Overcharge control methods, systems, controllers, storage media, and software products

By introducing relay valves, equalizing air cylinders, and solenoid valves into the locomotive braking system, combined with the precise control of the controller, the problem of inaccurate overcharge pressure changes in the traditional overcharge system has been solved. This has enabled intelligent management of overcharge relief and pressure release, improving the reliability and efficiency of the braking system.

CN123104602APending Publication Date: 2026-11-17SHUOHUANG RAILWAY DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611323609.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-28
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional locomotive overcharge systems cannot accurately control overcharge pressure changes, which affects the normal operation of the locomotive braking system. In particular, when the overcharge pressure is eliminated too quickly, the vehicle generates excessive braking force.

Method used

By introducing a relay valve, a balancing cylinder, a first solenoid valve, and a second solenoid valve into the overcharge control system, the controller can precisely control the charging rate and the exhaust port diameter, thereby achieving intelligent management of overcharge pressure.

Benefits of technology

It achieves accurate control over the overcharge relief process and the overcharge pressure release process of the train, improves the reliability and operating efficiency of the train braking system, and avoids unnecessary braking action caused by the vehicle's overcharge pressure being eliminated too quickly.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123104602A_ABST
    Figure CN123104602A_ABST
Patent Text Reader

Abstract

This application relates to an overcharge control method, system, controller, storage medium, and program product. The method is applied to the controller of an overcharge control system. The method includes: in response to receiving an overcharge command, closing a second solenoid valve, opening a first solenoid valve, and controlling the airflow rate at the output of the first solenoid valve to charge the overcharge cylinder to a preset overcharge pressure within a preset airflow time; in response to receiving an overcharge pressure release command, closing the first solenoid valve, opening the second solenoid valve, and determining the exhaust port diameter of the second solenoid valve based on its pressure condition. This application can intelligently and accurately control the train overcharge relief process and the overcharge pressure release process, thereby improving the reliability and operating efficiency of the train braking system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of rail transit braking technology, and in particular to an overcharge control system, method and controller. Background Technology

[0002] Currently, locomotive braking systems often have an overcharge function design. Through the overcharge function, the locomotive braking system can effectively reduce the charging time of the train and improve the release speed of the train pipe.

[0003] Traditional locomotive overcharge systems mainly control the main air supply to charge the overcharge cylinder, and then control the relay valve to generate overcharge pressure in the train pipe. When the locomotive brakes leave the overcharge position and return to the running position, the overcharge pressure is released through the exhaust port of the overcharge cylinder.

[0004] However, traditional locomotive overcharge systems cannot accurately control changes in overcharge pressure, which affects the normal operation of the locomotive braking system. For example, when releasing overcharge pressure, traditional locomotive overcharge systems often eliminate the pressure too quickly, causing pressurized air from the vehicle's auxiliary air cylinder to enter the brake cylinder, resulting in excessive braking force. Summary of the Invention

[0005] Therefore, it is necessary to provide an overcharge control method, system, controller, storage medium, and program product to address the aforementioned technical problems.

[0006] In a first aspect, this application provides an overcharge control method, applied to the controller of an overcharge control system; the overcharge control system further includes a relay valve, a balancing air cylinder, an overcharge air cylinder, a first solenoid valve, and a second solenoid valve;

[0007] One end of the relay valve is connected to the locomotive's main air pipe, and the other end is connected to the locomotive's train pipe; the equalizing air cylinder is connected to the first control terminal of the relay valve through the equalizing pipe; the overcharge air cylinder is connected to the second control terminal of the relay valve, one end of the first solenoid valve, and one end of the second solenoid valve; the other end of the first solenoid valve is connected to the train pipe; the other end of the second solenoid valve is used to connect to the atmosphere; the controller is connected to the control terminals of the first and second solenoid valves respectively; the method includes:

[0008] In response to receiving an overcharge command, the second solenoid valve is closed, the first solenoid valve is opened, and the air charging rate at the output of the first solenoid valve is controlled to charge the overcharge cylinder to a preset overcharge pressure within a preset air charging time.

[0009] In response to receiving an overcharge pressure release command, the first solenoid valve is closed and the second solenoid valve is opened. Based on the pressure of the second solenoid valve, the exhaust port diameter of the second solenoid valve is determined.

[0010] In one embodiment, determining the exhaust port diameter of the second solenoid valve based on its pressure condition includes:

[0011] Obtain a first pressure value and a second pressure value; wherein, the first pressure value is used to characterize the pressure value at one end of the second solenoid valve; and the second pressure value is used to characterize the pressure value at the other end of the second solenoid valve.

[0012] The pressure difference of the exhaust solenoid valve is determined based on the first pressure value and the second pressure value.

[0013] Determine the exhaust port diameter of the second solenoid valve based on the pressure difference of the exhaust solenoid valve.

[0014] In one embodiment, the exhaust port diameter of the second solenoid valve is negatively proportional to the pressure difference of the exhaust solenoid valve.

[0015] In one embodiment, the method further includes:

[0016] Obtain the third pressure value; whereby the third pressure value is used to characterize the pressure value of the overcharged air cylinder;

[0017] If the third pressure value remains at the preset overcharge pressure within the preset overcharge time, then the first solenoid valve is closed, the second solenoid valve is opened, and the exhaust port diameter of the second solenoid valve is determined according to the pressure of the second solenoid valve.

[0018] In one embodiment, the preset air charging time is determined based on the train formation.

[0019] Secondly, this application provides a controller, including:

[0020] Memory, used to store computer programs;

[0021] A processor for executing a computer program to implement the steps of the overcharge control method as described in any embodiment of the first aspect.

[0022] Thirdly, this application provides an overcharge control system, the system comprising: a relay valve, a balancing cylinder, an overcharge cylinder, a first solenoid valve, a second solenoid valve, and a controller as described in the second aspect; wherein...

[0023] One end of the relay valve is connected to the locomotive's main air pipe, and the other end is connected to the locomotive's train pipe;

[0024] The equalizing air cylinder is connected to the first control terminal of the relay valve via an equalizing pipe;

[0025] The overcharge cylinder is connected to the second control terminal of the relay valve, one end of the first solenoid valve, and one end of the second solenoid valve, respectively.

[0026] The other end of the first solenoid valve is connected to the train pipe; the other end of the second solenoid valve is used to connect to the atmosphere.

[0027] The controller is connected to the control terminals of the first solenoid valve and the second solenoid valve, respectively.

[0028] In one embodiment, the system further includes:

[0029] A first pressure sensor is disposed at one end of the second solenoid valve to obtain the pressure value at one end of the second solenoid valve.

[0030] The second pressure sensor is located at the other end of the second solenoid valve and is used to obtain the pressure value at one end of the second solenoid valve.

[0031] The third pressure sensor, and the second pressure sensor, are located inside the overcharge cylinder or at the output end of the overcharge cylinder, and are used to obtain the pressure value of the overcharge cylinder.

[0032] Fourthly, this application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method described in any of the embodiments of the first aspect.

[0033] Fifthly, this application provides a computer program product, including a computer program that, when executed by a processor, implements the steps of the method described in any of the embodiments of the first aspect.

[0034] The aforementioned overcharge control method, system, controller, storage medium, and program product, on the one hand, in response to receiving an overcharge command, the controller of the overcharge control system closes the second solenoid valve, opens the first solenoid valve, and controls the airflow rate at the output of the first solenoid valve to inflate the overcharge cylinder to a preset overcharge pressure within a preset airflow time, thereby achieving accurate control of the train overcharge relief process; on the other hand, in response to receiving an overcharge pressure release command, the controller closes the first solenoid valve, opens the second solenoid valve, and determines the exhaust port diameter of the second solenoid valve based on the pressure condition of the second solenoid valve, thereby achieving effective control of the overcharge pressure release process. Through the above methods, this application can intelligently and accurately control the train overcharge relief process and the overcharge pressure release process, thereby improving the reliability and operating efficiency of the train braking system. Attached Figure Description

[0035] To more clearly illustrate the technical solutions in the embodiments of this application or related technologies, the drawings used in the description of the embodiments of this application or related technologies will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0036] Figure 1 This is a diagram illustrating the application environment of an overcharge control method in one embodiment.

[0037] Figure 2 This is a schematic diagram of an exemplary relay valve structure in one embodiment;

[0038] Figure 3 This is a flowchart illustrating an overcharge control method in one embodiment;

[0039] Figure 4 This is a flowchart illustrating the process of determining the exhaust port diameter of the second solenoid valve in one embodiment.

[0040] Figure 5 This is a schematic diagram of the process for automatically releasing overcharge pressure in one embodiment;

[0041] Figure 6 This is a structural block diagram of an overcharge control device in one embodiment;

[0042] Figure 7 This is a diagram of the internal structure of an electronic device in one embodiment. Detailed Implementation

[0043] To make the objectives, technical solutions, and advantages of this application clearer, the following detailed description is provided in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the scope of this application.

[0044] It should be noted that the terms "first," "second," etc., used in this application may be used to describe various elements, but these elements are not limited by these terms. These terms are only used to distinguish the first element from the second element. The terms "comprising" and "having," and any variations thereof, used in this application, are intended to cover non-exclusive inclusion. The term "multiple" used in this application refers to two or more.

[0045] The overcharge control method provided in this application embodiment can be applied to, for example, Figure 1The overcharge control system 100 shown includes: a relay valve 104, a balancing cylinder 106, an overcharge cylinder 108, a first solenoid valve 110, a second solenoid valve 112, and a controller 102. One end of the relay valve 104 is connected to the main air pipe 114 of the locomotive, and the other end is connected to the train pipe 116 of the locomotive. The balancing cylinder 106 is connected to the first control terminal of the relay valve 104 through a balancing pipe. The overcharge cylinder 108 is connected to the second control terminal of the relay valve 104, one end of the first solenoid valve 110, and one end of the second solenoid valve 112. The other end of the first solenoid valve 110 is connected to the train pipe 116. The other end of the second solenoid valve 112 is connected to the atmosphere. The controller 102 is connected to the control terminals of the first solenoid valve 110 and the second solenoid valve 112.

[0046] In practical applications, the train pipe (also known as the brake pipe or train brake pipe) 116 is a continuous air pipeline that runs through the locomotive and all rolling stock, used to transmit air brake control commands. In practice, by controlling the increase, decrease, and maintenance of pressure within the train pipe, the entire train's brakes are uniformly controlled to achieve operations such as release, braking, and pressure maintenance. The main air duct (also known as the main air reservoir pipe or main air passage) 114 is a high-pressure air supply pipeline originating from the locomotive's main air source and running through the locomotive and all rolling stock, used to provide stable high-pressure compressed air to all types of pneumatic equipment (brake system, whistle, etc.) throughout the train. In some examples, the first solenoid valve 110 and the second solenoid valve 112 are both controllable solenoid valves whose ventilation port diameter can be controlled by a controller.

[0047] For example, such as Figure 2 As shown, Figure 2 This is an exemplary structure of the relay valve 104. The equalizing air cylinder 106 is connected to the first control terminal of the relay valve 104, so that when overcharging begins, the constant pressure of the equalizing air cylinder 106 can open the charging passage between the main air pipe 114 and the train pipe 116. The overcharge air cylinder 108 is connected to the second control terminal of the relay valve 104, so that during overcharge control, the pressure of the overcharge air cylinder 108 and the equalizing air cylinder 106 can be used to push the piston to move, causing the train pipe 116 to be overcharged to a preset overcharge pressure (e.g., 30~40 kPa). It should be noted that... Figure 2 The relay valve 104 shown is one possible structure. The relay valve 104 can also adopt other types of valve structures, as long as it can realize the function of controlling the air passage between the main air pipe 114 and the train pipe 116 according to the pressure of the overcharge air cylinder 108 and the equalizing air cylinder 106. Other possible structural implementations of the relay valve 104 in this application embodiment will not be described in detail.

[0048] In one exemplary embodiment, such as Figure 3 As shown, this application provides an overcharge control method, which is applied to... Figure 1Taking controller 102 as an example, the explanation includes the following steps S302 to S304. Wherein:

[0049] In step S302, in response to receiving an overcharge command, the second solenoid valve is closed, the first solenoid valve is opened, and the air charging rate at the output of the first solenoid valve is controlled to charge the overcharge cylinder to a preset overcharge pressure within a preset air charging time.

[0050] For example, the overcharge command can be sent by the user to the controller 102 of the overcharge control system when overcharge mitigation of the train is required. For instance, a self-resetting overcharge button can be set on the locomotive control platform. When the user presses the overcharge button, an overcharge command is sent to the controller 102 to initiate overcharge control of the train pipe 116.

[0051] Specifically, during train pipe overcharge control, if the controller 102 receives an overcharge command from the user, it controls the second solenoid valve 112 to close and simultaneously controls the first solenoid valve 110 to open. At this time, the constant pressure of the equalizing cylinder 106 can be controlled by the first control terminal of the relay valve 104 to open the air-charging passage between the main air pipe 114 and the train pipe 116. After the air-charging passage is opened, the train pipe 116 then charges the overcharge cylinder 108 through a branch pipe connected to it. Simultaneously, the controller 102 can synchronously control the air-charging rate (i.e., the gas output rate) at the output terminal of the first solenoid valve 110 to charge the overcharge cylinder 108 to the preset overcharge pressure within a preset charging time. Optionally, the preset overcharge pressure can be 30~40 kPa.

[0052] It should be noted that charging the overcharge cylinder 108 to the preset overcharge pressure within the preset charging time can include either increasing the pressure value of the overcharge cylinder 108 to the preset overcharge pressure at a fixed rate or increasing the pressure value of the overcharge cylinder 108 to the preset overcharge pressure at a non-fixed rate (non-linear). This application does not specifically limit the rate at which the overcharge cylinder 108 obtains the overcharge pressure, as long as it can increase the pressure value of the overcharge cylinder 108 to the preset overcharge pressure within the preset charging time.

[0053] Furthermore, the charging rate at the output of the first solenoid valve 110 can be controlled by adjusting the size of its charging port. In some examples, the charging port of the first solenoid valve 110 during overcharge control can be pre-calibrated based on the train formation (i.e., locomotive length; the more carriages a locomotive has, the longer the train formation). This allows for obtaining the charging port corresponding to various train formations. Under the current charging port size of the first solenoid valve 110, the train pipe 116 can charge the overcharge cylinder 108 to a preset overcharge pressure within a preset charging time, thereby achieving intelligent and accurate control of the train overcharge relief process and improving the operating efficiency of the train braking system.

[0054] In other examples, a charging port diameter variation strategy corresponding to the charging port diameter of the first solenoid valve 110 can be pre-designed according to the train formation. Based on this charging port diameter variation strategy, when the train pipe 116 is overcharged, the pressure value of the overcharge cylinder 108 can be controlled to increase uniformly to the preset overcharge pressure at a fixed rate within a preset charging time, thereby improving the safety and reliability of the train overcharge relief process.

[0055] Step S304: In response to receiving the overcharge pressure release command, the first solenoid valve is closed, the second solenoid valve is opened, and the exhaust port diameter of the second solenoid valve is determined according to the pressure of the second solenoid valve.

[0056] For example, the overcharge command can be sent to the controller 102 of the overcharge control system when it is necessary to release the overcharge pressure. For instance, a self-resetting overcharge button can be set on the locomotive control platform. When the user presses the overcharge button, an overcharge command is sent to the controller 102 to start overcharge control of the train pipe 116; and when the overcharge button is reset, an overcharge pressure release command is sent to the controller 102 to start releasing the overcharge pressure in the overcharge cylinder 108.

[0057] In some examples, the controller 102 can determine the exhaust port diameter corresponding to the second solenoid valve 112 based on the pressure values ​​at the input and / or output terminals of the second solenoid valve 112. In some possible implementations, the exhaust port diameter variation strategy of the second solenoid valve 112 can also be pre-designed in conjunction with the train formation. Based on this exhaust port diameter variation strategy, when it is necessary to release overcharge pressure, the pressure value of the overcharge cylinder 108 can be controlled to decrease uniformly at a fixed rate within a preset exhaust time, thereby avoiding the overcharge pressure from being eliminated too quickly.

[0058] Specifically, if the controller 102 receives an overcharge pressure release command, it indicates that the overcharge pressure in the overcharge cylinder 108 needs to be released. At this time, the controller 102 controls the first solenoid valve 110 to close and stop the charging process of the train pipe 116 to the overcharge cylinder 108. At the same time, the controller 102 controls the second solenoid valve 112 to open and determines the exhaust port diameter of the second solenoid valve 112 according to the pressure of the second solenoid valve 112, so as to avoid the overcharge pressure being released too quickly, causing the pressurized air in the vehicle's auxiliary air cylinder to enter the brake cylinder, resulting in excessive braking effect on the vehicle and affecting the normal braking process of the vehicle.

[0059] In one embodiment, such as Figure 4 As shown, the exhaust port diameter of the second solenoid valve is determined based on the pressure of the second solenoid valve, including the following steps S402 to S406. Wherein:

[0060] Step S402: Obtain the first pressure value and the second pressure value;

[0061] Step S404: Determine the pressure difference of the exhaust solenoid valve based on the first pressure value and the second pressure value;

[0062] Step S406: Determine the exhaust port diameter of the second solenoid valve based on the pressure difference of the exhaust solenoid valve.

[0063] The first pressure value is used to characterize the pressure value at one end of the second solenoid valve 112; the second pressure value is used to characterize the pressure value at the other end of the second solenoid valve 112.

[0064] For example, the controller 102 can acquire the first pressure value and the second pressure value through two pressure sensors respectively disposed at one end and the other end of the second solenoid valve 112. It can be understood that the pressure difference of the exhaust solenoid valve is actually the pressure difference between the input and output ends of the second solenoid valve during the overcharge pressure release process.

[0065] It should be noted that, for traditional overcharge control systems, when the driver operates to eliminate the overcharge pressure, the overcharge pressure in the train pipe is often eliminated quickly and the corresponding vehicle three-way valve brake sensitivity is high, causing the pressurized air in the vehicle's auxiliary air cylinder to enter the brake cylinder, thus causing the vehicle to generate unnecessary braking force.

[0066] In some examples, the pressure difference of the exhaust solenoid valve and the exhaust port diameter of the second solenoid valve 112 can be negatively correlated. That is, when the pressure difference of the exhaust solenoid valve is large, the controller 102 can set a smaller exhaust port diameter of the second solenoid valve 112; while when the pressure difference of the exhaust solenoid valve is small, the controller 102 can set a larger exhaust port diameter of the second solenoid valve 112. In this way, the embodiments of this application avoid the problem of excessively rapid elimination of overcharge pressure during the release of overcharge pressure caused by the large overcharge pressure in traditional overcharge control systems, thereby avoiding unnecessary braking action on the vehicle and effectively improving the train's relief efficiency.

[0067] Specifically, when releasing overcharge pressure, the controller 102 can obtain the first pressure value at one end of the second solenoid valve 112 and the second pressure value at the other end of the second solenoid valve 112. Then, based on the first pressure value and the second pressure value, the controller 102 determines the pressure difference of the exhaust solenoid valve. Next, the controller 102 determines the exhaust port diameter of the second solenoid valve 112 according to the pressure difference of the exhaust solenoid valve, so as to realize intelligent control of the overcharge pressure release process of the train.

[0068] In one embodiment, the exhaust port diameter of the second solenoid valve is negatively proportional to the pressure difference of the exhaust solenoid valve.

[0069] Specifically, when releasing overcharge pressure, the controller 102 can obtain the first pressure value at one end of the second solenoid valve 112 and the second pressure value at the other end of the second solenoid valve 112. Then, based on the first and second pressure values, it determines the pressure difference of the exhaust solenoid valve. Next, the controller 102 determines the exhaust port diameter of the second solenoid valve 112 according to the pressure difference of the exhaust solenoid valve in a negative proportional relationship. This avoids the problem of excessively rapid elimination of overcharge pressure during the release of overcharge pressure, which is common in traditional overcharge control systems. This also avoids unnecessary braking action on the vehicle and effectively improves the train's relief efficiency.

[0070] In one embodiment, such as Figure 5 As shown, the method further includes steps S502 to S504. Wherein:

[0071] Step S502: Obtain the third pressure value;

[0072] Step S504: If the third pressure value maintains the preset overcharge pressure within the preset overcharge time, then close the first solenoid valve, open the second solenoid valve, and determine the exhaust port diameter of the second solenoid valve based on the pressure of the second solenoid valve.

[0073] The third pressure value can be used to characterize the pressure value of an overcharged air cylinder.

[0074] For example, a third pressure value can be obtained by a pressure sensor located inside the overcharge cylinder 108 or at the output end of the overcharge cylinder 108.

[0075] In practical applications, due to driver negligence or accidents, the controller 102 may fail to receive the overcharge pressure release command, and the overcharge pressure may not be eliminated in time. Prolonged overcharging of the train pipe 116 can cause excessive pressure on components such as the auxiliary air cylinder, pipelines, and valves, resulting in damage to the components and affecting the normal braking ability of the locomotive.

[0076] Specifically, the controller 102 can obtain the third pressure value corresponding to the overcharge cylinder 108. Then, if the third pressure value maintains a preset overcharge pressure for a preset overcharge duration, it closes the first solenoid valve 110 and opens the second solenoid valve 112. Based on the pressure of the second solenoid valve 112, it determines the exhaust port diameter of the second solenoid valve 112. It should be noted that in this embodiment, the specific details of the controller determining the exhaust port diameter of the second solenoid valve based on its pressure have been discussed in detail in the preceding embodiments and will not be repeated here.

[0077] It is understood that, through the above methods, the embodiments of this application can realize automatic monitoring of the overcharging duration of the train tube by the controller, so as to avoid damage to the relevant components in the locomotive braking system due to the excessive duration of the overcharging state, thereby effectively improving the safety and reliability of the overcharging control system.

[0078] In one embodiment, the preset air charging time is determined based on the train formation.

[0079] Specifically, users can determine the preset charging time based on the train formation in actual applications. For example, when the train formation is longer, the preset charging time can be appropriately shortened to increase the overcharge rate. Through the above methods, the embodiments of this application can improve the applicability of the overcharge control method and overcharge control system in various train formation scenarios, effectively enhancing its versatility.

[0080] It should be understood that although the steps in the flowcharts of the embodiments described above are shown sequentially according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless explicitly stated herein, there is no strict order restriction on the execution of these steps, and they can be executed in other orders. Moreover, at least some steps in the flowcharts of the embodiments described above may include multiple steps or multiple stages. These steps or stages are not necessarily completed at the same time, but can be executed at different times. The execution order of these steps or stages is not necessarily sequential, but can be performed alternately or in turn with other steps or at least some of the steps or stages in other steps. It is understood that the steps in different embodiments can be freely combined as needed, and all non-contradictory solutions formed by such combinations are within the scope of protection of this application.

[0081] In one exemplary embodiment, this application also provides a controller, including: a memory for storing a computer program; and a processor for executing the computer program to implement the steps of the overcharge control method as described in any embodiment of the first aspect.

[0082] In one exemplary embodiment, such as Figure 1 As shown, this application also provides an overcharge control system, which includes: a relay valve, a balancing air cylinder, an overcharge air cylinder, a first solenoid valve, a second solenoid valve, and a controller as described in the above embodiments.

[0083] The relay valve is connected to the locomotive's main air pipe at one end and to the locomotive's train pipe at the other end; the equalizing air cylinder is connected to the first control terminal of the relay valve through the equalizing pipe; the overcharge air cylinder is connected to the second control terminal of the relay valve, one end of the first solenoid valve, and one end of the second solenoid valve respectively; the other end of the first solenoid valve is connected to the train pipe; the other end of the second solenoid valve is used to connect to the atmosphere; and the controller is connected to the control terminals of the first and second solenoid valves respectively.

[0084] Specifically, on the one hand, in response to receiving an overcharge command, the controller of the overcharge control system closes the second solenoid valve, opens the first solenoid valve, and controls the airflow rate at the output of the first solenoid valve to inflate the overcharge cylinder to a preset overcharge pressure within a preset airflow time, thereby achieving accurate control of the train overcharge relief process. On the other hand, in response to receiving an overcharge pressure release command, the controller closes the first solenoid valve, opens the second solenoid valve, and determines the exhaust port diameter of the second solenoid valve based on its pressure, thereby achieving effective control of the overcharge pressure release process. Through the above methods, this application can intelligently and accurately control the train overcharge relief process and the overcharge pressure release process, thereby improving the reliability and operating efficiency of the train braking system.

[0085] It is understood that the solution to the problem provided in this application is similar to the solution from the perspective of overcharge control method described above. Therefore, the specific limitations of this application and one or more overcharge control system embodiments provided below can be found in the limitations of the overcharge control method embodiments above, and will not be repeated here.

[0086] In one embodiment, such as Figure 1 As shown, the overcharge control system further includes: a first pressure sensor 118, which is disposed at one end of the second solenoid valve and is used to obtain the pressure value at one end of the second solenoid valve; a second pressure sensor 120, which is disposed at the other end of the second solenoid valve and is used to obtain the pressure value at one end of the second solenoid valve; and a third pressure sensor 122, which is disposed inside the overcharge cylinder or at the output end of the overcharge cylinder and is used to obtain the pressure value of the overcharge cylinder.

[0087] Based on the same inventive concept, this application also provides an overcharge control device for implementing the overcharge control method described above. The solution provided by this device is similar to the solution described in the above method; therefore, the specific limitations in one or more overcharge control device embodiments provided below can be found in the limitations of the overcharge control method described above, and will not be repeated here.

[0088] In an exemplary embodiment, as shown in the figure, this application provides an overcharge control device 600, applied to an overcharge control system, comprising:

[0089] The overcharge module 602 is used to respond to receiving an overcharge command by closing the second solenoid valve, opening the first solenoid valve, and controlling the air charging rate at the output of the first solenoid valve to charge the overcharge cylinder to a preset overcharge pressure within a preset air charging time.

[0090] The overcharge pressure relief module 604 is used to close the first solenoid valve and open the second solenoid valve in response to receiving the overcharge pressure relief command, and to determine the exhaust port diameter of the second solenoid valve according to the pressure of the second solenoid valve.

[0091] In one embodiment, the overcharge pressure relief module 604 is further configured to acquire a first pressure value and a second pressure value; wherein the first pressure value is used to characterize the pressure value at one end of the second solenoid valve; the second pressure value is used to characterize the pressure value at the other end of the second solenoid valve; based on the first pressure value and the second pressure value, the pressure difference of the exhaust solenoid valve is determined; and the exhaust port diameter of the second solenoid valve is determined according to the pressure difference of the exhaust solenoid valve.

[0092] In one embodiment, the exhaust port diameter of the second solenoid valve is negatively proportional to the pressure difference of the exhaust solenoid valve.

[0093] In one embodiment, the device 600 further includes:

[0094] The automatic pressure release module is used to obtain a third pressure value; the third pressure value is used to characterize the pressure value of the overcharge cylinder; if the third pressure value maintains the preset overcharge pressure within the preset overcharge time, the first solenoid valve is closed, the second solenoid valve is opened, and the exhaust port diameter of the second solenoid valve is determined according to the pressure of the second solenoid valve.

[0095] In one embodiment, the preset air charging time is determined based on the train formation.

[0096] Each module in the aforementioned overcharge control device can be implemented entirely or partially through software, hardware, or a combination thereof. These modules can be embedded in the processor of a computer device in hardware form or independent of it, or stored in the memory of the computer device in software form, so that the processor can call and execute the corresponding operations of each module.

[0097] In one exemplary embodiment, this application provides an electronic device, which may be a controller, and its internal structure diagram may be as follows: Figure 7 As shown, this electronic device includes a processor, memory, input / output (I / O) interfaces, and a communication interface. The processor, memory, and I / O interfaces are connected via a system bus, and the communication interface is also connected to the system bus via the I / O interfaces. The processor provides computational and control capabilities. The memory includes non-volatile storage media and internal memory. The non-volatile storage media stores the operating system, computer programs, and a database. The internal memory provides the environment for the operation of the operating system and computer programs stored in the non-volatile storage media. The database stores data such as first pressure values, second pressure values, and third pressure values. The I / O interfaces are used for exchanging information between the processor and external devices. The communication interface is used for communicating with external terminals via a network connection. When the computer program is executed by the processor, it implements an overcharge control method.

[0098] Those skilled in the art will understand that Figure 7 The structure shown is merely a block diagram of a portion of the structure related to the present application and does not constitute a limitation on the electronic device to which the present application is applied. The specific electronic device may include more or fewer components than shown in the figure, or combine certain components, or have different component arrangements.

[0099] In one embodiment, an electronic device is also provided, including a memory and a processor, wherein the memory stores a computer program, and the processor executes the computer program to implement the steps in the above-described method embodiments.

[0100] In one embodiment, a computer-readable storage medium is provided having a computer program stored thereon that, when executed by a processor, implements the steps in the above method embodiments.

[0101] In one embodiment, a computer program product is provided, including a computer program that, when executed by a processor, implements the steps in the above method embodiments.

[0102] Those skilled in the art will understand that all or part of the processes in the methods of the above embodiments can be implemented by a computer program instructing related hardware. The computer program can be stored in a non-volatile computer-readable storage medium, and when executed, it can include the processes of the embodiments of the above methods. Any references to memory, databases, or other media used in the embodiments provided in this application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM can take many forms, such as Static Random Access Memory (SRAM) or Dynamic Random Access Memory (DRAM). The databases involved in the embodiments provided in this application may include at least one type of relational database and non-relational database. Non-relational databases may include, but are not limited to, blockchain-based distributed databases. The processors involved in the embodiments provided in this application may be general-purpose processors, central processing units, graphics processing units, digital signal processors, programmable logic devices, quantum computing-based data processing logic devices, artificial intelligence (AI) processors, etc., and are not limited to these.

[0103] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0104] The embodiments described above are merely illustrative of several implementation methods of this application, and while the descriptions are specific and detailed, they should not be construed as limiting the scope of this patent application. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this application. Therefore, the protection scope of this application should be determined by the appended claims.

Claims

1. An overcharge control method, characterized in that, A controller applied to an overcharge control system; the overcharge control system further includes a relay valve, a balancing air cylinder, an overcharge air cylinder, a first solenoid valve, and a second solenoid valve; One end of the relay valve is connected to the main air pipe of the locomotive, and the other end is connected to the train pipe of the locomotive; the equalizing air cylinder is connected to the first control terminal of the relay valve through the equalizing pipe; the overcharge air cylinder is connected to the second control terminal of the relay valve, one end of the first solenoid valve, and one end of the second solenoid valve respectively; the other end of the first solenoid valve is connected to the train pipe; the other end of the second solenoid valve is used to connect to the atmosphere; the controller is connected to the control terminals of the first solenoid valve and the second solenoid valve respectively. The method includes: In response to receiving an overcharge command, the second solenoid valve is closed, the first solenoid valve is opened, and the air charging rate at the output of the first solenoid valve is controlled to charge the overcharge cylinder to a preset overcharge pressure within a preset air charging time. In response to receiving an overcharge pressure release command, the first solenoid valve is closed and the second solenoid valve is opened, and the exhaust port diameter of the second solenoid valve is determined according to the pressure of the second solenoid valve.

2. The method according to claim 1, characterized in that, The step of determining the exhaust port diameter of the second solenoid valve based on its pressure includes: Obtain a first pressure value and a second pressure value; wherein, the first pressure value is used to characterize the pressure value at one end of the second solenoid valve; and the second pressure value is used to characterize the pressure value at the other end of the second solenoid valve. Based on the first pressure value and the second pressure value, determine the pressure difference of the exhaust solenoid valve; The exhaust port diameter of the second solenoid valve is determined based on the pressure difference of the exhaust solenoid valve.

3. The method according to claim 2, characterized in that, The exhaust port diameter of the second solenoid valve is negatively proportional to the pressure difference of the exhaust solenoid valve.

4. The method according to any one of claims 1 to 3, characterized in that, The method further includes: Obtain a third pressure value; wherein the third pressure value is used to characterize the pressure value of the overcharged air cylinder; If the third pressure value maintains the preset overcharge pressure within the preset overcharge time, then the first solenoid valve is closed, the second solenoid valve is opened, and the exhaust port diameter of the second solenoid valve is determined according to the pressure of the second solenoid valve.

5. The method according to claim 4, characterized in that, The preset air charging time is determined based on the train formation.

6. A controller, characterized in that, include: Memory, used to store computer programs; A processor, configured to implement the steps of the overcharge control method as described in any one of claims 1 to 5 when executing the computer program.

7. An overcharge control system, characterized in that, The system includes: a relay valve, a balancing cylinder, an overcharge cylinder, a first solenoid valve, a second solenoid valve, and a controller as described in claim 6; wherein... One end of the relay valve is connected to the main air pipe of the locomotive, and the other end is connected to the train pipe of the locomotive; The equalizing air cylinder is connected to the first control terminal of the relay valve via an equalizing pipe; The overcharge cylinder is connected to the second control terminal of the relay valve, one end of the first solenoid valve, and one end of the second solenoid valve, respectively. The other end of the first solenoid valve is connected to the train pipe; the other end of the second solenoid valve is connected to the atmosphere. The controller is connected to the control terminal of the first solenoid valve and the control terminal of the second solenoid valve.

8. The system according to claim 7, characterized in that, The system also includes: A first pressure sensor is disposed at one end of the second solenoid valve to obtain the pressure value at one end of the second solenoid valve. The second pressure sensor is disposed at the other end of the second solenoid valve and is used to obtain the pressure value at the other end of the second solenoid valve. The third pressure sensor, and the second pressure sensor, are disposed inside the overcharge cylinder or at the output end of the overcharge cylinder, and are used to obtain the pressure value of the overcharge cylinder.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 5.

10. A computer program product, comprising a computer program, characterized in that, When the computer program is executed by a processor, it implements the steps of the method according to any one of claims 1 to 5.