Wind turbine generator housing sheet metal welding deformation suppression and correction device
By using a gradient clamping mechanism and dynamically adjusting roller pressure, the problem of insufficient deformation suppression efficiency and precision during the welding process was solved, achieving efficient and precise welding deformation control and improving the welding quality of the wind turbine generator casing sheet metal.
Patent Information
- Application Number
- CN202611309045.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-27
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, the static anti-deformation amount before welding relies on experience and is difficult to match the dynamic temperature field formed by the moving heat source. In-weld air cooling and symmetrical segmented welding can only slightly alleviate the shrinkage trend. Post-weld fixed-point correction is a forced remedy for the already formed permanent deformation, resulting in low overall shape control efficiency and insufficient upper limit of accuracy.
Employing a gradient clamping mechanism, driver, and horizontal mover, the suction pump and solenoid valve are controlled by a three-level pressure threshold, enabling the rollers to form a gradient clamping force that is "strong at the bottom and soft at the top." Combined with temperature changes, the roller pressure is dynamically adjusted in three stages to achieve continuous and efficient welding shape control.
It significantly improves the efficiency and precision of welding deformation suppression, reduces the risk of weld spalling and root micro-cracks, improves joint forming quality and dimensional stability, and reduces the hidden dangers of stress concentration and thermal crack fatigue failure.
Smart Images

Figure CN123102791A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of welding deformation suppression and correction technology, specifically to a device for suppressing and correcting welding deformation of sheet metal casings for wind turbine generators. Background Technology
[0002] The wind turbine casing, also known as the nacelle, is the external enclosure structure installed at the top of the wind turbine tower, enclosing the core power and electrical control components such as the gearbox, generator, and control system. It is mostly made of fiber-reinforced composite material (fiberglass) in one piece, which combines the characteristics of lightweight, high strength, weather resistance, corrosion resistance, and good insulation. Its streamlined aerodynamic shape reduces operating wind resistance and aerodynamic noise, while resisting the erosion of harsh environments such as wind, sand, rain, snow, salt spray, and extreme temperature differences. It can withstand wind loads and its own structural loads. The interior is reserved with maintenance passages and heat dissipation openings, which not only provide a stable working environment for the core components and extend the service life of the equipment, but also provide a safe working space for operation and maintenance personnel. It is an important structural component to ensure the long-term reliable operation of the wind turbine.
[0003] Wind turbine casing sheet metal welding deformation suppression and correction devices generally adopt a closed-loop working mode of pre-welding control, dynamic suppression during welding, and precise correction after welding. First, the sheet metal workpiece to be welded is hoisted to the tooling station and precisely positioned by a multi-point rigid clamping mechanism. Based on the workpiece thickness and weld layout, the corresponding anti-deformation amount is preset and pre-tightened constraint is applied. During the welding operation, the clamping reaction force at each point is adjusted and local air cooling is started simultaneously. Combined with the symmetrical segmented welding process, uneven thermal stress is offset to suppress welding deformation. After the workpiece is initially cooled after welding, the residual deformation area is corrected by a combination of hydraulic jacking and high-frequency induction local heating. This pre-welding static anti-deformation amount relies on experience and cannot match the dynamic temperature field changes brought about by the moving heat source during welding. At the same time, the air cooling and symmetrical segmented welding during welding can only slightly weaken the shrinkage trend. The post-weld fixed-point correction forcibly corrects the permanent deformation that has already been formed, resulting in low overall shape control efficiency and insufficient upper limit of accuracy. To address these issues, we designed a wind turbine casing sheet metal welding deformation suppression and correction device. Summary of the Invention
[0004] The purpose of this invention is to address the problems that pre-welding static anti-deformation amount relies on experience-based presets, making it difficult to match the dynamic temperature field formed by a moving heat source; during welding, air cooling and symmetrical segmented welding can only slightly alleviate the shrinkage trend; and post-weld fixed-point correction is a forced remedy for already formed permanent deformation, resulting in low overall shape control efficiency and insufficient upper limit for accuracy improvement. Therefore, this invention provides a deformation suppression and correction device for welding sheet metal of wind turbine generator housings.
[0005] To achieve the above objectives, the present invention provides the following technical solution: a sheet metal welding deformation suppression and correction device for wind turbine generator housing, comprising: a wind turbine generator housing, wherein a stiffening plate is provided on the top of the wind turbine generator housing, a robotic arm is provided on the top of the stiffening plate, a transverse linear module is fixedly connected to the output end of the robotic arm, a first connecting plate is fixedly connected to the output end of the transverse linear module, a servo motor is installed on the inner side of the first connecting plate, a rotating rod is rotatably connected to the output end of the servo motor extending to the bottom of the first connecting plate, and two rectangular rods are fixedly connected to the bottom of the first connecting plate. The rectangular plate has three bidirectional linear modules at its bottom, and these three modules are fixedly connected to the rectangular plate and the rotating rod, respectively. A gradient pressing mechanism is located at the bottom of the rotating rod and is used to press the rib plate in a gradient manner. The gradient pressing mechanism includes a thin plate fixedly connected to the bottom of the bidirectional linear modules, and two fixed plates fixedly connected to the bottom of the thin plate. Each of the two fixed plates has three rollers on one side. A horizontal mover is located on one side of the fixed plates and is used to drive the rollers to move horizontally.
[0006] As a further embodiment of the present invention: the gradient pressing mechanism further includes three first cylinders fixedly connected to the inner side of the fixed plate, each of the three first cylinders having a first piston rod slidably connected to its inner side, one end of the first piston rod being fixedly connected to a drive plate, and a sliding rod being slidably connected to the inner side of the drive plate, with a tension spring installed between the sliding rod and the drive plate, wherein a compression spring is installed between the inner side of the first cylinder and the first piston rod, and a driver is provided on one side of the first cylinder.
[0007] As a further embodiment of the present invention: the driver includes a first liquid storage shell fixedly connected to one side of the fixed plate, a first suction pump is installed at the liquid outlet of the first liquid storage shell, and a third connecting pipe is fixedly connected to the output end of the first suction pump.
[0008] As a further embodiment of the present invention: the driver further includes two limiting plates fixedly connected to one side of the fixed plate, a second connecting pipe fixedly connected to the inner side of the two limiting plates, and the inlet of the second connecting pipe fixedly connected to the other end of the third connecting pipe, a first connecting pipe installed at the outlet of the second connecting pipe, a first solenoid valve installed at the inlet of the first cylinder, and the other end of the first solenoid valve fixedly connected to the first connecting pipe.
[0009] As a further embodiment of the present invention: the horizontal mover includes a mounting base fixedly connected to one side of the sliding rod, a limiting slider is slidably connected to the inner side of the mounting base, a second connecting plate is fixedly connected to the bottom of the limiting slider, and the roller is rotatably connected to the outer wall of the second connecting plate.
[0010] As a further embodiment of the present invention: the horizontal mover further includes a limiting groove formed inside the mounting base, a second piston rod is slidably connected to the inner side of the limiting groove, and one end of the second piston rod is fixedly connected to the limiting slider. A return spring is installed on the second piston rod and the inner side of the limiting groove, and a power assembly is provided on the top of the mounting base.
[0011] As a further embodiment of the present invention: the power assembly includes a second liquid storage shell fixedly connected to the inner side of one of the drive plates, a second suction pump is installed at the liquid outlet of the second liquid storage shell, and a fourth connecting pipe is fixedly connected to the output end of the second suction pump.
[0012] As a further embodiment of the present invention: the power assembly further includes a sixth connecting pipe fixedly connected to the top of the mounting base, a second solenoid valve is installed at the liquid inlet of the limiting groove, a fifth connecting pipe is fixedly connected to the liquid outlet of the sixth connecting pipe, and the fifth connecting pipe is fixedly connected to the second solenoid valve.
[0013] Compared with the prior art, the beneficial effects of the present invention are: 1. By setting up a gradient clamping mechanism and controlling the operation of the suction pump and solenoid valve through three-level pressure thresholds, the upper, middle and lower three layers of rollers form a gradient clamping force of "strong at the bottom and soft at the top" to complete the initial lateral positioning of the stiffener plate; the three sets of rollers arranged along the weld seam work together in a division of labor: the first set is responsible for cold-state straightening of initial deviation and unifying the workpiece reference; the second set cooperates with the welding station to carry out welding operations; and the third set is responsible for post-weld pressure holding and shaping. At the same time, the pressure is adjusted synchronously during welding and the gradient is maintained to avoid high-temperature instability; the pressure in the cooling section increases step by step, eventually tending to a uniform high-pressure locking shape, thereby achieving continuous and efficient shape control during welding; 2. By setting up a driver, the roller pressure is dynamically adjusted in three stages according to temperature changes during the welding process. In the heating stage, the pressure is reduced while maintaining a strong bottom and soft top gradient to prevent the stiffener plate from becoming unstable at high temperatures. At the same time, the springs adaptively absorb thermal expansion. In the cooling transition stage, the pressure is gradually increased to match the shrinkage trend and avoid deformation lag. In the cooling and shaping stage, the pressure is converted to uniform high pressure to eliminate top rebound and stress stratification. Combined with the three-stage roller relay operation, the side bending and verticality deviation of the stiffener plate can be significantly reduced, the risk of weld point cracking and root micro-cracks can be reduced, and the joint forming quality and dimensional stability can be comprehensively improved. 3. By setting up a horizontal mover, the three-layer rollers are driven by a suction pump and a solenoid valve to build up pressure in layers, forming a gradient clamping force that is strong at the bottom and flexible at the top. This completes the initial positioning before welding the vertical seam. At the same time, during the welding process, the pressure is reduced and maintained in the heating section, and the pressure is gradually increased in the cooling section until it tends to be a uniform high pressure. This makes the constraint force and the plastic state of the material precisely matched, so as to adaptively absorb thermal expansion, homogenize the vertical residual stress, reduce the stress concentration at the weld toe, effectively alleviate the stress concentration, hot cracking and fatigue failure risks caused by the upward accumulation of heat in the vertical seam, and improve the mechanical properties and deformation suppression effect of the joint. 4. By setting up a power component, the middle and top rollers are driven to retreat in stages before welding, forming a gradient arrangement with increasing distance from the bottom to the top of the weld, matching the temperature decay law; during welding, the spacing narrows in the heating section to strengthen the constraint, and the cooling section gradually resets; after cooling, the middle and top rollers return to their original positions and are coplanar with the bottom roller, unifying the constraint benchmark. At the same time, the distance gradient and pressure gradient work together to make full use of high-temperature plasticity to control the shape from the source, thereby greatly improving the deformation suppression efficiency and avoiding shape deviations caused by residual gradient spacing. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the structure of the present invention; Figure 2 This is a schematic diagram of the gradient clamping mechanism of the present invention; Figure 3 This is a partial structural diagram of the gradient clamping mechanism of the present invention; Figure 4 This is a schematic diagram of the roller structure of the present invention; Figure 5 This is a schematic diagram of the driver structure of the present invention; Figure 6 This is a schematic diagram of a partial structure of the driver of the present invention; Figure 7 This is a schematic diagram of the fixing plate structure of the present invention; Figure 8 This is a schematic diagram of the first piston rod structure of the present invention; Figure 9 This is a schematic diagram of the first piston rod structure of the present invention; Figure 10 This is a schematic diagram of the power component structure of the present invention; Figure 11 This is a diagram showing the rolling state of the roller press wheel of the present invention.
[0015] In the diagram: 1. Wind turbine housing; 2. Rib plate; 3. Horizontal linear module; 4. First connecting plate; 5. Rectangular plate; 6. Bidirectional linear module; 7. Thin plate; 8. Rotating rod; 9. Roller; 10. Fixed plate; 11. Sliding rod; 12. Tension spring; 13. Drive plate; 14. Compression spring; 15. First solenoid valve; 16. First connecting pipe; 17. Second connecting pipe; 18. Limiting plate; 19. First liquid storage tank; 20. First suction pump; 21. Third connecting pipe; 22. First piston rod; 23. First cylinder; 24. Second liquid storage tank; 25. Second suction pump; 26. Fourth connecting pipe; 27. Fifth connecting pipe; 28. Sixth connecting pipe; 29. Mounting base; 30. Limiting groove; 31. Second piston rod; 32. Limiting slider; 33. Second connecting plate; 34. Return spring; 35. Second solenoid valve. Detailed Implementation
[0016] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0017] In the description of this invention, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating orientation or positional relationships, are based on the orientation or positional relationships shown in the accompanying drawings and are only for the convenience of describing this invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. In the description of this invention, it should be noted that unless otherwise explicitly specified and limited, the terms "installed," "connected," "linked," and "set up" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal communication of two components. Those skilled in the art can understand the specific meaning of the above terms in this invention based on the specific circumstances. The following describes embodiments of the invention based on its overall structure.
[0018] Please see Figures 1 to 11This embodiment provides a sheet metal welding deformation suppression and correction device for wind turbine generator housing; including: a wind turbine housing 1, a stiffening plate 2 is provided on the top of the wind turbine housing 1, a manipulator is provided on the top of the stiffening plate 2, a horizontal linear module 3 is fixedly connected to the output end of the manipulator, a first connecting plate 4 is fixedly connected to the output end of the horizontal linear module 3, a servo motor is installed on the inner side of the first connecting plate 4, the output end of the servo motor passes through to the bottom of the first connecting plate 4 and is rotatably connected to a rotating rod 8, and two rectangular plates 5 are fixedly connected to the bottom of the first connecting plate 4. Three bidirectional linear modules 6 are provided at the bottom of a connecting plate 4, and the three bidirectional linear modules 6 are fixedly connected to the rectangular plate 5 and the rotating rod 8 respectively; a gradient pressing mechanism is provided at the bottom of the rotating rod 8, which is used to press the rib plate 2 in a gradient manner. The gradient pressing mechanism includes a thin plate 7 fixedly connected to the bottom of the bidirectional linear module 6, and two fixed plates 10 fixedly connected to the bottom of the thin plate 7. Three rollers 9 are provided on one side of each of the two fixed plates 10; the gradient pressing mechanism also includes three first cylinders 23 fixedly connected to the inner side of the fixed plates 10. Each of the three first cylinders 23 has a first piston rod 22 slidably connected to its inner side. One end of the first piston rod 22 is fixedly connected to a drive plate 13, and a sliding rod 11 is slidably connected to the inner side of the drive plate 13. A tension spring 12 is installed between the sliding rod 11 and the drive plate 13. A compression spring 14 is installed between the inner side of the first cylinder 23 and the first piston rod 22. An actuator is provided on one side of the first cylinder 23. The actuator includes a first liquid storage shell 19 fixedly connected to one side of the fixed plate 10. A first piston rod 14 is installed at the liquid outlet of the first liquid storage shell 19. A suction pump 20 is provided, and a third connecting pipe 21 is fixedly connected to the output end of the first suction pump 20. The driver also includes two limiting plates 18 fixedly connected to one side of the fixed plate 10. A second connecting pipe 17 is fixedly connected to the inner side of the two limiting plates 18, and the inlet of the second connecting pipe 17 is fixedly connected to the other end of the third connecting pipe 21. A first connecting pipe 16 is installed at the outlet of the second connecting pipe 17. A first solenoid valve 15 is installed at the inlet of the first cylinder 23, and the other end of the first solenoid valve 15 is fixedly connected to the first connecting pipe 16. A PLC controller is installed on the top of the horizontal linear module 3, which can control the robot to start intermittently. When the worker needs to weld the stiffener 2, the PLC controller first controls the robot to start, thereby driving the robot to perform a clamping operation on the horizontal linear module 3, so as to place the horizontal linear module 3 on the top of the stiffener 2. Both the transverse linear module 3 and the bidirectional linear module 6 are controlled by a PLC controller, which can control the intermittent start of the transverse linear module 3 and the bidirectional linear module 6. Both the transverse linear module 3 and the bidirectional linear module 6 are composed of servo drive units, precision ball screws, synchronous belt transmission pairs, sliding bearing platforms and other components. Since this technology is existing technology, it is not described in detail in this solution.The PLC simultaneously starts three sets of first suction pumps 20 and controls all three sets of first solenoid valves 15 to open. Power is transmitted through the first piston rod 22, synchronously pushing the upper, middle, and lower three layers of rollers 9 to rapidly feed towards the rib plate 2. Before the rollers 9 contact the surface of the rib plate 2, the first suction pumps 20 continue to run continuously. When the bottom roller 9 is in contact with the surface of the rib plate 2, as the first piston rod 22 continues to advance, the tension spring 12 at the corresponding position is forced to stretch, and the pressing force of the rollers on the rib plate gradually increases. When the pressing force reaches the preset bottom target pressure threshold, the PLC immediately triggers the corresponding first solenoid valve 15 at the bottom to close, cutting off the power feed channel and keeping the bottom roller 9 maintaining its current elasticity. The spring tension and tension force lock the root constraint reference. The middle and top rollers 9 repeat this action: when the middle tension force rises to the preset middle target threshold, the corresponding first solenoid valve 15 is closed and the pressure of this layer is locked; when the top tension force rises to the preset top target threshold, the corresponding first solenoid valve 15 is closed and the pressure of this layer is locked. Through the preset three-level pressure parameters of "bottom threshold greater than middle threshold greater than top threshold", a gradient tension force that gradually decreases from bottom to top is naturally formed, completing the initial lateral restraint of the stiffener 2. The first and third sets of rollers 9 arranged along the weld seam travel direction adopt the same bottom, middle and top three-level pressure threshold standard: the first set of rollers During feeding and travel, the rollers can perform cold straightening correction on the initial uneven areas of the stiffening plate. The third set of rollers takes over the straightening and welding deformation suppression, and undertakes the pressure holding and shaping function to ensure the stability and solidification of the correction results. After the pressure of the three sets of rollers 9 is adjusted to the appropriate position, the PLC controller controls the transverse straight module 3 to start, driving the first connecting plate 4 to move synchronously along the weld direction. During the travel, the first set of rollers 9 acts on the ambient temperature base material area first, performing cold straightening on the initial lateral bending and local unevenness of the stiffening plate 2, and unifying the dimensional and positional deviations caused by blanking, misaligned welding and assembly to the standard reference, eliminating input deviations and providing a consistent starting state for subsequent welding shape control. When the second set of rollers moves to the corresponding position of the weld, the welding device starts welding. The welding process is existing technology, and this solution will not elaborate on it. During the welding process, the PLC uses the temperature data of the stiffener plate 2 side collected in real time by the temperature sensor on the outer wall of the bottom roller 9 as the core basis. When the welding heat source is close, the temperature of the stiffener plate 2 side continues to rise, and the material deformation resistance gradually decreases as the temperature rises. According to the built-in temperature change law, the PLC synchronously lowers the target threshold of the three-way clamping force, and adjusts the tension of the tension spring 12 by controlling the slight opening and closing of the first solenoid valve 15 to achieve precise fine adjustment of the tension force. As the weld cools and progresses, the tension force of the bottom, middle and top rollers 9 increases step by step in a gradient.After the weld has completely cooled, the three clamping forces tend to be consistent and maintain a relatively high pressure state, thus suppressing welding deformation throughout the process. During this process, the transverse linear module 3 drives the first connecting plate 4 to move back and forth along the weld direction, driving the second set of rollers 9 to reciprocate and roll the weld section, further enhancing the deformation suppression and stress equalization effect. After the shape control of a single weld section is completed, the transverse linear module 3 continues to drive the first connecting plate 4 to move to the next set of weld positions. At this time, the third set of rollers 9 moves to the corresponding position of the welded weld and enters the pressure holding and shaping process. During the welding heating phase, the temperature on the stiffener side rises as the heat source approaches, causing a decrease in the material's yield strength. This is especially true in the high-temperature bottom zone, where plasticity is extremely high and rigidity is relatively weak. At this point, the PLC simultaneously lowers the three-way pressure while maintaining a gradient characteristic of strong at the bottom and flexible at the top. This ensures the constraint force at the root deformation source while preventing lateral instability and bulging of the stiffener due to pressure overload at high temperatures. Simultaneously, the tension spring 12 adaptively absorbs the welding thermal expansion, preventing the introduction of additional residual stress due to forced constraint. In the cooling transition phase, as the weld temperature decreases, the material rigidity gradually recovers. The PLC controls the three-way pressure to increase gradually in a gradient, continuously counteracting the increasing cooling contraction trend, ensuring that the constraint force and contraction resistance are always matched, avoiding uncontrolled deformation due to "constraint lags behind contraction." In the cooling and shaping phase, after the temperature drops to the low-temperature elastic zone, the three-way pressure tends to be equal and maintains a high-pressure state. At this point, the rigidity difference of the stiffener along its height is significantly reduced. The uniform high pressure provides equal constraint on the contraction of the weld along its entire height, completely eliminating the cumulative rebound caused by insufficient constraint at the top, while also avoiding stress stratification problems caused by gradient pressure, resulting in higher final shaping accuracy. Through the synergistic effect of three-stage roller relay operation and dynamic closed-loop temperature regulation, the deviation of rib bending and verticality can be greatly reduced; at the same time, the weld points of the staggered welding are subjected to stable elastic constraint force throughout the process, without rigid impact and overload shear, the risk of weld point cracking and root micro-cracks is significantly reduced, and the joint forming quality and dimensional stability are comprehensively improved.
[0019] Please see Figures 2-11The horizontal mover is located on one side of the fixed plate 10 and is used to drive the roller 9 to move horizontally. The horizontal mover includes a mounting base 29 fixedly connected to one side of the sliding rod 11. A limit slider 32 is slidably connected to the inner side of the mounting base 29. A second connecting plate 33 is fixedly connected to the bottom of the limit slider 32, and the roller 9 is rotatably connected to the outer wall of the second connecting plate 33. The horizontal mover also includes a limiting groove 30 opened on the inner side of the mounting base 29. A second piston rod 31 is slidably connected to the inner side of the limiting groove 30, and one end of the second piston rod 31 is fixedly connected to the limit slider 32. The second piston rod 31 and the limiting groove A return spring 34 is installed on the inner side of the 30, and a power assembly is provided on the top of the mounting base 29. The power assembly includes a second liquid storage shell 24 fixedly connected to the inner side of one of the drive plates 13, a second suction pump 25 installed at the outlet of the second liquid storage shell 24, and a fourth connecting pipe 26 fixedly connected to the output end of the second suction pump 25. The power assembly also includes a sixth connecting pipe 28 fixedly connected to the top of the mounting base 29, a second solenoid valve 35 installed at the inlet of the limiting groove 30, a fifth connecting pipe 27 fixedly connected to the outlet of the sixth connecting pipe 28, and the fifth connecting pipe 27 fixedly connected to the second solenoid valve 35. The servo motor is uniformly controlled by the PLC controller, enabling intermittent start / stop and precise angle positioning. It is used to switch the roller posture during vertical seam welding. When welding is required at the vertical weld joint between two stiffening plates 2, the PLC first controls the robotic arm to lift vertically, driving the three sets of rollers 9 to move synchronously to the top of the stiffening plate 2 to avoidance position. Then, the PLC controls the horizontal linear module 3 to start feeding, moving the three sets of bidirectional linear modules 6 to the starting position at the top of the vertical seam. Next, the PLC controls the servo motor to start, driving the second set of rollers 9 to rotate 90 degrees, aligning the roller working surface with the side wall of the stiffening plate 2 and the vertical weld direction, completing the correct welding posture positioning. After the posture verification is successful, the PLC controls the bidirectional linear module 6 to start feeding, adjusting the first, second, and third sets of rollers 9 to three positions equidistant from the weld, ensuring uniform three-way constraint reference. Then, the PLC synchronously starts the three sets of first suction pumps 20 and simultaneously controls all three sets of first solenoid valves 15. When activated, power is transmitted via the first piston rod 22, simultaneously pushing the upper, middle, and lower three-layer rollers 9 rapidly towards one side of the rib plate 2. Before the rollers 9 contact the surface of the rib plate 2, the first suction pump 20 continues to run continuously, minimizing the pre-tightening auxiliary time. Once the bottom roller 9 is in contact with the surface of the rib plate 2, it continues to advance with the first piston rod 22, forcing the tension spring 12 at the corresponding position to stretch, and the tension force of the rollers on the rib plate gradually increases. When the tension force reaches the preset bottom target pressure threshold... When the value is reached, the PLC immediately triggers the first solenoid valve 15 corresponding to the bottom to close, cutting off the power feed channel, so that the bottom roller 9 maintains the current spring tension and tension, locking the root constraint reference. The middle and top rollers 9 use the same logic to build pressure in sequence: when the tension of the middle rises to the preset middle target threshold, the first solenoid valve 15 corresponding to the middle is closed and the pressure of this layer is locked; when the tension of the top rises to the preset top target threshold, the first solenoid valve 15 corresponding to the top is closed and the pressure of this layer is locked.By pre-setting three levels of pressure parameters—"bottom threshold > middle threshold > top threshold"—a gradient clamping force that gradually decreases from bottom to top is naturally formed, completing the initial lateral restraint before vertical seam welding. During welding, the PLC uses the temperature data of the stiffener 2 sides collected in real time by the temperature sensor on the outer wall of the bottom roller 9 as the core adjustment basis to perform dynamic closed-loop adjustment of the three clamping forces. When the welding heat source moves upward and approaches, the temperature of the stiffener 2 sides continues to rise, and the material deformation resistance gradually decreases with the temperature increase. Based on the built-in temperature-pressure matching model, the PLC proportionally and synchronously lowers the target threshold of the three clamping forces. By controlling the slight on / off state of the first solenoid valve 15, the tension of the tension spring 12 is finely adjusted to ensure that the constraint force is accurately matched with the plastic state of the material. As the weld gradually cools, the tension of the bottom, middle, and top rollers 9 increases progressively with the temperature drop. Once the weld has completely cooled to the low-temperature elastic zone, the three clamping forces become consistent and maintain a relatively high pressure, thus suppressing vertical weld deformation throughout the process. Through dynamic adjustment of gradient pressure, the high-temperature zone adaptively absorbs thermal expansion with elastic constraints, avoiding additional internal stress caused by forced constraints. The progressively increasing pressure during the cooling stage counteracts the shrinkage trend. Combined with the continuous rolling action of the rollers as the weld moves upward, this effectively homogenizes vertical residual stress, reduces the stress concentration factor at the weld toe, improves the overall mechanical properties of the joint, and effectively reduces the risk of heat accumulation at the top during vertical weld welding, which often leads to residual stress concentration in the lower part of the weld and increases the risk of hot cracking and weld toe fatigue failure. The second suction pump 25 is controlled by a PLC controller, enabling intermittent start / stop and micro-feed adjustment. Working in conjunction with the second solenoid valve 35, it precisely controls the vertical displacement of the middle and top rollers 9, achieving a gradient arrangement and dynamic adaptive adjustment of the distance between the rollers and the weld seam. Before welding, the PLC controller first starts the second suction pump 25, causing the middle and top rollers 9 to retreat vertically and synchronously in a step-by-step manner away from the root weld seam. When the middle roller 9 retreats to a preset distance, the PLC locks this displacement, while the top roller 9 continues to retreat to a larger set distance, ultimately achieving the gradient arrangement and dynamic adaptive adjustment of the distance between the rollers and the weld seam. The vertical distance between the bottom roller 9 and the root weld increases sequentially, forming a gradient arrangement with denser spacing at the bottom and sparser spacing at the top. This pre-matches the temperature decay characteristics of the weld heat source along the height of the stiffener. During welding, the material's deformation resistance gradually decreases as the temperature rises. Based on the temperature data of the stiffener 2 sides collected in real time by the temperature sensor on the outer wall of the bottom roller 9, and combined with the built-in temperature-displacement matching model, the PLC controls the second solenoid valve 35 to intermittently drive the second suction pump 25 to fine-tune the vertical position of the middle and top rollers 9, ensuring that the gradient slope of the roller spacing always matches the decay rate of the real-time temperature field. The roller spacing is narrowed synchronously in the temperature rising section to strengthen the constraint density in the high-temperature zone; the spacing is correspondingly widened in the temperature level section to avoid ineffective constraints. After the weld gradually cools down and the temperature drops to the low-temperature elastic range, the PLC controls the middle and top rollers 9 to retract and reset in stages, eventually returning to the same vertical reference plane as the bottom roller 9. This ensures that the constraint reference is consistent throughout the entire height of the stiffening plate, avoiding vertical shape deviations caused by residual gradient spacing. This ensures that the closer the rollers 9 are to the high-temperature plastic zone near the weld, the closer their position and the stronger their clamping force. This fully utilizes the high-temperature and high-plasticity characteristics of the material to directly suppress welding shrinkage, achieving precise shape control from the source of deformation. Compared with the equal-spacing single-pressure gradient scheme, this significantly improves the overall deformation suppression efficiency.
[0020] The above description is merely a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the scope of the technology disclosed in the present invention, based on the technical solution and inventive concept of the present invention, should be covered within the scope of protection of the present invention.
Claims
1. A device for suppressing and correcting deformation of sheet metal welding of wind turbine generator housing, characterized in that, include: A wind turbine housing has a rib plate on its top and a robotic arm on the top of the rib plate. The output end of the robotic arm is fixedly connected to a horizontal linear module, and the output end of the horizontal linear module is fixedly connected to a first connecting plate. A servo motor is installed on the inner side of the first connecting plate, and the output end of the servo motor extends through to the bottom of the first connecting plate and is rotatably connected to a rotating rod. Two rectangular plates are fixedly connected to the bottom of the first connecting plate, and three bidirectional linear modules are provided at the bottom of the first connecting plate. The three bidirectional linear modules are respectively fixedly connected to the rectangular plates and the rotating rod. A gradient pressing mechanism is provided at the bottom of the rotating rod for gradually pressing the rib plate. The gradient pressing mechanism includes a thin plate fixedly connected to the bottom of the bidirectional linear module. Two fixing plates are fixedly connected to the bottom of the thin plate, and three rollers are provided on one side of each of the two fixing plates. A horizontal mover, wherein one side of a fixed plate is provided for driving the roller to move horizontally.
2. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 1, characterized in that, The gradient pressing mechanism further includes three first cylinders fixedly connected to the inner side of the fixed plate. Each of the three first cylinders has a first piston rod slidably connected to its inner side. One end of the first piston rod is fixedly connected to a drive plate, and a sliding rod is slidably connected to the inner side of the drive plate. A first compression spring is installed between the sliding rod and the drive plate. A second compression spring is installed between the inner side of the first cylinder and the first piston rod. A driver is provided on one side of the first cylinder.
3. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 2, characterized in that, The driver includes a first liquid storage shell fixedly connected to one side of the fixed plate, a first suction pump installed at the liquid outlet of the first liquid storage shell, and a third connecting pipe fixedly connected to the output end of the first suction pump.
4. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 3, characterized in that, The driver also includes two limiting plates fixedly connected to one side of the fixed plate. A second connecting pipe is fixedly connected to the inner side of the two limiting plates, and the inlet of the second connecting pipe is fixedly connected to the other end of the third connecting pipe. A first connecting pipe is installed at the outlet of the second connecting pipe. A first solenoid valve is installed at the inlet of the first cylinder, and the other end of the first solenoid valve is fixedly connected to the first connecting pipe.
5. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 4, characterized in that, The horizontal mover includes a mounting base fixedly connected to one side of the sliding rod, a limit slider slidably connected to the inner side of the mounting base, a second connecting plate fixedly connected to the bottom of the limit slider, and the roller is rotatably connected to the outer wall of the second connecting plate.
6. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 5, characterized in that, The horizontal mover also includes a limiting groove formed inside the mounting base. A second piston rod is slidably connected to the inner side of the limiting groove, and one end of the second piston rod is fixedly connected to the limiting slider. A return spring is installed on the second piston rod and the inner side of the limiting groove. A power assembly is provided on the top of the mounting base.
7. The wind turbine generator housing sheet metal welding deformation suppression and correction device according to claim 6, characterized in that, The power assembly includes a second liquid storage tank fixedly connected to the inner side of one of the drive plates, a second suction pump installed at the liquid outlet of the second liquid storage tank, and a fourth connecting pipe fixedly connected to the output end of the second suction pump.
8. The sheet metal welding deformation suppression and correction device for wind turbine generator housing according to claim 7, characterized in that, The power assembly also includes a sixth connecting pipe fixedly connected to the top of the mounting base. A second solenoid valve is installed at the liquid inlet of the limiting groove. A fifth connecting pipe is fixedly connected to the liquid outlet of the sixth connecting pipe, and the fifth connecting pipe is fixedly connected to the second solenoid valve.