A continuous tie-rod composite bridge deck structure with synergistic deformation stress

By introducing connecting steel plates and high-ductility fiber-reinforced cement-based composite materials into the continuous bridge deck structure, combined with a friction-reducing isolation layer and unbonded sections, the problems of easy cracking, uneven force transmission, and poor durability of traditional continuous bridge decks have been solved, thereby improving the tensile strength and waterproof performance of the bridge.

CN123109050APending Publication Date: 2026-11-17GUIZHOU TRANSPORTATION PLANNING SURVEY & DESIGN ACADEME +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611175677.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-04
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Traditional continuous bridge deck structures are prone to cracking, uneven force transmission, and poor durability. Especially in high-intensity earthquake-resistant areas, the continuous layer of the bridge deck is prone to through-cracks under vehicle loads, temperature changes, and material shrinkage and creep, leading to water seepage, bearing corrosion, and fatigue damage to the pavement layer.

Method used

The bridge deck is constructed by combining connecting steel plates and longitudinal continuous steel bars with high-ductility fiber-reinforced cement-based composite materials to form a synergistic deformation and stress system. By setting a friction-reducing isolation layer and an unbonded section in the joint area, the deformation decoupling between the steel bars and the ECC matrix is ​​achieved, avoiding excessive local bond stress and enhancing the continuous tensile strength and waterproof performance of the bridge deck.

Benefits of technology

It effectively solved the problems of continuous cracking of bridge deck, uneven force transmission and poor durability, improved the tensile strength and waterproof performance of bridges, reduced the risk of cracking, and enhanced the durability and comfort of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109050A_ABST
    Figure CN123109050A_ABST
Patent Text Reader

Abstract

This invention discloses a tie-rod type composite bridge deck continuous structure with synergistic deformation and stress, comprising a connecting steel plate spanning the joint area of ​​adjacent main beams, and longitudinal continuous reinforcing bars of the bridge deck located above the connecting steel plate and evenly distributed along the bridge direction. In the joint area, the connecting steel plate and the longitudinal continuous reinforcing bars of the bridge deck in the joint area are solidified into one unit by casting a high-ductility fiber-reinforced cement-based composite material. A friction-reducing isolation layer is provided on the surface of the longitudinal continuous reinforcing bars of the bridge deck in the central area of ​​the joint to prevent bonding between the reinforcing bars and the solidified body. The longitudinal continuous reinforcing bars of the bridge deck outside the central area of ​​the joint are... The steel reinforcement is bonded to the solidified body; through connecting steel plates, the longitudinal continuous steel reinforcement of the bridge deck, which acts as a flexible tie rod in the joint area, and the high-ductility continuous material form a synergistic stress-bearing overall structure, realizing the deformation coordination of "rigidity and flexibility". This not only achieves the deformation decoupling of the steel reinforcement and the high-ductility continuous material matrix, ensuring that the steel reinforcement can play a role in resisting pull-out, but also avoids anchorage failure caused by excessive local bonding stress. It perfectly resolves the contradiction of "rigidity leads to cracking, flexibility leads to failure" in traditional structures, and effectively solves the problems of easy cracking, uneven force transmission and poor durability of traditional bridge decks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to simply supported beam bridges, and more specifically to a continuous tie-rod composite bridge deck structure with synergistic deformation stress. Background Technology

[0002] In areas with high seismic intensity, to improve the toughness of conventional beam bridges and enhance post-earthquake repairability, newly constructed highways are gradually reverting to the multi-span simply supported beam bridge structure. However, to eliminate the problems of driving bumps, noise, and maintenance difficulties caused by bridge deck expansion joints, and to maintain the comfort of highway vehicles at high speeds, a "simply supported beam bridge deck continuity" technique is typically used between spans. However, the continuous joint sections of conventionally made concrete bridge decks are prone to negative bending moments under vehicle live loads, material shrinkage and creep, and temperature effects. The bridge deck is continuously subjected to tensile stress, and some difficult-to-repair technical problems have emerged during long-term operation: 1. Insufficient tensile strength of materials, prone to cracking and water seepage: Traditional continuous layers often use ordinary concrete or asphalt concrete, which have low ultimate tensile strain. Under the influence of repeated vehicle loads, temperature gradient changes, and concrete shrinkage and creep, through-cracks are easily generated in the continuous zone. Once cracked, rainwater seeps through the cracks, leading to bearing corrosion and concrete spalling at the ends of the main beams, seriously affecting the durability of the bridge. 2. Abrupt stiffness change and uncoordinated stress in the "hollowed-out zone" of the expansion joint between spans: Below the gap between the main beams of two spans, there is a lack of direct support from the main beams, forming a hollowed-out zone. The continuous bridge deck layer in this area is suspended, and its bending stiffness is significantly lower than that of sections supported by the main beams. Under vehicle wheel loads, this area will experience significant local flexural deformation, leading to stress concentration and accelerating fatigue failure of the pavement layer. 3. While traditional tie-rod bridge deck structures lay isolation layers such as tar paper and plastic film between the top surface of the main beam and the continuous bridge deck to form a "debonding zone," the problem of easy cracking of concrete in ordinary continuous bridge decks is not actually solved. Furthermore, due to the debonding zone, the tensile stress on the concrete in the debonding zone is more concentrated, making it more prone to cracking and subsequent water seepage, affecting durability. Moreover, in traditional continuous bridge decks, the gaps reserved between the two spans to accommodate deformation and elongation significantly reduce the stiffness of the continuous bridge deck, causing stress concentration again and making it more prone to local cracking and failure. 4. Although traditional tie-rod bridge deck structures lay isolation layers such as tar paper and plastic film between the top surface of the main beam and the continuous bridge deck to form a "debonding zone," the problem of easy cracking of concrete in ordinary continuous bridge decks is not actually solved. Furthermore, the debonding zone causes more concentrated tensile stress on the concrete, making it more prone to cracking and leading to water seepage that affects durability. 5. Single waterproofing system, prone to failure: Traditional waterproofing layers are mostly laid on top of the main beam. Once the upper pavement layer cracks, moisture will accumulate between the waterproofing layer and the continuous bridge deck layer, causing corrosion and expansion of the steel reinforcement within the continuous bridge deck, further exacerbating damage to the continuous bridge deck and affecting long-term performance.

[0003] Therefore, a new type of continuous bridge deck structure is needed to solve the technical problems of traditional continuous bridge decks, such as easy cracking, uneven force transmission, and poor durability. Summary of the Invention

[0004] In view of this, the purpose of this invention is to provide a continuous tie-rod composite bridge deck structure with synergistic deformation and stress distribution. Through reasonable structural design, it compensates for the lack of stiffness at the beam ends and effectively solves the problems of easy cracking, uneven stress transmission between spans, and insufficient long-term durability of traditional bridge decks.

[0005] The present invention provides a continuous tie-rod composite bridge deck structure with synergistic deformation and stress, comprising a connecting steel plate spanning the joint area of ​​adjacent main beams, and longitudinal continuous reinforcing bars of the bridge deck located above the connecting steel plate and evenly distributed along the bridge direction. In the joint area, the connecting steel plate and the longitudinal continuous reinforcing bars of the bridge deck in the joint area are solidified into one body by casting a high ductility fiber-reinforced cement-based composite material. The surface of the longitudinal continuous reinforcing bars of the bridge deck located in the central area of ​​the joint is provided with a friction-reducing isolation layer so that there is no bond between the reinforcing bars and the solidified body. The longitudinal continuous reinforcing bars of the bridge deck outside the central area of ​​the joint are bonded to the solidified body.

[0006] Furthermore, the friction-reducing isolation layer, from the inside to the outside along the surface of the longitudinal continuous steel reinforcement of the bridge deck, includes a primer layer, a flexible buffer inner layer, and an anti-sticking isolation outer layer.

[0007] Furthermore, the primer layer is an epoxy phenolic paint coated on the reinforcing steel, the flexible buffer inner layer is a fiberglass cloth wrapped around the reinforcing steel, and the anti-sticking outer layer is a polyethylene tape wrapped around the reinforcing steel.

[0008] Furthermore, the primer layer, the flexible buffer inner layer, and the anti-sticking outer layer are all provided in at least two layers;

[0009] Furthermore, within the joint area, no transverse reinforcement is provided in the unbonded area formed by the lack of bonding between the reinforcement and the solidified body, while reinforcement is provided in the bonded area along the transverse bridge direction.

[0010] Furthermore, along the bridge direction, the width of the unbonded area is set to be greater than the width of the bonded area on one side;

[0011] Furthermore, C50 concrete is poured outside the joint area;

[0012] Furthermore, the connecting steel plate is provided with stiffening ribs, the connecting steel plate is fixedly connected to the main beam through shear connectors, and the surface of the connecting steel plate is provided with shear connectors for forming a firm mechanical engagement with the high ductility fiber-reinforced cement-based composite material layer;

[0013] Furthermore, the connecting steel plate is a T-shaped steel plate, with the vertical end of the T-shaped steel plate inserted into the joint. The shear connector on the connecting steel plate is a V-shaped shear groove or a stud.

[0014] Furthermore, a waterproof membrane layer is installed between the consolidated body and the pavement layer to block the upward transmission of reflective cracks in the negative bending moment zone and to prevent external moisture intrusion.

[0015] The beneficial effects of this invention are as follows: The continuous composite bridge deck structure with synergistic deformation and stress of this invention, through connecting steel plates, the longitudinal continuous steel bars of the bridge deck acting as flexible tie rods in the joint area, and the high-ductility continuous material forming a synergistic stress-bearing overall structure, achieves "rigidity and flexibility in combination" deformation coordination. It not only achieves deformation decoupling between the steel bars and the high-ductility continuous material matrix, ensuring that the steel bars play a role in resisting pull-out while avoiding anchorage failure caused by excessive local bonding stress, but also perfectly resolves the contradiction of "rigidity leads to cracking, flexibility leads to failure" in traditional structures, effectively solving the problems of easy cracking, uneven force transmission, and poor durability of traditional continuous bridge decks. Attached Figure Description

[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments:

[0017] Figure 1 This is a schematic diagram of the structure of the present invention;

[0018] Figure 2 This is a structural schematic diagram of the longitudinal continuous reinforcement of the bridge deck within the unbonded area. In the diagram, 1-connecting steel plate, 2-longitudinal continuous reinforcement of the bridge deck, 3-high ductility fiber-reinforced cementitious composite material, and 4-unbonded area.

[0019] 5-Adhesive area, 6-Waterproof membrane layer, 7-Road paving layer, 8-Transverse steel reinforcement, 21-Primer layer, 22-Flexible buffer inner layer, 23-Anti-sticking outer layer. Detailed Implementation

[0020] This embodiment features a continuous tie-rod composite bridge deck structure with synergistic deformation and stress distribution. It includes a connecting steel plate 1 spanning the joint area of ​​adjacent main beams, and longitudinal continuous reinforcing bars 2 evenly distributed along the bridge direction above the connecting steel plate 1. In the joint area, a high-ductility fiber-reinforced cementitious composite material 3 is poured to solidify the connecting steel plate 1 and the longitudinal continuous reinforcing bars 2 into a single unit. A friction-reducing isolation layer is provided on the surface of the longitudinal continuous reinforcing bars 2 in the central area of ​​the joint, preventing adhesion between the reinforcing bars and the solidified body. The longitudinal continuous reinforcing bars 2 outside the central area of ​​the joint are bonded to the solidified body. The connecting steel plate 1 serves as a permanent sealing formwork, sealing the beam end joints and acting as a bottom load-bearing reinforcement. It also directly serves as the permanent formwork for pouring the high-ductility fiber-reinforced cementitious composite material 3, eliminating the need for temporary formwork. It completely seals the beam expansion joints, preventing road surface water seepage down to the main beam ends, avoiding corrosion of the beam end reinforcing bars and main beam web, and improving the structure's waterproof and durability performance. The high-ductility fiber-reinforced cementitious composite material 3, also known as ECC, is used to solidify the connecting steel plate 1 and the longitudinal continuous steel reinforcement 2 of the bridge deck into a single unit through casting ECC, forming a high-strength composite section load-bearing system. The longitudinal continuous steel reinforcement 2 of the bridge deck is itself longitudinal reinforcement within the bridge deck pavement. When it enters the continuous section of the bridge deck, due to the anti-friction isolation layer on the surface of the longitudinal continuous steel reinforcement 2 in the joint center area, there is no bond within the solidified body formed by ECC. Therefore, the longitudinal continuous steel reinforcement 2 of the bridge deck in the joint section is divided into a bonded zone 5, an unbonded zone 4, and another bonded zone 5 along the bridge direction. The unbonded zone is a flexible tension-only section, where the steel reinforcement acts as a flexible tie rod, cooperating with the surrounding ECC with its low elastic modulus to bear the load. ECC – flexible tie rod (longitudinal reinforcement in unbonded zone 4) – connecting steel plate 1 together form a cooperative load-bearing system: the load-bearing principle is that ECC, with its low elastic modulus, easily generates large tensile deformation, meeting the large tensile and bending rotation requirements of the expansion joint section between two spans of a simply supported beam. The unbonded longitudinal steel tie rods and the connecting steel plate 1 at the bottom of the continuous bridge deck act like a safety lock between the two spans, gradually transferring the longitudinal tensile stress generated during stretching, bending, and rotation between the two spans from the unbonded center to the bonded area on the side, and then to the ordinary pavement subbase section, forming a coordinated force transmission system. This not only achieves deformation decoupling between the steel reinforcement and the ECC matrix, ensuring that the steel reinforcement performs its pull-out resistance while avoiding anchorage failure caused by excessive local bond stress. In this embodiment, the joint area includes not only the section joint but also the continuous bridge deck structure area formed around the section joint. For the joint area, the middle part spanning the joint is designated as the unbonded functional area, and the reserved areas on both the left and right sides serve as effective anchorage areas.

[0021] In this embodiment, the anti-friction isolation layer, from the inside to the outside, includes a primer layer 21, a flexible buffer inner layer 22, and an anti-adhesion isolation outer layer 23 along the surface of the longitudinal continuous steel bar 2 on the bridge deck. First, the primer is sprayed on the surface of the longitudinal continuous steel bar 2 on the bridge deck, then the flexible buffer inner layer 22 is set, and finally the anti-adhesion isolation outer layer 23 is set. Through the complementary properties of the layered materials, the chemical bonding and mechanical interlocking between the longitudinal steel bar and the outer high ductility fiber reinforced cementitious composite material 3 (ECC) are completely cut off, eliminating the stress transmission channel of the interface between the steel bar and the ECC matrix. When the beam joint expands and contracts or the beam end corner generates longitudinal tensile strain, the longitudinal steel bar can slide freely in the ECC along the bridge direction, realizing the decoupling of the deformation between the steel bar and the low elastic modulus ECC matrix. This allows the concentrated tensile stress across the joint to be gradually distributed and transmitted to the anchorage areas on both sides, avoiding the disease of local bond stress exceeding the limit and splitting the ECC matrix of traditional fully bonded steel bars, forming a flexible force transmission section that only bears axial tensile force.

[0022] In this embodiment, the primer layer 21 is an epoxy phenolic paint coated on the reinforcing steel, the flexible buffer inner layer 22 is a fiberglass cloth wrapped around the reinforcing steel, and the anti-sticking outer layer 23 is a polyethylene cloth wrapped around the reinforcing steel; the primer layer 21, the flexible buffer inner layer 22, and the anti-sticking outer layer 23 are all provided in at least two layers; preferably, two layers are used. A three-layer double-layer composite friction-reducing isolation system is set on the surface of the longitudinal reinforcement. The inner epoxy phenolic paint realizes corrosion protection and leveling transition of the reinforcing steel substrate, the middle fiberglass cloth provides buffering and friction-reducing protection, and the outer polyethylene cloth constructs a low-friction sliding interface. The three-layer structure works together to cut off the bonding effect between the reinforcing steel and the ECC substrate, so that the middle section forms a flexible pure tension rod that can slide freely; it adapts to the low elastic modulus and high ductility deformation characteristics of ECC, realizes the decoupling of the deformation between the reinforcing steel and ECC, evenly disperses the concentrated tensile stress in the beam joint, and at the same time, the multiple sealing structure provides long-term protection against corrosive media, taking into account both crack resistance and corrosion resistance durability of the reinforcing steel. Specifically:

[0023] The inner layer of the double-layer epoxy phenolic paint substrate is dense and waterproof, completely covering the transverse ribs and threaded grooves of the ribbed steel bars. It isolates ECC cement slurry, moisture, and chloride ions, blocking the electrochemical corrosion path of the steel and providing a long-lasting anti-rust substrate for the entire isolation system. At the same time, it also plays a role in interface transition and leveling: filling the uneven edges of the steel bar ribs, eliminating sharp protrusions, and preventing them from being punctured and damaged by the steel bar ribs when wrapping fiberglass cloth and polyethylene tape later, ensuring the integrity of the outer isolation structure. It also plays a role in bonding and fixing: the paint film has moderate adhesion, stably adhering to the surface of the steel bar and fixing the inner first layer of fiberglass cloth, preventing the buffer layer from slipping and loosening during pouring and vibration. The double-layer fiberglass cloth intermediate buffer and friction-reducing interlayer serves the following functions: 1. Buffering and damage resistance: The alkali-free fiberglass cloth is highly flexible, tensile, and wear-resistant. Sandwiched between the rigid epoxy coating and the smooth polyethylene outer layer, it absorbs the localized concentrated stress generated by the reciprocating slippage of the reinforcing bars and ECC extrusion, disperses the impact wear from aggregates and vibrators, and prevents the outer polyethylene cloth from tearing directly; 2. Gradient friction reduction: The low friction characteristics of the fiberglass cloth itself create a secondary low-friction interface between the epoxy base and the polyethylene surface, gradually reducing the resistance to reinforcing bar slippage. Compared with single-layer plastic film isolation, the freedom of longitudinal bar slippage is greatly improved; 3. Waterproof auxiliary protection: The double-layer cross-wound interlayer forms a dense waterproof interlayer, which, together with the inner and outer layers, creates multiple waterproof barriers, further preventing corrosive media from penetrating inward. The outer layer of double-layer polyethylene tape acts as a lubricating and isolating layer. The polyethylene material has an extremely low surface friction coefficient, allowing direct contact with the ECC matrix and completely eliminating the bonding effect between the reinforcing steel and the cement substrate. This is the core functional layer for achieving free sliding and deformation decoupling of the reinforcing steel. Simultaneously, the double-layer wrapping and end sealing completely encapsulate the isolation system, preventing ECC cement slurry from seeping into the gaps between the multiple layers and avoiding the formation of localized bonding points after cement hardening. This ensures unrestrained sliding throughout the unbonded section 4. Polyethylene possesses tensile ductility, allowing it to deform synchronously with the small reciprocating slides of the reinforcing steel, preventing brittle cracking failure under long-term temperature and load cyclic fatigue conditions of the bridge, thus playing a role in cyclic deformation adaptation. Through multi-layer processing, the interfacial bond is completely severed. The longitudinal reinforcement in the central unbonded section 4 only bears axial tensile force and does not transmit transverse bond shear stress. Concentrated tensile stress at the beam joint can be evenly diffused to the anchorage areas on both sides through flexible sliding, avoiding the high concentration of stress at the beam joint section as in traditional construction, significantly reducing the risk of ECC cracking. It adapts to the low elastic modulus characteristics of ECC material, achieving a synergistic effect of rigidity and flexibility in stress distribution. ECC has a much lower elastic modulus than ordinary concrete and strong deformation capacity; multi-layer friction reduction and isolation release the longitudinal reinforcement slippage constraint, so that the high stiffness steel bar and the high ductility ECC can achieve deformation matching: ECC bears the deformation of dispersed micro-cracks, and the longitudinal reinforcement bears the main longitudinal tensile force. The two deform together, which resolves the contradiction of "rigid steel bar restricting ECC deformation and ECC cracking constraining steel bar slippage".

[0024] In this embodiment, within the joint area, no transverse reinforcing bars 8 are provided in the unbonded area formed by the lack of bonding between the reinforcing bars and the solidified body, while uniformly distributed reinforcing bars along the transverse bridge direction are provided in the bonded area. The absence of transverse reinforcing bars 8 in the unbonded section 4 allows for greater slippage of the tie rod relative to the ECC layer within this area. Eliminating the transversely distributed reinforcing bars in the unbonded area completely eliminates transverse rigid constraints, preventing irregular cracking of the structure under complex spatial stress.

[0025] In this embodiment, along the bridge direction, the width of the unbonded area is set greater than the width of the bonded area on one side; the high-ductility continuous material poured within the joint area is ECC concrete, and the material outside the joint area is C50 concrete. For example, the total length of the ECC continuous slab along the bridge direction is set to 2.0m, of which the middle part spanning the joint is set as a 1.0m wide unbonded functional area, and 0.5m is reserved on each side as an effective anchorage area.

[0026] In this embodiment, stiffening ribs are provided on the connecting steel plate 1, and the connecting steel plate 1 is fixedly connected to the main beam through shear connectors. Shear connectors are provided on the surface of the connecting steel plate 1 to form a firm mechanical engagement with the high-ductility continuous material layer; the stiffening ribs can improve the rigidity of the connecting steel plate 1.

[0027] In this embodiment, the connecting steel plate 1 is a T-shaped steel plate, with its vertical end inserted into the joint. This not only increases the rigidity of the connecting steel plate 1, but also introduces T-shaped steel embedded parts and a flexible waterproof isolation layer at the bottom and top of the joint to adapt to large-angle deformation at the beam ends, respectively, thus constructing a complete synergistic stress-bearing and crack-resistant system. The shear connectors on the connecting steel plate 1 are V-shaped shear grooves or studs; welded steel bars can also be used, which not only firmly connects the connecting steel plate 1 to the ends of the main beams on both sides, but also forms a strong mechanical engagement with the upper ECC layer. A T-shaped steel plate (with bolt holes) with a cross-sectional dimension of 140mm×80mm×5mm can be installed at the expansion joint at the ends of the two main beams. High-strength bolts extending upwards need to be pre-embedded at the beam ends of the main beams here, and the high-strength bolts are riveted together after the T-shaped steel plate is positioned and installed. Regarding the reinforcement system, HRB400 grade steel bars with a diameter of 20mm and a transverse spacing of 100mm can be selected as the longitudinal main reinforcement. To achieve the aforementioned flexible tie rod mechanism, within the 1.0m long unbonded section 4, the surface of the longitudinal reinforcement was treated with a composite friction-reducing process consisting of "two layers of epoxy phenolic paint + two layers of inner fiberglass cloth + two layers of outer polyethylene adhesive tape". Simultaneously, no transverse reinforcement 8 was installed within the unbonded section 4; instead, transverse reinforcement with a diameter of 10mm and a longitudinal spacing of 150mm was arranged in the anchorage areas on both sides (covering an area of ​​800mm).

[0028] In this embodiment, a waterproof membrane layer 6 is installed between the consolidated body and the pavement layer 7 to block the upward transmission of reflective cracks in the negative bending moment zone and to prevent external moisture intrusion. A 1.0m wide SBS waterproof membrane (corresponding to the aforementioned unbonded section 4) is laid centered between the top surface of the ECC slab and the upper asphalt pavement layer 7 to effectively block the upward transmission of reflective cracks in the negative bending moment zone and to prevent external moisture intrusion. The SBS waterproof membrane is installed in the bonded section 5.

[0029] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not intended to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A continuous tie-rod composite bridge deck structure with synergistic deformation stress, characterized in that: It includes connecting steel plates that span the joint area of ​​adjacent main beams, and longitudinal continuous steel bars of the bridge deck that are located above the connecting steel plates and are evenly distributed along the bridge direction. In the joint area, the connecting steel plates and the longitudinal continuous steel bars of the bridge deck in the joint area are fixed together by casting high ductility fiber-reinforced cement-based composite material. The surface of the longitudinal continuous steel bars of the bridge deck in the central area of ​​the joint is provided with a friction-reducing isolation layer so that there is no bond between the steel bars and the fixed body. The longitudinal continuous steel bars of the bridge deck outside the central area of ​​the joint are bonded to the fixed body.

2. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 1, characterized in that: The friction-reducing isolation layer, along the longitudinal continuous steel reinforcement surface of the bridge deck, includes, from the inside out, a primer layer, a flexible buffer inner layer, and an anti-sticking isolation outer layer.

3. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 2, characterized in that: The primer layer is an epoxy phenolic paint coated on the reinforcing steel, the flexible buffer inner layer is a fiberglass cloth wrapped around the reinforcing steel, and the anti-sticking outer layer is a polyethylene cloth wrapped around the reinforcing steel.

4. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 3, characterized in that: The primer layer, the flexible buffer inner layer, and the anti-sticking outer layer are all provided in at least two layers.

5. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 1, characterized in that: Within the joint area, no transverse reinforcement is provided in the unbonded area formed by the lack of bonding between the reinforcement and the solidified body, while reinforcement is provided in the bonded area along the transverse direction.

6. The continuous tie-rod composite bridge deck structure with synergistic deformation stress according to claim 5, characterized in that: Along the bridge direction, the width of the unbonded area is set to be greater than the width of the bonded area on one side.

7. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 6, characterized in that: C50 concrete is poured outside the joint area.

8. The continuous tie-rod composite bridge deck structure with synergistic deformation and stress according to claim 1, characterized in that: The connecting steel plate is provided with stiffening ribs, and the connecting steel plate is fixedly connected to the main beam through shear connectors. The surface of the connecting steel plate is provided with shear connectors for forming a strong mechanical engagement with the high ductility fiber-reinforced cement-based composite material layer.

9. The continuous tie-rod composite bridge deck structure with synergistic deformation stress according to claim 8, characterized in that: The connecting steel plate is a T-shaped steel plate, with the vertical end of the T-shaped steel plate inserted into the joint. The shear connector on the connecting steel plate is a V-shaped shear groove or a stud.

10. The continuous tie-rod composite bridge deck structure with synergistic deformation stress according to claim 1, characterized in that: A waterproof membrane layer is installed between the consolidated body and the pavement layer to block the upward transmission of reflective cracks in the negative bending moment zone and to prevent external moisture intrusion.