforms from an artificial structure into natural soil during its service life, effectively solving the technical problems of insufficient support, poor water regulation, lack of root guidance, and inability to naturally integrate in existing technologies. The preparation method is simple and feasible, with controllable parameters. The material ratio and structural parameters can be adjusted according to the slope type to adapt to different slope ecological restoration needs. The application process is simple and efficient, enabling rapid vegetation implantation and growth, improving vegetation survival rate, and reducing slope ecological restoration costs, demonstrating significant practical value and ecological benefits. Attached Figure Description

[0014] Figure 1 This is a flowchart illustrating the preparation method of the present invention; Figure 2 This is a longitudinal sectional view of the planting rod of the present invention.

[0015] In the diagram: 100: outer support frame, 200: middle water storage and slow release layer, 300: central guide planting hole, 400: microchannel network. Detailed Implementation

[0016] The principles and features of the present invention are described below with reference to the accompanying drawings. The examples given are only for explaining the present invention and are not intended to limit the scope of the present invention.

[0017] Example 1: Preparation of Standard Planting Hole Sticks S1: Outer load-bearing skeleton construction: Quartz sand is selected as the mineral particle material, sulfoaluminate cement as the cementing material, and fly ash as the structural control component; it is compounded according to the mass ratio of cement:quartz sand:fly ash = 1:4:0.5.

[0018] A radial structural gradient was prepared using a graded particle size distribution method: the outer dense layer adopted a fine particle size distribution, with quartz sand particles ranging from 0.15 to 2 mm in size, of which 0.15–1 mm fine particles accounted for 65%; the inner loose layer adopted a coarse particle size distribution, with quartz sand particles ranging from 2 to 5 mm in size, of which 2–5 mm coarse particles accounted for 75%. During preparation, the outer layer material (fine particle size distribution) was first filled using a layered filling and layered static pressing process. The thickness of each layer was controlled at 30 mm, the static pressure at 8 MPa, the holding time at 60 s, and each layer was pressed three times, with a compaction degree controlled at 90%. Then, the inner layer material (coarse particle size distribution) was filled using the same layered static pressing process, with the thickness of each layer controlled at 30 mm, the static pressure at 6 MPa, the holding time at 45 s, and each layer was pressed twice, with a compaction degree controlled at 80%. The degree of compaction is calculated according to formula (I): degree of compaction (%) = (dry density after compaction / maximum dry density) × 100%. The maximum dry density of the raw material is determined by indoor compaction test. The above method forms a radial structural gradient with a dense zone (90% compaction) on the outer side and a loose zone (80% compaction) on the inner side of the skeleton, which takes into account both support and air permeability.

[0019] S2: Construction of the intermediate water-storage slow-release layer: Starch-based soluble filler and diatomaceous earth (pore-forming component) are added inside the outer supporting skeleton, mixed uniformly at a mass ratio of soluble filler:diatomaceous earth = 3:1, and then filled into shape. The particle size of the soluble filler is controlled at 1–3 mm, and its dosage accounts for 30% of the total mass of the intermediate layer; the particle size of the diatomaceous earth pore-forming agent is controlled at 0.1–0.5 mm, and its dosage accounts for 10% of the total mass of the intermediate layer. The water-cement ratio is controlled at 0.45. Soluble fillers can completely dissolve in water, forming a multi-level pore structure of macropores (>50μm), mesopores (2~50μm), and micropores (<2μm). The total porosity is controlled according to formula (II): Total porosity (%) = (1 - dry density after compaction / true density of material) × 100%, and the total porosity is controlled at 45%~55%. By pre-embedding plant fibers with a diameter of 0.2~0.5mm, a microchannel network is constructed that runs through the planting rod axis, with a channel spacing of 3~5mm, to ensure the longitudinal transport of water and nutrients.

[0020] S3: Construction of the centrally guided planting structure: A through-type central planting hole is integrally formed by a mold along the axis of the planting rod. The inner wall of the hole has a tapered guide structure with a hole opening diameter of 20mm and a hole bottom diameter of 12mm. The hole depth is consistent with the length of the planting rod. It is used to guide the plant roots downward into the slope and avoid root tangling.

[0021] S4: Three-layer coaxial composite molding: The outer load-bearing skeleton, the middle water-storage slow-release layer, and the central guiding planting structure are coaxially positioned and statically pressurized into an integrated composite molding process. The molding pressure is controlled at 5-8 MPa, the curing temperature is 20±2℃, the humidity is ≥90%, and the curing time is 7 days. This results in a planting rod with a three-layer coaxial composite structure and an overall coaxiality deviation of ≤1mm.

[0022] S5: Structural performance preset: By adjusting the amount of cementitious material, the proportion of soluble filler and the density of microchannels, the planting sticks meet the following requirements: 1-3 months is the structural support period, with a strength retention rate of ≥70%; 3-12 months is the moisture regulation and structural degradation period, with the strength gradually decreasing to less than 20% of the initial strength and the porosity increasing to more than 60%; 12-24 months is the complete degradation period, transforming into a porous soil structure and integrating with the original soil of the slope.

[0023] Example 2: Preparation of a planting stick for planting holes specifically designed for steep rock slopes S1: Outer Load-Bearing Skeleton Construction: Granite crushed stone (5-10mm) is used as the mineral particle material, P.O42.5 silicate cement as the cementing material, and slag powder as the structural control component, with a mass ratio of cement:mineral particles:slag powder = 1:3.5:0.3. A graded particle size distribution is used to prepare the radial structural gradient: the outer dense zone uses a finer particle size distribution, with granite crushed stone ranging from 5 to 8mm, of which 5-7mm particles account for 70%; the inner loose zone uses a coarser particle size distribution, with granite crushed stone ranging from 7 to 10mm, of which 8-10mm particles account for 75%. The preparation process involves first filling the outer layer of raw material (fine particle size distribution) using a layered filling and layered static pressure molding process. Each layer is 25mm thick, with a static pressure of 12MPa and a holding time of 90s. Each layer is pressed four times, achieving a compaction degree of 95%. Then, the inner layer of raw material (coarser particle size distribution) is filled, using the same layered static pressure molding process. Each layer is 25mm thick, with a static pressure of 8MPa and a holding time of 60s. Each layer is pressed three times, achieving a compaction degree of 88%. The compaction degree is calculated using formula (Ⅰ): Compaction degree (%) = (dry density after compaction / maximum dry density) × 100%. By increasing the static pressure in the outer dense zone to 12MPa and increasing the number of pressing cycles to four, the compaction degree reaches 95%, and the initial strength is increased to 15-20MPa, enhancing the erosion and sliding resistance of steep slopes and meeting the initial support requirements for rock slopes.

[0024] S2: Construction of the intermediate water-retaining slow-release layer: Foamed polypropylene particles and bentonite are mixed at a mass ratio of 2:1 to form a porous structure with high water absorption (water absorption ≥150%). The particle size of the foamed polypropylene particles is controlled at 0.5-2mm, and the dosage accounts for 25% of the total mass of the intermediate layer; the particle size of the bentonite pore-forming agent is controlled at 0.05-0.3mm, and the dosage accounts for 12.5% ​​of the total mass of the intermediate layer. The water-cement ratio is controlled at 0.38. By adjusting the ratio and particle size of the foamed particles and bentonite, the ratio of macropores to mesopores is controlled, and the total porosity is controlled at 50%-65% according to formula (II). By using a sacrificial plastic template to form radial and axial intersecting microchannels with a channel diameter of 1-2mm, the lateral infiltration and longitudinal transport capacity of water is improved, adapting to the water retention requirements of rock slopes.

[0025] S3: Center-guided planting structure construction: adopts a spiral-guided center planting hole with a pitch of 15mm, a spiral angle of 15°, a hole diameter of 25mm, and a hole bottom diameter of 15mm to enhance the root entanglement and anchoring effect, improve the bond between the root system and the slope, and prevent the plants from falling over.

[0026] S4: Three-layer coaxial composite molding: It adopts integrated molding with molding pressure of 8~10MPa, curing temperature of 25±2℃, humidity ≥95%, and curing time of 14d to ensure the integrity and strength stability of the structure, with an overall coaxiality deviation of ≤0.8mm.

[0027] S5: Structural performance preset: Extend the structural support period to 3-6 months, with a strength retention rate of ≥80%, adapting to the slow growth characteristics of vegetation on rock slopes; gradually degrades in the later stage, completely transforming into natural soil in 18-24 months, without producing ecological residues.

[0028] Example 3: Preparation of a rapidly degradable, eco-friendly planting stick for planting holes S1: Outer Load-Bearing Skeleton Construction: Phosphogypsum and straw fiber are used as mineral particles and structural control components, with low-alkali sulfoaluminate cement as the cementing material, at a mass ratio of cement:phosphogypsum:straw fiber = 1:6:0.2. A graded particle size distribution is used to prepare the radial structural gradient: the outer dense zone uses a fine particle size distribution, with phosphogypsum particle size ranging from 0.15 to 1 mm and fine particles accounting for 70%; the inner loose zone uses a coarse particle size distribution, with phosphogypsum particle size ranging from 1 to 3 mm and coarse particles accounting for 75%, and straw fibers (5 to 15 mm in length) are incorporated to enhance the interconnected pores. The preparation process involves first filling the outer layer of raw material (fine particle size distribution) using a layered filling and layered static pressure molding process. Each layer is 40mm thick, with a static pressure of 5MPa and a holding time of 40s. Each layer is pressed twice, achieving a compaction degree of 80%. Then, the inner layer of raw material (coarse particle size distribution) is filled using the same layered static pressure molding process. Each layer is 40mm thick, with a static pressure of 3MPa and a holding time of 30s. Each layer is pressed once, achieving a compaction degree of 70%. The compaction degree is calculated using formula (Ⅰ): Compaction degree (%) = (dry density after compaction / maximum dry density) × 100%. The initial strength is 3–5MPa, sufficient for short-term support, suitable for mildly disturbed slopes.

[0029] S2: Construction of the intermediate water-retaining slow-release layer: A high proportion of soluble starch filler is used, with the particle size of the soluble starch filler controlled at 2-5 mm, accounting for 60% of the total mass of the intermediate layer, and the water-cement ratio controlled at 0.55. Upon contact with water, it rapidly dissolves within 1-2 months, forming a large number of interconnected pores, significantly increasing the proportion of macropores. The total porosity is controlled at ≥65% according to formula (II), improving water retention and air permeability, and promoting rapid plant growth.

[0030] S3: Center-guided planting structure construction: adopts a straight cylindrical guide planting hole with a diameter of 18mm and a smooth inner wall, which facilitates the rapid growth of shallow-rooted plants and is suitable for the rapid planting of herbaceous and vine plants.

[0031] S4: Three-layer coaxial composite molding: Cured naturally at room temperature, curing time 3 days, simplified process, reduced cost, suitable for large-scale slope repair projects.

[0032] S5: Structural performance preset: Degradation is completed in 6 to 12 months, quickly transforming into a plant growth substrate. It is suitable for the rapid ecological restoration of disturbed slopes and mild slopes, realizing the rapid transition from artificial structures to natural ecology.

[0033] Comparative Example 1: Ordinary nutrient soil planting substrate Conventional garden soil (garden soil: humus: river sand = 3:2:1), without layered structure, guide planting holes, or preset strength, was used as a blank control to compare the performance advantages of the planting stick of the present invention.

[0034] Comparative Example 2: Single-structure planting stick Only the outer supporting skeleton was prepared (with the same proportions as in Example 1), without the intermediate water-retaining slow-release layer and the central guiding planting structure, to verify the synergistic effect of the layered structure.

[0035] Performance testing solution Two-year-old Virginia creeper cuttings were selected as the test plants. The nutrient soil (substrate after decomposition of the planting stick / corresponding substrate) from the above-mentioned examples and comparative examples was filled into flowerpots (pot specifications: diameter 25cm, height 20cm). One Virginia creeper cutting was planted in each pot. The initial main stem length of the cuttings was uniformly 15±1cm, and the number of branches was 0. Water was applied until saturated, and then supplemented daily according to the substrate moisture level, maintaining the substrate at 60%–80% of its field capacity. The entire experimental period was 2 months.

[0036] The following parameters were measured: substrate electrical conductivity (mS / cm), bulk density (g / cm³), maximum water holding capacity (%), field water holding capacity (%), evaporation loss ratio (%), pH, organic matter content (%), total nitrogen (mg / kg), available nitrogen (mg / kg), number of leaves per unit length of main stem (leaf / cm), total branch length (cm), and number of branches. The experimental results are shown in Table 1 below. Table 1 Comparison of substrate performance and plant growth indicators between the examples and comparative examples

[0037] Test Results Summary The planting sticks with planting holes prepared in each embodiment of the present invention are significantly superior to the comparative examples in terms of substrate physicochemical properties and plant growth indicators, as detailed below: Advantages of substrate physicochemical properties: The bulk density of each embodiment was significantly lower than that of the comparative example (as low as 0.76 g / cm³ in Example 3), the maximum water holding capacity and field water holding capacity were increased by more than 50% compared with the comparative example 1, and the evaporation loss was reduced by more than 50%. This indicates that the layered structure of the planting stick can effectively improve the looseness of the substrate, enhance water and fertilizer retention capacity, and reduce water evaporation. At the same time, the electrical conductivity, organic matter content, total nitrogen, and alkaline nitrogen content of the embodiments were much higher than those of the comparative example, and the pH was stable within the plant-suitable range of 6.7 to 7.0, providing sufficient nutrients and a suitable acid-base environment for plant growth.

[0038] Advantages in plant growth performance: The number of leaves per unit main stem, total branch length, and number of branches in each embodiment are significantly better than those in the comparative example. In particular, the total branch length of Example 3 reached 135.6 cm, which is 87.5% higher than that of Comparative Example 1, and the number of branches reached 8.8, which is 104.7% higher than that of Comparative Example 1. This verifies that the root guiding structure and water storage slow-release layer of the planting stick can effectively promote plant growth and improve the survival rate and growth status of vegetation.

[0039] Differentiated adaptability: Example 2 optimizes the strength and water retention performance for steep rock slopes, while Example 3 optimizes the degradation rate for rapid restoration needs. Each example can be flexibly selected according to the slope type and restoration cycle to achieve full-cycle adaptation of slope ecological restoration.

[0040] How to use planting sticks Planting rods prepared in any of the above embodiments are inserted into pre-drilled holes on the slope at a row spacing of 50cm and a plant spacing of 30cm. The diameter of the holes is 2-3cm larger than the diameter of the planting rods, and the hole depth is ≥4 / 5 of the length of the planting rods. The holes are filled with fine soil and compacted to ensure that the planting rods are in close contact with the slope.

[0041] The outer supporting framework of the planting stick provides initial support for the slope, preventing rainwater erosion and soil slippage, and ensuring slope stability. The middle water-retaining and slow-release layer continuously stores water and nutrients, slowly supplying them to the plant roots through a microchannel network, reducing watering frequency and improving water and fertilizer utilization. Seeds of vines such as Virginia creeper or transplanted seedlings are sown in the central guiding planting holes, guiding the roots to penetrate deep into the slope along the guiding structure and strengthening the root anchoring effect. As the planting stick gradually degrades and loosens over time, it eventually integrates completely into the soil, realizing the full-cycle transformation from artificial structure to natural ecology and completing the long-term ecological restoration of the slope.

[0042] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for preparing a planting hole planting rod, characterized in that, Includes the following steps: S1: Construction of the outer load-bearing skeleton: Mineral granular materials, cementitious materials, and structural control components are selected as raw materials and compounded. By controlling the particle size distribution of the raw materials, using layered fillers and layered static pressing molding processes, and controlling the pore formation method, an outer load-bearing skeleton with a preset initial strength is prepared. The compaction degree is adjusted by controlling the thickness of the layered fillers, the static pressure, the holding time, and the number of pressing cycles. The thickness of each layer of filler is controlled to be 20-50 mm, the static pressure is controlled to be 5-15 MPa, the holding time is 30-120 s, and the number of pressing cycles is 2-4. The compaction degree is calculated according to formula (I): Compaction degree (%) = (dry density after compaction / maximum dry density) × 100%; The compaction degree of the outer supporting skeleton is achieved by adjusting the static pressure and the number of pressing cycles to reach a preset value; the pore formation methods include: controlling the primary pores by particle size distribution, forming secondary pores by adding soluble fillers or pore-forming agents, and controlling the total porosity by adjusting the compaction degree. S2: Construction of the intermediate water storage slow-release layer: Pore-forming components or reserved channel structures are introduced into the outer supporting skeleton to form a porous water storage layer with multi-level pore size distribution, and a network of interconnected microchannels is constructed throughout the porous water storage layer; the multi-level pore size structure is controlled in the following ways: macropores (>50μm) are formed by the dissolution of soluble fillers, and their pore size and quantity are controlled by the particle size (0.5~5mm) and dosage (10%~40%) of the soluble fillers; mesopores (2~50μm) are formed by the addition of pore-forming agents, and their pore size and quantity are controlled by the particle size (0.05~2mm) and dosage (3%~15%) of the pore-forming agents; micropores (<2μm) are formed by the structure of the cementitious material hydration products themselves, and are controlled by the water-cement ratio (0.3~0.6); the total porosity is controlled by formula (II): Total porosity (%) = (1 - dry density after compaction / true density of material) × 100%; S3: Construction of a centrally guided planting structure: A through-hole is formed along the axial direction of the planting rod. The central planting hole is formed into a spatial configuration with root guiding function by means of mold forming or embedded structure. S4: Three-layer coaxial composite molding: The outer supporting skeleton prepared in step S1, the middle water storage and slow release layer prepared in step S2, and the center guiding planting structure prepared in step S3 are integrated into a molding process to obtain a planting rod with a three-layer coaxial composite structure. S5: Structural performance preset: In the above preparation process, by adjusting the material ratio of raw materials, the pore structure of the outer supporting skeleton and the middle water storage slow release layer, and the channel distribution of the microchannel network, the planting stick exhibits the evolutionary characteristics of gradually decreasing strength and gradually loosening structure during service.

2. The preparation method according to claim 1, characterized in that, The mineral particulate material is quartz sand, phosphogypsum, or granite crushed stone with a particle size of 5-10 mm; the cementing material is cement; and the structure regulating component is fly ash, slag powder, or straw fiber. The mass ratio of the cementing material, mineral particulate material, and structure regulating component is 1:(3.5-6):(0.2-0.5), and this mass ratio controls the initial strength and subsequent degradation rate of the planting stick.

3. The preparation method according to claim 1, characterized in that, The outer supporting skeleton is prepared using a graded particle size distribution method, which creates a dense zone and a loose zone in the radial direction, thereby forming a radial structural gradient. The graded particle size distribution is specifically as follows: the outer supporting skeleton is divided into at least two levels from the outside to the inside in the radial direction, and different levels are filled with mineral particles of different particle sizes. The outer dense zone uses a fine particle size distribution with a particle size range of 0.15-2 mm, of which the fine particle content is ≥60%. The inner loose zone uses a coarse particle size distribution with a particle size range of 2-10 mm, of which the coarse particle content is ≥70%. By filling the raw materials with different particle sizes in layers and controlling the compaction degree of each layer, the compaction degree of the outer dense zone is 5%-15% higher than that of the inner loose zone, forming a radial structural gradient with gradually increasing porosity from the outside to the inside.

4. The preparation method according to claim 1, characterized in that, The intermediate water-storing slow-release layer forms a multi-level pore structure by adding a pore-forming agent, soluble filler, or foaming component to the raw material. The soluble filler dissolves during the use of the planting stick and forms interconnected pores inside the intermediate water-storing slow-release layer. The pore-forming agent is bentonite, the soluble filler is starch-based soluble filler, and the foaming component is foamed polypropylene particles.

5. The preparation method according to claim 1, characterized in that, The microchannel network is formed by pre-embedding fiber materials, setting sacrificial templates, or directional molding, and the microchannel network is directionally distributed along the axial or radial direction of the planting rod.

6. The preparation method according to claim 1, characterized in that, The guiding structure of the central implantation hole is a spiral structure, a conical structure, or a tapered structure, and is formed by molding or by setting an inner lining component.

7. The preparation method according to claim 1, characterized in that, The planting stick goes through a structural support stage, a moisture regulation stage and a structural degradation stage in sequence during use. The structural degradation stage is achieved by water penetrating into the interior of the planting stick and expanding the pore structure.

8. A planting hole planting rod, characterized in that, It is prepared by the preparation method according to any one of claims 1 to 7.

9. The application of a planting hole-grown planting stick in slope ecological restoration, characterized in that, The planting stick described in claim 8 is implanted into the pre-set holes in the slope; the outer load-bearing skeleton provides initial support and erosion resistance for the slope, the middle water-storing slow-release layer provides water and nutrient supply for plant growth, and the central guiding planting structure guides the plant roots to grow into the interior of the slope; the planting stick gradually degrades during use and eventually transforms into a structure suitable for plant growth.