Construction method of fluidized solidified soil

The fluidized solidified soil construction method, which involves screening and processing soil materials, two-step mixing, layered pouring, and moisture retention, solves the problem of unstable construction quality in backfilling confined spaces. It achieves resource utilization and stable construction quality, while reducing material costs and construction period.

CN123109138APending Publication Date: 2026-11-17SHIJIAZHUANG MUNICIPAL CONSTR GENERAL
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202611414980.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-12
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing methods for constructing fluidized solidified soil have several drawbacks in backfilling confined spaces, including mismatch between design strength grade and mix design, insufficient control over fluidity differences, lack of coordination in layered pouring parameters, and inadequate control over foundation treatment and special conditions. These issues make it difficult to guarantee the stability of construction quality.

Method used

By screening and processing the soil, designing a systematic mix proportion, adopting a two-step mixing process, layered pouring, and combining base treatment and moisture retention, the fluidized solidified soil is ensured to self-level and self-compact under its own weight. Combined with seepage prevention and winter measures, the flow expansion and strength requirements of different filling parts are achieved.

Benefits of technology

It realizes the resource utilization of waste soil, reduces material costs, shortens the construction period, ensures that there are no dead corners in the filling of narrow spaces, improves the stability of construction quality and seepage prevention performance, and meets the requirements of multiple design strength levels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109138A_ABST
    Figure CN123109138A_ABST
Patent Text Reader

Abstract

This invention discloses a construction method for fluidized solidified soil, comprising: soil preparation, selecting engineering waste soil, recycled construction waste, or a mixture of both as soil material and screening to remove impurities; mix design, determining the mix ratio of soil material, composite curing agent, admixture, and water according to the design strength requirements of the filling project; two-step mixing, first mixing the composite curing agent, admixture, and water to form a curing agent slurry, and then forcibly mixing it with the soil material to obtain a fluidized solidified soil mixture; layered pouring, transporting the mixture to the filling area and pouring it layer by layer from bottom to top, allowing it to self-level and self-compact under its own weight to fill the filling area; and moisture curing to the design age, solidifying to form the engineering filling body. This invention solves the technical problems of difficulty in ensuring the compaction degree of backfilling in narrow spaces and insufficient stability of construction quality. It has the advantages of waste soil resource utilization, no vibration required, short construction period, and controllable quality, and is suitable for backfilling narrow spaces such as foundation pits, trenches, pipe trenches, and abutments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of geotechnical engineering and foundation treatment technology, specifically to a method for constructing fluidized solidified soil. Background Technology

[0002] In building construction, municipal engineering, and transportation engineering, backfilling of confined spaces such as foundation pits, pile spaces, municipal pipe trenches, bridge and culvert abutments, and rail transit foundation pits is a common process that significantly impacts project quality. These backfill spaces typically have narrow working surfaces, irregular shapes, and significant backfill depths. Traditional methods involve layering lime-soil, graded sand and gravel, or plain soil, relying on road rollers, vibratory rammers, and small compaction equipment for layered compaction. On the one hand, large compaction machinery struggles to access confined spaces, and corners and irregularly shaped areas easily become compaction dead zones, making it difficult to guarantee backfill density. This often leads to uneven settlement, ground subsidence, pipeline leaks, and even structural cracking after construction. On the other hand, traditional backfilling requires the purchase of external materials such as sand, gravel, and lime. Furthermore, the excavated soil from foundation pit excavation must be transported and disposed of separately, resulting in high material costs, transportation costs, and waste disposal costs. The construction period is long, and the transportation of waste soil and material production cause environmental problems such as dust and carbon emissions.

[0003] Fluidized solidified soil is a type of soil and rock solidification material with good fluidity and self-compacting properties, made primarily from soil materials (engineering waste soil, recycled construction waste, etc.), mixed with a certain proportion of solidifying agent, additives, and water. It can be poured by pumping or chute, and under its own weight, it self-levels and self-compacts. After curing and solidification, it forms a fill body with certain strength, low permeability, and good water stability. It has the dual advantages of waste soil resource utilization and non-vibration backfilling, and has been increasingly used in backfilling confined spaces in recent years.

[0004] Several construction methods for fluidized solidified soil have emerged in related technologies. For example, Chinese patent document CN112252336A discloses a construction method for backfilling foundation trenches with premixed fluidized solidified soil, including steps such as solidified soil preparation, foundation trench cleaning, construction of crushed stone drainage ditches, formwork erection, layered pouring, surface leveling, on-site protection of finished products, and solidified soil curing. It uses chute backfilling and the interface between layered constructions does not require roughening. Chinese patent document CN113585290A discloses a construction method for backfilling deep foundation pits and narrow trenches based on premixed fluidized solidified soil, which modifies the mixing process... The method involves pre-leaving material inlets on the support plate belt to pour fertilizer into the trough in layers, solving the problem of insufficient space around the fertilizer trough to build a mixing plant; Chinese patent document CN116949940A discloses a construction method for backfilling bridge and culvert abutments with fluidized solidified soil, which achieves backfilling of the abutment through soil sampling, solidifying agent preparation, mix design and symmetrical layered pouring; Chinese patent document CN118561568A discloses a self-compacting fluidized solidified soil and its backfilling process, which controls the floating of pipelines through segmented and layered pouring.

[0005] However, the aforementioned technologies still have the following shortcomings: First, there is a lack of systematic grading and matching rules and trial mixing verification rules between the design strength grade and mix design of fluidized solidified soil. When the strength requirements of different filling parts vary greatly, the determination of the mix proportion is highly arbitrary. Second, there is a lack of zoning control standards for the flowability of different filling parts (fertilizer trenches, pipe trenches, abutments, cushion layers, etc.). Excessive flowability can easily lead to segregation and excessive lateral pressure on the side molds and pipes, while insufficient flowability makes it difficult to self-flow and compact. Third, there is a lack of coordinated regulations for parameters such as layer pouring thickness, interlayer interval time, and height difference between adjacent areas. When there are seepage prevention requirements, the layer interface can easily become a weak surface for seepage. Fourth, insufficient consideration is given to the control measures under special conditions such as pre-pouring foundation treatment (wetting, isolation, dewatering, anti-floating) and winter curing, which makes it difficult to guarantee the stability of construction quality.

[0006] Therefore, how to provide a construction method for fluidized solidified soil that is adaptable to various design strength levels and backfilling conditions in various confined spaces, with controllable process parameters and stable quality has become a technical problem that urgently needs to be solved in this field. Summary of the Invention

[0007] To overcome the above-mentioned defects, embodiments of the present invention provide a method for constructing fluidized solidified soil, in order to solve the technical problems of difficulty in ensuring the compaction of backfill in confined spaces and insufficient stability of construction quality in related technologies.

[0008] This invention provides a method for constructing fluidized solidified soil, comprising the following steps: S1. Soil preparation steps: Select engineering waste soil, construction waste recycled material, or a mixture of the two as soil material, and screen the soil material to remove impurities and large-diameter particles. S2. Mix design steps: Based on the design strength requirements of the filling project, determine the mix proportions of soil, composite curing agent, admixture and water; wherein, the dosage of composite curing agent is expressed as a percentage of the mass of composite curing agent to the mass of dry soil. S3. Two-step mixing steps: First, mix the composite curing agent, additives and water according to the mixing ratio, stir evenly to make a curing agent slurry, and then mix the curing agent slurry with the sieved soil material and force it to mix evenly to obtain a fluidized solidified soil mixture with fluidity and self-compacting properties. S4. Layered pouring steps: The fluidized solidified soil mixture is transported to the filling area and poured in layers from bottom to top, so that the fluidized solidified soil mixture can self-level and self-compact to fill the filling area under its own weight. S5. Moisturizing and curing steps: Cover and moisturize the poured fluidized solidified soil until the designed age, so that the fluidized solidified soil solidifies and forms the engineering fill.

[0009] Furthermore, in the soil preparation step, the soil is screened to remove particles larger than 20mm, and the organic matter content of the soil is controlled to be no more than 5%; the soil is at least one of silt, clay, or sand, and expansive soil, saline soil, and contaminated soil must not be used; when the moisture content of the soil is higher than the optimum moisture content, the moisture content is reduced by sun-drying or turning; when the moisture content of the soil is lower than the optimum moisture content, the moisture is replenished by sprinkling water and simmering the soil.

[0010] Furthermore, in the mix design step, the design strength of the fluidized solidified soil is 0.4–1.2 MPa, and the target value of the 28-day cubic compressive strength set in the mix design is not less than 1.2 times the design strength value. Representative soil samples are taken from the site, and trial mixing tests are conducted using at least three mix proportions. The amount of composite curing agent in one mix proportion is used as the benchmark value, and the amount of composite curing agent in the other mix proportions is increased by 3%–5% and decreased by 3%–5% respectively compared to the benchmark value. The flow spread of the fluidized solidified soil mixture under each mix proportion is tested, and cubic test blocks are made. The test blocks are cured at 20℃±2℃ for a specified age, and then the cubic compressive strength is tested. Among the mix proportions that meet the strength and flowability requirements, the mix proportion with the lowest amount of composite curing agent is selected as the construction mix proportion.

[0011] Furthermore, in the mix design step, the raw materials for preparing the fluidized solidified soil, by weight, include: 100 parts of soil, 8-18 parts of composite curing agent, 45-75 parts of water, and 0.5-2 parts of admixture; the composite curing agent is a composite curing agent with industrial solid waste as the main component, and the admixture is one or more of water-reducing agent, early-strength agent, retarder, expansion agent, or air-entraining agent.

[0012] Furthermore, in the two-step mixing process, a forced mixer is used for mixing, and the mixing time is not less than 2 minutes. The metering deviation of each raw material during mixing is controlled within the following limits: no more than ±2% for composite curing agent and water, no more than ±3% for soil, and no more than ±1% for additives. The mixing water is drinking water with a pH value of not less than 4.5 or recycled water that has passed inspection. The flow spread of the fluidized solidified soil mixture exiting the machine is tested at least twice per shift, and the fluidized solidified soil mixture exiting the machine has a uniform color and no stratification or segregation.

[0013] Furthermore, prior to the layered pouring step, the process includes foundation treatment: removing accumulated water, laitance, loose soil, and debris from the foundation surface of the filling area; pre-wetting the dry foundation trench with water to a depth of not less than 10 cm; laying geotextile on the foundation of overly wet foundation trenches for isolation; lowering the groundwater level to not less than 0.5 m below the foundation level in areas with high groundwater levels; sealing leak-prone areas to prevent grout leakage; and taking measures to increase counterweights or anchor the existing structure or facilities when the fluidized solidified soil mixture generates buoyancy before solidification.

[0014] Furthermore, in the layered pouring step, the fluidized solidified soil mixture is pumped or chuted to the filling area; the thickness of the first layer is no more than 1m, and the thickness of each subsequent layer is no more than 2m, with an interval of no less than 24 hours between adjacent layers; the height difference between adjacent areas is no more than 1m; when the base elevation of the filling area is inconsistent, pouring is carried out in the order of deep to shallow; when constructing a large-area subbase, it is carried out symmetrically in sections, with the joints made into a stepped shape, and the staggered distance between upper and lower layers is no less than 1m.

[0015] Furthermore, when the fill material requires seepage prevention, a transition layer with a thickness of 100-200 mm is laid at the interface between adjacent layers. The amount of composite curing agent in the transition layer is 2%-3% higher than that in the normal fill layer. After 7 days of curing, the permeability coefficient of the transition layer is no greater than 5×10⁻⁶. -7 m / s.

[0016] Furthermore, in the layered pouring step, the flow spread of the solidified soil mixture is controlled according to the pouring location: 160-220mm for narrow trenches and rail transit filling locations, not less than 160mm for abutment and pipe trench backfill locations, and 120-180mm for foundation cushion and non-open area filling locations. When the flow spread is less than 150mm, the poured solidified soil is vibrated with an immersion vibrator. The vibration points are arranged in a quincunx pattern, and the spacing between vibration points is not greater than 1.5 times the effective radius of the vibrator. The vibration time at each point is 10-15s, and the insertion depth of the vibrator penetrates the current pouring layer and enters the underlying filled layer by 50-100mm.

[0017] Furthermore, in the aforementioned moisturizing and curing steps, plastic film is used for covering and curing. The plastic film is tightly covered and condensation is maintained inside the film. The curing time for the top layer of fluidized solidified soil is not less than 7 days. Each layer is kept moist before pouring the next layer. During winter construction, the temperature of the formwork is not lower than 5°C, and an antifreeze agent with a dosage determined by testing is added. For fill bodies located below the groundwater level or in areas with fluctuating water levels, the water stability coefficient is not less than 80%, and the water stability coefficient of the foundation treatment area is not less than 85%.

[0018] Compared with related technologies, the fluidized solidified soil construction method provided by the embodiments of the present invention has at least the following beneficial effects: (1) Resource utilization of waste soil, green and low carbon. Using engineering waste soil and / or recycled construction waste as raw materials, materials are sourced and disposed of locally, avoiding the transportation of waste soil and the mining of natural sand and gravel; composite solidifying agents with industrial solid waste as the main component are preferred, reducing cement usage and carbon emissions; engineering applications show that a large amount of excavated waste soil can be disposed of on site, and the material cost is reduced by about 51% compared with the traditional lime-soil and sand-gravel backfilling process.

[0019] (2) High fluidity and self-compacting properties, filling narrow spaces without dead corners. The fluidized solidified soil mixture can be pumped or poured in a chute, without the need for large compaction machinery to enter the working surface. Under its own weight, it self-levels and compacts to fill narrow and irregular spaces such as foundation pits, trenches, pile spaces, pipe trenches, and abutments, solving the problems of many dead corners and difficulty in ensuring compaction in traditional backfilling. The construction period is shortened by about 50% compared with traditional processes.

[0020] (3) Matching of strength grading and mix design system. The target value of 28d cube compressive strength is set to be no less than 1.2 times the design strength value. Trial mixes are conducted with at least three mix proportions with the benchmark dosage and fluctuations of 3% to 5% above and below. Among the mix proportions that meet the strength and flowability requirements, the one with the lowest curing agent dosage is selected as the construction mix proportion. This takes into account both quality redundancy and economy, and can stably cover the design strength requirements of 0.4 to 1.2 MPa.

[0021] (4) Control the flow spread according to the filling location. Set flow spread ranges for different working conditions such as narrow trenches and rail transit filling (160-220mm), backfilling of abutments and pipe trenches (not less than 160mm), foundation cushion layer and filling in non-open areas (120-180mm). When the flow spread is less than 150mm, use quincunx vibration to match the state of the filling material with the spatial shape, taking into account pumpability, filling properties and lateral pressure control.

[0022] (5) The pouring and curing system is coordinated, resulting in good seepage prevention and water stability. The integrity of the fill body is ensured by measures such as thin pouring of the first layer, control of layer thickness and inter-layer intervals, deep pouring followed by shallow pouring, and staggered joints in a stepped manner. For fill bodies with seepage prevention requirements, a transition layer with a 2% to 3% increase in the amount of curing agent is set at the layer interface. The permeability coefficient of the transition layer after 7 days is not greater than 5×10. -7 m / s; with the help of film moisturizing and winter antifreeze measures, the water stability coefficient of the fill body located below the groundwater level or in the water level fluctuation zone shall not be less than 80%, and the water stability coefficient of the foundation treatment part shall not be less than 85%. Attached Figure Description

[0023] To more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings used in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the drawings described below are merely some exemplary embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on the content of the exemplary embodiments of the present invention and these drawings without any creative effort.

[0024] Figure 1 This is a schematic flowchart of the construction method for fluidized solidified soil provided in an embodiment of the present invention. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions in the embodiments of this application will be described in more detail below with reference to the accompanying drawings. In the drawings, the same or similar reference numerals denote the same or similar components or components having the same or similar functions throughout. The described embodiments are some, but not all, embodiments of this application. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this application, and should not be construed as limiting this application. All other embodiments obtained by those skilled in the art based on the embodiments of this application without creative effort are within the scope of protection of this application.

[0026] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, an indirect connection through an intermediate medium, or the internal communication between two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0027] In the description of this application, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.

[0028] The terms "first," "second," "third," "fourth," etc., used in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate so that the embodiments of this application described herein can be implemented, for example, in a sequence other than those illustrated or described herein.

[0029] To make the drawings concise and easy to understand, some drawings only show one of the components with the same structure or function, or only one of them is marked. In this article, "one" not only means "only one", but can also mean "more than one", and "several" includes "two" and "more than two".

[0030] Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover a non-exclusive inclusion. For example, a process, method, system, product, or apparatus that includes a series of steps or units is not necessarily limited to those explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus. It is understood that the specific embodiments described herein are merely illustrative of the invention and not intended to limit it. The embodiments of this application are described in detail below with reference to the accompanying drawings.

[0031] like Figure 1 As shown in the figure, this invention provides a method for constructing fluidized solidified soil. The method includes, in sequence, a soil preparation step S1, a mix design step S2, a two-step mixing step S3, a layered pouring step S4, and a moisture retention and curing step S5. It is applicable to the filling construction of foundation pits, pile spaces, municipal pipe trenches, bridge and culvert abutments, rail transit foundation pits, and foundation cushion layers.

[0032] Step S1: Soil Preparation. Soil can be selected from excavated soil from construction projects, such as soil from foundation pits, trenches, roadbeds, and site leveling. Recycled construction waste can also be used, such as recycled soil from sorted and crushed construction waste, soil from the clearing of abandoned pile foundations, or a mixture of both. The soil should preferably be at least one of silt, clay, or sand. Expansive soil, saline soil, contaminated soil, and soil containing toxic or harmful substances must not be used. The soil should be screened, using a vibrating screen or manual sorting to remove debris such as branches, plastic, wood blocks, and stones. Particles larger than 20mm should be removed. When the soil is recycled construction waste, lightweight debris such as metal, wood blocks, and unburned materials should also be removed. The organic matter content of the soil should be controlled to no more than 5%, which can be tested using the burning method. If the organic matter content exceeds the standard, it can be diluted and mixed with other soil materials or discarded directly. Adjust the moisture content of the soil according to its natural moisture content and mix design requirements: when the moisture content is higher than the optimum moisture content, reduce it by sun-drying, turning, or adding dry soil; when the moisture content is lower than the optimum moisture content, replenish the moisture by sprinkling water and allowing the soil to sit for at least 24 hours to ensure even distribution of moisture in the soil. Before use, the soil should be homogenized and preferably piled into heaps no higher than 3 meters to prevent particle size separation and the introduction of impurities.

[0033] Step S2: Mix Design. The mix design is based on the design strength requirements of the filling project. The design strength of the fluidized solidified soil is 0.4–1.2 MPa, and can be selected according to the following principles: the design strength for general non-load-bearing backfill sections should not be less than 0.4 MPa, the design strength for abutment backfill sections should not be less than 0.8 MPa, and the design strength for roadbeds and low-level foundation treatment sections should not be less than 1.0 MPa. To mitigate the difference between on-site pouring conditions and standard test conditions, the target value for the 28-day cubic compressive strength set in the mix design should not be less than 1.2 times the design strength value.

[0034] During the trial mix design test, representative soil samples were taken from the site, and at least three mix proportions were tested in the laboratory. The composite curing agent dosage of one mix proportion was used as the baseline value, while the dosages of the other mix proportions were increased by 3%–5% and decreased by 3%–5% respectively compared to the baseline value. The flow spread of the freshly mixed, fluidized, solidified soil mixture was tested for each mix proportion, and 70.7mm × 70.7mm × 70.7mm cubic specimens were prepared. After curing under standard conditions of 20℃ ± 2℃ and relative humidity not less than 95% for 3 days, 7 days, and 28 days, the cubic compressive strength was tested. Among the mix proportions that met both strength and flowability requirements, the mix proportion with the lowest composite curing agent dosage was selected as the construction mix proportion to achieve a balance between strength redundancy and economy.

[0035] The raw materials for preparing fluidized solidified soil, by weight, include: 100 parts soil, 8-18 parts composite curing agent, 45-75 parts water, and 0.5-2 parts admixture, corresponding to a composite curing agent dosage of approximately 8%-18%. The amount of water should be adjusted according to the natural moisture content of the soil, and the water content should be included in the mixing water after deducting the moisture contained in the soil itself, so that the flowability of the mixture meets the requirements of the pouring location.

[0036] The composite curing agent is preferably a composite curing agent with industrial solid waste as the main component. As an example, the composite curing agent can be prepared from the following raw materials by weight: 10-30 parts cement, 25-45 parts fly ash, 20-40 parts slag powder, 5-15 parts steel slag powder, and 2-8 parts desulfurized gypsum, wherein the total amount of solid waste components such as fly ash, slag powder, and steel slag powder is not less than 50% of the total mass. The composite curing agent solidifies the soil through physicochemical processes such as cement hydration, pozzolanic reaction, ion exchange, and crystallization carbonization, giving the solidified body stable strength, low permeability coefficient, and good water stability. Upon arrival at the site, the composite curing agent is inspected in batches of 500 tons, testing its fineness, water requirement ratio, initial and final setting times, and mortar strength.

[0037] The admixture is selected from one or more of the following: water-reducing agent, accelerator, retarder, expanding agent, or air-entraining agent. It is used to adjust the fluidity, setting time, volume stability, or air content of the mixture. High-performance polycarboxylate-based water-reducing agents can be used as water-reducing agents; sugars, citric acid derivatives, etc., can be used as retarder; and magnesium oxide-based expanding agents can be used to compensate for the drying shrinkage of the solidified body. The dosage of the admixture should be determined experimentally. The mixing water should be drinking water with a pH value not less than 4.5, or recycled water that has passed inspection and does not affect the curing performance.

[0038] Step S3: Two-step mixing. A forced mixer (e.g., a horizontal shaft forced mixer or a vertical shaft planetary mixer) is used for two-step mixing. First, add mixing water to the mixer, then add the composite curing agent and additives, and mix at low speed for 60-90 seconds to prepare a curing agent slurry with uniform color and no dry powder lumps. Second, add the sieved soil material to the mixer and forcibly mix it with the curing agent slurry for at least 2 minutes, preferably 2-4 minutes, to obtain a fluidized solidified soil mixture with fluidity and self-compacting properties.

[0039] The reason for adopting the above two-step mixing process is that if the powdered curing agent is directly dry-mixed with the soil and then water is added, the soil has strong water absorption and the moisture content on site is uneven. The curing agent is prone to clumping and local enrichment or deficiency, resulting in poor uniformity and large strength dispersion of the mixture. By first dispersing the curing agent and additives in water to make a slurry, and then forcibly mixing it with the soil, the curing components can fully coat the soil particles, and the mixture has uniform color and stable performance.

[0040] Strictly control the metering accuracy during the mixing process. The metering deviation of each raw material should be controlled within the following limits: no more than ±2% for composite curing agent and water, no more than ±3% for soil, and no more than ±1% for admixtures. The flowability of the mixture leaving the mixer should be tested at least twice per shift. The mixture leaving the mixer should have a uniform color, be free of stratification, segregation, and lumps. If the test results deviate significantly from the target value set for the construction mix ratio, pouring should be suspended and the cause investigated. The time from the completion of mixing to the completion of pouring of the fluidized solidified soil mixture should not exceed 6 hours. When the transportation distance is long or the ambient temperature is high, an appropriate amount of retarder can be added, or the mixture can be transported to the site by mixer truck for secondary mixing before pouring.

[0041] Step S4: Layered Pouring. Before layered pouring, the foundation must be treated: remove accumulated water, laitance, loose soil, and debris from the surface of the foundation in the filling area; moisten the dry foundation trench with water 24 hours in advance, with a wet surface depth of not less than 10cm, to prevent the dry foundation from absorbing moisture from the mixture and affecting the interface bonding and curing effect; for overly wet foundation trenches, lay geotextile on the foundation for isolation to prevent the soft mud of the foundation from mixing with the mixture; for areas with high groundwater levels, use open ditch drainage or wellpoint dewatering to lower the groundwater level to not less than 0.5m below the foundation; seal easily leaking parts such as formwork joints, through-wall bolt holes, and reserved holes with mortar or quick-setting materials to prevent grout leakage; when the pouring location is on top of an already constructed base slab, side wall, or municipal facility, and the fluidized solidified soil mixture may generate buoyancy on it before solidification, anti-buoyancy calculations should be performed, and measures such as increasing counterweights, anchoring, or adjusting the pouring sequence and pouring speed should be taken if necessary.

[0042] The fluidized solidified soil mixture is pumped through a 40mm pump pipe or transported to the filling area via a chute, and poured in layers from bottom to top. During pouring, the discharge port should be close to the pouring surface and the pouring speed should be controlled. For the backfilling section near the pipeline, the material should be poured symmetrically on both sides of the pipeline to prevent pipeline misalignment. The fluidized solidified soil mixture self-levels and self-compacts under its own weight, densely filling narrow and irregularly shaped spaces within the filling area without the need for compaction. The initial filling layer thickness should not exceed 1m to ensure good adhesion to the substrate; subsequent filling layers should not exceed 2m in thickness; the interval between two adjacent layers should not be less than 24 hours, allowing the lower layer to solidify and gain sufficient strength before pouring the next layer, to avoid disturbing the lower layer or causing interlayer slippage; the height difference between adjacent areas should not exceed 1m to prevent the newly poured mixture from flowing to lower areas due to lateral pressure differences. When the base elevation of the filling area is inconsistent, construction shall be carried out in the order of deep to shallow; when constructing a large area of ​​subbase, it shall be carried out symmetrically in sections, with the joints made into a stepped shape, and the staggered distance between the upper and lower layers shall not be less than 1m. The space formed between the two side support structures 10 shall be filled by the first layer 21, the second layer 22 and the top layer 23 poured from bottom to top to form the filling body.

[0043] When pouring in layers, the flow spread of the solidified soil mixture should be controlled according to the pouring location: in narrow trenches and rail transit filling areas where space is limited and reinforcement and components are dense, the flow spread should be controlled at 160–220 mm; in abutment and trench backfill areas, the flow spread should not be less than 160 mm; and in foundation cushion layers and non-open area filling areas, the flow spread should be controlled at 120–180 mm. Excessive flow spread can easily lead to segregation and bleeding, and increase lateral pressure on formwork and pipes; insufficient flow spread makes self-compaction difficult. When the measured flow spread on site is less than 150mm, auxiliary vibration should be performed on the solidified fluid after pouring: use an immersion vibrator, with vibration points evenly arranged in a quincunx pattern, and the spacing between vibration points should not be greater than 1.5 times the effective radius of the vibrator. The vibration time for each point should be 10-15s, until the surface of the mixture no longer sinks significantly, no air bubbles appear, and slurry begins to rise. The vibrator should be inserted quickly and withdrawn slowly, with the insertion depth penetrating the current poured layer and entering the underlying filled layer by 50-100mm to eliminate voids at the interlayer interface. During the vibration process, the formwork, embedded parts, and pipelines should not be touched.

[0044] When the fill material requires seepage prevention, a transition layer 30 with a thickness of 100-200 mm is laid at the interface between adjacent layers. The amount of composite curing agent in the transition layer 30 is increased by 2%-3% compared to that in the normal fill layer to increase the curing density at the interface and reduce permeability. After 7 days of curing, the permeability coefficient of the transition layer should not exceed 5×10⁻⁶. -7 m / s. By setting a transition layer at the layer interface, the layer interface is transformed from a weak seepage surface to a reinforced seepage-proof surface, significantly improving the overall seepage-proof performance of the fill.

[0045] Step S5: Moisture Retention and Curing. Each layer should be cured promptly after pouring. After the top layer is completed, cover the surface of the fluidized solidified soil with a 50mm plastic film for moisture retention and curing. The overlap between adjacent films should be no less than 200mm. The edges of the film should be compacted with heavy objects, ensuring a tight seal and maintaining condensation inside the film. When there is no obvious condensation inside the film, it should be removed, watered, and then re-covered. The curing time for the top layer of fluidized solidified soil should be no less than 7 days. Each layer should be kept moist before pouring the next layer; if the surface is dry, it should be moistened with water first. During the curing period, the filling structure should be sealed and protected, and heavy objects should be strictly prohibited from crushing, impacting, or disturbing it.

[0046] During winter construction, if the ambient temperature is below 5℃, winter construction measures should be taken: the temperature of the mixture when it is poured into the formwork should not be lower than 5℃, and the mixing water should be heated if necessary; antifreeze agent with a dosage determined by testing should be added; after pouring, thermal insulation material should be covered on top of the plastic film for heat storage and curing, and temperature monitoring should be strengthened. For fill bodies located below the groundwater level or in areas with fluctuating water levels, the water stability coefficient should not be less than 80%; the water stability coefficient of the foundation treatment area should not be less than 85%, to ensure that the strength of the fill body does not significantly decrease under long-term water immersion conditions.

[0047] The construction method of this invention also includes quality control throughout the entire construction process. Regarding raw material inspection upon arrival: soil is inspected in batches of 500 m³, checking particle composition, organic matter content, and moisture content; composite curing agent is inspected in batches of 500 t; admixtures are inspected according to the batch number of arrival. Regarding construction process control: the time from mixing to completion of filling of the fluidized solidified soil mixture should not exceed 6 hours; flow spread should be sampled and tested at least once every 200 m³, and at least twice per shift. Regarding hardening performance testing: using 70.7mm×70.7mm×70.7mm standard test blocks, one set of test specimens is prepared every 200 m³ when continuously filling no more than 400 m³ with the same mix proportion, and one set of test specimens is prepared every 400 m³ when filling more than 400 m³, testing the 7-day and 28-day cubic compressive strength respectively; if necessary, core sampling or light dynamic penetration testing can be used to test the uniformity and compaction of the fill. The acceptance standards are as follows: For conventional non-load-bearing fill sections, the 28-day compressive strength should be no less than 0.4 MPa; for backfill sections, no less than 0.8 MPa; and for roadbed and low-level foundation treatment sections, no less than 1.0 MPa. When seepage prevention is required, the 7-day permeability coefficient of the transition layer should not exceed 5 × 10⁻⁶. -7 m / s; the water stability coefficient of the fill body located below the groundwater level or in the water level fluctuation zone shall not be less than 80%, and the water stability coefficient of the foundation treatment part shall not be less than 85%.

[0048] To facilitate understanding of the technical solution and effects of the present invention, further explanation is provided below with reference to specific embodiments. The raw materials and parameters in the following embodiments can be adapted according to the foregoing description.

[0049] Example 1: A building project has two underground floors. The excavation depth of the foundation pit is 9.6m, the width of the pit trench is 0.9-1.5m, the perimeter is approximately 340m, the backfill depth is 4.2m, and the backfill volume is approximately 1300m³. The working area is narrow, and compaction machinery cannot enter. The soil material used is silty clay excavated on-site. After screening to remove particles larger than 20mm and impurities, the organic matter content was measured to be 2.8%, the natural moisture content was 15.2%, and the optimum moisture content was 16.5%. The moisture content was adjusted to approximately 16.3% by sprinkling water to allow the material to settle. The design strength is taken as 0.6MPa, and the target value of the 28-day cubic compressive strength is taken as 0.72MPa. Three mix proportions with curing agent dosages of 10%, 12%, and 14% were tested. The 28-day compressive strengths were 0.65 MPa, 0.78 MPa, and 0.91 MPa, respectively, and the flow spreads were 205 mm, 185 mm, and 170 mm, respectively. The mix proportion with a curing agent dosage of 12% was selected as the construction mix proportion, which, by weight, consisted of: 100 parts soil, 12 parts composite curing agent, 55 parts water, and 0.8 parts polycarboxylate superplasticizer. The foundation trench was moistened with water 24 hours in advance, with a wet surface depth of 12 cm. A two-step mixing process was used: first, the curing agent slurry was mixed for 90 seconds, then the soil was added and forcibly mixed for 2.5 minutes. The flow spread of the mixture exiting the mixer was 185 mm. The concrete was poured using a pump, with the first layer being 1 m thick, and the second and third layers each 1.6 m thick, with an interval of approximately 30 hours between layers. The height difference between adjacent areas was no more than 0.8 m. After pouring, the concrete was covered with plastic film for 7 days to maintain moisture. Test results: 7-day average compressive strength 0.46 MPa, 28-day average compressive strength 0.83 MPa; core sampling showed that the core sample was intact, homogeneous, and free of voids and mud inclusions.

[0050] Example 2: Taking the backfilling of a rainwater sedimentation tank and pipe trench in a municipal road project as an example: The backfill length is approximately 120m, the width is 1.2-4.0m, the depth is 2.5-5.0m, and the backfill volume is approximately 960m³. The soil material is excavated waste soil from the site, which is silty soil. Particles larger than 20mm are removed by sieving, and the organic matter content is 3.6%. The design strength is taken as 0.5MPa, and the 28-day target value is taken as 0.6MPa. Three mix proportions with curing agent dosages of 8%, 10%, and 12% were tested. The 28-day compressive strengths were 0.53MPa, 0.64MPa, and 0.71MPa, respectively, and the flow spreads were 200mm, 185mm, and 172mm, respectively. The mix proportion with a curing agent dosage of 10% was selected as the construction mix proportion. The flow spread was controlled at 160-220mm according to the pouring location. The project employed a centralized mixing and pumping method for layered construction, with each layer ranging from 1.5 to 2 meters in thickness. Interlayer intervals were no less than 24 hours, followed by 7 days of curing. During construction, the mixture self-leveled and self-compacted, requiring no compaction or vibration. The 28-day compressive strength tests showed that all layers met design requirements, and the backfill quality passed inspection without any safety or quality incidents. This project effectively disposed of approximately 1152 cubic meters of excavated soil, reduced material costs by about 51% compared to traditional lime-soil and sand-gravel backfilling methods, and shortened the construction period from approximately 30 days using traditional methods to approximately 15 days, achieving significant economic, social, and environmental benefits.

[0051] Example 3: In a municipal road stormwater and sewage pipe trench section, the groundwater level is high. The trench backfill also serves as part of the seepage prevention and water-stopping curtain, and the fill material has seepage prevention requirements. The design strength is 1.0 MPa, the 28-day target value is 1.2 MPa, and the composite curing agent dosage is 15%. The flow spread is controlled within 120–180 mm according to the foundation cushion layer and the filling location in non-open areas. A 150 mm thick transition layer is laid at the interface between adjacent layers, and the composite curing agent dosage in the transition layer is increased by 2.5% compared to the normal fill layer. Test results: The 7-day permeability coefficient of the transition layer is 3.2 × 10⁻⁶. -7 m / s, satisfying a value not greater than 5 × 10 -7 The required m / s; the 28-day compressive strength of the fill is 1.25 MPa; the water stability coefficient measured by the saturation test is 87%, meeting the requirement of not less than 80%. No leakage points were found in the trench section during the operation and observation period, and there was no uneven settlement of the surrounding ground.

[0052]

[0053] The above three embodiments cover three typical filling locations: fertile trenches, pipe trenches, and bedding layers with seepage prevention requirements. The measured 7-day and 28-day compressive strengths are not lower than the corresponding design strength target values. The flow spread, permeability coefficient, and water stability coefficient all meet the control requirements, indicating that the construction method of the embodiments of the present invention has good adaptability to different engineering conditions, and the filling body is of uniform, dense, and stable quality.

[0054] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications can be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features, without departing from the spirit of the present invention. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to depart from the spirit and scope of the present invention. The scope of protection of the present invention should be determined by the appended claims.

Claims

1. A construction method for fluidized solidified soil, characterized in that, Includes the following steps: S1. Soil preparation steps: Select engineering waste soil, construction waste recycled material, or a mixture of the two as soil material, and screen the soil material to remove impurities and large-diameter particles. S2. Mix design steps: Based on the design strength requirements of the filling project, determine the mix proportions of soil, composite curing agent, admixture and water; wherein, the dosage of composite curing agent is expressed as a percentage of the mass of composite curing agent to the mass of dry soil. S3. Two-step mixing steps: First, mix the composite curing agent, additives and water according to the mixing ratio, stir evenly to make a curing agent slurry, and then mix the curing agent slurry with the sieved soil material and force it to mix evenly to obtain a fluidized solidified soil mixture with fluidity and self-compacting properties. S4. Layered pouring steps: The fluidized solidified soil mixture is transported to the filling area and poured in layers from bottom to top, so that the fluidized solidified soil mixture can self-level and self-compact to fill the filling area under its own weight. S5. Moisturizing and curing steps: Cover and moisturize the poured fluidized solidified soil until the designed age, so that the fluidized solidified soil solidifies and forms the engineering fill.

2. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the soil preparation step, the soil is screened to remove particles larger than 20mm, and the organic matter content of the soil is controlled to be no more than 5%. The soil is at least one of silt, clay, or sand, and expansive soil, saline soil, and contaminated soil must not be used. When the moisture content of the soil is higher than the optimum moisture content, the moisture content is reduced by sun-drying or turning. When the moisture content of the soil is lower than the optimum moisture content, the moisture is replenished by sprinkling water and allowing the soil to sit.

3. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the mix design step, the design strength of the fluidized solidified soil is 0.4–1.2 MPa, and the target value of the 28-day cubic compressive strength set in the mix design is not less than 1.2 times the design strength value. Representative soil samples are taken from the site, and trial mixing tests are conducted using at least three mix proportions. The amount of composite curing agent in one mix proportion is used as the benchmark value, and the amount of composite curing agent in the other mix proportions is increased by 3%–5% and decreased by 3%–5% respectively compared to the benchmark value. The flow spread of the fluidized solidified soil mixture under each mix proportion is tested, and cubic test blocks are made. The test blocks are cured at 20℃±2℃ for a specified age, and then the cubic compressive strength is tested. Among the mix proportions that meet the strength and flowability requirements, the mix proportion with the lowest amount of composite curing agent is selected as the construction mix proportion.

4. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the mix design step, the raw materials for preparing fluidized solidified soil, by weight, include: 100 parts of soil, 8-18 parts of composite curing agent, 45-75 parts of water, and 0.5-2 parts of admixture; the composite curing agent is a composite curing agent with industrial solid waste as the main component, and the admixture is one or more of water-reducing agent, early-strength agent, retarder, expansion agent, or air-entraining agent.

5. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the two-step mixing process, a forced mixer is used for mixing, and the mixing time is not less than 2 minutes. The metering deviation of each raw material during mixing is controlled within the following limits: no more than ±2% for composite curing agent and water, no more than ±3% for soil, and no more than ±1% for additives. The mixing water is drinking water with a pH value of not less than 4.5 or recycled water that has passed inspection. The flow spread of the fluidized solidified soil mixture exiting the machine is tested at least twice per shift. The fluidized solidified soil mixture exiting the machine has a uniform color and no stratification or segregation.

6. The construction method for fluidized solidified soil according to claim 1, characterized in that, Before the layered pouring step, the following steps are also included: base treatment: removing accumulated water, laitance, loose soil and debris from the base surface of the filling area; pre-wetting the dry foundation trench with water to a depth of not less than 10 cm; laying geotextile on the base of the overly wet foundation trench for isolation; for areas with high groundwater levels, lowering the groundwater level to not less than 0.5 m below the base; sealing easily leaking parts to prevent grout leakage; and taking measures to increase counterweight or anchor when the fluidized solidified soil mixture generates buoyancy on the existing structure or facility before solidification.

7. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the layered pouring step, the fluidized solidified soil mixture is pumped or transported to the filling area; the thickness of the first layer is no more than 1m, and the thickness of each subsequent layer is no more than 2m, with an interval of no less than 24 hours between adjacent layers; the height difference between adjacent areas is no more than 1m; when the base elevation of the filling area is inconsistent, pouring is carried out in the order of deep to shallow. When constructing a large-area subbase, the work should be carried out symmetrically in sections, with the joints made into a stepped shape, and the staggered distance between the upper and lower layers should not be less than 1m.

8. The construction method for fluidized solidified soil according to claim 7, characterized in that, When the fill material requires seepage prevention, a transition layer with a thickness of 100-200 mm is laid at the interface between adjacent layers. The amount of composite curing agent in the transition layer is 2%-3% higher than that in the normal fill layer. After 7 days of curing, the permeability coefficient of the transition layer is no greater than 5×10⁻⁶. -7 m / s.

9. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the layered pouring step, the flow spread of the solidified soil mixture is controlled according to the pouring location: 160-220mm for narrow trenches and rail transit filling locations, not less than 160mm for abutment and pipe trench backfill locations, and 120-180mm for foundation cushion and non-open area filling locations. When the flow spread is less than 150mm, the poured solidified soil is vibrated with an immersion vibrator. The vibration points are arranged in a quincunx pattern, and the spacing between vibration points is not greater than 1.5 times the effective radius of the vibrator. The vibration time at each point is 10-15s, and the insertion depth of the vibrator penetrates the current pouring layer and enters the underlying filled layer by 50-100mm.

10. The construction method for fluidized solidified soil according to claim 1, characterized in that, In the aforementioned moisturizing and curing steps, plastic film is used for covering and curing. The plastic film is tightly covered and condensation is maintained inside the film. The curing time for the top layer of fluidized solidified soil is not less than 7 days. Each layer is kept moist before pouring the next layer. During winter construction, the temperature of the formwork is not lower than 5°C, and an antifreeze agent with a dosage determined by testing is added. For fill bodies located below the groundwater level or in areas with fluctuating water levels, the water stability coefficient is not less than 80%, and the water stability coefficient of the foundation treatment area is not less than 85%.

Citation Information

Patent Citations

  • Premixed flow-state solidified soil foundation trench backfill construction method

    CN112252336A

  • Deep foundation pit narrow fertile groove backfilling construction method based on premixed flow state solidified soil

    CN113585290A

  • Backfill construction method for abutment back of flow-state solidified soil bridge and culvert

    CN116949940A

  • Self-sealing type flow state solidified soil and backfilling technology thereof

    CN118561568A