A control method for coordinated material placement of the boom hook of a tower conveyor
By establishing a two-dimensional and three-dimensional spatial coupled geometric model and closed-loop leveling technology, the problem of relying on manual experience for tower belt conveyors has been solved, achieving efficient and stable full-range material distribution control, which is suitable for tower belt conveyors without independent drive for secondary conveyor arms.
Patent Information
- Application Number
- CN202611331928.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-31
- Publication Date
- 2026-11-17
AI Technical Summary
Existing tower belt conveyor control methods rely on manual experience, resulting in low adjustment efficiency, inability to achieve predictive adjustment, limited applicable scenarios, difficulty in automation, and poor stability. In particular, tower belt conveyors without independent drive for the secondary conveyor arm cannot achieve stable material distribution throughout the entire range.
A two-dimensional and three-dimensional multi-degree-of-freedom spatially coupled geometric model is established. The horizontal position of the cloth platform is used as a mandatory constraint condition to construct a quantitative mathematical correlation, realize predictive collaborative control, and form a closed-loop leveling by combining real-time attitude data for reverse verification.
It achieves efficient, precise, and stable material placement across the entire range of the tower conveyor belt, improving construction efficiency, reducing failure rate, adapting to complex construction scenarios, and supporting automated and intelligent control.
Smart Images

Figure CN123105469A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of concrete engineering machinery technology, and in particular to a control method for the coordinated placement of concrete by the boom hook of a tower crane. Background Technology
[0002] Tower belt conveyors are specialized equipment in the field of concrete construction. They combine tower cranes and belt conveyor mechanisms, relying on two-stage articulated belt conveyor arms to transport concrete materials. They are widely used in continuous pouring operations for large-scale infrastructure construction, water conservancy and hydropower projects, and super high-rise buildings.
[0003] The mechanical structure of a conventional tower belt conveyor mainly includes the tower crane body, jib, hook, and two-stage articulated conveyor arms. The primary conveyor arm (near-end conveyor arm) is hinged to the tower crane body at its base and can independently perform pitch and slewing movements. The secondary conveyor arm (far-end conveyor arm) is hinged to the end of the primary conveyor arm, and its end is equipped with a placing platform. In some specific models, the secondary conveyor arm does not have an independent pitch drive cylinder; its pitch attitude is changed entirely by the tower crane hook suspending and pulling it via wire rope. During construction, the operator passively adjusts the pitch angle of the secondary conveyor arm by synchronously adjusting the luffing of the tower crane jib and the raising and lowering of the hook, thereby changing the spatial position of the secondary arm's lifting point. To ensure the normal transport of concrete materials, the placing platform at the end of the tower belt conveyor must be kept approximately horizontal during pouring to prevent material slippage, spillage, or blockage on the belt. Meanwhile, in order to cover the 360° all-around material distribution area, the tower conveyor needs to adapt to different material distribution radii and height positions, which corresponds to different extension lengths and pitch angles of the two-stage conveyor arms.
[0004] For tower cranes with the aforementioned structure, the current industry standard operating procedure is as follows: operators rely on their personal construction experience to manually and synchronously adjust the boom luffing and hook lifting, without any quantitative calculation model in the entire control process. Operators can only observe the attitude of the two boom stages in real time and find a rough horizontal position through repeated adjustments. This control method, which relies entirely on manual experience, has the following significant drawbacks:
[0005] (1) Low adjustment efficiency: Due to the lack of quantitative geometric coupling formula, operators have no basis for calculation and can only rely on experience to repeatedly adjust the position of the tower crane boom and hook, which leads to long adjustment time for the concrete placing platform and seriously affects the construction efficiency of continuous pouring.
[0006] (2) Unable to achieve predictive adjustment: There is no analytical model, and it is impossible to calculate the adjustment parameters of the tower crane mechanism in advance based on the target material placement position. It can only passively adjust the attitude in real time, which makes it difficult to meet the requirements of high-precision continuous pouring.
[0007] (3) Limited application scenarios: Some existing automated posture adjustment schemes rely on the built-in drive cylinder of the tower belt conveyor for posture adjustment. This is completely unsuitable for the passive tower belt conveyor model mentioned above, which has no independent drive for the secondary arm and relies on the tower crane hook for adjustment. As a result, this type of machine is in a state of manual operation for a long time.
[0008] (4) Difficult to achieve automation: Due to the lack of mathematical correlation between the position and angle of the tower crane mechanism and the two-stage boom posture, it is difficult to develop an automated collaborative control program. It can only rely on manual operation and cannot achieve automated and intelligent material placement control.
[0009] (5) Poor stability and high failure rate: The stability of manual adjustment is poor, the concrete placement platform often tilts, and it is very easy to cause problems such as concrete belt deviation and spillage. This not only causes material waste and on-site pollution, but also causes material blockage and shutdown in severe cases, affecting the overall construction progress.
[0010] In summary, for tower conveyor belts with no independent drive for the secondary conveyor arm and relying on hook pulling for adjustment, the existing technology lacks a control method that can establish a quantitative mathematical correlation between the tower crane mechanism and the posture of the two-stage arm, realize predictive collaborative control, and ensure stable material distribution throughout the entire range. Summary of the Invention
[0011] The purpose of this invention is to overcome the problems in the prior art and provide a control method for the coordinated material placement of the boom hook of a tower conveyor. This invention targets tower conveyors where the secondary conveyor boom lacks independent drive and relies on hook suspension and traction for attitude adjustment. It establishes a two-dimensional and three-dimensional multi-degree-of-freedom spatially coupled geometric model, embedding the horizontal position of the material placement platform as a mandatory constraint into the equation system. By forward solving for the target parameters of the tower crane's luffing, hoisting, and slewing axes at the target material placement point, predictive coordinated control is achieved. Simultaneously, real-time attitude data is collected for reverse verification, dynamically compensating for spatial offsets and forming a closed-loop leveling. This establishes a quantitative mathematical correlation between the tower crane mechanism and the attitudes of the two-stage boom of the tower conveyor, eliminating the need for manual trial and error adjustments and ensuring stable material placement throughout the entire range.
[0012] To achieve the aforementioned objectives, the present invention employs the following technical solution: a control method for the coordinated material placement of a tower conveyor boom hook, comprising the following steps:
[0013] Step S1: System Initialization and Parameter Fixation: The system performs a power-on self-test, completing self-tests and zero-point calibrations for the tower crane luffing mechanism, hoisting mechanism, slewing mechanism, tower belt conveyor's two-stage boom angle sensors, slewing angle sensor, and belt conveyor system; it loads and fixes the inherent geometric parameters of the tower belt conveyor, including the total length of the first-stage boom L1, the total length of the second-stage boom L2, the distance S from the second-stage boom lifting point to the root hinge center, the vertical height difference H0 between the root hinge point of the first-stage boom and the slewing hinge point of the tower crane boom, and the height H1 of the root hinge point of the first-stage boom from the ground.
[0014] Step S2: Construction Parameter Input and Trajectory Analysis: Input construction process parameters and pouring plan, including the inclination angle safety limit β. limit The system analyzes the spatial position parameters corresponding to the target material placement points, including the pouring trajectory, the current target material horizontal extension distance D, the material radius range, and the belt feeding speed threshold.
[0015] Step S3: Solve the target attitude parameters by forward equations: With the horizontal β=0° of the material placement platform as the forced geometric constraint, based on the target material placement distance D and the inherent geometric parameters, calculate the tower crane target luffing distance R and the target hook lifting height h by forward solving the plane geometric coupling equations.
[0016] Step S4: Mechanism Drive and Coarse Attitude Adjustment: Based on the target parameters R and h obtained from the solution, the tower crane luffing mechanism and hoisting mechanism are driven synchronously to perform actions, pulling the tower crane's first and second jibs toward the target attitude. The passive second jib is suspended and pulled by the hook to initially complete the attitude adjustment of the conveyor arm.
[0017] Step S5: Real-time attitude acquisition and deviation determination: Real-time acquisition of the actual operating attitude data of the tower conveyor, including the actual pitch angle α of the first-stage boom. 实测 Actual pitch angle β of the second-stage boom 实测 Actual amplitude range R 实测 Actual hook height h 实测 Determine whether the absolute value of the actual pitch angle of the secondary boom satisfies |β 实测 |≤β limit ;
[0018] Step S6: Coordinated fine-tuning and closed-loop verification: If the result of step S5 is "no", that is, the tilt angle deviation exceeds the allowable threshold, the system generates a small compensation adjustment amount, drives the tower crane luffing and hoisting mechanism to perform coordinated fine-tuning again, corrects the attitude deviation, and then jumps back to step S5 to continue the judgment; if the result is "yes", the attitude meets the level requirements and enters the material preparation stage.
[0019] Step S7: Speed Matching and Material Feeding Start: After the posture meets the tilt angle limit, the system matches the belt conveyor speed with the mechanism movement speed and starts the belt conveyor system to begin material feeding; at the same time, it enters a continuous posture verification cycle and adaptively adjusts the belt output speed in real time according to the point movement rate: when the point movement speed is fast, the feeding speed is increased synchronously, and when the point is moving at a low speed or pausing, the speed is automatically reduced to match the output amount.
[0020] Step S8: Monitoring and Inflection Point / Boundary Handling of the Concrete Placement Process: The concrete placement operation is monitored in real time throughout the pouring process to determine whether the trajectory inflection point or construction boundary has been reached. If the determination is "yes", the mechanism collaborative deceleration logic is triggered: the tower crane slewing speed, luffing fine-tuning speed and belt conveyor speed are reduced simultaneously to smoothly complete the trajectory switch; then the operation switches to the next target concrete placement distance D and jumps back to step S3 to perform forward solution and attitude adjustment again; if the determination is "no", the concrete placement operation and attitude verification loop continues to be executed.
[0021] Step S9: Full-area material placement completion judgment: Determine whether all planned material placement points have been completed; if not, continue to execute material placement monitoring and attitude cycle verification; if all are completed, end the continuous material placement cycle; relying on the tower crane's horizontal slewing mechanism, reuse the same geometric solution model in any circumferential orientation to achieve 360° full-area continuous material placement; after a single layer of pouring is completed, automatically raise the hook, reset the trajectory, and enter the next layer of pouring cycle;
[0022] Step S10: Smooth shutdown and data saving: After all material placement points are completed, the system executes the finishing process in the order of "stop material first, return to position, and then stop the machine". Stop the belt feeding, empty the belt of residual material, return the control mechanism to the safe position, and finally stop the whole machine, and save all parameter data of this construction.
[0023] Further, in step S3, the planar geometric coupling equation set includes:
[0024] Total horizontal fabric stretch distance: D = L1cosα + L2cosβ;
[0025] Vertical height difference of the fabric platform: ΔH = L1sinα + L2sinβ;
[0026] The plane coordinate equations of the lifting point on the secondary boom are: Xs=L1cosα+Scosβ, Ys=H1+L1sinα+Ssinβ;
[0027] Tower crane mechanism and lifting point position matching constraint equations: R=Xs, h=Ys;
[0028] Horizontal constraint condition for the cloth platform: |β|≤β limit Or β=0°. Establish a quantitative geometric relationship between the tower crane luffing distance R, hook height h, and the pitch angles α and β of the two-stage boom of the tower conveyor. Embed the horizontal level of the material placement platform as a hard constraint into the equation solution logic. This provides a mathematical basis for directly calculating the adjustment amount of the tower crane mechanism from the target material placement point, thus eliminating the blindness of repeated trial and error based on manual experience.
[0029] Furthermore, in step S3, solving the target attitude parameters using the forward equation system specifically includes:
[0030] Substituting the horizontal constraint β=0 into the formula, we obtain the system of equations:
[0031] D = L1cosα + L2
[0032] Xs=L1cosα+S
[0033] Ys=L1sinα
[0034] R=Xs
[0035] H=Ys+H0
[0036] We derive that:
[0037] cosα = (D - L2) / L1
[0038] sinα=√[1-((D-L2) / L1) 2 ]
[0039] Adjustment range of tower crane under plane:
[0040] R = D - L² + S
[0041] h = H1 + √[L1] 2 - (D-L2) 2 In planar operation, the target material distance D is directly converted into an explicit expression for the tower crane's target luffing distance R and target hook height h, realizing a one-step forward solution of "target position → execution parameters" without repeated iterative calculations, which greatly improves the response speed and accuracy of attitude adjustment.
[0042] Furthermore, in the case of three-dimensional full-area material placement, step S3 further substitutes the horizontal rotation angle θ1 of the primary boom and the horizontal rotation angle θ2 of the secondary boom relative to the primary boom, and solves the global coordinates of the lifting point through the spatial coordinate transformation equation system to match the tower crane's rotation azimuth angle θ. t The luffing distance R and the hook height h;
[0043] The spatial coordinate transformation equations include:
[0044] Spatial coordinates of endpoint A of the first-stage arm:
[0045] X A =L1cosαcosθ1
[0046] Y A =L1cosαsinθ1
[0047] Z A =H1+L1sinα;
[0048] The local coordinates of suspension point C relative to point A are transformed by rotation to convert them into the spatial offset between point A and point C in the global coordinate system:
[0049] Δx = Scos(θ1 + θ2)
[0050] Δy = Ssin(θ1 + θ2)
[0051] Δz=0;
[0052] By overlaying the global coordinates of point A, we obtain the complete global spatial coordinates of the suspension point C:
[0053] X C =L1cosαcosθ1+Scos(θ1+θ2)
[0054] Y C =L1cosαsinθ1+Ssin(θ1+θ2)
[0055] Z C =H1+L1sinα;
[0056] The hook is in real-time aligned with the spatial position of the lifting point C, achieving passive traction and leveling.
[0057] Rcosθ t =X C
[0058] Rsinθ t =Y C
[0059] h 吊钩 =h. Breaking through the limitations of traditional two-dimensional planar calculations, it fully incorporates the independent horizontal rotation degrees of freedom of the two-stage boom, accurately describing the spatial motion law of the lifting point as the boom posture changes during spatial rotation, realizing three-dimensional passive traction leveling of the hook following the swing, following the lifting and lowering, and following the amplitude change, providing theoretical support for 360° full-area fabric placement.
[0060] Furthermore, in step S3, Rcosθ is solved. t =X C and Rsinθ t =Y C To obtain the target slewing azimuth angle θ required by the tower crane t This enables coordinated control of the tower crane's slewing, luffing, and hoisting axes. By incorporating the tower crane's slewing azimuth angle θt into the forward solution of the target parameters, synchronous and coordinated driving of the slewing, luffing, and hoisting axes is achieved. This avoids attitude oscillations caused by sequential adjustments of a single axis, ensuring that the hook's spatial trajectory closely matches the motion law of the target lifting point, further improving dynamic leveling stability.
[0061] Furthermore, the actual operating posture data of the tower conveyor belt collected in real time in step S5 also includes: the horizontal rotation angle θ of the first-stage boom. 1实测 The horizontal rotation angle θ of the second-stage arm relative to the first-stage arm 2实测Actual measured and actual tower crane slewing azimuth angle θ t实测 Actual measurements were conducted. The horizontal rotation angle of the two booms and the azimuth angle of the tower crane were included in the real-time acquisition and reverse verification range. This enabled the spatial reverse verification model to accurately compensate for the spatial position offset caused by the rotation and reversal of the two booms, thereby improving the attitude recognition accuracy of the closed-loop leveling under three-dimensional dynamic working conditions.
[0062] Furthermore, step S7, matching the belt conveyor speed with the mechanism's movement speed, specifically includes: the system adaptively matching the belt conveyor speed based on the current material distribution radius and point movement rate; when the boom rotates and the point movement speed is fast, the belt discharge speed is simultaneously increased; when the point moves at low speed or stops at inflection points, the speed is automatically reduced to match the discharge volume, achieving dynamic coupling between the walking speed and the discharge flow rate. This achieves real-time dynamic coupling between the belt discharge flow rate and the mechanism's movement speed, preventing material accumulation, shortages, and uneven thickness during the material distribution process, thus improving material utilization and material flatness while ensuring casting quality.
[0063] Furthermore, the trigger mechanism coordinated deceleration logic in step S8 specifically includes: synchronously reducing the tower crane's slewing speed, luffing fine-tuning speed, and belt conveyor speed to smoothly complete the trajectory switch; continuously maintaining attitude verification and correction during the inflection point adjustment process to ensure that the material placement in the inflection point area is flat without cold seams or accumulation; and automatically and sequentially stopping the machine and material upon reaching the construction boundary to prevent over-range material placement. Synchronous coordinated deceleration and continuous attitude verification by multiple mechanisms are achieved at the trajectory inflection point and construction boundary to avoid platform tilting and material splashing caused by sudden speed changes, ensuring flat material placement without cold seams in the inflection point area, and preventing material waste caused by over-range material placement.
[0064] Furthermore, it includes fault monitoring and full-process protection steps: real-time monitoring of sensor anomalies, mechanism overtravel, tilt angle deviation, and belt blockage faults throughout the operation; once an anomaly is detected, the system immediately and simultaneously locks the tower crane's luffing and hoisting actions and stops the belt conveyor discharge, maintaining the current posture to avoid sudden instability, while triggering a fault alarm; after the overall pouring task is completed, the system completes the smooth completion of the entire machine in the sequence of "stop material first, then return to position, then stop machine". This achieves real-time fault monitoring and active protection throughout the operation, synchronously locking the mechanism and maintaining the current posture in case of anomalies to avoid equipment damage and safety accidents caused by sudden instability; the "stop material first, then return to position, then stop machine" completion sequence ensures a smooth and orderly shutdown process, improving the overall reliability of the machine.
[0065] Furthermore, the tower conveyor is a type of tower conveyor with a secondary conveyor arm that does not have an independent drive cylinder and relies on the steel wire rope of the tower crane hook to change its pitch attitude. This makes the entire control method specifically adapted to the unique structure of the tower conveyor, which has a "secondary arm without an independent drive and passively adjusts its attitude by relying on the hook traction," filling the technical gap in the spatial attitude quantitative collaborative control of this type of passive tower conveyor and broadening the engineering application scenarios of the method.
[0066] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0067] (1) This invention constructs a quantitative mathematical system encompassing a two-dimensional baseline geometric model and a three-dimensional multi-degree-of-freedom spatial coupling model, completely changing the traditional control mode of tower belt conveyors that relies on repeated trial and error adjustments based on manual experience. By establishing a set of analytical geometric equations between the tower crane's luffing distance, hook height, and the pitch angle and horizontal rotation angle of the two-stage boom, direct conversion from the target material placement point to the adjustment parameters of the tower crane's three-axis actuators is achieved. This forward solution mechanism enables the system to predict the adjustment amount of the tower crane mechanism corresponding to different material placement points in advance, eliminating the need for repeated iterative calculations on-site, significantly shortening the attitude adjustment time, and significantly improving the construction efficiency of continuous concrete pouring, providing a solid theoretical and algorithmic foundation for the automated control of tower belt conveyors.
[0068] (2) This invention uses the absolute level of the placing platform as a rigid geometric constraint to embed the equation solution logic, and combines it with real-time sensor data acquisition and reverse verification to form a closed-loop dynamic leveling scheme of "forward prediction calculation + actual measurement reverse verification". This scheme can continuously ensure that the end placing platform is within the allowable level range under complex dynamic working conditions such as horizontal rotation and relative deflection of the two-stage boom, effectively overcoming the defects of slow response and poor accuracy of single hysteresis feedback control. By compensating in advance for the three-dimensional spatial offset of the lifting point caused by rotation reversal, it avoids faults such as belt misalignment, concrete spillage, and material blockage, reduces material loss and equipment wear, and improves the casting quality and construction stability.
[0069] (3) By simultaneously incorporating the horizontal slewing angle of the primary boom and the horizontal slewing angle of the secondary boom relative to the primary boom, the limitations of traditional two-dimensional planar calculations are overcome. The supporting equipment relies on the tower crane's horizontal slewing mechanism to reuse the same set of geometric solution models in any circular orientation, achieving 360° continuous material placement operation. The standardized mathematical model can be directly embedded into the electrical control program, facilitating the transformation of the project into an unmanned intelligent material placement system, adapting to complex construction scenarios such as irregular floor slabs and multi-layer cyclic pouring, and improving the construction coverage and site space utilization. Attached Figure Description
[0070] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used together with the embodiments of the invention to explain the invention and do not constitute a limitation thereof.
[0071] Figure 1 A simplified model diagram of a tower conveyor belt conveyor.
[0072] Figure 2 This is a side view of the geometric model of the tower conveyor belt machine.
[0073] Figure 3 This is a top view of the geometric model of the tower conveyor belt machine.
[0074] Attached reference numerals: 1. Lifting boom; 2. Tower crane tower body; 3. Ground; 4. First-stage boom; 5. Second-stage boom; 6. Hook lifting point; 7. End position of the concrete placing platform. Detailed Implementation
[0075] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to the accompanying drawings and embodiments. Of course, the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0076] like Figures 1-3 As shown, this embodiment is applied to a tower belt conveyor with a secondary conveyor boom that lacks an independent drive cylinder and relies on the steel wire rope suspension of the tower crane hook to change its pitch attitude. It implements a control method for coordinated material placement by the tower belt conveyor boom and hook. The tower belt conveyor includes a tower crane body, boom, hook, primary boom, secondary articulated boom, and end material placement platform. The root of the primary boom is hinged to the tower crane body and can independently complete pitch and horizontal rotation. The secondary articulated boom is hinged to the end of the primary boom, and the end is fixedly connected to the material placement platform. The distance S between the lifting point of the secondary boom and its root articulation center is provided. The system is equipped with two-stage boom angle sensors, a slewing angle sensor, a luffing sensor, a height sensor, and a complete machine electrical control system to collect attitude parameters in real time and execute coordinated control commands. A planar geometric coordinate system is established as follows: with the ground as the reference.
[0077] Fixed intrinsic parameters:
[0078] L1: Total length of the first-stage boom of the tower conveyor;
[0079] L2: Total length of the secondary articulated arm of the tower conveyor;
[0080] S: Distance from the lifting point of the secondary boom to the center of the hinge at the root of the secondary boom;
[0081] H0: The vertical height difference between the center of the hinge at the root of the first-stage boom and the slewing hinge point of the tower crane boom;
[0082] H1: Height of the center of the first-stage boom root hinge from the ground;
[0083] Real-time variable attitude parameters:
[0084] α: First-stage boom pitch angle (angle between the boom and the horizontal right axis);
[0085] β: Pitch angle of the secondary articulated arm;
[0086] D: Total horizontal projection distance of the material distribution point at the end of the tower conveyor;
[0087] ΔH: Vertical height of the fabric platform relative to the hinge point of the first-stage arm;
[0088] Xs: Horizontal coordinates of the hook lifting point;
[0089] Ys: Vertical coordinate of the hook lifting point;
[0090] θ1: The horizontal slewing angle of the first-stage boom of the tower conveyor relative to the tower body;
[0091] θ2: The independent horizontal rotation angle of the second-stage boom relative to the first-stage boom of the tower belt conveyor;
[0092] R: Tower crane boom luffing distance;
[0093] h: Vertical height of the hook lifting;
[0094] θ t : Tower crane overall horizontal slewing angle
[0095] Figure 1 In the diagram, 1 represents the crane boom, 2 represents the tower crane tower body, 3 represents the ground, 4 represents the first-stage boom, 5 represents the second-stage boom, 6 represents the hook lifting point, and 7 represents the end position of the material placing platform.
[0096] This embodiment of a control method for the coordinated material placement of a tower conveyor boom hook includes the following steps:
[0097] Step S1: After the system is powered on, the overall control system first completes self-tests and zero-point calibrations of the tower crane's luffing mechanism, hoisting mechanism, slewing mechanism, tower belt conveyor's two-stage boom angle sensors, slewing angle sensor, and belt conveyor system to ensure that all actuators and sensors are in normal working condition. Subsequently, the system automatically reads and stores the inherent geometric parameters of the tower belt conveyor, including the total length of the first-stage boom L1, the total length of the second-stage boom L2, the distance S from the second-stage boom lifting point to the root hinge center, the vertical height difference H0 between the first-stage boom root hinge point and the tower crane's boom slewing hinge point, and the height H1 from the first-stage boom root hinge point to the ground. This completes the initial attitude zeroing of the mechanism, ensuring accurate sampling references for all sensors and providing reliable basic data for subsequent geometric modeling and forward solving.
[0098] Step S2: The operator or the host computer system enters the process parameters and pouring plan for this construction project, including the safety limit value β for the tilt angle. limit The system analyzes and extracts the spatial location parameters of the target material placement points corresponding to each placement position according to the preset pouring trajectory, including the pouring trajectory, the current target horizontal extension distance D, the material radius range, and the belt feeding speed threshold. It then passes the target horizontal extension distance D as the core input variable to the next step.
[0099] Step S3: The system uses the horizontal β=0° of the cloth platform as a forced geometric constraint, and calls the plane geometric coupling equation set to solve the tower crane target luffing distance R and target hook lifting height h in a forward manner based on the target cloth distance D and the solidified inherent geometric parameters.
[0100] The planar geometric coupling equations include:
[0101] Total horizontal fabric stretch distance: D = L1cosα + L2cosβ;
[0102] Vertical height difference of the fabric platform: ΔH = L1sinα + L2sinβ;
[0103] The plane coordinate equations of the lifting point on the secondary boom are: Xs=L1cosα+Scosβ, Ys=H1+L1sinα+Ssinβ;
[0104] Tower crane mechanism and lifting point position matching constraint equations: R=Xs, h=Ys;
[0105] Horizontal constraint condition for the cloth platform: |β|≤β limit Or β=0°.
[0106] Substituting the horizontal constraint β=0° into the formula, we obtain the system of equations:
[0107] D = L1cosα + L2
[0108] Xs=L1cosα+S
[0109] Ys=L1sinα
[0110] R=Xs
[0111] H=Ys+H0
[0112] We derive that:
[0113] cosα = (D - L2) / L1
[0114] sinα=√[1-((D-L2) / L1) 2 ]
[0115] Adjustment range of tower crane under plane:
[0116] R = D - L² + S
[0117] h = H1 + √[L1] 2 - (D-L2) 2 ].
[0118] If it is a three-dimensional full-area material placement case, step S3 further substitutes the horizontal rotation angle θ1 of the first-stage boom and the horizontal rotation angle θ2 of the second-stage boom relative to the first-stage boom, and solves the global coordinates of the lifting point through the spatial coordinate transformation equation system to match the tower crane rotation azimuth angle θ. t The luffing distance R and the hook height h;
[0119] The spatial coordinate transformation equations include:
[0120] Spatial coordinates of endpoint A of the first-stage arm:
[0121] X A =L1cosαcosθ1
[0122] Y A =L1cosαsinθ1
[0123] Z A =H1+L1sinα;
[0124] When the fabric platform remains horizontal, the secondary arm rotates only horizontally relative to the primary arm. A local horizontal coordinate system is established at hinge point A, rotating synchronously with the primary arm. The local coordinates of lifting point C relative to point A are as follows:
[0125] Δxˊ=Scosθ2
[0126] Δyˊ=Ssinθ2
[0127] Δzˊ=0
[0128] By using a planar rotation transformation matrix, the local coordinates are converted into spatial offsets from point A to point C in the global coordinate system:
[0129] Δx=Scosθ1cosθ2-Ssinθ1sinθ2
[0130] Δy=Ssinθ1cosθ2+Scosθ1sinθ2
[0131] Δz=0
[0132] Right now:
[0133] Δx = Scos(θ1 + θ2)
[0134] Δy = Ssin(θ1 + θ2)
[0135] Δz=0
[0136] By overlaying the global coordinates of point A, we obtain the complete global spatial coordinates of the suspension point C:
[0137] X C =L1cosαcosθ1+Scos(θ1+θ2)
[0138] Y C =L1cosαsinθ1+Ssin(θ1+θ2)
[0139] Z C =H1+L1sinα
[0140] Similarly, given that the distance between point B and point A is L2, the global coordinates of point B can be obtained:
[0141] XB=L1cosαcosθ1+L2cos(θ1+θ2)
[0142] YB=L1cosαsinθ1+L2sin(θ1+θ2)
[0143] The hook is in real-time aligned with the spatial position of the lifting point C, achieving passive traction and leveling.
[0144] Rcosθ t =X C
[0145] Rsinθ t =Y C
[0146] h 吊钩 =h.
[0147] The target rotation azimuth angle θ is obtained by solving the above two equations. t This enables three-axis coordinated control.
[0148] Step S4: The control system solves for the target parameters R, h, and θ obtained in step S3. t It adopts a synchronous output command mode to synchronously drive the tower crane's luffing mechanism, hoisting mechanism, and slewing mechanism to perform actions. By suspending and pulling the passive secondary boom through the hook, the tower crane's primary and secondary booms are pulled towards the target posture, initially completing the posture adjustment of the conveyor boom and bringing the material placement platform close to a horizontal state, laying the foundation for subsequent fine leveling.
[0149] Step S5: During and after the attitude coarse adjustment process, the system collects real-time actual operating attitude data of the tower conveyor through various sensors, including the actual pitch angle α of the first-stage boom. 实测 Actual pitch angle β of the second-stage boom 实测 Actual amplitude range R 实测 Actual hook height h 实测 and the horizontal rotation angle θ of the first arm 1实测 The horizontal rotation angle θ of the second-stage arm relative to the first-stage arm 2实测 The actual slewing azimuth angle θ of the tower crane t实测 Actual measurement. The system determines in real time whether the absolute value of the actual pitch angle of the secondary boom satisfies |β. 实测 |≤β limit This serves as the basis for determining whether to proceed to the fabric stage.
[0150] Step S6: If the result of step S5 is "No", meaning the tilt angle deviation exceeds the allowable threshold, the system generates a small compensation adjustment based on the reverse verification model, and drives the tower crane's luffing and hoisting mechanisms to perform coordinated fine-tuning to correct the attitude deviation. Then, it jumps back to step S5 to continue the judgment. If the result is "Yes", the attitude meets the level requirements, and the system enters the material preparation stage to prepare for starting the belt conveyor.
[0151] Step S7: After the posture meets the tilt angle limit, the system adaptively matches the belt conveyor speed according to the current material distribution radius and point movement rate, dynamically coupling the belt conveyor speed with the mechanism's movement speed. Then, the belt conveyor system is started to begin material distribution. Simultaneously, the system enters a continuous posture verification cycle, adaptively adjusting the belt discharge speed in real time according to the point movement rate: when the point movement speed is fast, the feeding speed is increased synchronously; when the point is moving at a low speed or pausing at an inflection point, the speed is automatically reduced to match the discharge volume, preventing material accumulation and shortage.
[0152] Step S8: Monitoring and Inflection Point / Boundary Handling of Concrete Placement. Throughout the concrete placement operation, the system monitors the pouring trajectory in real time to determine whether an inflection point or construction boundary has been reached. If the determination is "yes," the mechanism's coordinated deceleration logic is triggered: the tower crane's slewing speed, luffing adjustment speed, and belt conveyor speed are reduced synchronously to smoothly complete the trajectory switch. The inflection point adjustment process continuously maintains attitude verification and correction. Then, the system switches to the next target concrete placement distance D and jumps back to Step S3 to re-perform the forward solution and attitude adjustment. If the determination is "no," the concrete placement operation and attitude verification loop continues.
[0153] Step S9: Full-area material placement completion judgment. The system determines whether all planned material placement points in the current circumferential orientation or the current layer have been completed. If not, the system continues to execute material placement monitoring and attitude cycle verification. If all are completed, the current continuous material placement cycle ends. Relying on the tower crane's horizontal slewing mechanism, the system can reuse this set of geometric solution models in any circumferential orientation to achieve 360° full-area continuous material placement. After a single layer of pouring is completed, the system automatically raises the hook, resets the trajectory, and enters the next layer of pouring cycle.
[0154] Step S10: Smooth Shutdown and Data Saving. After all material placement points are completed, the system executes the final procedure in the order of "stop material first, return to position, then stop the machine." First, the belt feed is stopped, and the remaining material on the belt is emptied. Then, the control mechanism returns to the safe position, and finally the entire machine stops, saving all parameter data for this construction. In addition, the system monitors sensor anomalies, mechanism overtravel, tilt angle deviation, and belt blockage faults in real time throughout the operation. Once an anomaly is detected, the system immediately and simultaneously locks the tower crane's luffing and hoisting actions and stops belt feeding to maintain the current posture and prevent sudden instability. At the same time, a fault alarm is triggered to ensure construction safety.
[0155] In summary, this embodiment details the complete execution process of a control method for coordinated material placement using the boom hook of a tower conveyor belt crane according to the present invention. This method, by constructing a coupled two-dimensional and three-dimensional spatial geometric model and using the horizontal position of the material placement platform as a mandatory constraint, achieves forward solving and predictive coordinated control from the target material placement point to the target parameters of the tower crane's three axes. Combined with real-time data acquisition and reverse verification, a dynamic logic of "forward calculation + closed-loop leveling" is formed, effectively solving the problems of passive tower conveyor belt cranes relying on manual experience, having poor adjustment accuracy, and being unable to achieve stable material placement across the entire range. Performing the above steps can significantly improve the level of automation and pouring efficiency under complex working conditions, ensure operational continuity and molding quality, and provide a feasible path for the intelligent upgrading of construction machinery.
[0156] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A control method for the coordinated fabric placement of the boom hook of a tower conveyor, characterized in that, Includes the following steps: Step S1: System Initialization and Parameter Fixation: The system performs a power-on self-test, completing self-tests and zero-point calibrations for the tower crane luffing mechanism, hoisting mechanism, slewing mechanism, tower belt conveyor's two-stage boom angle sensors, slewing angle sensor, and belt conveyor system; it loads and fixes the inherent geometric parameters of the tower belt conveyor, including the total length of the first-stage boom L1, the total length of the second-stage boom L2, the distance S from the second-stage boom lifting point to the root hinge center, the vertical height difference H0 between the root hinge point of the first-stage boom and the slewing hinge point of the tower crane boom, and the height H1 of the root hinge point of the first-stage boom from the ground. Step S2: construction parameter input and trajectory analysis: input construction process parameters and pouring planning, including inclination safety limit value β limit , pouring trajectory, current target material level extension distance D, material radius interval, belt feeding speed threshold; the system analyzes the spatial position parameters corresponding to the target material point. Step S3: Solve the target attitude parameters by forward equations: With the horizontal β=0° of the material placement platform as the forced geometric constraint, based on the target material placement distance D and the inherent geometric parameters, calculate the tower crane target luffing distance R and the target hook lifting height h by forward solving the plane geometric coupling equations. Step S4: Mechanism Drive and Coarse Attitude Adjustment: Based on the target parameters R and h obtained from the solution, the tower crane luffing mechanism and hoisting mechanism are driven synchronously to perform actions, pulling the tower crane's first and second jibs toward the target attitude. The passive second jib is suspended and pulled by the hook to initially complete the attitude adjustment of the conveyor arm. Step S5: Real-time posture acquisition and deviation determination: Real-time acquisition of actual running posture data of the tower crane, including actual pitch angle a of the primary arm 实测 , actual pitch angle β of the secondary arm 实测 , actual luffing distance R 实测 , actual hook height h 实测 ; determining whether the absolute value of the actual pitch angle of the secondary arm satisfies |β 实测 |≤β limit ; Step S6: Coordinated fine-tuning and closed-loop verification: If the result of step S5 is "no", that is, the tilt angle deviation exceeds the allowable threshold, the system generates a small compensation adjustment amount, drives the tower crane luffing and hoisting mechanism to perform coordinated fine-tuning again, corrects the attitude deviation, and then jumps back to step S5 to continue the judgment. If the judgment result is "yes", then the posture meets the horizontal requirement and the process enters the fabric preparation stage; Step S7: Speed Matching and Material Feeding Start: After the posture meets the tilt angle limit, the system matches the belt conveyor speed with the mechanism movement speed and starts the belt conveyor system to begin material feeding; at the same time, it enters a continuous posture verification cycle and adaptively adjusts the belt output speed in real time according to the point movement rate: when the point movement speed is fast, the feeding speed is increased synchronously, and when the point is moving at a low speed or pausing, the speed is automatically reduced to match the output amount. Step S8: Monitoring and Inflection Point / Boundary Handling of the Material Placement Process: The status of the pouring trajectory is monitored in real time throughout the material placement operation to determine whether the trajectory inflection point or construction boundary has been reached. If the determination is "yes", the mechanism collaborative deceleration logic is triggered: the tower crane slewing speed, luffing fine-tuning speed and belt conveyor speed are reduced simultaneously to smoothly complete the trajectory switch; then the next target material placement distance D is switched, and the process jumps back to step S3 to perform forward solution and attitude adjustment again; if the determination is "no", the material placement operation and attitude verification loop continues to be executed. Step S9: Global Clothing Completion Judgment: Determine whether all planned cloth placement points have been completed; if not, continue to execute cloth monitoring and attitude loop verification. If all are completed, the continuous material placement cycle ends; relying on the tower crane's horizontal rotation mechanism, the geometric solution model is reused in any circumferential orientation to achieve 360° continuous material placement; after a single layer is poured, the hook is automatically raised and the trajectory is reset to enter the next layer of the cycle. Step S10: Smooth shutdown and data saving: After all material placement points are completed, the system executes the finishing process in the order of "stop material first, return to position, and then stop the machine". Stop the belt feeding, empty the belt of residual material, return the control mechanism to the safe position, and finally stop the whole machine, and save all parameter data of this construction.
2. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, In step S3, the planar geometric coupling equation set includes: Total horizontal fabric stretch distance: D = L1cosα + L2cosβ; Vertical height difference of the fabric platform: ΔH = L1sinα + L2sinβ; The plane coordinate equations of the lifting point on the secondary boom are: Xs=L1cosα+Scosβ, Ys=H1+L1sinα+Ssinβ; Tower crane mechanism and lifting point position matching constraint equations: R=Xs, h=Ys; Cloth platform level constraint condition: | β | ≤ β limit Or β = 0°.
3. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 2, characterized in that, In step S3, solving the target attitude parameters using the forward equation system specifically includes: Substituting the horizontal constraint β=0 into the formula, we obtain the system of equations: D = L1cosα + L2 Xs=L1cosα+S Ys=L1sinα R=Xs H=Ys+H0 We derive that: cosα = (D - L2) / L1 sin a = V [1 - ((D - L2) / L1) 2 ] Adjustment range of tower crane under plane: R = D - L² + S h = H1+ V[L1 2 - (D - L2) 2 ].
4. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 2, characterized in that, If it is a three-dimensional full-area material placement case, step S3 further substitutes the horizontal rotation angle θ1 of the first-stage boom and the horizontal rotation angle θ2 of the second-stage boom relative to the first-stage boom, and solves the global coordinates of the lifting point through the spatial coordinate transformation equation system to match the tower crane rotation azimuth angle θ. t The luffing distance R and the hook height h; The spatial coordinate transformation equations include: Spatial coordinates of endpoint A of the first-stage arm: X A =L1cosαcosθ1 AND A =L1cosαsinθ1 WITH A =H1+L1sinα; The local coordinates of suspension point C relative to point A are transformed by rotation to convert them into the spatial offset between point A and point C in the global coordinate system: Δx = Scos(θ1 + θ2) Δy = Ssin(θ1 + θ2) Δz=0; By overlaying the global coordinates of point A, we obtain the complete global spatial coordinates of the suspension point C: X C =L1cosαcosθ1+Scos(θ1+θ2) Y C =L1cosαsinθ1+Ssin(θ1+θ2) WITH C =H1+L1sinα; The hook is in real-time aligned with the spatial position of the lifting point C, achieving passive traction and leveling. Rcosθ t =X C Rsinθ t =Y C h 吊钩 =h。 5. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 4, characterized in that, In step S3, Rcosθ is solved. t =X C and Rsinθ t =Y C To obtain the target slewing azimuth angle θ required by the tower crane t This enables coordinated control of the tower crane's slewing, luffing, and hoisting axes.
6. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, The actual operating posture data of the tower conveyor belt collected in real time in step S5 also includes: the horizontal rotation angle θ of the first-stage boom. 1实测 The horizontal rotation angle θ of the second-stage arm relative to the first-stage arm 2实测 Actual measured and actual tower crane slewing azimuth angle θ t实测 Actual measurement.
7. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, The specific steps in step S7, which involve matching the belt conveyor speed with the mechanism movement speed, include: the system adaptively matching the belt conveyor speed based on the current fabric radius and point movement rate; when the boom rotates and the point movement speed is fast, the belt discharge speed is increased synchronously; when the point moves at a low speed or stops at an inflection point, the speed is automatically reduced to match the discharge volume, thereby achieving dynamic coupling between the walking speed and the discharge flow rate.
8. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, The trigger mechanism coordinated deceleration logic in step S8 specifically includes: synchronously reducing the tower crane's slewing speed, amplitude adjustment speed, and belt conveyor speed to smoothly complete the trajectory switching; continuously maintaining attitude verification and correction during the inflection point adjustment process to ensure that the material is laid flat without cold seams or accumulation in the inflection point area; and automatically stopping the machine and material in sequence after reaching the construction boundary to prevent material from being laid beyond the range.
9. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, It also includes fault monitoring and full-process protection steps: real-time monitoring of sensor abnormalities, mechanism overtravel, tilt angle deviation, and belt blockage faults throughout the operation; once an abnormality is detected, the system immediately locks the tower crane's luffing and hoisting actions and stops the belt discharge to maintain the current posture and avoid sudden instability, while triggering a fault alarm; after the overall pouring task is completed, the system completes the smooth completion of the whole machine in the order of "stop material first, then return to position, and then stop machine".
10. The control method for coordinated material placement of the boom hook of a tower conveyor according to claim 1, characterized in that, The tower conveyor is a two-stage conveyor arm without an independent drive cylinder, which relies on the steel wire rope of the tower crane hook to suspend and pull to change its pitch attitude.