A sludge removal device and method for industrial wastewater sedimentation equipment

By designing a sludge removal belt and movable rollers, combined with the reciprocating movement of the inclined discharge port and baffle, the problem of sludge removal in industrial wastewater settling equipment has been solved, achieving stable and efficient sludge removal and separation, and ensuring the settling effect and effluent quality.

CN123102011APending Publication Date: 2026-11-17HANGZHOU DABANG URBAN CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611397552.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-09
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

In existing industrial wastewater gravity sedimentation equipment, sludge tends to accumulate and harden, making it difficult to clean. This leads to a reduction in the effective volume of the equipment and a deterioration in the quality of the effluent. Conventional cleaning methods can easily disturb the water flow and affect the sedimentation effect.

Method used

The system employs a sludge removal belt, movable rollers, and an inclined discharge outlet. The movable rollers are driven synchronously by a drive motor to achieve low-speed circulating sludge removal. Combined with the reciprocating movement of the movable plate and baffle, it achieves continuous and stable cleaning and separation of sludge, avoiding water flow disturbance.

Benefits of technology

It achieves continuous sludge removal during the sedimentation process, maintains stable water flow, prevents sludge adhesion and secondary deposition, and ensures the continuous stability of sedimentation separation effect and excellent effluent quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123102011A_ABST
    Figure CN123102011A_ABST
Patent Text Reader

Abstract

This invention discloses a sludge removal device and method for industrial wastewater settling equipment, relating to the field of industrial wastewater treatment technology. It includes a settling equipment body, a sludge removal belt, and a discharge outlet. The sludge removal belt is movably installed on the inner wall of the settling equipment body, and a discharge outlet is provided at one end of the settling equipment body, with its upper end movably connected to the outer wall of the sludge removal belt. By incorporating the sludge removal belt and discharge outlet, the sludge removal belt moves at a low speed, continuously and slowly transporting the bottom sediment, achieving uninterrupted online sludge removal during the settling process. The low operating speed of the sludge removal belt does not disturb the bottom water flow or the water body's flow pattern, thus not disrupting the stable settling environment of the wastewater, preventing bottom sludge from being stirred up and impurities from floating, ensuring a continuous and stable settling separation effect. The inclined discharge outlet fits against the outer wall of the sludge removal belt, automatically scraping off the attached sludge, achieving sludge-belt separation, preventing sludge adhesion and secondary deposition, and resulting in more thorough sludge removal.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of industrial wastewater treatment technology, specifically to a sludge removal device and method for industrial wastewater sedimentation equipment. Background Technology

[0002] Industrial wastewater is a general term for all types of wastewater generated during industrial production processes. It mainly originates from industries such as chemical engineering, metallurgy, printing and dyeing, papermaking, electroplating, and food processing. Its composition is complex and its pollution is highly potent. The water quality varies greatly depending on the production process, often containing pollutants such as suspended solids, heavy metals, organic matter, acids and alkalis, and toxic and harmful substances. If discharged directly without treatment, it will severely pollute surface water and groundwater, damage the ecological environment, and endanger human health. The core of industrial wastewater treatment is to remove pollutants from the water through physical, chemical, and biological methods, ensuring it meets discharge standards before discharge or recycling. Sedimentation is a key pretreatment step, used to separate suspended particulate matter in the water, reducing the load on subsequent treatment processes. Properly treating industrial wastewater is not only an environmental responsibility for enterprises but also an important measure to achieve water resource recycling and promote green industrial development.

[0003] Industrial wastewater settling equipment is a core pretreatment device for treating industrial wastewater. It is mainly used to separate suspended solids, silt, flocs and other impurities in wastewater, reduce the load on subsequent treatment, and ensure the quality of effluent. Gravity natural settling equipment in industrial wastewater settling equipment is a basic pretreatment device that relies on the fact that the weight of the suspended solids is greater than the buoyancy of the water to achieve solid-liquid separation. It is widely used in various industrial wastewater treatment scenarios and is suitable for the different water volume requirements of large, medium and small enterprises.

[0004] In existing technologies, during the operation of gravity sedimentation equipment for industrial wastewater, suspended impurities in the wastewater continuously settle and accumulate at the bottom of the equipment. Long-term accumulation can easily form a thick sludge layer. The impurities accumulated at the bottom are prone to hardening and compaction, making them difficult to discharge naturally. This reduces the effective sedimentation volume of the tank, shortens the water flow residence time, directly reduces the solid-liquid separation effect, and leads to the deterioration of the effluent quality. When cleaning the impurities at the bottom simultaneously during sedimentation, the conventional sludge scraping and sludge discharge structure has a limited cleaning range and dead corners, making it impossible to completely remove the deposited impurities. Continuous dredging can easily disturb the water flow, destroy the stable sedimentation environment, and cause the bottom impurities to float to the surface and mix with the clean water again. Summary of the Invention

[0005] Based on this, the purpose of the present invention is to provide a dredging device and a dredging method for industrial wastewater sedimentation equipment, so as to solve the technical problems in the background art mentioned above.

[0006] To achieve the above objectives, the present invention provides the following technical solution: a sludge removal device for industrial wastewater settling equipment, comprising a settling equipment body, a sludge removal belt and a discharge outlet, wherein the sludge removal belt is movably installed on the inner wall of the settling equipment body, and a discharge outlet is provided at one end of the settling equipment body, and the upper end of the discharge outlet is movably connected to the outer wall of the sludge removal belt. The settling equipment has movable rollers installed on the inner wall of the main body, and two sets of movable rollers are connected by a toothed synchronous belt. The outer walls of both sets of movable rollers are movably connected to the inner wall of the dredging belt. A drive motor is mounted on the outer wall of the main body of the settling equipment, and one end of one set of movable rollers extends to the outer wall of the main body of the settling equipment and is connected to the output end of the drive motor. After the drive motor is started, it slowly drives one set of movable rollers to rotate.

[0007] By adopting the above technical solution, the problem of sludge removal is solved. Relying on the drive motor to drive the movable roller to operate synchronously, the sludge removal belt moves at a low speed, which can continuously and slowly transport the bottom sedimented sludge, realizing online uninterrupted sludge removal during the settling process. The low operating speed of the sludge removal belt will not disturb the water flow and water state at the bottom of the pool, and will not damage the stable settling environment of the wastewater, avoiding the bottom sludge from turning up and the impurities from floating up, ensuring the continuous and stable settling and separation effect. The inclined sewage outlet fits against the outer wall of the sludge removal belt, which can automatically scrape off the attached sludge, realize the separation of sludge and belt, prevent sludge from sticking and remaining, and secondary deposition, and make the sludge removal more thorough.

[0008] The present invention is further configured such that a set of movable rollers is equipped with a movable bevel gear at one end, a drive shaft is movably installed on the inner wall of the main body of the settling device, a drive bevel gear is installed at one end of the drive shaft, and the drive bevel gear is meshed with the movable bevel gear.

[0009] Preferably, the two sets of movable rollers rotate continuously, one set of movable rollers drives the movable bevel gear to rotate, the movable bevel gear meshes with the drive bevel gear, so the drive bevel gear rotates, thereby driving the drive shaft to rotate.

[0010] The present invention is further configured such that a movable plate is movably mounted on the outer wall of the drive shaft, a reciprocating thread groove is formed on the outer wall of the drive shaft, and a protrusion is provided on the inner wall of the movable plate to be movably connected to the reciprocating thread groove on the outer wall of the drive shaft. A mounting groove is formed on one side of the movable plate, and a toothed plate is installed inside the mounting groove.

[0011] Preferably, the drive shaft rotates, and the reciprocating threaded groove on the outer wall of the drive shaft is movably connected to the protrusion on the inner wall of the movable plate. Therefore, the movable plate moves back and forth, thereby driving the toothed plate to move.

[0012] The present invention is further configured such that a first limiting shaft and a second limiting shaft are movably installed on the inner wall of the main body of the settling device, and a one-way bearing is provided at the center end of both the first limiting shaft and the second limiting shaft. A first limiting gear and a second limiting gear are respectively installed at one end of the first limiting shaft and the second limiting gear, and the first limiting gear and the second limiting gear are sequentially meshed with the toothed plate.

[0013] Preferably, the toothed plate meshes with the first limiting gear and the second limiting gear in sequence, so the first limiting gear and the second limiting gear rotate in sequence, thereby driving the first limiting shaft and the second limiting shaft to rotate in sequence.

[0014] The present invention is further configured such that a first drive shaft is movably installed on the inner wall of the main body of the settling device, and a toothed synchronous belt is provided between the first drive shaft and the first limiting shaft, and a first drive bevel gear is installed at one end of the first drive shaft.

[0015] Preferably, the first limiting shaft rotates, and the first limiting shaft is connected to the first transmission shaft by a toothed synchronous belt. Therefore, the first transmission shaft rotates, thereby driving the first transmission bevel gear to rotate.

[0016] The present invention is further configured such that a first reserved groove is provided inside the main body of the settling device, and one end of the first reserved groove is connected to the sewage outlet. A first baffle is movably installed inside the first reserved groove. Multiple sets of first connecting shafts are movably installed inside the main body of the settling device, and toothed synchronous belts are respectively provided to connect the multiple sets of first connecting shafts. One end of one set of first connecting shafts is equipped with a first connecting bevel gear, and the first connecting bevel gear meshes with a first transmission bevel gear. The outer walls of the multiple sets of first connecting shafts are provided with reciprocating threaded grooves, and the inner wall of the first baffle is provided with multiple sets of protrusions that are movably connected to the reciprocating threaded grooves on the outer walls of the multiple sets of first connecting shafts.

[0017] Preferably, the first transmission bevel gear rotates and meshes with the first connecting bevel gear, thus the first connecting bevel gear rotates, thereby driving a set of first connecting shafts to rotate. The multiple sets of first connecting shafts are connected to each other by toothed synchronous belts, so the multiple sets of first connecting shafts rotate synchronously. The reciprocating threaded grooves on the outer wall of the multiple sets of first connecting shafts are movably connected to the protrusions on the inner wall of the first baffle, so the first baffle moves back and forth.

[0018] The present invention is further configured such that a second drive shaft is movably installed on the inner wall of the main body of the settling device, and a toothed synchronous belt is provided between the second drive shaft and the second limiting shaft, and a second drive bevel gear is installed at one end of the second drive shaft.

[0019] Preferably, the second limiting shaft rotates, and the second limiting shaft is connected to the second transmission shaft by a toothed synchronous belt. Therefore, the second transmission shaft rotates, thereby driving the second transmission bevel gear to rotate.

[0020] The invention is further configured such that a second reserved groove is provided inside the main body of the settling device, and one end of the second reserved groove is connected to the sewage outlet. A second baffle is movably installed inside the second reserved groove. Multiple sets of second connecting shafts are movably installed inside the main body of the settling device, and toothed synchronous belts are respectively provided to connect the multiple sets of second connecting shafts. A second connecting bevel gear is installed at one end of one set of second connecting shafts, and the second connecting bevel gear meshes with a second transmission bevel gear. Reciprocating threaded grooves are provided on the outer walls of the multiple sets of second connecting shafts, and multiple sets of protrusions are provided on the inner wall of the second baffle, which are movably connected to the reciprocating threaded grooves on the outer walls of the multiple sets of second connecting shafts.

[0021] Preferably, the second transmission bevel gear rotates and meshes with the second connecting bevel gear, thus the second connecting bevel gear rotates, thereby driving a set of second connecting shafts to rotate. The multiple sets of second connecting shafts are connected to each other by toothed synchronous belts, so the multiple sets of second connecting shafts rotate synchronously. The reciprocating threaded grooves on the outer wall of the multiple sets of second connecting shafts are movably connected to the protrusions on the inner wall of the second baffle, so the second baffle moves back and forth.

[0022] The present invention is further configured such that one end of the first baffle and the second baffle are both inclined, and the inner wall of the sewage outlet is provided with a groove that matches the inclined ends of the first baffle and the second baffle, and the sewage outlet is connected to a sludge recovery device.

[0023] Preferably, when the upper ends of the first and second baffles bear the weight of silt, the inclined ends of the first and second baffles cooperate with the grooves to improve the stability of the first and second baffles.

[0024] A sludge removal device and method for industrial wastewater sedimentation equipment includes the following steps: S1: Wastewater settling: Industrial wastewater is poured into the main body of the settling equipment. After a period of settling, the impurities in the wastewater fall to the upper end of the sludge removal zone to form sludge. S2: Silt removal: The sludge removal belt rotates slowly, and the sludge is moved by the sludge, which slides down to the upper part of the first baffle. S3: Initial discharge of sludge: The first baffle moves back and forth, and after the sludge falls to the upper part of the second baffle, the first baffle seals the space between the remaining second baffles; S4: Sludge discharge: The second baffle moves back and forth, and the sludge is discharged through the sewage outlet to the outer end of the settling equipment.

[0025] In summary, the present invention has the following main beneficial effects: 1. This invention solves the problem of sludge cleaning by incorporating a sludge removal belt, movable rollers, and a discharge outlet. The movable rollers are driven synchronously by a drive motor, causing the sludge removal belt to circulate at low speed. This allows for continuous and slow transport of bottom-sedimented sludge, achieving uninterrupted online sludge removal during the settling process. The low operating speed of the sludge removal belt does not disturb the bottom water flow or the overall water flow pattern, thus preserving the stable settling environment of the wastewater and preventing bottom sludge from being stirred up or impurities from floating. This ensures a continuous and stable settling and separation effect. The inclined discharge outlet fits against the outer wall of the sludge removal belt, automatically scraping off attached sludge and separating the sludge from the belt, preventing sludge adhesion and secondary deposition, resulting in more thorough sludge removal.

[0026] 2. This invention features a movable plate, a first baffle, and a second baffle. The movable plate's displacement causes the first and second baffles to reciprocate. The first baffle, in conjunction with a pre-reserved groove, reciprocates and expands, temporarily catching scraped sludge. Through intermittent retraction and retraction, the sludge is transferred in layers, acting as a buffer to prevent direct sludge accumulation and blockage, thus ensuring orderly sludge transport. The second baffle works in conjunction with the first baffle in stages and phases, forming a two-stage sealing structure. It opens intermittently during sludge discharge and closes completely when not discharging sludge, effectively preventing industrial wastewater from leaking out with the sludge, avoiding water disturbance and secondary pollution, while also blocking odors and ensuring stable water pressure and flow inside the settling equipment, without affecting normal wastewater settling operations. Attached Figure Description

[0027] Figure 1 This is the main body of the settling device in this invention; Figure 2 This is a cross-sectional view of the main body of the settling device in this invention; Figure 3 This is a schematic diagram of the first baffle and the second baffle in this invention; Figure 4 This is a schematic diagram of the dredging equipment in this invention; Figure 5 This is a bottom view of the dredging belt in this invention; Figure 6 This is a schematic diagram of the movable roller in the present invention; Figure 7 This is a schematic diagram of the drive shaft in this invention; Figure 8 This is a schematic diagram of the first and second drive shafts in this invention.

[0028] Explanation of reference numerals in the attached figures: 1. Settling equipment body; 2. Dredging belt; 3. Sewage outlet; 4. Drive motor; 5. Movable roller; 6. First reserved groove; 7. First baffle; 8. Second reserved groove; 9. Second baffle; 10. Movable bevel gear; 11. Drive shaft; 12. Drive bevel gear; 13. Movable plate; 14. Mounting groove; 15. Tooth plate; 16. First limiting shaft; 17. First limiting gear; 18. Second limiting shaft; 19. Second limiting gear; 20. First transmission shaft; 21. First transmission bevel gear; 22. First connecting shaft; 23. First connecting bevel gear; 24. Second transmission shaft; 25. Second transmission bevel gear; 26. Second connecting shaft; 27. Second connecting bevel gear. Detailed Implementation

[0029] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and should not be construed as limiting the present invention.

[0030] The embodiments of the present invention will now be described.

[0031] Please refer to the sludge removal equipment for industrial wastewater sedimentation. Figure 1 - Figure 8 It includes a settling equipment body 1, a dredging belt 2 and a sewage outlet 3. The dredging belt 2 is movably installed on the inner wall of the settling equipment body 1. A sewage outlet 3 is opened at one end of the settling equipment body 1, and the upper end of the sewage outlet 3 is movably connected to the outer wall of the dredging belt 2. Movable rollers 5 are movably installed on the inner wall of the main body 1 of the sedimentation equipment, and a toothed synchronous belt connects the two sets of movable rollers 5. The outer walls of the two sets of movable rollers 5 are movably connected to the inner wall of the sludge removal belt 2. A drive motor 4 is mounted on the outer wall of the main body 1 of the sedimentation equipment, and one end of one set of movable rollers 5 extends to the outer wall of the main body 1 of the sedimentation equipment and is connected to the output end of the drive motor 4. After the drive motor 4 starts, it slowly drives one set of movable rollers 5 to rotate. The sludge removal belt runs at a low speed, which will not disturb the bottom water flow and water flow pattern, will not damage the stable sedimentation environment of wastewater, avoid bottom sludge stirring and impurities floating, and ensure the continuous and stable sedimentation separation effect.

[0032] Please see Figure 4 - Figure 6 A set of movable rollers 5 is equipped with a movable bevel gear 10 at one end. A drive shaft 11 is movably installed on the inner wall of the main body 1 of the settling equipment. A drive bevel gear 12 is installed at one end of the drive shaft 11, and the drive bevel gear 12 is meshed with the movable bevel gear 10. The two sets of movable rollers 5 rotate continuously. One set of movable rollers 5 drives the movable bevel gear 10 to rotate. The movable bevel gear 10 is meshed with the drive bevel gear 12, so the drive bevel gear 12 rotates, thereby driving the drive shaft 11 to rotate.

[0033] Please see Figure 6 - Figure 7 A movable plate 13 is movably mounted on the outer wall of the drive shaft 11. A reciprocating threaded groove is provided on the outer wall of the drive shaft 11, and a protrusion is provided on the inner wall of the movable plate 13 to be movably connected to the reciprocating threaded groove on the outer wall of the drive shaft 11. A mounting groove 14 is provided on one side of the movable plate 13, and a toothed plate 15 is installed inside the mounting groove 14. When the drive shaft 11 rotates, the reciprocating threaded groove on the outer wall of the drive shaft 11 is movably connected to the protrusion on the inner wall of the movable plate 13, so the movable plate 13 moves back and forth, thereby driving the toothed plate 15 to move.

[0034] Please see Figure 6 - Figure 7 The settling equipment body 1 has a first limiting shaft 16 and a second limiting shaft 18 movably installed on its inner wall. Both the first limiting shaft 16 and the second limiting shaft 18 are provided with one-way bearings at their center ends. A first limiting gear 17 and a second limiting gear 19 are respectively installed at one end of the first limiting shaft 16 and the second limiting shaft 18. The first limiting gear 17 and the second limiting gear 19 are sequentially meshed with the toothed plate 15. The toothed plate 15 is sequentially meshed with the first limiting gear 17 and the second limiting gear 19. Therefore, the first limiting gear 17 and the second limiting gear 19 rotate sequentially, thereby driving the first limiting shaft 16 and the second limiting shaft 18 to rotate sequentially.

[0035] Please see Figure 7 - Figure 8 A first drive shaft 20 is movably installed on the inner wall of the main body 1 of the settling equipment, and a toothed synchronous belt is provided between the first drive shaft 20 and the first limiting shaft 16. A first drive bevel gear 21 is installed at one end of the first drive shaft 20. When the first limiting shaft 16 rotates, the first limiting shaft 16 and the first drive shaft 20 are connected by a toothed synchronous belt. Therefore, when the first drive shaft 20 rotates, it drives the first drive bevel gear 21 to rotate.

[0036] Please see Figure 2 - Figure 8The settling equipment body 1 has a first reserved groove 6 inside, and one end of the first reserved groove 6 is connected to the sewage outlet 3. A first baffle 7 is movably installed inside the first reserved groove 6. Multiple sets of first connecting shafts 22 are movably installed inside the settling equipment body 1, and the multiple sets of first connecting shafts 22 are connected by toothed synchronous belts. One end of one set of first connecting shafts 22 is equipped with a first connecting bevel gear 23, and the first connecting bevel gear 23 meshes with a first transmission bevel gear 21. The outer walls of the multiple sets of first connecting shafts 22 are provided with reciprocating threaded grooves, and the inner wall of the first baffle 7 is provided with... Multiple sets of protrusions are movably connected to the reciprocating threaded grooves on the outer wall of multiple sets of first connecting shafts 23. The first transmission bevel gear 21 rotates and meshes with the first connecting bevel gear 23. Therefore, the first connecting bevel gear 23 rotates, thereby driving a set of first connecting shafts 22 to rotate. Multiple sets of first connecting shafts 22 are connected to each other by toothed synchronous belts, so multiple sets of first connecting shafts 22 rotate synchronously. The reciprocating threaded grooves on the outer wall of multiple sets of first connecting shafts 22 are movably connected to the protrusions on the inner wall of the first baffle 7, so the first baffle 7 reciprocates.

[0037] Please see Figure 7 - Figure 8 A second drive shaft 24 is movably installed on the inner wall of the main body 1 of the settling equipment, and a toothed synchronous belt connects the second drive shaft 24 and the second limit shaft 18. A second drive bevel gear 25 is installed at one end of the second drive shaft 24. The second limit shaft 18 rotates, and the second limit shaft 18 and the second drive shaft 24 are connected by a toothed synchronous belt. Therefore, the rotation of the second drive shaft 24 drives the second drive bevel gear 25 to rotate.

[0038] Please see Figure 2 - Figure 8The settling equipment body 1 has a second reserved groove 8 inside, and one end of the second reserved groove 8 is connected to the sewage outlet 3. A second baffle 9 is movably installed inside the second reserved groove 8. Multiple sets of second connecting shafts 26 are movably installed inside the settling equipment body 1, and the multiple sets of second connecting shafts 26 are connected by toothed synchronous belts. One end of one set of second connecting shafts 26 is equipped with a second connecting bevel gear 27, and the second connecting bevel gear 27 meshes with a second transmission bevel gear 25. The outer walls of the multiple sets of second connecting shafts 26 are provided with reciprocating threaded grooves, and the inner wall of the second baffle 9 is provided with... Multiple sets of protrusions are movably connected to the reciprocating threaded grooves on the outer wall of multiple sets of second connecting shafts 26. The second transmission bevel gear 25 rotates and meshes with the second connecting bevel gear 27. Therefore, the second connecting bevel gear 27 rotates, thereby driving a set of second connecting shafts 26 to rotate. The multiple sets of second connecting shafts 26 are connected to each other by toothed synchronous belts, so the multiple sets of second connecting shafts 26 rotate synchronously. The reciprocating threaded grooves on the outer wall of the multiple sets of second connecting shafts 26 are movably connected to the protrusions on the inner wall of the second baffle 9, so the second baffle 9 moves back and forth.

[0039] Please see Figure 2 - Figure 3 The first baffle 7 and the second baffle 9 are both inclined at one end, and the inner wall of the sewage outlet 3 is provided with a groove that matches the inclined end of the first baffle 7 and the second baffle 9. The sewage outlet 3 is connected to a sludge recovery device. When the upper end of the first baffle 7 and the second baffle 9 bears the weight of sludge, the inclined end of the first baffle 7 and the second baffle 9 cooperates with the groove to improve the stability of the first baffle 7 and the second baffle 9.

[0040] The working principle of this invention is as follows: When the sedimentation equipment is used to treat industrial wastewater, the workers pour the industrial wastewater into the main body 1 of the sedimentation equipment. After a certain period of sedimentation, the impurities inside the industrial wastewater fall to the upper end of the sludge removal belt 2. After the impurities fall to the upper end of the sludge removal belt 2, they accumulate into mud, and the sludge removal equipment is started. When the staff uses the dredging equipment to dredge the inside of the main body 1 of the settling equipment, the staff starts the drive motor 4. The drive motor 4 drives a set of movable rollers 5 to rotate slowly. The two sets of movable rollers 5 are connected by a toothed synchronous belt, so the two sets of movable rollers 5 rotate slowly in sync, thereby driving the dredging belt 2 to move slowly. The dredging belt 2 moves the sludge slowly. The movement speed is low, so it will not cause a large flow at the bottom of the industrial wastewater and affect the settling state of the industrial wastewater. The dredging belt 2 moves the sludge to the upper end of the discharge outlet 3. The upper end of the discharge outlet 3 is set at an inclination. The inclination end of the discharge outlet 3 contacts the outer wall of the dredging belt 2. The upper end of the discharge outlet 3 scrapes the sludge on the outer wall of the dredging belt 2, so that the sludge is separated from the dredging belt 2 and falls to the upper end of the first baffle 7. Two sets of movable rollers 5 rotate continuously. One set of movable rollers 5 drives the movable bevel gear 10 to rotate. The movable bevel gear 10 meshes with the drive bevel gear 12, so the drive bevel gear 12 rotates, thereby driving the drive shaft 11 to rotate. The reciprocating thread groove on the outer wall of the drive shaft 11 is movably connected to the protrusion on the inner wall of the movable plate 13, so the movable plate 13 reciprocates, thereby driving the toothed plate 15 to move. As the toothed plate 15 moves continuously, it first meshes with the first limiting gear 17, causing the first limiting gear 17 to rotate. This, in turn, causes the first limiting shaft 16 to rotate. The first limiting shaft 16 is connected to the first transmission shaft 20 via a toothed synchronous belt. Therefore, the first transmission shaft 20 rotates, causing the first transmission bevel gear 21 to rotate. The first transmission bevel gear 21 meshes with the first connecting bevel gear 23, causing the first connecting bevel gear 23 to rotate. This, in turn, causes a set of first connecting shafts 22 to move forward. As the first set of first connecting shafts 22 rotates, they are connected by toothed synchronous belts, so the first set of first connecting shafts 22 rotate synchronously. The reciprocating threaded grooves on the outer wall of the first set of first connecting shafts 22 are movably connected to the protrusions on the inner wall of the first baffle 7, so the first baffle 7 moves back and forth. The first baffle 7 first moves into the first reserved groove 6, and the silt at the upper end of the first baffle 7 falls to the upper end of the second baffle 9. Then the first baffle 7 moves out of the first reserved groove 6, and the first baffle 7 seals the space between the first baffle 7 and the second baffle 9. The toothed plate 15 continuously moves, separating from the first limiting gear 17. Then, the toothed plate 15 meshes with the second limiting gear 19, causing the second limiting gear 19 to rotate. This, in turn, causes the second limiting shaft 18 to rotate. The second limiting shaft 18 is connected to the second transmission shaft 24 via a toothed synchronous belt, causing the second transmission shaft 24 to rotate. This, in turn, causes the second transmission bevel gear 25 to rotate. The second transmission bevel gear 25 meshes with the second connecting bevel gear 27, causing the second connecting bevel gear 27 to rotate. The first set of second connecting shafts 26 is driven to rotate. Multiple sets of second connecting shafts 26 are connected to each other by toothed synchronous belts, so multiple sets of second connecting shafts 26 rotate synchronously. The reciprocating threaded grooves on the outer wall of multiple sets of second connecting shafts 26 are movably connected to the protrusions on the inner wall of the second baffle 9, so the second baffle 9 moves back and forth. The second baffle 9 first moves into the second reserved groove 8, so that the sludge at the upper end of the second baffle 9 is discharged into the body of the settling equipment 1 through the sewage outlet 3. The sludge recovery device on the outside of the body of the settling equipment 1 collects the sludge.

[0041] Although embodiments of the present invention have been shown and described, these specific embodiments are merely explanations of the invention and are not intended to limit it. The specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions, and variations to the embodiments as needed without departing from the principles and spirit of the invention, but such modifications, substitutions, and variations are protected by patent law as long as they are within the scope of the claims of the present invention.

Claims

1. A sludge removal device for industrial wastewater settling, comprising a settling device body (1), a sludge removal belt (2), and a discharge outlet (3), characterized in that: The settling equipment body (1) is movably installed with a dredging belt (2) on its inner wall. A sewage outlet (3) is opened at one end of the settling equipment body (1). The upper end of the sewage outlet (3) is inclined and is movably connected to the outer wall of the dredging belt (2). The settling equipment body (1) is equipped with movable rollers (5) on its inner wall, and two sets of movable rollers (5) are connected by a toothed synchronous belt. The outer walls of the two sets of movable rollers (5) are movably connected to the inner wall of the dredging belt (2). The outer wall of the settling equipment body (1) is equipped with a drive motor (4), and one end of a set of movable rollers (5) extends to the outer wall of the settling equipment body (1) and is connected to the output end of the drive motor (4). After the drive motor (4) is started, it slowly drives a set of movable rollers (5) to rotate.

2. The sludge removal equipment for industrial wastewater sedimentation as described in claim 1, characterized in that: A set of movable rollers (5) is equipped with a movable bevel gear (10) at one end. A drive shaft (11) is movably installed on the inner wall of the settling equipment body (1). A drive bevel gear (12) is installed at one end of the drive shaft (11), and the drive bevel gear (12) meshes with the movable bevel gear (10).

3. The sludge removal equipment for industrial wastewater sedimentation as described in claim 2, characterized in that: A movable plate (13) is movably mounted on the outer wall of the drive shaft (11). A reciprocating thread groove is provided on the outer wall of the drive shaft (11), and a protrusion is provided on the inner wall of the movable plate (13) to be movably connected to the reciprocating thread groove on the outer wall of the drive shaft (11). A mounting groove (14) is provided on one side of the movable plate (13), and a toothed plate (15) is installed inside the mounting groove (14).

4. The sludge removal equipment for industrial wastewater sedimentation as described in claim 3, characterized in that: The settling equipment body (1) is movably installed with a first limiting shaft (16) and a second limiting shaft (18) on its inner wall. The center ends of the first limiting shaft (16) and the second limiting shaft (18) are provided with one-way bearings. A first limiting gear (17) and a second limiting gear (19) are respectively installed at one end of the first limiting shaft (16) and the second limiting shaft (18). The first limiting gear (17) and the second limiting gear (19) are sequentially meshed with the toothed plate (15).

5. The sludge removal equipment for industrial wastewater sedimentation as described in claim 4, characterized in that: The settling equipment body (1) has a first drive shaft (20) movably installed on its inner wall, and the first drive shaft (20) is connected to the first limiting shaft (16) by a toothed synchronous belt. A first drive bevel gear (21) is installed at one end of the first drive shaft (20).

6. The sludge removal equipment for industrial wastewater sedimentation as described in claim 5, characterized in that: The settling equipment body (1) has a first reserved groove (6) inside, and one end of the first reserved groove (6) is connected to the sewage outlet (3). A first baffle (7) is movably installed inside the first reserved groove (6). Multiple sets of first connecting shafts (22) are movably installed inside the settling equipment body (1), and toothed synchronous belts are respectively provided between the multiple sets of first connecting shafts (22). One end of one set of first connecting shafts (22) is equipped with a first connecting bevel gear (23), and the first connecting bevel gear (23) meshes with the first transmission bevel gear (21). The outer walls of the multiple sets of first connecting shafts (22) are provided with reciprocating thread grooves, and the inner wall of the first baffle (7) is provided with multiple sets of protrusions that are movably connected to the reciprocating thread grooves on the outer walls of the multiple sets of first connecting shafts (23).

7. The sludge removal equipment for industrial wastewater sedimentation as described in claim 6, characterized in that: The second drive shaft (24) is movably installed on the inner wall of the main body (1) of the settling equipment, and a toothed synchronous belt is provided between the second drive shaft (24) and the second limiting shaft (18). A second drive bevel gear (25) is installed at one end of the second drive shaft (24).

8. The sludge removal equipment for industrial wastewater sedimentation as described in claim 7, characterized in that: The settling equipment body (1) has a second reserved groove (8) inside, and one end of the second reserved groove (8) is connected to the sewage outlet (3). A second baffle (9) is movably installed inside the second reserved groove (8). Multiple sets of second connecting shafts (26) are movably installed inside the settling equipment body (1), and toothed synchronous belts are respectively provided between the multiple sets of second connecting shafts (26). One end of one set of second connecting shafts (26) is equipped with a second connecting bevel gear (27), and the second connecting bevel gear (27) meshes with the second transmission bevel gear (25). The outer walls of the multiple sets of second connecting shafts (26) are provided with reciprocating thread grooves, and the inner wall of the second baffle (9) is provided with multiple sets of protrusions that are movably connected to the reciprocating thread grooves on the outer walls of the multiple sets of second connecting shafts (26).

9. The sludge removal equipment for industrial wastewater sedimentation as described in claim 8, characterized in that: The first baffle (7) and the second baffle (9) are both inclined at one end, and the inner wall of the sewage outlet (3) is provided with a groove that matches the inclined end of the first baffle (7) and the second baffle (9). The sewage outlet (3) is connected to a sludge recovery device.

10. A sludge removal device and method for industrial wastewater sedimentation equipment, characterized in that... The process of using any one of claims 1-9 includes the following steps: S1: Wastewater settling: Industrial wastewater is poured into the main body (1) of the settling equipment. After a period of settling, the impurities in the wastewater fall to the upper end of the sludge removal zone (2) to form sludge. S2: Silt removal: The sludge removal belt (2) rotates slowly, and the sludge removal belt (2) moves the sludge, and the sludge slides down to the top of the first baffle (7); S3: Initial discharge of silt: The first baffle (7) moves back and forth, and after the silt falls to the upper end of the second baffle (9), the first baffle (7) seals the space between the remaining second baffles (9); S4: Sludge discharge: The second baffle (9) moves back and forth, and the sludge is discharged through the sewage outlet (2) to the outer end of the settling equipment body (1).