A structure and construction method for treating steep slopes that integrates retaining structure, backfilling, drainage, and vegetation for coordinated stress distribution.

By adopting a combined structure of gravity retaining walls, layered backfill, composite reverse filter drainage layer and vegetation soil stabilization layer in the treatment of steep lakeside slopes, the problems of water backflow, drainage blockage and disaster chain reaction were solved, and the long-term stability of the slope and the synergistic effect of ecological restoration were achieved.

CN123109183APending Publication Date: 2026-11-17江苏省水文地质工程地质勘察院有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611411065.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-09-11
Publication Date
2026-11-17

AI Technical Summary

Technical Problem

Existing technical solutions cannot achieve the organic combination of zoned unidirectional water control, multi-level composite reverse filtration, backfill load gradient transfer, and vegetation root anchoring reinforcement in the treatment of steep lakeside slopes. This leads to problems such as water backflow, drainage blockage, chain reaction amplification of disasters, and shallow soil collapse, making it difficult to simultaneously meet the dual requirements of long-term slope stability and ecological restoration.

Method used

The system adopts a combination structure of gravity retaining walls, layered backfill, composite reverse filter drainage layer and vegetation soil stabilization layer. Through zoned water control and drainage, multi-stage reverse filtration and vegetation root anchoring, an integrated and coordinated force-bearing system is formed to cut off the chain reaction of disasters and realize the connection of hydraulic channels and load linkage.

Benefits of technology

It effectively prevents soil deformation and drainage blockage caused by increased water pressure, improves the long-term service stability and ecological restoration effect of slopes, reduces the risk of retaining wall slippage and overturning, reduces operation and maintenance workload, and achieves synergistic effects of disaster prevention and ecological restoration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123109183A_ABST
    Figure CN123109183A_ABST
Patent Text Reader

Abstract

This invention discloses a high and steep slope treatment structure that integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution. A gravity retaining wall serves as the main retaining component, with multiple rows of through-holes spaced along the wall's height. The inner side of each hole connects to a gravel drainage channel located behind the wall. The layered backfill is divided by the high-water level interface for site flood control. Below the interface, crushed stone is used for layered backfilling and compaction, connecting to the gravel drainage channel. Above the interface, a mixture of crushed stone and plain soil is used for layered backfilling and compaction, forming a slope. A composite reverse filter drainage layer is fully distributed on the top surface of the layered backfill. A vegetation soil-stabilizing layer is laid on top of the composite reverse filter drainage layer, with the vegetation roots intertwining downwards to reinforce and anchor the surface soil. Compared with existing technologies, this invention forms a closed-loop collaborative system by connecting and nesting four structural spaces: gravity retaining wall, layered backfill, composite reverse filter drainage layer and vegetation soil stabilization layer, with hydraulic channels connected and loads transferred in a coordinated manner, thereby achieving coordinated disaster prevention and ecological restoration of water-adjacent slopes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of lakeside steep slope treatment technology, and particularly relates to a high and steep slope treatment structure and its construction method that realizes integrated support-backfilling-drainage-vegetation synergistic force bearing. It is applicable to geological disaster treatment and ecological restoration projects of high and steep backfilled rock slopes along lakes, reservoirs and rivers with periodic water level fluctuations. It can also be extended to slope protection projects in scenic sightseeing belts, mountain trails and waterfront cultural tourism landscape areas. Background Technology

[0002] Gravity retaining walls are commonly used as slope protection facilities in lakeside scenic area high and steep slope treatment projects. These structures rely on the self-weight of concrete or boulders to maintain slope stability, are easy to construct, and have controllable costs, making them a common support solution for lakeside geological disaster control and ecological restoration projects. Traditional waterfront retaining wall treatment methods simply stack retaining wall support, backfilling, drainage, and slope vegetation protection as independent sub-projects. These components lack a two-way mechanical-hydraulic linkage and collaborative structural system, which can only meet general slope protection needs and is difficult to adapt to the complex conditions of periodic rises and falls in lakeside water levels, while also considering disaster prevention and ecological landscape.

[0003] Some existing improvement schemes only focus on the drainage and water control components of the retaining wall itself. By adding check valves to the drainage holes below the high water level and setting up local gravel drainage channels on the back of the wall, the problem of water backflow during the flood season can be alleviated to some extent. However, such improvements are limited to the local drainage structure of the retaining wall. The backfill behind the wall does not have a differentiated filling design based on elevation zones. Only a small-scale local water filtration structure is set at the inlet of the drainage hole. There is no overall drainage and filtration system covering the entire backfill. The slope vegetation is only used as surface landscaping. The vegetation roots do not participate in soil reinforcement and do not participate in slope anti-sliding stress. The retaining, backfill, drainage and vegetation are still isolated from each other. They cannot solve the problems of uneven settlement and deformation of the backfill and siltation of deep drainage channels. They cannot prevent the chain disaster of "increased water pressure → soil compression and deformation → increased drainage siltation → slope erosion and collapse". It is difficult to achieve coordinated protection of ecological and structural safety.

[0004] Existing conventional gravity retaining wall solutions for water-related projects suffer from several significant drawbacks. Firstly, the drainage system lacks differentiated water control structures based on the site's high-water level (determined by the highest measured flood level during historical flood seasons). Most systems either have check valves installed as a whole or lack check valve components altogether. When all drainage holes are equipped with check valves, those above the high water level are constantly exposed to the alternating wet and dry environment of the lake, leading to sediment and impurities accumulating at the valve openings, causing valve jamming and malfunction. Conversely, the complete absence of check valves results in lake water backflow into the back of the wall during flood season, softening the backfill material, reducing soil shear strength, and significantly increasing lateral earth pressure, potentially triggering wall slippage and overturning. Secondly, the drainage and backfill systems are disconnected, often employing single-layer, localized filter structures only at the drainage hole openings. These structures lack sufficient anti-clogging capabilities, and drainage failure can trigger a chain reaction of disasters: increased water pressure → soil compression and deformation → intensified drainage clogging → slope erosion and collapse. The vegetation on the slope is only used as surface greening and decoration. Its root system is not integrated with the deep drainage structure and cannot participate in the reinforcement and anti-sliding of the shallow soil. It only has a landscape effect and does not bear the load-bearing function of the slope.

[0005] Therefore, there is currently a lack of an integrated and collaborative governance structure that is suitable for steep slopes in lakeside scenic areas and organically combines zoned unidirectional water control, multi-level composite reverse filtration, backfill load gradient transfer, and vegetation root anchoring reinforcement. Traditional solutions and existing solutions that only optimize local drainage components of retaining walls cannot simultaneously solve multiple technical problems such as water backflow, drainage blockage, cascading disaster amplification, and shallow soil collapse. They are also unable to meet the dual requirements of long-term slope stability and lakeside ecological restoration. Summary of the Invention

[0006] The purpose of this invention is to provide a high and steep slope treatment structure and its construction method that achieves integrated and coordinated force distribution of retaining walls, backfilling, drainage, and vegetation. Gravity retaining walls provide rigid boundary constraints, layered backfilling completes load dissipation and transfer, zoned water control and drainage plus multi-stage composite reverse filtration achieves controllable drainage of pore water, and vegetation roots complete the anchoring of the surface soil. The four structural spaces overlap and nest, hydraulic channels are connected, and load is transferred in a coordinated manner to form a closed-loop coordinated system, breaking the chain of disasters of "increased water pressure → soil deformation → drainage blockage → surface erosion", and achieving coordinated disaster prevention and ecological restoration of water-adjacent slopes, thereby solving the problems mentioned in the background art.

[0007] To achieve the above objectives, the present invention provides the following technical solution: A high-steep slope treatment structure that integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution includes a gravity retaining wall, a gravel drainage channel, layered backfill, a composite filter drainage layer, and a vegetation soil stabilization layer. The gravity retaining wall serves as the main retaining component, with multiple rows of continuous drainage holes spaced along its height. The drainage holes are connected to the gravel drainage channel located on the back of the wall, and the drainage outlets are located on the lake-facing side of the retaining wall. The layered backfill controls the high water level interface (based on the highest measured flood level during historical flood seasons at the site). (Location determined) serves as the boundary. Below the high water level interface for site flood control, crushed stone is used for layered backfilling and compaction, connected to the crushed stone drainage channel. No plain soil is mixed in this elevation range, and pure crushed stone forms a permeable rigid skeleton. Above the high water level interface for site flood control, a mixture of crushed stone and plain soil is used for layered backfilling and compaction in a slope shape. The composite reverse filter drainage layer is fully distributed on the top surface of the layered backfill. The vegetation soil stabilization layer is laid on top of the composite reverse filter drainage layer, and the vegetation roots interweave downwards to achieve reinforcement and anchoring of the surface soil.

[0008] A further aspect of the present invention is that the gravity retaining wall is a concrete structure, the overall height of the wall is 2.0 to 5.5 m, and the wall is higher than the low line of the vegetation soil stabilization layer.

[0009] A further embodiment of the present invention is that the drainage holes are divided by the high water level interface of the site flood control, and a check valve is installed at the outlet of the drainage holes below the high water level interface of the site flood control, while no check valve is installed at the drainage holes above the high water level interface of the site flood control.

[0010] A further aspect of the present invention is that the volume ratio of the crushed stone and plain soil mixture in the layered backfill above the high water level interface for site flood control is 1:1.

[0011] A further aspect of the present invention is that the composite reverse filter layer has a composite structure, comprising a graded sand and gravel layer, a reverse filter nonwoven fabric, and a medium-coarse sand layer arranged sequentially from bottom to top.

[0012] A further aspect of the present invention is that the graded sand and gravel layer has a thickness of 25-30 cm, and the medium-coarse sand layer has a thickness of 5-15 cm.

[0013] A further aspect of the present invention is that the composite reverse filter drainage layer is provided with a water-guiding slope toward the gravity retaining wall, and the upper and lower ends of the reverse filter nonwoven fabric are respectively fixed to the backfill body by anchoring strips, which effectively prevents the fabric from slipping under the action of water and soil pressure, and the overlap width of the reverse filter nonwoven fabric is not less than 30cm.

[0014] A construction method for a high and steep slope treatment structure that achieves integrated and coordinated stress distribution of retaining, backfilling, drainage, and vegetation includes the following steps: Step 1: Clean the slope base and excavate the foundation trench, level and compact the foundation, and test the bearing capacity.

[0015] Step 2: Construct and build the gravity retaining wall. Simultaneously install check valves at the outlet of the drainage hole below the high water level interface of the site for flood control, and cure until the strength meets the standard.

[0016] Step 3: Construction of the gravel drainage channel behind the wall.

[0017] Step 4: Using the high water level interface for site flood control as the boundary, the backfill body is filled and compacted in layers.

[0018] Step 5: Lay the composite reverse filter layer.

[0019] Step 6: Lay a vegetation layer to stabilize the soil.

[0020] Step 7: Planting and maintaining vegetation on the slope.

[0021] Step 8: Project completion and acceptance.

[0022] A further aspect of the present invention is that after each layer of the backfill is completed, a compaction test is conducted, and only after the test is passed can the next layer be carried out.

[0023] The beneficial effects of this invention are: First, the integrated support-backfill-drainage-vegetation structure and construction method for high and steep slope treatment, as described in this invention, compared to existing improvement schemes that only optimize the drainage components of the retaining wall, embeds a zoned differentiated backflow prevention and control structure into the entire support-backfill-drainage-vegetation collaborative system. By setting a high-water level interface for site flood control (determined by the highest measured flood level during the flood season in previous years), and using a zoned water control structure with check valves at the outlets of the drainage holes below this interface and no check valves at the drainage holes above the interface, it can both prevent backflow of external water bodies during high water levels in rivers and lakes, avoid soaking and softening of the backfill soil behind the wall, and allow seepage water in the high-level area to drain freely, avoiding the problem of valve burial and siltation failure caused by installing check valves in all drainage holes. This achieves controlled drainage of pore water behind the wall of the water-facing slope, reducing the safety risks of retaining wall slippage and overturning.

[0024] Secondly, the high and steep slope treatment structure and construction method of the present invention, which integrates support, backfilling, drainage, and vegetation for coordinated stress, differs from the existing structure that only sets a local crushed stone filter layer at the inlet of the drainage hole. The present invention sets a composite reverse filter drainage layer with a water-guiding slope that covers the entire area on the top surface of the layered backfill body, realizing unified filtration and drainage of infiltration water across the entire slope. By using graded sand and gravel, medium and coarse sand, and reverse filter non-woven fabric to form a water and soil separation system with progressively changing particle size, impurities are intercepted in the infiltrated water on the slope, preventing fine soil particles and humus from entering the drainage path, greatly reducing the probability of siltation in drainage channels and drainage holes, improving the long-term reliability of the drainage system, and reducing the amount of maintenance and dredging work in the later stage.

[0025] Third, the present invention realizes the integrated support-backfill-drainage-vegetation synergistic stress-bearing structure and construction method for high and steep slope treatment. Through the layered backfill body elevation zone filling and layered compaction interlocking structure, the site flood control below the high water level interface adopts a permeable rigid skeleton of crushed stone, and above the interface, a mixture of crushed stone and plain soil is layered and compacted. This realizes the internal dissipation of lateral water and soil loads and the uniform transfer to the gravity retaining wall step by step, avoids local load concentration, gives full play to the shear resistance of the backfill body itself, and improves the overall slope anti-sliding and anti-overturning safety reserve.

[0026] Fourth, the present invention realizes a high and steep slope treatment structure and its construction method that integrates support, backfilling, drainage and vegetation for coordinated stress. By having the roots of the slope protection vegetation in the vegetation soil stabilization layer extend downward and interlock to the upper part of the composite reverse filter drainage layer, a three-dimensional reinforced structure of root system-gravel-soil is constructed. This allows the vegetation to no longer be just a landscape decoration, but to directly participate in the shallow slope anti-sliding, constrain the deformation of the surface soil, reduce the erosion effect of rainwater on the slope, inhibit shallow landslides and soil erosion, realize the synergy of disaster prevention and ecological restoration functions, and suppress backfill voids and uneven settlement.

[0027] Fifth, the present invention realizes an integrated high and steep slope treatment structure and its construction method that integrates retaining, backfilling, drainage, and vegetation for coordinated stress. By spatially overlapping and nesting gravity retaining walls, layered backfill, composite reverse filter drainage layer, and vegetation soil stabilization layer, a mechanical-hydraulic integrated coordinated system is constructed. This breaks the chain reaction of disasters of "increased water pressure → soil deformation → drainage blockage → surface erosion". It overcomes the defects of traditional separate treatment and only optimizing the local drainage components of the retaining wall, such as independent operation of each structure, weak interface, and repeated occurrence of secondary diseases, and improves the long-term service stability of water-adjacent slopes.

[0028] Sixth, the high and steep slope treatment structure and its construction method of the present invention, which realizes the integrated synergistic force of support, backfilling, drainage and vegetation, adopts the forward construction process, which does not require special reverse support equipment. The processes such as layered compaction, installation of check valves and laying of filter layers can all be completed by conventional earthwork and concrete equipment, which is convenient for promotion and implementation in lakeside scenic areas, geological disaster management and reservoir and river slope engineering. Attached Figure Description

[0029] Figure 1 This is a cross-sectional schematic diagram of the integrated treatment structure for steep lakeside slopes according to the present invention.

[0030] Figure 2 for Figure 1 A magnified view of a portion of the image.

[0031] Figure 3 This is a partially enlarged cross-sectional view of the composite reverse filter layer of the present invention.

[0032] Figure 4This is a flowchart of the construction process of the present invention.

[0033] In the diagram: 1-gravity retaining wall, 101-drainage hole, 2-gravel drainage channel, 3-layered backfill, 301-gravel backfill, 302-gravel and soil mixture backfill, 4-composite reverse filter drainage layer, 401-graded sand and gravel layer, 402-reverse filter non-woven fabric, 403-medium and coarse sand layer, 5-vegetation soil stabilization layer, 6-slope protection vegetation. Detailed Implementation

[0034] The present invention will be further explained below with reference to the accompanying drawings and specific embodiments.

[0035] Example 1: As Figure 1 , 2 As shown, a high and steep slope treatment structure that achieves integrated synergistic force distribution of retaining wall, backfill, drainage and vegetation includes a gravity retaining wall 1, a gravel drainage channel 2, a layered backfill body 3, a composite reverse filter drainage layer 4 and a vegetation soil stabilization layer 5.

[0036] The gravity retaining wall 1 serves as the main supporting component. Multiple rows of through-holes 101 are spaced along the wall's height. The inner side of each through-hole 101 connects to a gravel drainage channel 2 located on the back of the wall. The outlets of the through-holes 101 are located on the lake-facing side of the retaining wall. The gravity retaining wall 1 is a concrete structure with an overall height of 2.0–5.5m. In actual engineering projects, the wall height can be adjusted reasonably based on slope soil and rock conditions and load conditions, and the wall is higher than the low-level line of the vegetation-stabilized soil layer 5. The through-holes 101 are divided by the site's flood control high-water level interface. Check valves are installed at the outlets of the through-holes 101 below the site's flood control high-water level interface, while no check valves are installed above the site's flood control high-water level interface, forming a differentiated water discharge and control mode based on elevation zones.

[0037] The layered backfill body 3 is divided by the site flood control high water level interface (determined by the highest flood level measured during the flood season in the past years). Below the site flood control high water level interface, crushed stone is used for layered backfilling and compaction and is connected to the crushed stone drainage channel 2. No plain soil is mixed in this elevation range. The pure crushed stone forms a permeable rigid skeleton to avoid the softening and loss of plain soil when it comes into contact with water, resulting in voids and uneven settlement. Above the site flood control high water level interface, a mixture of crushed stone and plain soil with a volume ratio of 1:1 is used for layered backfilling and compaction in a slope shape.

[0038] The composite reverse filtration layer 4 is fully distributed on the top surface of the layered backfill body 3, breaking through the limitation of traditional methods that only set a local gravel filtration structure at the inlet of the drainage hole 101. Figure 3As shown, the composite reverse filter drainage layer 4 is a composite structure, comprising a graded sand and gravel layer 401, a reverse filter non-woven fabric 402, and a medium-coarse sand layer 403 arranged sequentially from bottom to top. The composite reverse filter drainage layer 4 is composed of a 30cm thick graded sand and gravel layer 401, a reverse filter non-woven fabric 402, and a 10cm thick medium-coarse sand layer 403 arranged sequentially from bottom to top. The composite reverse filter drainage layer 4 is provided with a water-guiding slope towards the gravity retaining wall 1. The upper and lower ends of the reverse filter non-woven fabric 402 are fixed to the backfill body by anchoring strips, effectively preventing the fabric from slipping under the action of water and soil pressure. The overlap width of the reverse filter non-woven fabric 402 is not less than 30cm. The seepage water flows down the slope and converges into the gravel drainage channel 2 behind the wall, achieving unified water and soil separation and filtration of seepage water across the entire slope before being introduced into the gravel drainage channel 2. This constructs a multi-level particle size gradient barrier system to intercept backfilled fine-particle soil, preventing siltation of the gravel drainage channel 2 and the drainage hole 101, thus achieving directional drainage of seepage water and effective separation of water and soil.

[0039] The vegetation soil stabilization layer 5 is laid on top of the composite reverse filter drainage layer 4. The vegetation roots intertwine downwards to reinforce and anchor the surface soil. The vegetation soil stabilization layer 5, together with the composite reverse filter drainage layer 4, forms a complete hydraulic pathway from the surface layer to the middle layer to the back wall. The vegetation is upgraded from a simple landscape component to a load-bearing component, directly participating in the shallow slope anti-sliding stress. The gravity retaining wall 1, the gravel drainage channel 2, the layered backfill 3, the composite reverse filter drainage layer 4, and the vegetation soil stabilization layer 5 are spatially overlapped and nested, with the hydraulic pathway running through the entire length. The loads are mutually transferred and linked, forming an integrated and collaborative load-bearing system of retaining, backfilling, drainage, and vegetation. The diagram also marks the arrows indicating the direction of earth pressure transmission and the direction of seepage flow, intuitively reflecting the collaborative working path of structural mechanics and hydraulics.

[0040] Example 2: As Figure 3 As shown in the figure, this embodiment discloses a construction method for a high and steep slope treatment structure that achieves integrated synergistic stress distribution of retaining structure, backfilling, drainage, and vegetation, including the following steps: Step 1: Clean the slope base and excavate the foundation trench, level and compact the foundation, and test the bearing capacity.

[0041] Step 2: Construct gravity retaining wall 1. Simultaneously install check valves at the outlet of drainage hole 101 below the high water level interface of the site flood control and cure until the strength meets the standard.

[0042] Step 3: Construct the drainage channel 2 behind the wall with crushed stone, and connect it to the inner port of the drainage hole 101.

[0043] Step 4: Using the high water level interface for site flood control as the boundary, the backfill material 301 with crushed stone is compacted in layers below the boundary, and the backfill material 302 with a 1:1 mixture of crushed stone and plain soil is compacted in layers above the boundary.

[0044] After step 4 is completed, the compaction degree of the backfill is tested. If it is not up to standard, the backfill is compacted again. If it is up to standard, proceed to the next step.

[0045] Step 5: Lay the composite reverse filter drainage layer 4, which involves repairing the base surface → laying 30cm of graded sand and gravel → laying reverse filter non-woven fabric 402 → laying a 10cm thick medium-coarse sand layer 403, and setting the water guiding slope towards the retaining wall.

[0046] Step 6: Lay the vegetation soil stabilization layer 5, with a 40cm gravel-soil mixture at the bottom and a 20cm pure planting soil at the top.

[0047] Step 7: Planting and maintaining slope vegetation, specifically sowing grass seeds, planting trees and shrubs, and maintaining the slope vegetation until it survives.

[0048] Step 8: Project completion and acceptance. Inspect and accept the appearance of the retaining wall, backfill compaction, drainage, and ecological quality of the slope to complete the slope treatment.

[0049] The specific working principle of this invention is as follows: This invention addresses the cascading disasters caused by the amplified effects of hydrostatic pressure, soil deformation, drainage blockage, and slope erosion on lakeside slopes. It constructs an integrated and synergistic system consisting of a gravity retaining wall (1), layered backfill (3), a composite reverse filter drainage layer (4), and a vegetation soil stabilization layer (5). Unlike existing technologies that only optimize the retaining wall's drainage components, this invention treats the retaining wall's drainage-checkpoint structure as a hydraulic control subunit of the entire system. It relies on a four-pronged synergistic mechanism—mechanical coordination, hydraulic zonal water control, multi-layered gradient reverse filtration to prevent blockage, and three-dimensional root reinforcement to stabilize the soil—to break the vicious cycle of disasters and achieve a balance between overall slope stability and ecological protection.

[0050] In terms of hydraulic water control mechanisms, the high water level interface for site flood control (determined by the highest measured flood level during the flood season over the years) serves as the boundary for zoned water discharge control. A check valve is installed at the outlet of drainage hole 101 below the high water level interface. When the external river and lake water level rises and exceeds this elevation, the check valve automatically closes, preventing external lake water from flowing back into the backfill area and avoiding softening of the backfill material by lake water. When the river and lake water level falls and the pore water pressure inside the backfill is higher than the external water pressure, the check valve automatically opens, smoothly discharging the stagnant pore water. No check valve is installed at drainage hole 101 above the high water level interface. Infiltration water from the slope and backfill can be discharged directly without obstruction, avoiding the valve siltation and jamming defects caused by the long-term alternating wet and dry environment of the lake area after installing valves at high drainage hole 101. A continuous and interconnected gravel drainage channel 2 is set on the back of the wall, which is reliably connected to each drainage hole 101 to form a water-guiding framework for the entire back of the wall. The seepage of the gravel drainage channel 2 on the back of the wall mainly comes from the seepage of the entire slope collected by the entire composite reverse filter drainage layer 4 above, and does not only receive seepage from local locations around the drainage holes 101.

[0051] Regarding the soil-water separation and anti-siltation mechanism, a composite reverse filter drainage layer 4 with a water-guiding slope is set on the upper part of the backfill. After the rainwater seeps down the slope and passes through the vegetation soil stabilization layer 5, it flows into a gradient reverse filter system composed of a graded sand and gravel layer 401, a reverse filter non-woven fabric 402, and a medium-coarse sand layer 403. Soil-water separation is achieved by relying on multi-level particle size gradients, intercepting fine soil particles and humic impurities, and only allowing water to flow downwards. Under the guidance of the water-guiding slope, the seepage water gathers and flows to the gravel drainage channel 2 on the back of the wall, and then is discharged to the outside of the wall through the drainage hole 101. This prevents fine soil particles from entering the drainage channel and drainage hole 101 from the source, maintains the drainage path unobstructed in the long term, and prevents the drainage system from becoming silted up and failing.

[0052] Regarding the mechanical load transfer mechanism, the layered backfill 3 adopts zoned filling material. Below the high water level interface for site flood control, large crushed stones are used, and plain soil is removed to prevent the plain soil from softening when exposed to water and being washed away by the water flow, thus avoiding problems such as voids and uneven settlement in the filling material, forming a permeable rigid skeleton. Above the high water level interface for site flood control, a mixture of crushed stones and plain soil is used for layered compaction, with interlocking layers. The vertical load and lateral earth pressure generated by the slope are partly dissipated internally by the shear strength of the backfill itself, and the other part is transferred step by step to the gravity retaining wall 1, avoiding the load concentration on a local location of the retaining wall. The gravity retaining wall 1 bears the lateral water and soil loads transferred from the backfill by its own weight, and restrains the lateral displacement of the bottom of the backfill.

[0053] Regarding the surface ecological reinforcement mechanism, the roots of the vegetation in the inner slope protection layer 6 extend downwards, intertwining and bonding to the upper part of the composite reverse filter and drainage layer 4, forming a three-dimensional reinforced structure of roots, gravel, and soil. The vegetation roots constrain the shallow backfill soil, reducing the shallow sliding thrust on the slope surface and indirectly reducing the lateral load borne by the retaining wall; the vegetation canopy intercepts part of the rainfall, reducing the intensity of rainwater erosion and the total amount of rainwater infiltration; at the same time, the vegetation can slow down the weathering of exposed rock and soil, inhibit surface collapse and soil erosion, and the vegetation is no longer just used for decorative greening, but directly participates in the shallow slope anti-sliding stress.

[0054] Overall, the gravity retaining wall 1 provides rigid boundary constraints, layered backfilling completes load dissipation and transfer, zoned water control and drainage + multi-stage composite reverse filtration achieves controllable drainage of pore water, and vegetation root system completes the anchoring of surface soil; the four structural spaces overlap and nest, hydraulic channels are connected, and load is transferred in a coordinated manner to form a closed-loop collaborative system, breaking the chain of disasters of "increased water pressure → soil deformation → drainage blockage → surface erosion", and achieving coordinated disaster prevention and ecological restoration of water-adjacent slopes.

[0055] The above embodiments are only for illustrating the technical concept and features of the present invention, and are intended to enable those skilled in the art to understand the content of the present invention and implement it accordingly. They should not be construed as limiting the scope of protection of the present invention. All equivalent transformations or modifications made in accordance with the spirit and essence of the present invention should be covered within the scope of protection of the present invention.

Claims

1. A high and steep slope treatment structure that achieves integrated and coordinated force-bearing of retaining structure, backfilling, drainage, and vegetation, characterized in that: The structure includes a gravity retaining wall (1), a gravel drainage channel (2), a layered backfill (3), a composite reverse filter drainage layer (4), and a vegetation soil stabilization layer (5). The gravity retaining wall (1) is the main supporting component, with multiple rows of through drainage holes (101) spaced along the height of the wall. The drainage holes (101) are connected to the gravel drainage channel (2) located on the back of the wall, and the outlet of the drainage holes (101) is located on the lake-facing side of the retaining wall. The layered backfill (3) is bounded by the high water level interface for site flood control. Below the high water level interface, crushed stone is used for layered backfilling and compaction and connected to the crushed stone drainage channel (2). No plain soil is mixed in this elevation range. Pure crushed stone forms a permeable rigid skeleton. Above the high water level interface for site flood control, crushed stone and plain soil mixture is used for layered backfilling and compaction in a slope shape. The composite reverse filter drainage layer (4) is fully distributed on the top surface of the layered backfill body (3). The vegetation soil stabilization layer (5) is laid on the top of the composite reverse filter drainage layer (4). The vegetation roots intertwine downwards to achieve reinforcement and anchoring of the surface soil.

2. The high and steep slope treatment structure as described in claim 1, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The gravity retaining wall (1) is a concrete structure with an overall height of 2.0 to 5.5 m, and the wall is higher than the low line of the vegetation soil stabilization layer (5).

3. The high and steep slope treatment structure as described in claim 1, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The drainage hole (101) is divided by the high water level interface of the site flood control. A check valve is installed at the outlet of the drainage hole (101) below the high water level interface of the site flood control, and no check valve is installed at the drainage hole (101) above the high water level interface of the site flood control.

4. The high and steep slope treatment structure as described in claim 1, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The volume ratio of the crushed stone and plain soil mixture in the layered backfill (3) above the high water level interface of the site flood control is 1:

1.

5. The high and steep slope treatment structure as described in claim 1, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The composite reverse filter layer (4) is a composite structure, including a graded sand and gravel layer (401), a reverse filter non-woven fabric (402), and a medium-coarse sand layer (403) arranged from bottom to top.

6. The high and steep slope treatment structure as described in claim 5, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The thickness of the graded sand and gravel layer (401) is 25-30 cm, and the thickness of the medium-coarse sand layer (403) is 5-15 cm.

7. The high and steep slope treatment structure as described in claim 5, which integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution, is characterized in that: The composite reverse filter drainage layer (4) is set with a water guiding slope toward the gravity retaining wall (1). The upper and lower ends of the reverse filter nonwoven fabric (402) are fixed to the backfill body by anchoring strips, and the overlap width of the reverse filter nonwoven fabric (402) is not less than 30cm.

8. A construction method for a high and steep slope treatment structure that achieves integrated support-backfilling-drainage-vegetation synergistic stress distribution as described in any one of claims 1-7, characterized in that, Includes the following steps: S1. Cleaning of the slope base and excavation of the foundation trench, leveling and compaction of the foundation, and testing of the bearing capacity; S2, gravity retaining wall (1) is poured and masonry, and check valves are installed at the outlet of the drainage hole (101) below the high water level interface of the site for flood control, and the wall is cured until the strength meets the standard. S3, Construction of the gravel drainage channel (2) behind the wall; S4. Using the high water level interface for site flood control as the boundary, the backfill body (3) is filled and compacted in layers; S5. Lay a composite reverse filter layer (4). S6. Lay a vegetation soil stabilization layer (5); S7. Slope vegetation planting and maintenance; S8. Project completion acceptance.

9. The construction method for a high and steep slope treatment structure that integrates retaining, backfilling, drainage, and vegetation for coordinated stress distribution as described in claim 8, characterized in that: After each layer of the backfill (3) is completed, a compaction test is carried out. Only after the test is qualified can the upper layer be carried out.